Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Sandia-UT Academic Alliance Project Summary

This project seeks to leverage various hyperspectral tensor products for the purposes of target classification/detection/prediction. In addition to hyperspectral, these products may be images, time series, geometries, or other modalities. The scenarios in which the targets of interest must be identified are typically from remote sensing platforms such as satellites. As such, there are numerous real-world constraints that drive algorithmic formulation. Cost, complexity, and feasibility of the algorithm should all be considered. Targets of interest are exceedingly rare, and collecting many data samples is prohibitively expensive. Furthermore, model interpretability is paramount due to the application space. The goal of this project is to develop a constrained supervised tensor factorization framework for use on hyperspectral data products. Supervised tensor factorizations already exist in the literature, although they have not seen widespread adoption in the remote sensing domain. The novelty of this project will be the formulation and inclusion of constraints that take into account mission considerations and physics based limits to learn a factorization that is both physically interpretable and mission deployable. This will represent a new contribution to the field of remote sensing for performing supervised learning tasks with hyperspectral data.

97 MATHEMATICS AND COMPUTING↗

Recorded Information Management Records Move Project

Throughout the history of Sandia National Laboratories, both federal and corporate records have been stored in 12 structures in remote areas of the lab, none of which are compliant storage facilities under federal regulations. Upon inspection by the National Archives and Records Administration (NARA), findings were levied against Sandia along with recommendations on correcting the issues. The RM Department anticipated over 38,000 boxes of legacy records in Sandia’s current holdings. The current storage areas present an abundance of unknown issues and risks associated with the move project. Along with the large amount of records, and media types, this project faces issues with over 50 years of ever changing filing systems and human error pertaining to data entry, boxes being processed and destroyed. This document presents the final data and results pertaining to the Recorded Information Management Department corrective actions in a well laid out project plan that accommodated safety, security, environmental concerns and of course the records.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Samish Climate Resilience Planning Project

The Samish Indian Nation recognizes that climate change is indeed occurring and that even the most conservative climate projections threaten Samish members, culture, and natural resources. This report is a representation of the Samish Indian Nation’s commitment to providing a bright, sustainable future for the Seventh Generation and beyond by developing an institutional understanding of how climate change may impact the Tribe, determining what is most vulnerable to future changes, and creating strategies to mitigate these impacts and protect our resources. This report is the product of over a year of collaboration between Samish Indian Nation staff and Tribal community members, led by the Samish Climate Change Working Group (hereafter referred to as Working Group). This sharing of knowledge built a list of over 200 planning areas, including infrastructure, human health, and culturally important species, all of which were evaluated in this vulnerability assessment using up to date climate projections, recent reports, and internal expertise. This vulnerability assessment is the foundation for upcoming climate adaptation planning. It will provide staff with a knowledge base that can be used to develop effective climate adaptation strategies and foster a climate resilient community. This work will help ensure that Samish People can continue utilizing the bountiful natural resources of the Salish Sea that is such an important part of the Samish cultural identity. This document and associated web links within it represent the work and deliverables accomplished during the course of this project. It summarizes the last 2 years of effort by the Samish Tribe to understand, plan for and adapt to our changing climate and will provide planning guidance to the Tribe moving forward.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Thermal Modeling of the TN-32B Cask for the High Burnup Spent Fuel Data Project

This report describes thermal modeling done for the High Burnup Dry Storage Research Project that is being performed by the U.S. Department of Energy’s Spent Fuel and Waste Science and Technology (SFWST) research and development (R&D) program. The purpose of this project to investigate the performance of high-burnup spent nuclear fuel in dry storage. Part of this project is a demonstration test being performed with a storage module in the North Anna Nuclear Power Station’s Independent Spent Fuel Storage Installation (ISFSI). The storage module selected for this demonstration is an Orano TN-32B High Burnup cask (Fig. S-1) which has been loaded with fuel assemblies from the North Anna spent fuel pool. The main goals of this test are to provide confirmatory data for model validation and potential improvement, support license renewals and new licenses for ISFSIs, and support transportation licensing for high burnup spent nuclear fuel (EPRI 2014).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Vegetation Assessment at Project 57 for 2019

During the late 1950s, the Atomic Energy Commission (AEC), now the U.S. Department of Energy (DOE), conducted a series of experiments in Emigrant Valley to determine if a nuclear device subjected to a large conventional explosives detonation would result in a nuclear yield. One of these tests, Project 57, disseminated plutonium across the ground surface. Plutonium isotopes dispersed across the land surface can adhere to soil particles, particularly fine soil materials. Plutonium can be redistributed beyond the Contamination Area (CA) boundary by both wind and water. A vegetation survey was initiated in 2016 to assess the vegetation cover of the Project 57 CA and was repeated in 2018 and 2019. The purpose of the survey was to inform managers and provide data about the site’s vegetation with a perspective toward aeolian (wind) transport of soil particles. Results from the 2019 survey are reported here, with comparison to previous surveys. Perennial cover has remained stable (16 percent) during the survey time period, from 2016 to 2019. Shrub cover measured for the 2019 survey was calculated at 14 percent, which is slightly less than reported in earlier surveys but still typical for Great Basin valley shrublands. Annual plant cover was dramatically higher in 2019 at 33 percent, comprised primarily of forbs. This is because of the even distribution of precipitation events from the prior winter compared with previous years. Annual plant cover was 17 percent in 2016 and less than 2 percent in 2018. The spike in annual production following a wet winter demonstrates the variability and resiliency of the desert shrubland environment, which can be difficult to predict over long time periods. Consequently, the percent of bare soil was considerably less than seen in prior years, down from 60 percent to 47 percent, primarily because of the high percentage of annuals. The burned area of the CA remained dominated by native annual plants. The entirety of the plant cover within the burned area as surveyed was comprised of annuals (44 percent), primarily bristly fiddleneck (Amsinckia tessellata), leaving 56 percent of the burned area as bare ground. No bromus tectorum (cheatgrass) was recorded in the 2019 survey in the burned area, but it was observed throughout the area in general. Lacking perennial shrub cover and despite the dramatic increase in annual cover in 2019, the burned area remains a potential and geographically large source for sediment transport. Therefore, the variability of annual plant cover and the potential for changes in the perennial plant cover because of fire or drought mortality continues to suggest sediment transport from the Project 57 study site could vary dramatically over time.

54 ENVIRONMENTAL SCIENCES↗

Scoping Sampling at the Site 300 Water Line Project: Soil Sampling and Analysis Plan/Quality Assurance Plan

Lawrence Liverniore National Laboratory’s (LLNL) Mechanical Utilities Division (MUD) is currently scoping a project with the Project Management Office (PMO) Experimental Test Site 300 (S300) to install/upgrade roughly six miles of water line along established roads within the complex. This Sampling and Analysis Plan (SAP) outlines the requirements to collect an initial round of soil samples from the proposed alignment of the water line to provide preliminary data and information that can be used during project design. The samples will be submitted to an offsite contract laboratory for analysis.

54 ENVIRONMENTAL SCIENCES↗

Placer County Biomass Utilization Pilot Project (Final Technical Report)

The County of Placer, California utilized the Congressionally Directed Project via the U.S. Department of Energy (DOE) award No. DE-FG36-08G088026 to facilitate a comprehensive project that integrated all facets of feasibility for the successful deployment of a woody biomass to energy project located within Placer County in the Lake Tahoe Region. A two-megawatt (MW) wood-to-energy biomass facility that would use a gasification technology was analyzed.

09 BIOMASS FUELS↗

ECP ST Project 2.3.1.06-STPM08-RAJA (Final Report)

Modern high-performance computing architectures are diverse, with hardware designs that feature multicore CPUs and CPUs plus accelerators, such as GPUs or FPGAs. Achieving good application performance often requires using a programming model and managing application data in ways that are best suited to a particular platform. For large codes that are used daily in production, and are under continual development, architecture-specific ports are untenable. Maintainability requires single-source code that is performance portable across a range of architectures and programming model back-ends. This report describes RAJA, Umpire, and CHAI, three software libraries that provide complementary capabilities to enable application portability for high performance computing (HPC) platforms. In particular, these libraries provide software abstractions that insulate application source code from hardware architecture and programming model-specific implementation details. These development of these libraries was motivated by the needs of multiphysics applications in the Weapons Simulation and Computing Program (WSC) at Lawrence Livermore National Laboratory (LLNL). Funding though the Exascale Computing Project (ECP) Software Technology (ST) project 2.3.1.06 RAJA has fostered outreach and collaboration with the ECP application and software technology development communities. In this report, we describe ECP adoption and integration of these tools to this point. The larger goal of the report is to describe to the ECP community what these projects offer, how they are used, and how to approach adoption and integration of them.

97 MATHEMATICS AND COMPUTING↗

Western sector in-situ chemical oxidation project: Supplemental results after injection activities

The purpose of the Western Sector ISCO project is to inject chemical oxidants (i.e., potassium permanganate and sodium persulfate) into the eight injections wells (i.e., WSI001B, WSI001C, WSI002B, WSI002C, WSI003B, WSI003C, WSI004B, and WSI004C) and evaluate the effectiveness of the chemical oxidants at degrading indiscriminate DNAPL that is present in the subsurface. Fifteen monitoring wells (i.e., WSM001BB, WSM001B, WSM001CC, WSM001C, WSM002BB, WSM002B, WSM002CC, WSM002C, WSM003BB, WSM003B, WSM003CC, WSM003C, MSB107B, MSB107CC, and MSB107C) are currently being used by SRS to monitor the effect of the oxidant injections on the VOC plume of the Western Sector of the M-Area HWMF. Figure 1 shows the project location in reference to the M-Area Settling Basin. This is the second of three planned interim reports to track the performance of the project. The purpose of this document is to report groundwater monitoring data collected during the baseline monitoring before oxidant injections occurred and the fifteen months after oxidant injections were completed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Notification of Operational Scope Change for the FTWC Venting Project at Los Alamos National Laboratory (LANL)

This letter is intended to provide you an update on the scope of work for the venting of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area (TA-) 54. This project was described in the Application for Pre-Construction Approval 1 ("the Application") that was approved by EPA Region 6 on May 22, 2019. As operational planning for this project has been finalized, the scope of work described in the Application has slightly changed. The project has now determined that each FTWC may be vented multiple times, and these venting activities may take place at more than one location. The original application only discussed a single venting operation for each FTWC at a single location, TA-54. However, the radionuclide inventory and expected air releases remain bounded by the values described in the Application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pitka's Point/St. Mary's Wind Energy Construction Project. Final report

This is the final report for the St. Mary’s/Pitka’s Point Wind Construction Project. Under the project Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Pitka’s Point about 4 miles from the diesel-fired prime power plant in St. Mary’s. The main objective of this project is to generate electric power from a renewable resource in an effort to reduce the local dependency on fuel oil as the sole source of electric power generation. The wind generator’s output augments the prime source generation provided by the diesel-powered generators.

17 WIND ENERGY↗

Optimization of Archimedes Screw for Use in Hydroelectric Projects

In 2017, the Department of Energy’s (DOE) Water Power Technologies Office (WPTO) made federal funding available to several awardees to investigate and provide innovative technological solutions to reduce capital costs of installed hydroelectric facilities at non-powered dam’s (NPD’s) across the United States, while maintaining a high level of efficiency. Awardees were to develop specific technologies that showed promise of reducing installed capital cost (ICC) by at least 20% over a given baseline and maintain a water-to-wire efficiency of at least 80% at head levels of 50 feet or less and flows of 1000 cubic feet per second (cfs) or less. Canyon Hydro (Canyon) was selected as an awardee for this funding and worked to refine the implementation of the Archimedes screw turbine for use at these site conditions. Canyon and its project partners analyzed several dam inventory datasets to determine the most common head and flow range of current NPD’s in order to best select design conditions for a turbine that would perform successfully at common heads and flows. Computational Fluid Dynamic (CFD) analyses were conducted after site conditions had been selected to optimize the turbine geometry for efficiency. Through this effort we were able to estimate water-to-wire efficiency over a range of flows. Equipment design focused on concepts of modularity and pre-fabricated construction. These methodologies were used where possible to reduce costly on-site construction and shorten deployment timelines. Cost modeling was conducted with input from industry experts in general construction, pre-fabricated concrete construction, and composite fabrication. As a hydroelectric turbine manufacturer of 35 years, Canyon drew upon its own knowledge base in steel fabrication, water-to-wire component specification and ancillary systems to develop the remaining cost matrix for the project. As a result of these efforts, Canyon was able to present findings that indicated a modular Archimedes screw turbine system could be designed that reduced ICC by 23.9% and maintain a maximum water-to-wire efficiency of 82.3%, meeting the goals of the project.

13 HYDRO ENERGY↗

Site 200 #1400 Block Area New Trailers Project, Soil Sampling and Analysis Plan/Quality Assurance Plan

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is proposing to install a series of modular trailers and install associated underground utilities in the 1400 Block at the Livermore Site. This Sampling and Analysis Plan (SAP) outlines the processes and procedures to collect environmental and geotechnical soil samples from the project area and to send the samples to the appropriate laboratory or laboratories for analysis or testing. The resulting environmental laboratory data will determine whether excavated soils can be reused on the project, or which type of landfill or landfills the soils may be sent for disposal. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2019), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives programs (EPA, 2006).

54 ENVIRONMENTAL SCIENCES↗

FIU Project 3: Waste and D&D Engineering and Technology Development [Slides]

This project focuses on delivering solutions under deactivation and decommissioning (D&D) in support of DOE EM-4.11 as well as IT development for environmental applications (KM-IT for EM-4.11) and waste & material management (WIMS for EM-4.22). All technology development related activities will also engage the Office of Technology Development (EM-3.2). This work is also relevant to infrastructure management activities being carried out at DOE sites such as Oak Ridge, Savannah River, Hanford, Idaho and Portsmouth. As appropriate and within the parameters of the DOE-FIU Cooperative Agreement (CA), coordination at the proper level will occur with the sites and national laboratories involved in the project research efforts as well as with the points-of-contact at DOE HQ (e.g., HQ Project Leads, HQ Field Liaisons, Office of Technology Development, CA Technical Monitor, COR, etc.).

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Preserving Manhattan Project historic sites

Beginning in 1943, Project Y – the code name for Los Alamos during World War II – transformed the isolated Pajarito Plateau. The sounds of construction equipment replaced the voices of the Los Alamos Ranch School boys and local homesteaders. Construction crews hurriedly built many structures on mesa tops and in the canyons of Los Alamos. Countless concerns flooded Manhattan Project staff, but designing structures to withstand the test of time was not one of them. The top-secret race to develop an atomic bomb before Nazi Germany was on and everyone felt the pressure. Over the next 75 years, some of the structures slumped into disrepair from exposure to the harsh northern New Mexico environment - concrete cracking and spalling, wood frames rotting. That’s where Los Alamos National Laboratory’s historic preservation team enters the Manhattan Project story.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Report of the Atmosphere to Electrons Mesoscale-to-Microscale Coupling Project (FY2019)

The overall goal of the Mesoscale-to-Microscale Coupling (MMC) project is to improve coupling between mesoscale and microscale simulations via improved guidance and new strategies for setting up simulations and the development of new tools that can be used across the community. Including the mesoscale forcing is critical to modeling the full energy transfer across scales in the atmosphere. The project-specific objectives include: Apply rigorous verification and validation (V&V) techniques to the new modeling tools that are developed as part of the project to ensure the accuracy of our codes and results and develop estimates of the relative uncertainty. Improve computational performance of the coupled MMC models through the development of methods that can be used to reduce turbulence spin-up time and hence the size of computational domains. Improve representation of the surface layer in microscale models to enhance simulations of hub-height wind speed. Develop guidance for the community describing the best ways to couple mesoscale and microscale models, including specific spatial scales at which the handoff to the microscale model should occur. Prepare documentation and a suite of software tools that can be used across the community. Transition MMC research to the offshore environment.

17 WIND ENERGY↗

Final Report from Cal Poly on LLNL sponsored project

This final report consists of updates the project for the entire project period. The project started in 2018, ends on Sep 30th, 2020. Topics included are: Powder removal; Tensile Properties Test; Powder Flowability; and Thin walled Structure. Reports are included for each area.

36 MATERIALS SCIENCE↗

Final Report for ARPA-E NODES "Real-Time Optimization and Control of Next-Generation Distribution Infrastructure" Project

The project examined next-generation power distribution systems with high levels of power- electronics-interfaced distributed energy resources (DERs) that include: renewable energy systems (RESs), energy-storage devices, electric vehicles, fuel cells, small-scale diesel generators, and controllable loads. The project developed a comprehensive distribution- network management framework that unifies real-time voltage and frequency control with network-wide energy management under an integrated framework. The aim of the project was to: i) systematically optimize network-wide operation and congruently regulate voltages and frequency in the face of high volatility induced by rapidly varying RES and uncontrolled loads; ii) facilitate high renewable integration beyond 50% on an energy basis; iii) meet power-quality requirements and operational constraints; and, iv) respect response, ramp- time, and hold-time requirements for synthetic frequency and regulating reserves via fast- and longer-term dynamic energy management.

24 POWER TRANSMISSION AND DISTRIBUTION↗