Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Managing the Digital Thread for Structural Applications With Fit for Purpose Materials

With the increased emphasis on reducing the cost and time to market of new materials, the need for analytical tools that enable the virtual design and optimization of materials throughout their processing - internal structure - property - performance envelope, along with the capturing and storing of the associated material and model information across its lifecycle, has become critical. This need is also fueled by the demands for higher efficiency in material testing; consistency, quality and traceability of data; product design; engineering analysis; as well as control of access to proprietary or sensitive information. Consequently, at NASA Glenn Research Center a robust information management system that manages the digital thread across the full material life (i.e., capture, analysis, maintenance, and dissemination of data) cycle directed at the design of ‘fit-for-purpose materials’ is under development. To this end the Application Table has been incorporated within NASA Glenn Research Center’s ICME Information Management framework within the ANSYS Granta MI tool. The Application Table provides a place where material and structural application information/requirements can be linked to marry the “design-the-material” (structural engineering) and the “design-with-material” (material science) paradigms and thereby enable application-driven design and optimization of materials and structures. In additional several associated toolsets, specifically: AIMAOS (Automated Information Management Across Organizations and Scales), Py MILab, and JARIMIS (Just A Rather Intelligent Material Interrogation System) are also under development to assist in the judicious automation of this process. AIMOAS offers users an interactive graphical user interface for connecting material information management systems with both commercial and in-house simulation tools at various length scales to enable such automation in the handoff across scales and maintenance of material digital twins and the digital thread. Py MILab, is an automatic framework for the capture, analysis, maintenance, and storage of material test data. Py MILab uses a modular approach for capturing raw data, analyzing the data, and storing the data in a database, interfaced by neutral file structures, to promote plug-and-play capabilities for various analysis types. Finally, JARIMIS is an expert system that integrates various materials informatics tools (e.g., MicroNet, Surrogate ML models, ANSYS Granta MI, etc.) to enable inverse design of materials and facilitate the application of machine learning (ML) and data science with human in the loop decision making to rapidly discover and optimize new materials.

Digital Transformation↗

Progress in Developing the STFNSF Configuration

The design features developed for the Spherical Tokamak (ST) in the PPPL pilot plant study was used as the starting point in developing designs to meet the mission of a Fusion Nuclear Science Facility (FNSF) considering a range of machine sizes based on the influence of tritium consumption and maintenance strategies. The compact nature of a steady state operated ST device for this mission pushes operating conditions and places challenges in the design of components, device maintenance and the integration of supports and services. This paper reviews the general arrangement, design details and maintenance strategy of the ST-FNSF device core for a 1.6-m and 1.0-m device; operating points which bracket the region between purchasing and breeding tritium.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

SBIR Phase II Final Report - Multi-Protocol Energy Management Gateway for Home-Area Networks

Significant amounts of electricity, natural gas, and heating oil are wasted by homeowners due to inefficient operation and inadequate maintenance of heating, ventilation, and air conditioning (HVAC) equipment. Coincident’s work under this award reduces energy waste, saves consumers money, and reduces carbon emissions. It does so in three ways: First, Coincident’s approach replaces the traditional thermostat with a wireless network of sensors and controllers that measure temperature, humidity and occupancy in multiple rooms in the house. The “Internet of Things” is a technology trend holding the promise of ubiquitous inexpensive sensors. The reality, however, is that energy and HVAC monitoring and management is a patchwork of incompatible protocols and expensive proprietary technologies. Coincident’s multi-protocol architecture, developed in part under this award tackles this problem and brings low cost interoperable sensor and control devices to market. Second, the Coincident system eliminates hard-to-program and rigid thermostat schedules and instead provides automatic operation of heating and cooling by combining individual temperature and comfort preferences with energy-saving targets, real-time utility use information, weather data, and room utilization patterns. Energy efficiency technology must be appealing to consumers otherwise it will not be used. The Coincident user interface has engaging features such as remote control from any smart phone or web browser and per-room performance breakdowns. Expected energy savings resulting from more efficient operation of heating and air conditioning equipment are in the range of 10-20%. Third, the Coincident system provides heating and air-conditioning contractors with fine-grained performance data for every residence they support (subject to customer privacy controls). This data is integrated from diverse networks within the residence and includes HVAC performance and fuel use data. This information allows the partner to validate energy savings and identify potential system faults (whether from installation problems or maintenance issues). When combined with professional installation as part of high-efficiency HVAC upgrade, energy savings levels of 20-30% can be achieved. Economic feasibility of energy efficiency technology is one of the key challenges addressed in this award. The Coincident system is engineered to be delivered at a disruptive price point, making the system financially feasible for new and retrofit homes of all types and sizes. The Coincident system is intended to be sold through the HVAC professional—the industry most capable of improving HVAC efficiency. Providing HVAC contractors with detailed home performance data motivates them to sell the product, provides them with maintenance and upgrade revenue opportunities, and therefore delivers customer savings and environmental benefits. Having demonstrated technical and financial feasibility, Coincident has won additional grants and awards, participated in pilot projects, started partnership discussions with several HVAC equipment vendors, and has lined up several large channel partners ready to participate in large pilot rollouts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Availability Considerations in the Design of K-DEMO

A DEMO device has been considered the next step following ITER as a near-term prototypical reactor design that is tritium self-sufficient and produces a limited amount of net electricity. The machine maintenance approach and planned configuration concept plays a major role in establishing the design point. DEMO will also need to show that adequate operating availability can be achieved over a reasonable time period, as a last step before full-scale electricity production. The ability to operate with high availability/reliability plays a key ingredient in defining the DEMO configuration, fostering the need for rapid removal/replacement of limited-life in-vessel components. DEMO pre-conceptual studies are being carried out by South Korea (with US participation) and other countries. The device designs span a range of maintenance approaches from full radial extraction of large in-vessel modules through all TF horizontal openings to vertical maintenance of segmented in-vessel components. Progress made on the S. Korea's K-DEMO design will be provided with emphasis on the design choices identified to promote high availability.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Aging Behavior of the EPDM O-Rings in the H1616 Shipping Package

The H1616 shipping package is used within the DOE complex for shipping tritium reservoirs. The annual recertification frequency can create logistical difficulties with other constraints on the timing of shipments; thus, a longer re-certification period is desirable. The ethylene propylene diene monomer (EPDM) O-rings used in the H1616 shipping package are being aged and tested at the Savannah River National Laboratory (SRNL) to provide a technical basis for extending the annual maintenance of the H1616 shipping package. H1616 EPDM O-rings are being aged at elevated temperature, and tested for degradation in mechanical properties, compression stress relaxation (CSR) behavior, and leak performance. Mechanical properties of aged O-rings show significant degradation can occur, but an inert atmosphere (argon backfill) greatly reduces the rate of degradation. The CSR behavior of O-rings was evaluated in air at 79 to 177 °C. These collective data were used to develop a predictive model for extrapolation of CSR behavior to relevant service temperatures (<67 °C). O-rings were also aged in H1616 Containment Vessels (CV) in an inert atmosphere at 71 to 149 °C. The vessels are helium leak tested periodically to determine if they continue to remain leak-tight. The vessel tests provide a solid demonstration that the H1616 O-rings will remain leak-tight at temperatures up to 113 °C for up to approximately 2.3 years. Significantly longer periods of leak-tight service are expected at the lower temperatures actually experienced in service. The predictive model developed from the CSR data conservatively indicates a service life of ~5 years at 67 °C. Although the relationship between CSR behavior and leak-tight performance has not been established for this design, the CSR predictions for this O-ring are conservative relative to leak-tight performance. Based on the collective data developed to date, SRNL has recommended that the maintenance interval for the H1616 package be extended from 1 year to 2 years. Future recommendations in support of even longer maintenance intervals are expected, as additional aging data become available.

36 MATERIALS SCIENCE↗

Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS&M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness.

54 ENVIRONMENTAL SCIENCES↗

FRAMEWORK FOR STRUCTURAL ONLINE HEALTH MONITORING OF AGING AND DEGRADATION OF SECONDARY PIPING SYSTEMS DUE TO SOME ASPECTS OF EROSION

This paper describes the current state of research related to critical aspects of erosion and selected aspects of degradation of secondary components in nuclear power plants (NPPs). The paper also proposes a framework for online health monitoring of aging and degradation of secondary components. The framework consists of an integrated multi-sensor modality system, which can be used to monitor different piping configurations under different degradation conditions. The report analyses the currently known degradation mechanisms and available predictive models. Based on this analysis, the structural health monitoring framework is proposed. The Light Water Reactor Sustainability Program began to evaluate technologies that could be used to perform online monitoring of piping and other secondary system structural components in commercial NPPs. These online monitoring systems have the potential to identify when a more detailed inspection is needed using real time measurements, rather than at a pre-determined inspection interval. This transition to condition-based, risk-informed automated maintenance will contribute to a significant reduction of operations and maintenance costs that account for the majority of nuclear power generation costs. Furthermore, of the operations and maintenance costs in U.S. plants, approximately 80% are labor costs. To address the issue of rising operating costs and economic viability, in 2017, companies that operate the national nuclear energy fleet started the Delivering the Nuclear Promise Initiative, which is a 3 year program aimed at maintaining operational focus, increasing value, and improving efficiency. There is unanimous agreement between industry experts and academic researchers that identifying and prioritizing inspection locations in secondary piping systems (for example, in raw water piping or diesel piping) would eliminate many excessive in-service inspections. The proposed structural health monitoring framework takes aim at answering this challenge by combining long range guided wave technologies with other monitoring techniques, which can significantly increase the inspection length and pinpoint the locations that degraded the most. More widely, the report suggests research efforts aimed at developing, validating, and deploying online corrosion monitoring techniques for complex geometries, which are pervasive in NPPs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NuScale Power Module Instrumentation

The safe and efficient operation of any nuclear power plant (NPP) depends on accurate and timely measurement of the primary system temperature, pressure, level, flow, and neutron flux. Integral pressurized water reactor (iPWR) or small modular reactors (SMRs) present unique challenges to instrumentation and control (I&C) sensors and their maintenance strategies. More specifically, the calibration and response time of these sensors may have to be verified periodically to ensure that they maintain their required degree of accuracy and speed of response. A review of technical reports and safety analysis documentation of the NuScale Power Module (NPM) by Analysis and Measurement Services Corporation (AMS), together with NuScale engineers, confirms that the I&C sensors within the NPM will need to be testable as installed to verify their static and dynamic performance at plant operating conditions. Sensor placement and installation as well as the process conditions expected in natural circulation integral SMRs like the NPM are very different from those in large scale NPPs with conventional primary system loop piping. In particular, reactor coolant system (RCS) flows are more complex and flow rates much lower, the average containment temperature is higher, nuclear radiation levels in some areas are greater, and the accessibility of sensors for hands-on maintenance is very limited. These challenges among others related to I&C sensors can be overcome by adapting existing I&C sensor test methods, developing new techniques for non-conventional I&C sensors, and incorporating online monitoring (OLM) technologies into the I&C architecture of the plant to verify the calibration and response time of sensors within the NPM prior to startup, during operation, and during subsequent refueling outages. These methods and technologies will be demonstrated and validated through a research and development (R&D) grant recently awarded to AMS by the U.S. Department of Energy (DOE) to facilitate timely deployment of the first NuScale SMR in the United States and to enable efficient I&C maintenance strategies during the life of the plant. Lastly, this paper presents the R&D plan for the DOE project with a focus on temperature measurement needs of NuScale.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evaluating the Incident Energy of Arcs in Photovoltaic DC Systems: Comparison Between Calculated and Experimental Data

Solar Photovoltaic (PV) systems have permeated the energy generation world at a very high rate, some of the safety codes and standards are still lagging in accurately assessing the hazards and risks associated with PV array arcing energies. Safety professionals and maintenance workers using NFPA 70E have utilized the Doan, Stokes & Oppenlander or Enrique models, meant to determine arc energies in DC power systems using the maximum power method. These methods may lead to overestimating the energy available in PV systems. Since PV modules/arrays are non-linear, current limited DC devices, some of these calculation methods may overestimate the arcing energy available to small PV arrays. This paper will validate current arc energy models for PV systems by comparing experimental and calculated data. This data will help modify the current NFPA 70E models related to smaller solar arrays. Understanding where the real safety threshold for DC arc flash in PV systems exists will help maintenance and safety professionals better prepare for a variety of work related activities. This paper will analyze real arc data taken for PV systems <1000VDC and <60amps and compare this to the calculated models in 70E. Using these comparisons, it may be possible to reduce the safety hazard severity and thus relax the PPE requirements for installation and maintenance crews.

14 SOLAR ENERGY↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters: Preprint

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

industry support↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

converter↗

Challenges for Lithuania: Ignalina NPP Early Closure

As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was started but never completed. Since Lithuania became independent in 1990, Ignalina NPP has typically contributed more than 70% of national power supply. The town of Visaginas (population approx. 30,000) was purpose built to serve the plant and staff were brought in from throughout the USSR. With 3200 direct employees, Ignalina NPP remains by far the largest employer. Although there are pockets of Russian-language speakers in communities throughout Lithuania, Visaginas is the only example on a whole-town scale. Thus closure of Ignalina NPP within the restricted timescale required by the EU Accession Treaty commitment set an exceptional challenge to Lithuania. However, since the preparatory phase of decommissioning started in 2000, notable progress has been made, experience gained and lessons learnt. At present Unit 1 remains partially fueled in a state of care and maintenance. Partly burnt fuel is being transferred from Unit 1 to Unit 2 for further irradiation in order to minimize the commitment of new fuel thereby reducing operating costs and the final quantity of spent fuel. Design and construction of the facilities for spent fuel storage, waste processing and free-release is ongoing. The siting of the Near Surface Repository is now in the final stages of approval and construction of the landfill facility is under tendering. In order to facilitate the approval process and minimize the transport of waste, both disposal facilities will be within the boundary of the NPP site. Approximately 450 staff are employed at the shutdown Unit 1 for the safe maintenance of essential systems. The total staffing level at the plant is currently being reduced by around 200 each year, with a larger release to take place at the closure of Unit 2. It is envisaged that 2000 staff will be required for the dismantling operations. Although Ignalina NPP is still in the early stages of closure and decommissioning, some important lessons have already been learnt: Firstly, the importance considering social and financial issues as well as technical factors in deciding the decommissioning strategy. This should be done before the preparation is started of the FDP. The same broad consideration should also be given to the economic restructuring of the local area. Consultation is necessary with local and national authorities, and other stakeholders up to ensure a common vision. At Ignalina NPP it was considered essential to staff morale and the maintenance of a strong safety culture to guarantee the special social and employment benefits to dismissed staff in law [9]. At the same time, measures were also adopted to encourage certain key personnel to remain at the plant until closure. The case of Lithuania, which at independence had no legislative framework or management infrastructure for radioactive waste, may be exceptional; however, for all decommissioning projects it is necessary to have, from the outset, a clear strategy on waste storage and disposal. Finally, coordination at all levels must be assured, especially with the involvement of the nuclear regulators and other regulatory authorities, to achieve a smooth progression from operation into decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Long Term Storage with Surveillance of Canadian Prototype Nuclear Power Reactors

Atomic Energy of Canada (AECL) was originally formed by the government of Canada in 1952 to perform research in radiation and nuclear areas. In the mid 1950's Canada decided to limit itself to peaceful uses of nuclear energy and AECL embarked on several research and development programs, one of them being the development of nuclear power plants. This led to the development of the CANDU{sup TM} design of heavy water power reactors, of which there are now 29 operating around the world. This presentation discusses the present state of the first two CANDU{sup TM} prototype reactors and a prototype boiling light water reactor and lessons learnt after being in a long-term storage with surveillance state for more than 20 years. AECL facilities undergo decommissioning by either a prompt or a deferred removal approach. Both approaches are initiated after an operating facility has been declared redundant and gone through final operational shutdown. For the deferred approach, initial decommissioning activities are performed to put the facility into a sustainable, safe, shutdown state to minimize the hazards and costs of the ensuing extended storage with surveillance (SWS) or Safestor phase. At the appropriate time, the facility is dismantled and removed, or put into a suitable condition for re-use. AECL has a number of facilities that were built during its history, and some of these are now redundant or will become redundant in the near future. The deferred removal approach is part of AECL's decommissioning strategy for several reasons: 1. Reduction in radiation doses to workers during the final dismantling, 2. No facilities are available yet in Canada for the management of quantity of wastes arising from decommissioning, 3. Financial constraints presented by the number of facilities that will undergo decommissioning, compared to the availability of funds to carry out the work. This has led to the development of a comprehensive decommissioning plan that includes all of AECL's redundant and presently operating facilities. Several significant issues have arisen over the decades these reactors have been in the SWS phase. With the long time frames encompassed by this approach to decommissioning, the storage and maintenance of facility information for future decommissioning, and the knowledge and training of successive generations of staff to perform facility inspections and maintenance are major issues. Complacency of both staff and management is a potential issue. The problem arises primarily because these facilities have been put into a comparatively low hazard state, are remotely located, and not much changes over time and changes are slow. During the period that these facilities have been in this state, regulatory scrutiny and expectations have increased. This along with continuing changes in regulatory staff requires a continuous education and communication activity with the regulator. Because of the long time frames involved, the building structures continue to deteriorate slowly, and repairs and maintenance are required upon occasion. The costs can be significant, for example, to replace a roof. When these occasions arise, the balance of cost and benefit is always questioned, i.e., 'Wouldn't it be better to spend the money on dismantling rather than fixing?'. One positive note is that ancillary buildings that either have very low radiation hazards or were decontaminated during the initial decommissioning activities have been used for several alternate uses. This has helped to defray costs, and also keeps an interest in maintaining the building structures and systems in good condition during the SWS phase. Over the past few years, the lessons learnt from these and other facilities in SWS, have been addressed in a holistic manner by moving from a short-term, project-oriented approach to a comprehensive, long term stewardship approach. Key to this approach was the development of an integrated plan to decommission all of AECL's facilities. One of the prime results of the implementation of this plan was the development of an organizational structure that addressed the lessons learnt to date including information management, quality assurance, training, waste management, funding, etc. that are required to successfully maintain these prototype reactors until they can be fully decommissioned.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Level Waste Remote Handling Equipment in the Melter Cave Support Handling System at the Hanford Waste Treatment Plant

Cold war plutonium production led to extensive amounts of radioactive waste stored in tanks at the Department of Energy's (DOE) Hanford site. Bechtel National, Inc. is building the largest nuclear Waste Treatment Plant in the world located at the Department of Energy's Hanford site to immobilize the millions of gallons of radioactive waste. The site comprises five main facilities; Pretreatment, High Level Waste vitrification, Low Active Waste vitrification, an Analytical Lab and the Balance of Facilities. The pretreatment facilities will separate the high and low level waste. The high level waste will then proceed to the HLW facility for vitrification. Vitrification is a process of utilizing a melter to mix molten glass with radioactive waste to form a stable product for storage. The melter cave is designated as the High Level Waste Melter Cave Support Handling System (HSH). There are several key processes that occur in the HSH cell that are necessary for vitrification and include: feed preparation, mixing, pouring, cooling and all maintenance and repair of the process equipment. Due to the cell's high level radiation, remote handling equipment provided by PaR Systems, Inc. is required to install and remove all equipment in the HSH cell. The remote handling crane is composed of a bridge and trolley. The trolley supports a telescoping tube set that rigidly deploys a TR 4350 manipulator arm with seven degrees of freedom. A rotating, extending, and retracting slewing hoist is mounted to the bottom of the trolley and is centered about the telescoping tube set. Both the manipulator and slewer are unique to this cell. The slewer can reach into corners and the manipulator's cross pivoting wrist provides better operational dexterity and camera viewing angles at the end of the arm. Since the crane functions will be operated remotely, the entire cell and crane have been modeled with 3-D software. Model simulations have been used to confirm operational and maintenance functional and timing studies throughout the design process. Since no humans can go in or out of the cell, there are several recovery options that have been designed into the system including jack-down wheels for the bridge and trolley, recovery drums for the manipulator hoist, and a wire rope cable cutter for the slewer jib hoist. If the entire crane fails in cell, the large diameter cable reel that provides power, signal, and control to the crane can be used to retrieve the crane from the cell into the crane maintenance area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Renewing Skills in Nuclear R and D - opportunities arising from the UK's formation of a National Nuclear Laboratory

This paper summarises challenges to maintenance of scientific and engineering skills relevant to the nuclear industry in the UK. A number of new initiatives are discussed, included the contribution to be made by the recently announced National Nuclear Laboratory (NNL). Working with both the university sector and major stakeholders in the UK nuclear industry, the National Nuclear Laboratory will bring valuable contributions to the overall skills maintenance approach. It is well suited to the provision of industrially-relevant training and occupies facilities for experimental study of radioactive materials which are unique in the UK. A strong contribution to skills maintenance from the National Nuclear Laboratory will produce benefits across the UK's nuclear industry at an important stage in the country's management of nuclear energy. (authors)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Application of Margin-Based Methods to Assess System Health

Health management of complex systems such as nuclear power plants is an essential task to guarantee system reliability. This task can be greatly enhanced by constantly monitoring asset status and performances and process such data (through anomaly detection, diagnostic, and prognostic computational algorithms) to identify asset degradation trends and faulty states. While such information and data are typically available for many of the assets, they are not propagated from the asset to the system level in order to identify the most critical assets and prioritize maintenance and surveillance activities. The main reason is driven by the fact that current reliability modeling techniques are inadequate to process such information/data. This is due to the nature of these techniques which are based on the concept of failure rate/probability that do not serve an operational context where quantitative asset health information is available. Simply stated, current reliability techniques serve a run-to-failure operational setting and not a predictive maintenance one where the goal is to perform maintenance and surveillance activities only when they are needed based on asset health. The risk informed asset management (RIAM) project is focusing on the development of a different kind of reliability modeling techniques designed to adequately serve a predictive operational setting. Such reliability techniques move aways from a failure rate/probability to a margin-based mindset where margin is here used as a metric to quantify asset health based only on current and past operational experience of the asset under consideration. In addition, margin-based reliability techniques are able to propagate asset health information from the component to system level and provide importance measure to each asset. This report summarizes a recent activity performed in collaboration with plant modernization pathway designed to integrate monitoring data into margin-based reliability models. Such activity focuses on a specific system of an existing nuclear power plant where large amount of historic monitoring data is used to monitor asset and system health.