Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Retrofitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Safeguards-by-Design: Guidance for High Temperature Gas Reactors (HTGRs) With Pebble Fuel

The following is a guidance document from a series prepared for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), under the Next Generation Safeguards Initiative (NGSI), to assist facility designers and operators in implementing international Safeguards-by-Design (SBD). SBD has two main objectives: (1) to avoid costly and time consuming redesign work or retrofits of new nuclear fuel cycle facilities and (2) to make the implementation of international safeguards more effective and efficient at such facilities. In the long term, the attainment of these goals would save industry and the International Atomic Energy Agency (IAEA) time, money, and resources and be mutually beneficial. This particular safeguards guidance document focuses on pebble fuel high temperature gas reactors (HTGR). The purpose of the IAEA safeguards system is to provide credible assurance to the international community that nuclear material and other specified items are not diverted from peaceful nuclear uses. The safeguards system consists of the IAEA’s statutory authority to establish safeguards; safeguards rights and obligations in safeguards agreements and additional protocols; and technical measures implemented pursuant to those agreements. Of foremost importance is the international safeguards agreement between the country and the IAEA, concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). According to a 1992 IAEA Board of Governors decision, countries must: notify the IAEA of a decision to construct a new nuclear facility as soon as such decision is taken; provide design information on such facilities as the designs develop; and provide detailed design information based on construction plans at least 180 days prior to the start of construction, and on "as-built" designs at least 180 days before the first receipt of nuclear material. Ultimately, the design information will be captured in an IAEA Design Information Questionnaire (DIQ), prepared by the facility operator, typically with the support of the facility designer. The IAEA will verify design information over the life of the project. This design information is an important IAEA safeguards tool. Since the main interlocutor with the IAEA in each country is the State Regulatory Authority/SSAC (or Regional Regulatory Authority, e.g. EURATOM), the responsibility for conveying this design information to the IAEA falls to the State Regulatory Authority/SSAC.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Home Energy Professional Certifications (Fact Sheet)

As the weatherization and home energy upgrade industries expand and gain recognition, the need for a qualified workforce becomes more apparent. The certification component of the Guidelines project was designed to create meaningful and lasting careers for weatherization workers. Intended for experienced home energy professionals, the four new certifications focus on the most common jobs in the industry: energy auditor, retrofit installer technician, crew leader, and quality control inspector.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Efficient Opportunities During Remodeling or Renovation

Residential buildings go through many changes during their useful life, which is defined more by their care and maintenance, than age. Many homes that are a century old are still serviceable and desirable and even older homes that have been abandoned can be renovated. In contrast, many newly built homes are good candidates for energy efficiency retrofit measures before occupancy.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ceramic High Efficiency Particulate Air (HEPA) Filter (Final Report)

The technical objective of this project was to develop a ceramic HEPA filter technology, by initially producing and testing coupon ceramics, small scale prototypes, and full scale prototype HEPA filters, and to address relevant manufacturing and commercialization technical issues. The deliverable of the project would be a ceramic HEPA filter technology meeting the specifications of existing, glass fiber, nuclear grade HEPA systems. The existing HEPA filters are made from glass fiber, which is fragile and easily damaged due to impact by chemicals, high pressures and temperatures (see photographs in Fig. 1). A ceramic HEPA filter technology would overcome these problems and would allow the filter to be cleaned and reused, thereby reducing secondary waste. Additionally, ceramic HEPA filters will eliminate the associated costs and risks of contamination posed by "hot breaks" - the breaching of containment - required to periodically replace HEPA filters of current design. The ceramic HEPA filter technology would be designed to minimize retrofit problems and costs while meeting several key HEPA filter requirements.

36 MATERIALS SCIENCE↗

Energy Savings and Economics of Advanced Control Strategies for Packaged Heat Pumps

Pacific Northwest National Laboratory (PNNL), with funding from the U.S. Department of Energy’s (DOE’s) Building Technologies Program (BTP), evaluated a number of control strategies for packaged cooling equipment that can be implemented in an advanced controller, which can be retrofit into existing packaged heat pump units to improve their operational efficiency. This report documents the results of that analysis.

Wang, Weimin↗

Direct Evaporative Precooling Model and Analysis: Development and Simulations of an Improved Algorithm for Import into EnergyPlus and Applications to Commercial Buildings in the United States

Evaporative condenser pre-cooling expands the availability of energy saving, cost effective technology options (market engagement) and serves to broaden the range of options in upcoming codes and equipment standards (impacting regulation). Commercially available evaporative pre-coolers provide a low cost retrofit for existing packaged rooftop units, commercial unitary split systems, and air cooled chillers. We map the impact on energy savings and peak energy reduction in three building types (medium office, secondary school, and supermarket) in 16 locations with four levels of pad effectiveness and show the effect for HVAC systems using either refrigerants R22 or R410A (See Section 5.4). EnergyPlus simulations are conducted with an improved algorithm for estimating the condenser pre-cooling wet bulb efficiency. EnergyPlus version 5.0.0 provides an option for a curve-fit form of calculating evaporative cooling efficiency (currently available only for evaporative pads used for space cooling, not condenser precooling). This option requires a large body of empirical data to obtain the 11 parameters required in the polynomial equation and, being a general curve fit, it is also not physically meaningful. Our study departs from this approach by presenting an alternative mathematical model that is physically intuitive, simpler in form, and provides better agreement with manufacturer’s data. In this report, we describe the simpler algorithm and provide the metrics that show how it is an improvement over the algorithm used in EnergyPlus version 5.0.0. We then generate performance values that can be directly input into EnergyPlus for simulations. By this process, we examine the annual and peak energy reductions of three building types (medium office, secondary school and supermarket) in 16 locations within the U.S. These three building types were chosen because they have distinctive loads, zones, and equipment. In addition to performing the requisite calculations, computer algorithms were developed for use with EnergyPlus to simulate the performance of commercial units under a variety of operating parameters. Performance maps were generated and estimated energy savings and peak demand reductions were calculated. Performance curves that were used in these EnergyPlus simulations were shared with the National Renewable Energy Laboratory (NREL) and with the Florida Solar Energy Center (FSEC) for possible inclusion in the next update to EnergyPlus.

air conditioner↗

Initial Decision and Risk Analysis

Commercialization of new carbon capture simulation initiative (CCSI) technology will include two key elements of risk management, namely, technical risk (will process and plant performance be effective, safe, and reliable) and enterprise risk (can project losses and costs be controlled within the constraints of market demand to maintain profitability and investor confidence). Both of these elements of risk are incorporated into the risk analysis subtask of Task 7. Thus far, this task has developed a prototype demonstration tool that quantifies risk based on the expected profitability of investments to retrofit carbon capture technology on a stylized 650 MW pulverized coal electric power generator. The prototype is based on the selection of specific technical and financial factors believed to be important determinants of the expected profitability of carbon capture, subject to uncertainty. The uncertainty surrounding the technical performance and financial variables selected thus far is propagated in a model that calculates the expected profitability of investments in carbon capture and measures risk in terms of variability in expected net returns from these investments. Ultimately, this tool will allow for analysis of the financial risks associated with adopting carbon capture technology from the perspective of decision makers at utilities.

Engel, David W.↗

Streamlining and Refining FEDS Loads Models (Final Report)

The Facility Energy Decision System (FEDS) software is a powerful buildings energy analysis tool developed by Battelle at the Pacific Northwest National Laboratory with support from numerous organizations including several within the U.S. Department of Energy (DOE) and U.S. Department of Defense (DoD). FEDS is used extensively throughout the federal sector to examine building energy efficiency potential and recommend energy saving retrofit projects. The focus of this CRADA was to update the foundation of the FEDS loads models, to improve the core functionality and calculation methods and position the building efficiency analysis software for continued growth. The broader intent was to increase FEDS utility and user satisfaction via improving modeling accuracy, facilitating development and making possible a wide range of new and desired capability enhancements. This report provides an summary of the various tasks performed under the CRADA.

Dahowski, Robert T.↗

Solar Thermal Demonstration Project

HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada. The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with Kalwall building panels. An added feature of the Kalwall system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Expert Meeting Report: Energy Savings You Can Bank On

In October 2011, ARBI organized and conducted an Experts' Meeting on the topic of performance guarantees and financing vehicles for Energy Efficiency Upgrades. The meeting brought together technical, policy, and financial experts, including researchers, experienced installation contractors, and innovative energy business leaders, in order to discuss the opportunities and challenges for the energy efficiency upgrade industry to increase market uptake of Home Energy Upgrades (HEUs) through innovative offerings, such as performance guarantees. The meeting had several primary goals. First, it sought to understand how other industries have developed successful models for financing renewable energy installations while providing performance guarantees. This has been most recently demonstrated by the solar leasing industry. Second, the meeting explored the applicability of such business models to the energy efficiency upgrade industry. Third, the meeting sought to identify technical impediments to performance guarantees for energy efficiency retrofits. Fourth, the meeting sought to provide a common framework for these goals within the context of current financing mechanisms for energy efficiency upgrades.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluating Ventilation Systems for Existing Homes

During the course of this project, an affordable and high performance ductwork system to directly address the problems of thermal losses, poor efficiency, and air leakage was designed. To save space and enable direct connections between different floors of the building, the ductwork system was designed in such a way that it occupied interior or exterior frame wall cavities. The ductwork system satisfied building regulations for structural support when bridging multiple floors, the spread of fire and smoke, and insulation to reduce the heat flow into or out of the building. Retrofits of urban residential buildings will be the main focus for the application of this ductwork system. Highly reflective foils and insulating materials were used to aid in the increase of the overall R-value of the ductwork itself and the wall assembly. It is expected that the proposed system will increase the efficiency of the HVAC system and the thermal resistance of the building envelope. The performance of the proposed ductwork design was numerically evaluated in a number of different ways. Our results indicate that the duct method is a very cost attractive alternative to the conventional method.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hybrid Wall Evaluation for Ten New Construction Homes in Wyandotte, Michigan

The Wyandotte NSP2 project aims to build 20 new houses and retrofit 20 existing houses in Wyandotte, MI. This report will detail the design and construction of 10 new houses in the program. Wyandotte is part of a Michigan State Housing Development Authority-led consortium that is funded by HUD under the NSP2 program. The City of Wyandotte has also been awarded DOE EE&CBG funds that are being used to develop a district GSHP system to service the project. This draft report examines the energy efficiency recommendations for new construction at these homes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final report for EEB Hub, Task 10.2, Metrics Development, BP2

The long-term EEB Hub goal quantified during BP2 is to accelerate the adoption of advanced energy retrofits to reduce building energy use 20% by 2020 for commercial buildings in the greater Philadelphia region. For each budget period, the EEB Hub develops deliverables targeted at methods and means to achieve this long-term goal. The purpose of metrics is to regularly measure progress towards achieving the annual budget-period deliverables.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ductless Mini-Split Heat Pump Comfort Evaluation

Field tests were conducted in two homes in Austin, TX to evaluate the comfort performance of ductless mini-split heat pumps (DMSHPs), measuring temperature and relative humidity measurements in four rooms in each home before and after retrofitting a central HVAC system with DMSHPs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Scoping Report: Advanced Technologies for Multi-Load Washers in Hospitality and Healthcare

The purpose of this demonstration project is to quantify the energy savings and water efficiency potential of commercial laundry wastewater recycling systems and low-temperature detergent supply systems to help promote the adoption of these technologies in the commercial sector. This project will create a set of technical specifications for efficient multi-load laundry systems (both new and retrofit) tailored for specific applications and/or sectors (e.g., hospitality, health care). The specifications will be vetted with the appropriate Better Buildings Alliance (BBA) members (e.g., Commercial Real Estate Energy Alliance, Hospital Energy Alliance), finalized, published, and disseminated to enable widespread technology transfer in the industry and specifically among BBA partners.

Parker, Graham B.↗

Measure Guideline: Steam System Balancing and Tuning for Multifamily Residential Buildings

This report was written as a resource for professionals involved in multifamily audits, retrofit delivery, and program design, as well as for building owners and contractors. It is intended to serve as a guide for those looking to evaluate and improve the efficiency and operation of one-pipe steam heating systems. In centrally heated multifamily buildings with steam or hydronic systems, the cost of heat for tenants is typically absorbed into the owner's operating costs. Highly variable and rising energy costs have placed a heavy burden on landlords. In the absence of well-designed and relevant efficiency efforts, increased operating costs would be passed on to tenants who often cannot afford those increases. Misinvestment is a common problem with older heating systems -- multiple contractors may inadequately or inappropriately upgrade parts of systems and reduce system functionality and efficiency, or the system has not been properly maintained.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstration Assessment of Light-Emitting Diode Parking Structure Lighting at U.S. Department of Labor Headquarters

This report documents a solid-state lighting (SSL) technology demonstration at the parking structure of the U.S. Department of Labor (DOL) Headquarters in Washington, DC, in which light-emitting diode (LED) luminaires were substituted for the incumbent high-pressure sodium (HPS) luminaires and evaluated for relative light quantity and performance. The demonstration results show energy savings of 52% from the initial conversion of HPS to the LED product. These savings were increased to 88% by using occupancy sensor controls that were ultimately set to reduce power to 10% of high state operation after a time delay of 2.5 minutes. Because of the relatively high cost of the LED luminaires at their time of purchase for this project (2010), the simple payback periods were 6.5 years and 4.9 years for retrofit and new construction scenarios, respectively. Staff at DOL Headquarters reported high satisfaction with the operation of the LED product.

LEDs↗

Measure Guideline: Condensing Boilers—Control Strategies for Optimizing Performance and Comfort in Residential Applications

The combination of a gas-fired condensing boiler with baseboard convectors and an indirect water heater has become a common option for high-efficiency residential space heating in cold climates. While there are many condensing boilers available on the market with rated efficiencies in the low to mid 90% efficient range, it is imperative to understand that if the control systems are not properly configured, these heaters will perform no better than their non-condensing counterparts. Based on previous research efforts, it is apparent that these types of systems are typically not designed and installed to achieve maximum efficiency (Arena 2010). It was found that there is a significant lack of information for contractors on how to configure the control systems to optimize overall efficiency. For example, there is little advice on selecting the best settings for the boiler reset curve or how to measure and set flow rates in the system to ensure that the return temperatures are low enough to promote condensing. It has also been observed that recovery from setback can be extremely slow and, at times, not achieved. Recovery can be affected by the outdoor reset control, the differential setting on the boiler and over-sizing of the boiler itself. This guide is intended for designers and installers of hydronic heating systems interested in maximizing the overall system efficiency of condensing boilers when coupled with baseboard convectors. It is applicable to new and retrofit applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗