Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

ANDRA's strategy and approach for post-closure safety of geological disposal - 15128

The French National Radioactive Waste Management Agency, or ANDRA, has, among its roles in management of radioactive waste, to ensure the protection of man and the environment from all radioactive waste generated in France. In order to verify compliance to the safety objectives, radiological and chemical impact evaluations are to be assessed. The objective of the paper is to present the overall approach for assessing the post-closure safety of French nuclear waste disposals in particular on the Geological Disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Talking about radioactive waste management: feedback on France's experience and on the 2013 public debate on the Cigeo project - 15202

Following a brief presentation of the legal and historical framework in France, the article will take a retrospective look at the debate, from its preparation and the running of the debate process to the French national commission for public debate's publication of the report and the conclusions of this debate. Finally, it will describe the experience of information and dialogue from Andra's point of view and will explain Andra's follow-up to the debate, giving a first glimpse of the implementation of this follow-up. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering management challenges of the CIGeO Project - 15576

After being involved for years in the conceptual studies on the French Deep Geological Repository's (DGR) design for ANDRA, INGeROP (www.ingerop.com) is carrying out since 2012 the global project management and the technical integration of the preliminary, basic and detailed design of the Cigeo project, within the framework of GAIYA consortium. The article presents some particular organizational aspects that turned out to be more challenging than foreseen in the course of our activities. Starting from the presentation of real examples, some lessons learned are derived as well as practices of interest in solving analogue issues in similar projects, with focus on their application to the engineering phase of geological repositories in different countries. Finally, the paper concludes with some avenues for reflection on the 'reversibility' - including 'retrievability' - requirement asked for by the French public and government and its consequences on the engineering choices, on the expected lifetime of components and structures and on the (increased) complexity of CIGeO systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Construction of the Paddys Run Streambank Stabilization Project at the Fernald Preserve, Harrison, Ohio - 16165

The Fernald Preserve is a former uranium-processing plant that underwent extensive remediation pursuant to CERCLA and is now managed by the US DOE Office of Legacy Management. While remediation of buildings and soil contamination was completed in 2006, aquifer remediation is ongoing. Paddys Run is a second-order stream that runs to the south along the western side of the Fernald Preserve. The Paddys Run watershed encompasses nearly 41 km{sup 2} (16 mi{sup 2}), including most of the Fernald site. Field personnel conducting routine site inspections in March 2014 observed that Paddys Run was migrating east via bank erosion into the 'Pit 3 Swale', an area of known surface-water contamination. The soil there was certified pursuant to site regulatory agreements and meets all final remediation levels. However, weekly surface-water monitoring is conducted from two puddles within the swale area, when water that exceeds the final remediation levels is present. Paddys Run had migrated east approximately 4 m (13 ft) in 2 years and was approximately 29 m (95 ft) from the sample location. This rapid migration threatened existing conditions that allowed for continued monitoring of the swale area and also threatened Paddys Run water quality. Therefore, DOE and regulators determined that the east bank of Paddys Run required stabilization. This was accomplished with a design that included the following components: relocation of approximately 145 m (475 ft) of streambed 9 m (30 ft) west, installation of a rock toe along the east bank, installation of two cross-vane in-stream grade-control structures, stabilization of a portion of the east bank using soil encapsulated lifts, and regrading, seeding, and planting within remaining disturbed areas. In an effort to take advantage of low-flow conditions in Paddys Run, construction was initiated in September 2014. Weather delays and subsurface flow within the Paddys Run streambed resulted in an interim shutdown of the project area in December 2014. Construction activities resumed in April 2015, with completion in November 2015. To date, this stabilization project has been successful. The regraded bank and streambed have remained stable, and no compromise to installed cross-vanes, the rock toe, or the soil encapsulated lifts has been observed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition and Transfer of Remediated FUSRAP Sites from USACE to US DOE for Long-Term Surveillance and Maintenance - 16209

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS and M). US DOE's Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS and M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM's perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS and M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost Savings Resulting From Classified Component Disposal at the Nevada National Security Site (NNSS) - 16440

This paper discusses the Nevada National Security Site (NNSS) capability to dispose of both radioactive and non-radioactive classified components and the tremendous cost-avoidance in storage, sanitization and/or demilitarization (Demil), and disposal that have been experienced by generators. One generator, The U.S. Air Force Materiel Command (AFMC), 414. Supply Chain Management Squadron out of Hill Air Force Base (HAFB) experienced total cost-avoidance in the last two years of $218 million on an investment of $1.9 million for disposal at the NNSS. They also accelerated the planned component disposition schedule by 7 years. In 2012, the NNSS added the capability of meeting a key national resource for the safe, secure disposal of classified components that have been declared excess to national security requirements. Since that time the program has continued to grow and expand. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System with 2015-16 Waste Streams - 16463

The Waste Information Management System (WIMS) 2015-16 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 35 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAWPS Technology Maturation Program and Scaled Testing - 18488

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Talent Programs; Engaging Young Professionals to Increase Engagement in the Radwaste Environment - 19075

In 2015, Millennials became the most populous workforce demographic in the United States. As the largest generation ever, they will have a major influence in the workplace for decades to come. The challenge now faced by employers is the ability to attract, engage, and retain this new generation in a highly competitive labor market. While the Baby Boomer generation continues to retire, maximizing the transfer of knowledge and preparing future leaders in the Radwaste Environment is of utmost importance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 100: An Integrated Systems-Based Monitoring Approach

This panel focused on recent advancements in monitoring and remaining challenges associated with the implementing cost-effective monitoring approaches for complex DOE sites. Monitoring presents one of the largest, long-term costs for environmental remediation and site stewardship within the DOE because contamination at complex sites will likely be present for tens to hundreds of years into the future. Integration of monitoring with predictive modeling is an approach that can reduce long-term monitoring costs as well as support the effective monitoring design and data interpretation for managing a site toward closure and long-term stewardship. Panelists with presentations: Autonomous Electrical Geophysical Monitoring of Contaminated Sites (Tim Johnson); Systems Based Long-Term Monitoring for DOE Legacy Management (David Shafer); Long-Term Systems Based Monitoring (Anderson Ward)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential Advantages to Employing an Onsite Laboratory at FUSRAP Sites Contaminated with Radionuclides and Metals - 20353

Various factors that support an evaluation of the relative costs, advantages and disadvantages of utilizing an onsite laboratory or an offsite laboratory for remediation of Formerly Utilized Sites Remedial Action Program (FUSRAP) sites contaminated with radionuclides and metals are presented. In terms of how much more quickly an onsite laboratory provides results versus an offsite laboratory, the results of this study provide tools for calculating the amount of cost savings per day for excavation of contaminated soils for various scenarios including: - State, municipal or local property remediation where the remediation schedule becomes time-critical due to the extra cost and inconvenience to the town or municipality caused by the need for increased security and safety personnel, possible road closures and detours, and the inconvenience to the public due to modified or decreased services of State or municipal facilities; - Residential property where the remediation schedule becomes time-critical due to the inconvenience to the homeowner as well as the importance of maintaining good community relations; - Commercial property where the remediation schedule becomes time-critical due to the hardship and potential loss of revenue endured by the property owner; - Open area where treatment of excavation water is required, and - Open area where treatment of excavation water is not required. For every scenario, the number of matrices, radionuclide and metal contaminants of concern and the project duration are important factors. The costs for the onsite laboratory included the capital costs associated with setting up the lab such as trailer(s) or building(s), power and water hookup, analytical testing equipment, balances, computers, desks and bookcases; support equipment such as hot plates, filtration assemblies, safety equipment, ovens, etc.; and supplies such as glassware, pipettes, filters, etc. and ongoing costs such as labor, chemicals and reagents, standards, cost of the laboratory obtaining certification and maintenance. Offsite laboratory sample testing costs are generally very competitive and typically substantially lower than onsite laboratory costs if only the sample testing costs are considered. The great disadvantage of using an offsite laboratory is that they often cannot guarantee rapid turnaround times for results which creates project delays associated with the remediation process including delays determining the completeness of the characterization and remediation processes, delays in backfilling a property and additional costs for treating wastewater (excavation water, stormwater or both). These costs will vary greatly depending upon the area of the country in which the project is located due to the wide range of labor costs for the onsite laboratory and field workers, as well as the contaminants of interest, matrices and most importantly the size of the impacted area and the number of properties located in that area. This paper provides guidelines for calculating the cost savings that may be realized if an onsite laboratory can generate results more quickly than an offsite laboratory by estimating the costs associated with the remediation process for the various scenarios noted above such as work crew labor costs, excavator and dump truck equipment rentals, wastewater treatment costs (if applicable) and the additional costs incurred by homeowners, commercial property owners and towns/municipalities that are reimbursed by the potentially responsible parties. Key assumptions involve the typical quickest turnaround time provided by the onsite and offsite laboratories. Costs for the operation of a wastewater treatment system and the remediation of a site area or property were provided by personnel who have been involved in the operation of a large FUSRAP site in New Jersey for many years. This study provides valuable information for determining the most cost-effective approach for analysis of project samples and therefore may be used on upcoming FUSRAP projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Incorporation of Pump-and-Treat Data in the New Tracking Restoration and Closure (TRAC)Web-Based Mapping Tool - 20339

Groundwater pump-and-treat (P and T) systems are a common remediation strategy for sites with contaminated groundwater within the U.S. Department of Energy (DOE) Office of Environmental Management (EM). Currently, there are six DOE-EM sites with active P and T systems, but integrated information on individual systems is only primarily available in separate annual reports. To provide a broad view of both current and historical P and T operations, data has been collected on all of the P and T systems. This summary information not only includes capital and average annual costs, but also identifies contaminants treated and forecasted P and T closure dates. Principal contaminants of concern treated with P and T systems include trichloroethylene, chromium (VI), strontium-90, technetium-99, and uranium. DOE-EM is continuing to create a web-based mapping tool that compiles information on groundwater contaminants, remediation strategies and, current data related to plumes and cleanup progress within all DOE-EM sites. The information collected on P and T systems will be added to the TRAC (Tracking Restoration and Closure) tool using interactive maps to quickly access and share information. This information sharing supports the transition from active to passive remediation methods and long-term monitoring approaches. TRAC can ensure that managers, stakeholders, regulators, and contractors remain up to date on cleanup progress for all sites within the complex. The information on P and T systems expands the use of TRAC and can assist in project monitoring and budget planning and support potential shifts in management plans based on plume data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational scheme for burnup credit applied to long term waste disposal - 14448

The application of burnup credit (BUC) to criticality safety evaluations (CSE) of geological repositories for long term disposal of spent nuclear fuel (SNF) is under consideration in Switzerland. Therefore, in collaboration with the national waste management organization, PSI is conducting research towards the development of a BUC methodology tailored for Swiss specific applications. As part of this research, a computational sequence from the in-core burnup phase, through the interim storage, until final disposal is being established. The tools selected for this methodology, referred to as BUCSS-R (Burnup Credit System for Swiss reactors and Repositories), are CASMO for the in-core fuel depletion, the decay module of SERPENT for the decay calculations, and MCNP for the criticality calculations. In connection to BUCSS-R, a computational interface to validated reference core models of the Swiss reactors is being developed. The purpose is to apply reconstructed depletion histories based on real core operation conditions with CASMO assembly calculations, to transfer the pin wise nuclide compositions at discharge to the subsequent SERPENT decay calculations, and afterwards to the final MCNP criticality calculations. An objective of this paper is to present the elements of the BUCSS-R methodology, and to show a first application to so-called bounding analyses of a preliminary Swiss disposal canister design loaded with fuel assembly types operated in a Swiss PWR reactor. The rationale for these bounding analyses is that before starting the integration of methodologies for bias and uncertainty quantifications, the span of the k-eff variation between fresh and burnt fuel loadings should first be quantified in a realistic manner. The obtained results are reported in this paper together with studies performed in order to evaluate the effects from burnup levels and nuclides credit at flooded conditions on the k-eff values. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selection of Isotopes and Elements for Fuel Cycle Analysis

Fuel cycle system analysis simulations examine how the selection among fuel cycle options for reactors, fuel, separation, and waste management impact uranium ore utilization, waste masses and volumes, radiotoxicity, heat to geologic repositories, isotope-dependent proliferation resistance measures, and so forth. Previously, such simulations have tended to track only a few actinide and fission product isotopes, those that have been identified as important to a few criteria from the standpoint of recycled material or waste, taken as a whole. After accounting for such isotopes, the residual mass is often characterized as “fission product other” or “actinide other”. However, detailed assessment of separation and waste management options now require identification of key isotopes and residual mass for Group 1A/2A elements (Rb, Cs, Sr, Ba), inert gases (Kr, Xe), halogens (Br, I), lanthanides, transition metals, transuranic (TRU), uranium, actinide decay products. The paper explains the rationale for a list of 81 isotopes and chemical elements to better support separation and waste management assessment in dynamic system analysis models such as Verifiable Fuel Cycle Simulation (VISION)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Site Characterization and Adaptation - Lessons Learned from the Port Granby LLRW Project in Canada - 19255

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Town of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. The Port Granby Project is part of the broader PHAI being completed by Canadian Nuclear Laboratories (CNL). The scope of remediation activities at Port Granby includes: 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF) to the newly constructed LTWMF. Remediation design required extensive site investigations of waste buried in unmarked and unlined trenches across the PGWMF area. Investigations included reviews of historical records, interviews with past staff of Eldorado and Atomic Energy Canada Limited (the entity managing the PHAI cleanup prior to CNL), radiological surveys, and the advancement of boreholes across the site to facilitate the physical sampling of soil and groundwater contaminants indicative of the presence of LLRW. This paper describes the challenges associated with characterizing and quantifying waste prior to remediation and lessons-learned to adjust procedural adaptations during the characterization phase of a project to better anticipate the unanticipated nature and growth of the contamination profile that often occurs during remediation. Despite substantial pre-remediation investigative efforts, current PGWMF remediation activities have resulted in growth of both the areal and vertical extent of contamination. The contamination profile was shown to be dramatically influenced by leaching of contaminants deeper into native soils. In addition, remedial excavation discovered specific waste types such as unidentified compressed gas cylinders outside of the location indicated by historical records, as well as a quantity of unknown liquids and unmarked drums. These discoveries have resulted in higher waste quantity estimates and have required a partial redesign of the LTWMF mound (a higher final elevation and steeper slopes) to accommodate the increased waste volume. In addition, the means and methods necessary to execute the remedial construction had to be modified to account for the new conceptual model developed from the new contamination data. Despite extensive historical review and site characterization to define the nature and extent of LLRW buried at the PGWMF, actual conditions encountered during remediation efforts necessitated taking an adaptive approach to both the design of the LTWMF and the means and methods used for excavation and transport of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel and High-Level Radioactive Waste Inventory Report

This report provides information on the inventory of commercial spent fuel (SNF) and high-level radioactive waste (HLW) in the United States, as well as non-commercial SNF and HLW in the U.S. Department of Energy (DOE) complex. Actual or estimated quantitative values for current inventories are provided along with inventory forecasts derived from examining different future commercial nuclear power generation scenarios. The report also includes select information on the characteristics associated with the wastes examined (e.g., type, packaging, heat generation rate, decay curves). This report was produced for the U.S. Department of Energy (DOE) to support various analyses on options for storage and transport of SNF and HLW and sponsored by DOE’s Office of Spent Fuel and Waste Disposition (SFWD). The report draws from and complements a previously issued report, Fuel Cycle Potential Waste Inventory for Disposition, developed for DOE’s Used Nuclear Fuel Research & Development Campaign. The current report is not intended as a revision to either Fuel Cycle Potential Waste Inventory for Disposition or Evaluation of Options for Permanent Geologic Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste in Support of a Comprehensive National Nuclear Fuel Cycle Strategy from which some underlying data is used as referenced in the current report. Rather, this report is intended as a stand-alone report providing estimates of current and projected SNF and HLW inventory and has been generated for SFWD planning purposes. This is a technical report that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this report conflict with the provisions of the Standard Contract, the Standard Contract governs the obligations of the parties, and this report in no manner supersedes, overrides, or amends the Standard Contract. This report reflects technical work which could support future decision making by DOE. No inferences should be drawn from this report regarding future actions by DOE, which are limited both by the terms of the Standard Contract and a lack of Congressional appropriations for the Department to fulfill its obligations under the Nuclear Waste Policy Act including licensing and construction of a spent nuclear fuel repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Safety [Vol. 33, No. 1, January-March 1992]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 1 Technical Note: A New Approach to Fission Reactor Safety, Yu. V. Petrov; 5 Erratum; ACCIDENT ANALYSIS: 6 Analysis and Modeling of Fission Product Release from Various Uranium-Aluminum Plate-Type Reactor Fuels, R. P. Taleyarkhan; CONTROL AND INSTRUMENTATION: 23 Applications of a Surveillance and Diagnostics Methodology Using Neutron Noise From a Pressurized-Water Reactor, R. T. Wood, L. F. Miller, and R. B. Perez; DESIGN FEATURES: 36 Westinghouse Advanced Passive 600 Plant, B. A. McIntyre and R. K. Beck; 47 System 80+™ PWR Safety Design, C. W. Bagnal, R. A. Matzie, and R. S. Turk; ENVIRONMENTAL EFFECTS: 58 The MATS Experiments—Mesoscale Atmospheric Transport Studies at the Savannah River Site, A. H. Weber, S. Berman, R. J. Kurzeja, and R. P. Addis; 75 Book Review: Environmental Radioactivity in the European Community 1984-1985-1986, C. A. Little; WASTE AND SPENT FUEL MANAGEMENT: 76 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver; OPERATING EXPERIENCES: 87 Aging Assessment of BWR Control Rod Drive Systems, R. H. Greene; 100 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 103 Selected Safety-Related Events, Compiled by G. A. Murphy; 110 Operating U.S. Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver; RECENT DEVELOPMENTS: 129 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 139 Reports, Standards, and Safety Guides, D. S. Queener; 143 Proposed Rule Changes as of Sept. 30 1991; ANNOUNCEMENTS: 128 Harvard School of Public Health Announces Short Courses; 128 16th Biennial ANS Topical Meeting on Reactor Operating Experience: Present and Future Technologies—Applying Lessons Learned (Call for Papers); 147 The Authors; 150 Indexes to Nuclear Safety, Volume 32; 154 Errata.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Co-Disposal Waste Package Loading Options for DOE SNF and HLW - 20331

The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) that is currently in, or will in the future come into, its possession. DOE must continue to safely store that SNF, transport it to an interim storage site or a repository, and dispose of it. These fuels come from a wide range of reactor types with various cladding materials and enrichments. Many of these reactors, now decommissioned, had unique design features, such as core configuration, fuel element and assembly geometry, moderator and coolant materials, operational characteristics, and neutron spatial and spectral properties, resulting in a large diversity of reactor and fuel designs. Because of the wide variety and conditions of SNF, a robust DOE Standard Canister was proposed that would confine radionuclides and preclude moderator. The DOE Standard Canister had four variations: 3.05-meter (10-foot) or 4.57-meter (15-foot) length, and 45.7-cm (18-inch) or 61.0-cm (24-inch) diameter. For ultimate disposal in the Yucca Mountain Repository, these canisters were to be grouped with 61.0-cm (24-inch) diameter high level waste (HLW) canisters in a 2.13-meter (84-inch) diameter co-disposal waste package. The smaller 45.7-cm (18-inch) diameter DOE Standard Canister could be placed in the middle of five HLW canisters. The larger 61.0-cm (24-inch) diameter DOE Standard Canister would take the place of one of the five HLW canisters on the outer ring in the co-disposal waste package. No DOE Standard Canisters have been loaded. A preliminary evaluation has estimated the number of elements of a fuel type that can fit into the different sizes of the DOE Standard Canister, but no definitive loading configuration has been selected. Changing the loading configuration could impact the number of loadable DOE Standard Canisters and the number of co-disposal waste packages needed for eventual disposition. This paper conveys the ranges of DOE Standard Canisters and HLW canisters that may be produced under certain conditions. It also examines the differences in the estimated number of co-disposal waste packages produced for eventual disposal when using different loading strategies in the DOE Standard Canister for Advanced Test Reactor (ATR), Peach Bottom, and High Flux Isotope Reactor (HFIR) SNF. Changing the loading configurations of ATR, Peach Bottom, and HFIR SNF slightly impacted the number of co-disposal waste packages that may be needed for ultimate disposal. The change in loading configuration was more impactful when a different canister was used, as opposed to varying the number of elements that could fit inside the same size canister. In one case, a reduction of co-disposal waste packages could be achieved by allowing mixing of short HLW canisters with long DOE Standard Canisters. The main conclusion from this analysis is that the ratio between HLW canisters and DOE Standard Canisters will drive the total number of co-disposal waste packages. If too many HLW canisters (i.e., more than five times the number of 18-inch DOE standard canisters) or DOE Standard Canisters are produced, some co-disposal waste packages may not have all positions filled. A co-disposal waste package may be filled with all HLW with no DOE Standard Canister, or a co-disposal waste package could be filled with a single DOE Standard Canister. A ratio that does not closely align to optimum could allow for the design of waste packages that hold just HLW canisters or just DOE SNF canisters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗