Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

An Integrated Hydrological Model for Long-Term Monitoring in Tims Branch Watershed, SC - 19435

The Tims Branch watershed in Savannah River Site (SRS), South Carolina is a small-scale watershed that has been impacted by contaminated runoff and discharge wastewater from nuclear research facilities located within the watershed over the past century. Innovative remediation technologies, such as tin injection and pump and treat, have been implemented to remove heavy metals and volatile organic compounds (VOCs) from the watershed. Today, the Tims Branch watershed serves as a test-bed for monitoring the performance of remediation activities. This study describes the development of the two-dimensional integrated surface water/groundwater model for Tims Branch watershed to assess the impact of cleanup activities on hydrological processes in this watershed. This model will serve as a tool to simulate the effect of climatic events on overland flow distribution and further on will be used to assess contaminant transport. This paper illustrates the application of the developed model for simulation of overland flow depth and velocity in Tims Branch watershed and streamflow in A-014 outfall tributary. The watershed includes the second order Tims Branch stream, several outfalls, and a network of tributaries. Simulation of non-calibrated overland flow was conducted for the years 2016 using available stream flow data within the watershed. Recent flow data from a newly deployed stage gauge was also used to assess the model results. The results show the model ability to simulate overland flow and stream flow and can be used as a tool to represent the hydrological conditions in the Tims Branch watershed. The results of this model simulation will be further used to develop contaminant transport model. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FUSRAP Data Management and Information Transitions - 19459

The Formerly Utilized Sites Remedial Action Program (FUSRAP) was created in the mid-1970's to clean up radiological contamination resulting from early development of nuclear weapons. The US Department of Energy (US DOE) was responsible for FUSRAP until October 1997, when Congress transferred administration and execution of FUSRAP site cleanup to the US Army Corps of Engineers (USACE). Currently, the US DOE Office of Legacy Management (LM) determines the eligibility of a site for referral to USACE. USACE determines whether the site is included in FUSRAP for cleanup, conducts remedial actions, and transfers sites back to LM for long-term surveillance and maintenance (LTS and M). LM and USACE established the Data Management Working Group (DMWG) to (1) establish a common understanding of US DOE and USACE district-specific data, records practices, and requirements as they apply to FUSRAP programmatic documents for site transition and transfer; (2) establish methods to ensure accurate data transfer; and (3) develop a timeline for data and records transfer. These methods will ensure continuity of stewardship while transitioning from cleanup to LTS and M and beyond as more FUSRAP sites transfer from USACE to LM. The DMWG has met monthly and the meetings are attended by a wide range of LM and USACE project managers and subject matter experts. Discussion topics have addressed site records management, including data needs and uses; transfer and posting of Administrative Record and Permanent Record files for public accessibility; and management of legal and classified files. There have been a number of group successes, including the following: - Establishment of a common understanding of data and records practices and requirements as the sites transition and transfer from USACE to LM; - Development of effective lines of communication between USACE and LM concerning data management for transition; - Establishment of a cohesive approach to data management between the two agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Low-cost, Full HD, CMOS Cameras for Use in the Calcine Retrieval Project - 19530

This paper describes results from radiation testing conducted on low-cost, commercial off-the-shelf, full high-definition (HD) resolution (1920 x 1080 p), complementary metal-oxide-semiconductor (CMOS) camera sensors. The purpose of the testing was to evaluate the sensors' suitability for use in the Calcine Retrieval Project by determining their image quality and life expectancy while operating in an ionizing radiation field of 20.0 Gy/h. The two camera sensors tested were the Axis FA1105 and Axis FA1125. These commercial camera sensors were designed for retail security surveillance and have no radiation-hardened (rad-hard) components. In addition to radiation testing, the sensors' field-of-view, resolution, and low-light image quality were tested at several target distances to ensure they meet project requirements. Testing was divided into two phases. During Phase 1, four FA1105 sensors and four FA1125 sensors were tested simultaneously without any shielding in radiation fields of 25.5 Gy/h and 49.3 Gy/h. In Phase 2, three FA1105 and five FA1125 sensors were shielded by 22.2 mm of lead and tested simultaneously in radiation fields of 26.8 Gy/h, 52.3 Gy/h, 143.0 Gy/h, 200.7 Gy/h, 404.6 Gy/h, and 2,317.5 Gy/h. Dose rate values were established using film dosimetry readings. Apertures in the shielding allowed for a 40-degree field of view while shielding all parts of the sensor except for directly in front of the CMOS sensor array. All testing was conducted at the Idaho Accelerator Center in Pocatello, Idaho, using a 450 keV X-ray generator. Sensor images were automatically captured at regular intervals throughout the testing for qualitative evaluation by the test team. Film dosimetry was placed near the sensors to record actual dose totals. The 450 keV setting generates X-ray radiation with an energy level close to the primary gamma energy level produced by the Cesium-137 isotope in the calcine, which is 662 keV. Results from Phase 1 indicate the sensors failed at an average cumulative dose of 226.3 Gy. For a given 20.0 Gy/h field this results in a mean time to failure (MTTF) of 11.3 hours. Recorded images from all sensors showed minimal image degradation due to radiation-induced noise. When the sensors finally failed, the failure mode was an abrupt loss of video. The image went black suggesting some other component in the sensor head besides the CMOS sensor array was responsible for the failure. During a portion of Phase 1 testing, a commercial, rad-hard camera was irradiated in the 25.5 Gy/h field along with the eight Axis FA series sensors. Image quality from the FA series sensors significantly outperformed the image quality of the rad-hard camera in radiation-induced noise tolerance, image resolution, and dynamic range. During Phase 2 testing, all sensors produced excellent images in radiation fields as high as 404.6 Gy/h. One FA1125 sensor was tested at the highest dose rate of 2,317.5 Gy/h. At this dose rate, the image was color shifted towards red and contained a significant amount radiation-induced noise. The sensor did not fail and was producing usable imagery after one hour, at which time the test was ended due to allotted beam-time at the test facility. Eighteen hours after X-rays were shut off, the sensor image returned to normal color and all eight sensors continued to operate without any visible, permanent image degradation. For Phase 2 testing, it was not possible to establish a MTTF since none of the shielded sensors failed during the allotted test time. However, given the highest cumulative dose of 4,142.1 Gy received by a shielded FA1125 sensor, a minimum life expectancy of 207 hours (8.6 days) is predicted while operating in a 20.0 Gy/h field. Test results indicate the radiation tolerance of the FA series sensor's CMOS array, along with the small form factor, full HD image quality, wide dynamic range, and Ethernet standard makes it suitable for short-term use in monitoring and visually documenting waste remediation efforts for the Calcine Retrieval Project at the INL. The sensor's low-cost of about $140 US, compared to commercial rad-hard cameras costing between $5,000 and $7,000 US each, allow them to be used as an affordable, disposable resource for many short-duration, radioactive waste remediation efforts where decontamination of an expensive, commercial rad-hard camera is undesirable or not possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolution of Stakeholder Relations at the Mound Laboratory-End of DoE's Mission to the Present - 19551

In November 1989, the same month the Berlin Wall fell, the US Environmental Protection Agency (EPA) placed the Mound Laboratory (Mound Plant or Mound site) in Ohio on the National Priorities List (NPL) due to volatile organic compound contamination in the groundwater. As a result of the Cold War ending, the United States sought to greatly reduce the nation's nuclear weapons arsenal, consolidate the US Department of Energy's (DOE) mission, and close many DOE facilities. In 1991, the City of Miamisburg learned that DOE was planning to close the Mound Laboratory. The city spent two years lobbying in Washington, DC, to keep the facility open; however, that effort was not successful. By 1993, DOE, EPA, and Ohio EPA had signed a Federal Facility Agreement that formalized EPA and Ohio EPA oversight of the DOE environmental cleanup of the Mound NPL site under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The decontamination and cleanup of the Mound site fell under two federal laws, CERCLA and the Resource Conservation and Recovery Act. DOE, EPA, Ohio EPA, the City of Miamisburg, and other local stakeholders all agreed that the Mound site should be cleaned up to an industrial/commercial land use standard. This would allow the site to transition into a privately owned business park. In 1994, the City of Miamisburg created the nonprofit Miamisburg Mound Community Improvement Corporation (MMCIC) that would own, market, and redevelop the site. The City also chartered the Mound Reuse Committee to act as an independent advisory organization, composed of representatives from the local community and business, government, education, and special interest groups. In 1994, DOE and the MMCIC entered into a lease agreement that facilitated immediate reuse of site buildings that were no longer required by DOE and did not require remediation. In 1995, DOE, EPA, and Ohio EPA developed the Mound 2000 Process to more effectively use CERCLA Removal Action authority to evaluate and remediate, as necessary, disparate areas of the Mound site. The Mound 2000 process divided the site into smaller, more manageable areas that accelerated cleanup and allowed areas to be reused more quickly. All areas of the Mound site were cleaned up to meet the EPA standard for industrial/commercial land use. The CERCLA process included opportunities for the public to review proposed cleanup strategies. Public input on cleanup and reuse included that from local citizens, businesses, Miamisburg City Council, local schools and financial institutions, Ohio EPA, Montgomery County, and the State of Ohio. In 1998, while site cleanup was still in process, DOE agreed to sell the entire Mound property to the MMCIC for $10.00. The site sales agreement accelerated reuse by allowing DOE to offer ownership of discrete land parcels to MMCIC as soon as EPA confirmed those areas met CERCLA standards for property transfer. This allowed the Mound site to become one of the first former DOE weapons sites to transition to reuse as a privately owned and operated community asset. Many other former DOE production facilities require continued federal ownership to protect the integrity of the environmental cleanup. In 2011, the MMCIC changed its name to the Mound Development Corporation (MDC) and continued to transition the site for reuse as part of the Mound Business Park. The MMCIC/MDC is a nonprofit economic development arm of the City of Miamisburg. DOE supported the economic development efforts with grants and matching funds. Individual land parcels were transferred from DOE to the MDC according to the DOE Mound Land Transfer Process. Ownership of parcels was transferred to the MDC via quitclaim deeds with no repair, replacements, or rebuild of areas. Each parcel's quitclaim deed contains the CERCLA institutional controls. To reduce the property tax burden, the Miamisburg City Council passed an ordinance that allowed the City to accept temporary ownership of specific parcels and hold ownership until the MDC could either lease or sell them. With the exception of one 23-acre parcel that includes the Operable Unit 1 area (site of former sanitary landfill), the entire site has been transferred to the MDC. Today, the former Mound Laboratory site is home to the vibrant Mound Business Park operated by the MDC. The site contains numerous buildings with active businesses and multiple areas suitable for new construction. Private companies continue cutting-edge work that carries forward the legacy of more than 50 years of DOE research, development, production, and inspiration from the former Mound Laboratory scientists, engineers, technicians, and support personnel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative: Information Management for A Very Large Radiation Survey - 19567

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities - Port Hope. The PHAI is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. The PHAI is being implemented by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. The waste is the result of radium and uranium processing in Port Hope by the former federal crown corporation Eldorado Nuclear Limited between 1933 and 1988. The waste has been distributed in the Municipality of Port Hope through placement of contaminated materials (e.g. fill), reuse of contaminated objects (e.g. tailings use in concrete, steel posts, structural wood) and air-borne deposition. Signature contaminants of potential concern (COPCs) are Ra-226, Th-230, uranium and arsenic; however, there are an additional 17 COPCs that also need to be considered. A very large amount of information has been collected during the survey and effectively managing and analyzing this information is critical to the success for the property owners, CNL's implementation of the PHAI, and Arcadis. Data collected during the survey includes information pertaining to long-term interior radon gas measurements, interior gamma radiation surveys, contaminated objects and surfaces, exterior gamma radiation and subsurface investigations. exterior gamma radiation surveys. The information management (IM) is structured with SharePoint as a focal point supported by an EQuIS database, mobile data collection and GIS support. The IM process for this project is being advanced using recent software developments to assist with internal activities (e.g. QA) and interactions with CNL including notifications and scheduling and status of property completion. Different applications have been developed to help automate, visualize, actively track, and QA different processes using recent software developments by Microsoft. We have used SharePoint to organize and track our data. Power BI has been used to actively track and visualize our data from Interior gamma surveying to exterior drilling. The creation of dynamic/advanced visualizations in Power BI gathers data daily from our multiple sources and analyzes it for anomalous data and trends. Microsoft Flow syncs with Power BI and has been implemented to automate many processes including the QA of surveys and soil results for identification of LLRW. To tie everything together, our GIS and EQuIS systems are our primary data compilation source that makes our advanced analytics/visualization and automation/tracking our data possible. Specific examples will be discussed, as will challenges encountered during the continuing development of the IM system. The incorporation of software advancements to the existing IM system for Port Hope characterization has improved the quality of the surveys, the tracking of completion, meeting schedule requirements and providing the required data for tracking, report preparation and supporting remediation of contamination on the properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mineral Dissolution upon Alkaline Treatment and Variable Redox Conditions

Over 200.000 kg of uranium released to vadose zone from historic leaks and improper disposal of wastes from plutonium production. U highly mobile due to presence of carbonates and oxidizing conditions with partition coefficients k{sub d} of 0.11-8 mL/g at pH 8. Ammonia (NH{sub 3}) gas injection investigated as an in situ remediation technique that will not introduce additional liquid to the subsurface. Objectives: Understand the impact of remediation with base injection on geochemical process in Hanford site vadose zone. Understand effects of different base treatments on mineral dissolution. Results: - incongruent dissolution based on mineral stoichiometry: if ratio = 1 congruent dissolution occurs, if ratio <1.0 greater leaching of Si and Al and incongruent dissolution occurs. Conclusions: incongruent dissolution occurred for both alkaline treatments and redox conditions across all minerals. By 1440 hr. all normalised Al:Si ratios were <1 representing less [Al]{sub aq} and suggesting formation of secondary Al precipitates as a function of time. [Si]{sub aq} increased and [Al]{sub aq} decreased with increasing contact time with both alkaline treatments. NaOH dissolved slightly more than NH{sub 4}OH especially for [Al]{sub aq} in all investigated minerals. No clear trend for muscovite and montmorillonite for redox conditions but slightly greater Si dissolved under anaerobic conditions for illite. Ammonia gas injection increases the pH and dissolves aluminosilicate minerals in the vadose zone. U is likely to coprecipitate with secondary minerals forming at elevated pH and as the system reequilibrates at natural neutral pH. Further, U solids may be coated with low solubility, secondary precipitates.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Metal Bioavailability and Ecotoxicity of Bioremediated Oils and Tailings by BioTiger{sup TM}, a Microbial Consortium

Oil Sands and Mature Fine Tailings: Oil sand reserves are a major source of oil for the United States. Oil sands are a mixture of sand, clay, water, and bitumen. The refining process requires large volumes of water and generates hazardous Mature Fine Tailings (MFTs) that are stored in engineered settling ponds. They are of major environmental concern due to their persistence and difficulty to naturally biodegrade. MFT Contaminants of Concern: Naphthenic Acids (NAs), Polycyclic Aromatic Hydrocarbons (PAHs), Benzene, Toluene, Ethylbenzene and Xylene (BTEX), Metals, Residual Bitumen. BioTiger{sup TM} (BT{sup TM}), the SRNL patented 12 component microbial consortia was found to cometabolically degrade some NAs and PAHs. Previous studies performing short term exposure (48 hours and 7 days) to BT{sup TM} have resulted in increased toxicity due to the partial degradation of PAHs forming toxic intermediates. Objective: Evaluate the ecotoxicity of BT{sup TM} remediated MFTs exposed to a 2 week period w/ yeast (Y) extract. This work will determine BT{sup TM}'s remediation of MFTs from Fort McMurray, Alberta. Acute toxicity tests will be performed under section 9 of EPA's Method for Measuring Acute Toxicity using the freshwater organism, Ceriodaphnia dubia. Monitor BT{sup TM} growth through Most Probable Number (MPN) counts, pH, and metal bioavailability will also be evaluated. Preparing tailing solutions for biodegradation: BT{sup TM} components were grown in R2A media and combined. Mother BT{sup TM} was centrifuged at 7000 rpm for 20 minutes and resuspended in Bushnell Haus. 33 g of tailings were added to 1100 mL Bushnell Haus along with yeast extract (11 g) to create a 3% tailing solution. Treatments were performed in triplicate. Preparing solutions for toxicity tests using C. dubia: Supernatant was collected immediately after centrifuging at 7000 rpm for 20 min. Supernatant was filtered via a 0.22 μm sterile system. All treatments except MFT, Y peaked at T=4. This decrease in microbial growth could be associated with toxicity from intermediate byproducts. Treatments containing only MFTs decreased in the initial 11 days before growing significantly. Final solution for MFT, Y treatment had the highest pH. This could potentially be due to increased microbial activity linked with yeast consumption. All treatments except MFT, Y peaked at T=4. This decrease in microbial growth could be associated with toxicity from intermediate byproducts. Treatments containing only MFTs decreased in the initial 11 days before growing significantly. Future Direction: Await results from Acute Toxicity Tests and Metal Bioavailability Quantification of biosurfactant production. Evaluate hydrocarbon degradation byproducts using an analytical chemistry approach. More toxicity experiments with variations in time and conditions.

54 ENVIRONMENTAL SCIENCES↗

US EPA Superfund Radon Vapor Intrusion Screening Level (RVISL) Electronic Calculator - 20340

Currently, there is no U.S. Environmental Protection Agency (EPA) guidance on correlating soil or groundwater levels of radon with indoor radon concentrations at Superfund sites. EPA is developing the Radon Vapor Intrusion Level Calculator (RVISL) Calculator which is an online tool. The RVISL calculator: (1) lists three radon isotopes (Rn-219, Rn-220 and Rn-222) known to pose a potential cancer risk through the inhalation pathway; (2) provides generally recommended risk and Applicable or Relevant and Appropriate Requirements (ARAR) based preliminary remediation goals (PRG) for groundwater, soil gas (exterior to buildings and sub-slab) and indoor air for default target risk and ARAR based levels and exposure scenarios; and (3) allows calculation of site-specific PRGs based on user-defined target risk and ARAR based levels and exposure scenarios. EPA developed the RVISL calculator to help risk assessors, remedial project managers, and others involved with risk assessment and decision making at radioactively contaminated sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GPS-Based Gamma Survey for Characterizing and Decommissioning NORM Sites - 20389

Gamma survey techniques are an especially powerful decommissioning tool at naturally occurring radioactive material (NORM) sites due to both the low cost to obtain data over a large spatial scale and the abundance of gamma emitters in the uranium and thorium decay series. Gamma surveys are executed by coupling a detector - most often a sodium iodide crystal - to a global positioning system (GPS), then reporting a location and gross gamma reading coincidentally to a data logger. Systems may be carried by workers or mounted to a car, all-terrain vehicle, or unmanned aerial system (UAS). The resulting data set provides a high-resolution but low precision map of the gamma radiation field over the area surveyed. Frequently this map is also correlated to soil concentrations of NORM radionuclides (most often, Ra-226) and/or exposure rate. Gamma survey parameters such as movement speed, transect spacing, and data logging frequency define the spatial resolution of the resulting surface, and can be optimized depending on the desired survey sensitivity. This paper examines gamma survey as a tool for decommissioning NORM sites and provides an overview of current gamma survey technology designed to improve the efficiency and effectiveness of the decommissioning process. Topics to be discussed in the paper include: - An overview of gamma survey systems, and the utility of different delivery vehicles depending on desired cost, desired spatial resolution, and site topography. - The influence of physical detector characteristics on detection sensitivity and survey planning. - The tradeoff between high-resolution and large spatial extent, but inherently uncertain data, and low-resolution, low spatial extent, but highly certain data, as well as the specific utility of each of these types of data during NORM facility decommissioning. - Confounding variables that may limit the utility of gamma survey at some sites (e.g., radon gas and spatial heterogeneity / hot spots), and methods to plan for and control these conditions. Results show that the confounding variables, such as radon and data output can greatly influence the overall data quality associated with the decommissioning process. In addition, the use of real-time and aerial survey platforms provides a method for ensuring proper spatial extent of the data. When applied thoughtfully, gamma survey is a powerful tool for detecting NORM radionuclides in the environment and a cost-effective technique for identifying areas requiring remediation. However, entities performing or using gamma survey as a decommissioning tool must be aware of both its advantages and its limitations before basing remediation or regulatory action on gamma survey results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Test Bed for Vadose-Zone Monitoring Approaches - 20404

In the Central Plateau at the U.S. Department of Energy Hanford Site, a large inventory of contaminants resides in unsaturated sediments within the approximately 100-meter-thick vadose zone, posing a potential continuing risk to groundwater. Vadose zone remedies used to address these contaminants will require performance monitoring to provide feedback during implementation and for long-term verification that remedial action objectives have been met. Passive approaches may also need long-term monitoring to demonstrate that the flux of contaminants from the vadose zone to the groundwater are below thresholds established to meet groundwater protection goals. Collection of physical (e.g., groundwater or sediment) samples is a common method for identifying contaminant concentration distributions, but this approach is limited by the number of locations and the frequency with which data can be collected. In situ vadose zone measurements have evolved over the past few years to include key measurements of water content, soil water pressure, temperature, and chemical concentration. However, the current generation of sensors is designed for relatively short-term use in near-surface soils or sediments. Geophysical methods have been evolving but are also limited in that they have not been designed for the specific long-term vadose zone monitoring needs at the Hanford Site. Overall, monitoring under unsaturated conditions can be difficult due to the need to install and maintain instrumentation over a large area and depth and the need to identify preferential flow pathways due to geologic and chemical heterogeneities over long periods. Thus, a vadose zone monitoring test bed was initiated to address these challenges and identify cost-effective approaches for implementation and postclosure monitoring of the deep vadose zone. The monitoring test bed is expected to provide valuable field-scale information for the design of vadose zone monitoring systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stakeholder-Engaged Structured Decision Making for the Los Alamos Legacy Cleanup Mission - 20501

The Los Alamos National Laboratory (LANL) environmental legacy cleanup program requires decisions to be made for environmental remediation, decommissioning and disposal or management of radioactive waste. This legacy cleanup program was established to address groundwater contamination, material disposal areas (MDAs) that have been used to dispose of radioactive and other waste material, and 'aggregate areas' that might produce radioactive or other chemical waste as a result of remediation activities. The LANL site is regulated for environmental concerns under the Resource Conservation and Recovery Act (RCRA). However, some parts of LANL, such as material disposal area G (MDA G), have disposed of radioactive waste under DOE Order 435.1, and are subject to other regulations. For example, decommissioning the remote-handled TRU material stored in 33 shafts at MDA G falls under EPA's 40 CFR 191. Collectively, the regulations are all aimed in the same direction of finding the best solution, either through constructs such as 'as low as reasonably achievable' (ALARA), considering balancing factors as opposed to only cost and human health risk, and, under EPA regulations such as RCRA and NEPA, evaluating impact from all chemicals and both human health and ecological endpoints. Despite the basic goals and objectives of the regulations or their guidance, the main challenge is in their implementation. Arguably perhaps, but really in principle, all of these (and similar) regulations are asking for a decision analysis to be performed. Implementation challenges encountered have included lack of understanding of decision analysis in the industry, lack of effective stakeholder engagement in the decision analysis process, and lack of appreciation of the need to separate value judgments from science, the latter leading to developing conservative, or protective, science-based models. Conservative models lead to poor solutions, lack of effective stakeholder engagement leads to long drawn out protracted approaches to finding a solution (which also might never be found with this approach), and lack of understanding of decision analysis and Bayesian statistics causes poor models to be built, which creates unfortunate situations of 'garbage in, garbage out' becoming the basis for decision making. Stakeholder-engaged structured decision making (SDM) is an approach to solving problems that relies on the theory of decision science to involve stakeholders in the decision-making process. This approach incorporates stakeholder values using a scientifically rigorous methodology that separates value judgments from science in a way that helps avoid the pitfalls of biased, protective, or conservative modeling. This approach has its foundation in Keeney's 1992 treatise on value-focused thinking [1]. Keeney advocated a paradigm shift in decision making based on the idea that the standard way of thinking about decisions is backwards. The standard approach of focusing first on identifying alternatives rather than on articulating values results in a reactive approach with the emphasis on mechanics and fixed choices instead of the core values that have meaning to stakeholders. This paradigm shift effectively engages all stakeholders in the decision-making process while using a values focused thinking approach that can lead to the identification of decision opportunities and the creation of better alternatives. The intent is to be proactive and generate solutions that are related directly to values and objectives as identified by stakeholders. There are, perhaps, two overarching reasons why SDM can be used to benefit LANL's environmental legacy cleanup. Some of LANL's remaining waste management and environmental management problems are challenging and complex (for example, the Cr and RDX plumes, and MDAs) and while the traditional approach has, arguably, worked well for relatively simple risk-based problems, it cannot, or should not, be applied to more complex problems if the most effective and efficient solutions are desired. The second reason is cost. This has perhaps become more critical since publication of the Government Accountability Office (GAO) reports that DoE's environmental liability is considered a high-risk concern for the nation [2]. The focus of SDM is on structuring solutions to decision risk problems by first addressing stakeholder and decision maker values and subsequently developing decision objectives and ways to measure those objectives, preference weighting across objectives, identifying decision alternatives that best achieve those values, and characterizing uncertainty in predictions of the measures. Because a complete decision model is created using SDM, it can be evaluated to find the main elements of the model that drive, or predict, the best solution. This approach creates complete decision models that are transparent, traceable, reproducible and technically defensible. The science behind SDM, or decision analysis, is well founded, yet it is not unusual to see ad hoc approaches to decision making implemented under various environmental regulations that are pertinent to the LANL site, including NEPA, RCRA and DOE Order 435.1. Such ad hoc approaches are often not transparent or traceable, and lack reproducibility and technical defensibility. The LANL legacy cleanup program has embarked on using SDM to address the complex problems that remain. Stakeholder meetings have been held, and a prototype version of the stakeholder value system has been developed. Further meetings are expected in the future to address specific project needs. This is a long-term endeavor considering the complex environmental problems faced by DOE EM in Los Alamos (EM-LA), and careful planning, consideration of stakeholder value systems, and engagement with stakeholders throughout the SDM process is expected to lead to a successful endpoint. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 129: Perspectives (US and Non-US) on the Use of Risk and Dose Assessment Tools (R9.3)

This panel focused on various dose and risk assessment tools for assessments, Deactivation and Decommissioning, remediation, and closure of sites of chemical and radioactive wastes. Representatives from the US government agencies, non-US countries and their representative regulatory bodies or authorities, as well as performance/risk assessment practitioners compared and contrasted the various guidance from regulatory agencies and authorities on how tools such as the Preliminary Remediation Goals (PRG) calculator, the Dose Compliance Concentrations (DCC) calculator, and Residual Radioactivity (RESRAD) should be used in support of analyses and decisions for environmental cleanup activities. Panelists with presentations: Cumulative Impact Evaluation: Innovative Tools for Evaluation of Groundwater Protection (Alaa Aly); Superfund Evaluation Process for Alternative Risk and Dose Models (with Focus on EPA and DOE Tools) (Stuart Walker); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Data Review of Analytical Laboratory Results at Los Alamos National Laboratory - 20299

Newport News Nuclear BWXT-Los Alamos, LLC (N3B) collects samples in support of the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) Los Alamos Legacy Cleanup Contract (LLCC). N3B receives and reviews over 1.6 million sample data points annually in support of various ongoing environmental monitoring and remediation projects of the LLCC. N3B must demonstrate and document that reported external analytical laboratory data produced for the LLCC are of sufficient quality to fulfill their intended purpose and to support defensible decision making as described in EPA QA/G4 Guidance for the Data Quality Objectives Process 1994. In 2018, N3B assumed management of the LLCC along with the Environmental Information Management (EIM) database that contains all historical and current environmental data associated with the LLCC. The entire EIM database is shared between N3B, Triad National Security, LLC (Triad), and New Mexico Environment Department (NMED). These three parties jointly manage the database, its configuration, and changes / updates. All environmental data that are entered into EIM are updated and available, on a daily basis, in the linked public database Intellus New Mexico (Intellus). The quality and defensibility of the environmental data generated from sampling activities is a key component of an effective remediation process. Providing quality data is accomplished through a data assessment process that includes examination, verification, and validation. Examination is the assessment of completeness of the deliverables, identification of any reporting errors, and determining the usability of the data based on the laboratory's evaluation of its data as described in the case narrative received with the data. Verification consists of an evaluation of the Electronic Data Deliverables (EDD) data report to determine the extent to which the external analytical laboratories met method and contract-specific quality control and reporting requirements. Validation consists of determining the data quality and the extent to which the external analytical laboratories accurately and completely reported all sample and quality control results and satisfied all contract requirements. EIM contains an automatic Data Validation Module which performs automated data review (DVM ADR). DVM ADR is a tool to assist in the validation process. When DVM ADR is used in conjunction with manual examination of sample data packages, the combination of the two will meet and exceed the requirements of verification. N3B recognized an opportunity for process improvement, focusing on DVM ADR configuration and enhancements in EIM. Testing EIM's configuration provided proof of the DVM ADR's capabilities and flexibility to accurately perform routine data checks based on analytical methods and regulatory requirements. In addition, the DVM ADR module was improved through enhancements for all analytes, particularly upgrades for radiochemistry data. Extensive testing of the DVM ADR module occurred using EDDs from actual laboratory analyses on the EIM testing site. During this process, N3B manipulated EDD information to verify that the actual outcomes matched the expected outcomes. The results of this testing were shared with the database architects, and configuration improvements were identified to address these results. During this process, N3B identified that the radiochemical DVM ADR capabilities were underutilized, and so enhanced the DVM ADR functionality with respect to radioanalytical assessment. N3B environmental data uploads to Intellus on a daily basis from EIM, once the analytical data undergoes examination and verification. As such, it is important to have a high level of confidence in the quality and defensibility of the data. The process of manual examination, along with the DVM ADR, in conjunction with full validation of a percentage the data specified through the Data Quality Objectives greatly increases efficiency of data review and confidence level of the quality of the data, and gives the project managers, governmental offices, and the public expedited access to high-quality data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Port Hope Areas Initiative's Port Granby Project: The Decontamination of Site Equipment from a Low Level Waste Facility - 20330

The Port Hope Area Initiative (PHAI) is the Government of Canada's response to the community recommended solutions for the remediation and safe, long-term management of historic low-level radioactive waste (LLRW) that was the result of uranium and radium processing operations in the Municipality of Port Hope, Ontario from the 1930's to the 1980's. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project involves the construction of a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and the excavation and relocation of approximately 1,200,000 m{sup 3} of historic low-level radioactive waste and marginally contaminated soil from the PGWMF to the newly constructed LTWMF. Since the project's inception in 2016, the bulk of the material has since been moved to the final long term storage cell. This has taken over 500,000 person-hours and a large amount of one site heavy equipment to accomplish including excavators, bulldozers, rock trucks, baker tanks and vacuum trucks. While many of the pieces of heavy equipment and water management equipment has further work to do on site, several of the sites larger items have already undergone the decontamination process prior to release from the site. This process has posed a serious challenge as the waste has a caustic nature to it and over the last few years it has had time to work its way into the metallic structures and framework of the equipment. Coupled with the tight work spaces and in some cases confined work areas there have been many issues that needed to be addressed to successfully reach a state where items can be free released to the unrestricted limits of the sites license. This ongoing process has led to a more refined decontamination program at the Port Granby Facility and has had a rather high success rate considering the length of time the equipment has been exposed to the waste materials on site. This paper discusses the varied challenges of decontamination faced at a low-level radioactive waste facility with a focus on the following aspects: - Challenges faced regarding different equipment types and the solutions implemented by Wood to address these challenges; - An examination of various decontamination methods employed throughout the project; and - Lessons learned over three years of remediation work and how they impact the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contaminant Transport Modeling for Technology Evaluation and Long-Term Monitoring in the Tims Branch Testbed, SC - 20343

Studies conducted at U.S. DOE sites have shown the presence of heavy metals, radionuclides, and volatile organic compounds in surface water, groundwater, and soil as a result of nuclear activity in the Cold War era. Since the 1990's, innovative cleanup methods have been implemented in the Tims Branch watershed at Savannah River Site (SRS) to limit the contaminant flux to the stream that have reduced the contaminant concentrations to acceptable regulatory levels in the dissolved phase. A tin-based treatment which effectively eliminated all local anthropogenic mercury inputs to this ecosystem resulted in a known step function addition of inert tin oxide particles which now serve as a potential tracer for sedimentation and particle transport processes in the stream. The long-term effectiveness of this and other remediation techniques and the potential for remobilization of adsorbed contaminant in sediment during extreme hydrologic conditions however remains unclear. It is therefore important to understand not only the fate and transport of dissolved contaminants, but also the movement of sediment and the relevant interactions with dissolved contaminant. To narrow this knowledge gap, a study is being conducted using the Tims Branch watershed as a stream-scale ecosystem test-bed to identify the primary transport processes of major contaminants of concern (such as mercury, nickel and uranium) with an emphasis on interactions with sediment transport. This involves the development of a fully distributed hydrologic watershed model of the Tims Branch watershed to predict streamflow under extreme weather conditions, as well as the development of a comprehensive contaminant transport model that can properly account for coupled contaminant and sediment transport. Review of relevant research reports and peer-reviewed journals revealed that aside from advection-dispersion transport of dissolved contaminants, adsorption and desorption with suspended solids and bed sediment also play an important role in the transport of those contaminants of concern. To develop the fully distributed hydrologic watershed model, the MIKE SHE 2-dimensional (2D) land surface/3D groundwater model that simulates surface/subsurface hydrologic processes (such as overland flow, evapotranspiration, and infiltration) was coupled with a 1D streamflow model that accounts for stream water hydraulics (such as hydraulic structures, cross-sections, and network). To model contaminant transport, the MIKE 11 streamflow component was coupled with the MIKE 11 AD module that simulates solute transport through advection and dispersion, and MIKE ECO Lab module that accounts for both sediment transport and interactions with dissolved contaminant. At this stage, the development and optimization of the fully distributed hydrologic model has been completed, achieving satisfactory statistical results between observed and predicted discharge as indicated by a root mean square error (RMSE) of 0.039 cms and a Nash-Sutcliffe efficiency coefficient (NSE) of 0.764. The ongoing development of the contaminant transport model has also yielded realistic results from preliminary tests. Results from this study are a key to evaluating the effectiveness of tin (II)-based mercury treatment of wetlands at the SRS site, and are also relevant to evaluating the potential of using this type of novel remediation technology in other mercury-contaminated stream systems. Knowledge acquired from this research will also support interpretation of historical data on the trends of contaminant concentration distribution in Tims Branch, particularly considering the effect of extreme hydrological events on the stream flow and pollutant transport. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of the Manuela 3D/Radiation Scanning Tool at Nuclear Facilities - 20437

Licensees, facility operators and decommissioning contractors have a need for comprehensive, accurate and precise radiological and topographical data to plan and execute safe and efficient Decontamination and Decommissioning (D and D) projects. Traditional approaches rely greatly upon labor and administratively intensive data collection methods that require considerable time and effort to glean the relevant data to plan and perform work in a radiological work area. Orano Decommissioning Services has developed and utilized at French nuclear facilities a lightweight portable scanning instrument called MANUELA (Mobile Apparatus for Nuclear Expertise Localization Assistance). Recently Orano conducted demonstrations at two United States nuclear facilities using MANUELA that may prove useful in areas of the fuel cycle including: - ALARA (As Low As Reasonably Achievable) planning during facility operations; - Scoping and site characterization during the D and D planning phase; - Remedial action support during active decommissioning work; - Radiation and modeling planning for plant modifications; - Support Final Status Survey and demonstration of 'end state' compliance for license termination. MANUELA is currently being evaluated for use during decommissioning of nuclear facilities and could aide in demonstrating compliance with end state criteria after decommissioning. Of particular interest are decommissioning projects planned for various sites across the United States. Most of these sites present unique challenges and opportunities to safely and efficiently decommission in a regulatory compliant manner. The two demonstration site's current conditions of relatively low radiation levels inside containment proved to be ideal platforms to deploy the MANUELA instrument for evaluation of the complex geometries typically found in a nuclear facility. The MANUELA instrument was able to precisely identify local hot spots of the reactor system's primary equipment and was able to simultaneously overlay the dose information onto the scanned 3D images. Using data like this, a licensee would be able to make informed technical and personnel decisions on methods to remediate, shield or properly dispose of the radioactive source term. MANUELA can be used throughout the decommissioning process to validate progress and continue to refine the work activities to optimize the efforts of the crew which reduces downtime waiting for survey results, whereas traditional survey methodology relies on a physical survey to be performed and the data transcribed onto survey maps that are only two dimensional. The traditional format tends to be inaccurate and difficult to interpret the precise location(s) of hot spots or generalized dose rates. The resultant scan also allows the user to know the exact extent of the survey versus transposing information onto a map with only a portion of the map area scanned. MANUELA also compiles all of the relevant survey data into a downloadable table format which includes the measurement identification number, time stamp, point space location on the XYZ plane, and the dose rate value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life cycle Management of 324 Project High-Activity, Mixed/Low-Level Radioactive Waste - 20506

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) manages the 324 Building and is preparing to remotely excavate and disposition the radioactive soil beneath the building to allow further deactivation of the building. The 324 Building is a non-reactor Category 2 Nuclear Facility located in the 300 Area of the Hanford Site. Records indicate that in October 1986, approximately 516 liters of a concentrated liquid waste stream containing cesium-137 ({sup 137}Cs) and strontium-90 ({sup 90}Sr) spilled onto the floor of a hot cell, B-Cell, in the 324 Building. The spill contained an estimated 1.3 million curies (Ci) of radioactivity. A breach in the sump of B-Cell was discovered in November 2009 during characterization of the soil under the building. Exposure rates in excess of 10,000 R/hr were detected through a system of access pipes installed under the hot cell, and an estimated 1.557 E+05 Ci of {sup 137}Cs and 6.842 E+04 Ci of {sup 90}Sr are in the soil beneath B-Cell. The magnitude of the soil contamination below B-Cell represents one of the most challenging remediation activities in the DOE complex. The objective of CHPRC's 324 Project is to remotely excavate and disposition the highly contaminated soil under the hot cell so building deactivation and stabilization activities can resume. Depending on the volume and radioactivity of contaminated soil under B-Cell, the material will be dispositioned either at the Hanford Site's Environmental Restoration Disposal Facility (ERDF) or in grout monoliths that will be created in the hot cells (A, C and D) next to B-Cell during future building demolition activities. The current project scope includes installing structural supports under the walls of B-Cell and using remotely operated equipment to remove debris from the hot cell, remove debris mixed with grout on the floor, saw through and remove the cell floor and liner, and excavate contaminated soil under B-Cell to a depth of up to 3.66 meters (12 feet). Addition or removal of debris in A-Cell may be required to support B-Cell cleanout and excavation activities. The base approach is to disposition debris and soil bins in the Radiochemical Engineering Cell (REC) monoliths, and subsequently disposition the monoliths during building demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗