Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Model-based task planning system for a space laboratory environment

This paper describes the design of a model-based autonomous planning system that will enable robots to manage a space-borne chemical laboratory. In a model-based planning system, knowledge is encapsulated in the form of models at the various layers to support the predefined system objectives. Thus the model-based approach can be considered as an extended planning paradigm which is able to base its planning, control, diagnosis, repair, and other activities on a variety of objectives-related models. A System Entity Structure/Model Base framework is employed to support autonomous system design through the ability to generate a family of planning alternatives as well as to build hierarchical event-based control structures. The model base is a multilevel, multiabstraction, and multiformalism system organized through the use of system morphisms to integrate related models.

Chi, Sung-Do↗

Small planetary mission plan: Report to Congress

This document outlines NASA's small planetary projects plan within the context of overall agency planning. In particular, this plan is consistent with Vision 21: The NASA Strategic Plan, and the Office of Space Science and Applications (OSSA) Strategic Plan. Small planetary projects address focused scientific objectives using a limited number of mature instruments, and are designed to require little or no new technology development. Small missions can be implemented by university and industry partnerships in coordination with a NASA Center to use the unique services the agency provides. The timeframe for small missions is consistent with academic degree programs, which makes them an excellent training ground for graduate students and post-doctoral candidates. Because small missions can be conducted relatively quickly and inexpensively, they provide greater opportunity for increased access to space. In addition, small missions contribute to sustaining a vital scientific community by increasing the available opportunities for direct investigator involvement from just a few projects in a career to many.

Source record↗

SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

Desimone, Roberto↗

Using AI/expert system technology to automate planning and replanning for the HST servicing missions

This paper describes a knowledge-based system that has been developed to automate planning and scheduling for the Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART has been delivered to the HST Flight Operations Team (FOT) at Goddard Space Flight Center (GSFC) where it is being used to build integrated time lines and command plans to control the activities of the HST, Shuttle, Crew and ground systems for the next HST Servicing Mission. SM/PART reuses and extends AI/expert system technology from Interactive Experimenter Planning System (IEPS) systems to build or rebuild time lines and command plans more rapidly than was possible for previous missions where they were built manually. This capability provides an important safety factor for the HST, Shuttle and Crew in case unexpected events occur during the mission.

Bogovich, L.↗

Rotorcraft master plan

The Rotorcraft Master Plan contains a comprehensive summary of active and planned FAA vertical flight research and development. Since the Master Plan is not sufficient for tracking project status and monitoring progress, the Vertical Flight Program Plan will provide that capability. It will be consistent with the Master Plan and, in conjunction with it, will serve to ensure a hospitable environment if the industry presents a practical vertical-flight initiative.

Hwoschinsky, Peter V.↗

Crisis action planning and replanning using SIPE-2

Rome Laboratory and DARPA are jointly sponsoring an initiative to develop the next generation of AI planning and scheduling technology focused on military operations planning, especially for crisis situations. SRI International has demonstrated their knowledge-based planning technology in this domain with a system called SOCAP, System for Operations Crisis Action Planning. SOCAP's underlying power comes from SIPE-2, a hierarchical, domain-independent, nonlinear AI planner also developed at SRI. This paper discusses the features of SIPE-2 that made it an ideal choice for military operations planning and which contributed greatly to SOCAP's success.

Skidmore, Jennifer D.↗

Strategic planning as a focus for continuous improvement. A case study

What do most of the successful people and organizations in our world have in common? Instead of worrying about the future, they work to create it. They have a plan, or a vision of what they want to accomplish and they focus their efforts on success. Strategic planning has been described as a disciplined, ongoing process to produce fundamental decisions and actions that shape what an organization is, what it does, and how it will respond to a changing environment. This case study discussion will evaluate the relationship between strategic planning and Total Quality Management (TQM), or continuous improvement, through the experience of the NASA Johnson Space Center in developing a strategy for the future. That experience clearly illustrates the value of strategic planning in setting the framework and establishing the overall thrust of continuous improvement initiatives. Equally significant, the fundamentals of a quality culture such as strong customer and supplier partnerships, participative involvement, open communications, and ownership were essential in overcoming the challenges inherent in the planning process. A reinforced management commitment to the quality culture was a clear, long-term benefit.

Oneill, John W.↗

A review of mission planning systems

A general definition of Mission Planning is given. The definition covers the full scope of an end-to-end mission planning system. Noting the mission-specific nature of most mission planning systems, a classification of autonomous spacecraft missions is made into Observatory, Survey, multi-instrument science, and Telecommunications missions. The mission planning approach for one mission in each category is examined critically. The following missions were chosen: ISO (Infrared Space Observatory); ERS-1 (European Remote Sensing Satellite); and Eureca (European Retrievable Carrier). The paper gives a summary of lessons learned from these missions suggesting improvements in areas such as requirements analysis, testing, user interfacing, rules, and constraints handling. The paper will also examine commonalities in functions, which could constitute a basis for identification of generic mission planning support tools.

Jones, M.↗

Planning: Management of predictability and uncertainty and keeping abreast of developments

The purpose of this study is to propose method to set up and control of a space mission plan such as that of the HERMES spaceplane. The interest of this subject, other than its complexity, is due to the need to manage imprecision and uncertainty during a mission, as well as changes in between missions. Under these conditions, the set up and control of a flight plan require certain special attention and this has led us to define a certain number of qualities: mastery of complexity in order to resolve conflicts between activities: configuration, resource and time management; consideration of various criteria such as risk minimization or the attainment of mission objectives; robustness and flexibility to allow for hazards and deviations from the norm during operation without having to draw up new plans; aptness for replanning by making changes to the plan without having to set up the whole plan again; and memorization and explanation facility in order to manage developments between missions.

Bastien-Thiry, Christophe↗

A genetic technique for planning a control sequence to navigate the state space with a quasi-minimum-cost output trajectory for a non-linear multi-dimnensional system

There are many multi-stage optimization problems that are not easily solved through any known direct method when the stages are coupled. For instance, we have investigated the problem of planning a vehicle's control sequence to negotiate obstacles and reach a goal in minimum time. The vehicle has a known mass, and the controlling forces have finite limits. We have developed a technique that finds admissible control trajectories which tend to minimize the vehicle's transit time through the obstacle field. The immediate applications is that of a space robot which must rapidly traverse around 2-or-3 dimensional structures via application of a rotating thruster or non-rotating on-off for such vehicles is located at the Marshall Space Flight Center in Huntsville Alabama. However, it appears that the development method is applicable to a general set of optimization problems in which the cost function and the multi-dimensional multi-state system can be any nonlinear functions, which are continuous in the operating regions. Other applications included the planning of optimal navigation pathways through a transversability graph; the planning of control input for under-water maneuvering vehicles which have complex control state-space relationships; the planning of control sequences for milling and manufacturing robots; the planning of control and trajectories for automated delivery vehicles; and the optimization and athletic training in slalom sports.

Hein, C.↗

The International Space Life Sciences Strategic Planning Working Group

Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

White, Ronald J.↗

The Consolidated Planning and Scheduling System for Space Transportation and Space Station operations - Successful development experience

In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.

Hornstein, Rhoda S.↗

Generic mission planning and scheduling: The AXAF solution

During SpaceOps 92 the idea of generic mission planning concepts for space astronomy missions, that could be applied to future missions in order to simplify software development, was introduced. It was proposed that mission planning systems could be decomposed into functional elements that could be standardized and then organized into optimal functional flows for each individual mission. In addition, it was further suggested that these flows themselves could be reduced to a small set of possibilities by describing them in terms of generic mission type, such as manned, unmanned, high orbit, low orbit, etc. The Advanced X-ray Astrophysics Facility (AXAF), planned for launch in the latter part of '98, represents the first application of this idea on an unmanned mission. This paper examines the AXAF Mission Planning and Scheduling concept in light of the generic system theory. Each functional element is evaluated according to AXAF characteristics and requirements and then compared to its generic counterpart. Functional flow considerations are then derived from the overall AXAF mission planning concept to determine the viability and sensitivity of the generic flow to actual requirements. The results of this analysis are then used to update the generic system concept and to define the level of commonality and core system components that are practical to achieve across multiple missions.

Guffin, O. T.↗

Transport aircraft loading and balancing system: Using a CLIPS expert system for military aircraft load planning

The requirement for improving aircraft utilization and responsiveness in airlift operations has been recognized for quite some time by the Canadian Forces. To date, the utilization of scarce airlift resources has been planned mainly through the employment of manpower-intensive manual methods in combination with the expertise of highly qualified personnel. In this paper, we address the problem of facilitating the load planning process for military aircraft cargo planes through the development of a computer-based system. We introduce TALBAS (Transport Aircraft Loading and BAlancing System), a knowledge-based system designed to assist personnel involved in preparing valid load plans for the C130 Hercules aircraft. The main features of this system which are accessible through a convivial graphical user interface, consists of the automatic generation of valid cargo arrangements given a list of items to be transported, the user-definition of load plans and the automatic validation of such load plans.

Richardson, J.↗

Automated Procurement System (APS): Project management plan (DS-03), version 1.2

The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.↗

An empirical evaulation of computerized tools to aid in enroute flight planning

The paper describes an experiment using the Flight Planning Testbed (FPT) in which 27 airline dispatchers were studied. Five general questions was addresses in the study: Under what circumstances does the introduction of computer-generated suggestions (flight plans) influence the planning behavior of dispatchers; what is the nature of such influences; How beneficial are the general design concepts underlying FPT; How effective are the specific implementation decisions made in realizing these general design concepts; How effectively do dispatchers evaluate situations requiring replanning and how effectively do they identify appropriate solutions to these situations. The study leaves little doubt that the introduction of computer-generated suggestions for solving a flight planning problem can have a marked impact on the cognitive processes of the user and on the ultimate plan selected.

Smith, Philip J.↗

Generic astronomy mission planning and scheduling: The AXAF solution

During SpaceOps 92 the idea of generic mission planning concepts for space astronomy missions, that could be applied to future missions in order to simplify software development, was introduced. It was proposed that mission planning systems could be decomposed into functional elements that could be standardized and then organized into optimal functional flows for each individual mission. In addition, it was further suggested that these flows themselves could be reduced to a small set of possibilities by describing them in terms of generic mission type, such as manned, unmanned, high orbit, low orbit, etc. The Advanced X-ray Astrophysics Facility (AXAF), planned for launch in the latter part of 1998, represents the first application of this idea on an unmanned mission. This paper examines the AXAF Mission Planning and Scheduling concept in light of the generic system theory. Each functional element is evaluated according to AXAF characteristics and requirements and then compared to its generic counterpart. Functional flow considerations are then derived from the overall AXAF mission planning concept to determine the viability and sensitivity of the generic flow to actual requirements. The results of this analysis are then used to update the generic system concept and to define the level of commonality and core system components that are practical to achieve across multiple missions.

Guffin, O. T.↗

Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

Davis, Randal↗