Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrable systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Waste heat recovery lube oil management

A waste heat recovery system comprising a thermal circuit. The thermal circuit includes a boiler and an expander fluidly coupled to the boiler. The thermal circuit further includes a power transfer system integrated to the expander. The power transfer system is configured to receive mechanical energy from the expander. The thermal circuit further includes an ejector fluidly coupled to the boiler and to the power transfer system. The ejector is configured to receive a motive flow of working fluid from the boiler. The ejector is further configured to receive a suction flow of working fluid from the power transfer system. The ejector is further configured to combine the motive flow of working fluid and the suction flow of working fluid.

Ernst, Timothy C.↗

The DeepLynx Data Warehouse

Digital Engineering and the development of digital twins necessitate the use of highly sophisticated tools and software. These methodologies and systems bring many benefits but rely on accomplishing challenging goals such as disparate data and systems integration into a single cohesive and holistic system. Idaho National Laboratory has recently released an open-source data warehouse – DeepLynx – to help in the planning, creation, execution, and management of projects in the digital engineering space, with an emphasis on supporting digital twins in an operational space.

97 MATHEMATICS AND COMPUTING↗

Next Generation Renewables and, Separately, Energy System Transformation, and Related Topics (CRADA CRD-14-557 Final Report)

The Joint Institute for Strategic Energy Analysis (JISEA, an institute within NREL) will support the design, development, delivery and dissemination of two (2) informational whitepapers, identified as Task 1 and Task 2, respectively: Next Generation Renewables and Energy Systems Integration. Note: multiple abstracts with each of 10 modifications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Cooling Loop A Anomaly of 2013: A Case Study in Human-Systems Resilience

Throughout the history of human spaceflight, NASA has employed an operational paradigm of 24/7 dependence on experts in Mission Control Center (MCC). In addition to nominal flight control and mission operations, these 85+ experts per shift manage anomaly detection, diagnosis, and response, and support the crew in real-time in performing maintenance and repair, procedure execution, and other complex mission operations. Future long-duration exploration missions (LDEMs) beyond low-Earth orbit (LEO) will not operate successfully using this same Human-Systems Integration Architecture (HSIA) where crew rely on ground controllers, have ready access to resupply, and have a fallback plan of evacuation. As distance from Earth increases and the communication delay grows, crews will need to respond independently and adequately to time-critical vehicle malfunctions. It will not always be sufficient or even possible to ‘safe the system’ and then wait upon ground intervention. A new and radically different HSIA is needed to accommodate the paradigm shift of deep-space travel. Historical International Space Station (ISS) data show that for a 30-day mission, the likelihood of a high-consequence vehicle anomaly of uncertain origin that requires rapid response is greater than 10%. The likelihood of such an event is 50% by the fourth month of the mission, and it grows exponentially with time. Our team has conducted in-depth investigations into these events and their corresponding anomaly resolution activities. Using MCC and Mission Evaluation Room (MER) anomaly resolution artifacts (including meeting summaries, caution and warning data, and ISS daily summaries), we created timelines detailing ground actions and in-orbit events for two significant anomalies. We then mapped these timelines onto Mars transit conditions, introducing a ground-crew communications time delay and shifting immediate response, time-critical task execution, and vehicle commanding to the crew. In detailing successful anomaly resolution in transit to Mars, the timelines highlight where effective resolution requires drastically evolved onboard capabilities. Though this research has yielded a rich data set based on ground response in past missions, there is still insufficient knowledge to assess the potential impact of inflight anomalies on a small autonomous crew on future LDEMs beyond LEO. To begin building an evidence base that will inform future HSIA standards and requirements, we are developing an approach to systematically capture crew anomaly response and procedure execution during early Artemis missions. Being the first human spaceflight beyond LEO since Apollo, early Artemis missions provide a rare and unique opportunity to serve as a testbed for Mars missions. Our work aims to capitalize on planned data collection to derive crew operational responses to anomalous events in real-time. Our team is also researching the level of simulation fidelity required for empirically validating proposed HSIA standards and evaluating HSIA implementations for LDEMs beyond LEO. This work will produce a trade space study of HSIA simulation objectives and fidelity requirements. Ultimately, these research efforts will assist in developing the standards and technologies needed to build a next-generation HSIA for LDEMs beyond LEO.

human-systems integration architecture↗

Joint Management and Optimization of Residential Natural Gas and Electricity Distribution Networks Coupled via Fuel Cells

The attractive features of natural gas as well as the growing electric power demand worldwide have created increasing interest in natural-gas-based distributed generation applications for electric distribution networks. Here, this paper investigates the interdependency between a residential natural gas network and an electric distribution network that are linked together via fuel cells. The modeling of the natural gas network is introduced first, and then the algorithm for gas flow study is presented. The optimal placement and sizing of fuel cell based distributed generation systems are formulated to minimize the losses in both the natural gas network and the electric distribution grid, subject to the constraints imposed by both networks. In addition, a probabilistic model for both gas and electricity demands is developed based on historical electricity and natural gas demand data. A K-means clustering method is used to determine the hourly load states to solve the joint probabilistic optimization problem. Simulation studies are carried out on an integrated system consisting of the IEEE 69-bus distribution network and a radial 27-node natural gas network to verify the developed optimization model and the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Taming the wild edge of smart grid – Lessons from transactive energy market deployments

For two decades, the idea of using market-based approaches in field deployments that coordinate the flexible operation of electricity customer assets has occupied the efforts of transactive energy practitioners. While the purported benefits of this distributed decision-making approach have been well explored, the practical aspects of implementing such a system to address real-world problems are just beginning to emerge. This report surveyed 24 field-deployed programs and interviewed experts instrumental in these deployments. The results of the survey and interviews reveal the diversity of designs and applications. They highlight the technical promise of the approaches as well as challenges with system integration, sustainable business strategy, and regulatory policy obstacles. Insights from the survey offer considerations to direct future effort and investment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Performance optimized, small structurally integrated ion thruster system

A 5-cm structurally integrated ion thruster has been developed for attitude control and stationkeeping of synchronous satellites. As optimized with a conventional ion extraction system, the system demonstrates a thrust T = 0.47 mlb at a beam voltage of 1600 V, total mass efficiency of 76%, and electrical efficiency of 56%. Under the subject contract effort, no significant performance change was noted for operation with two dimensional electrostatic thrust-vectoring grids. Structural integrity with the vectoring grids was demonstrated for shock (+ or - 30 G), sinusoidal (9 G), and random (19.9 G rms) accelerations. System envelope is 31.2 cm long by 13.4 cm flange bolt circle, with a mass of 9.0 Kg, including 6.8 Kg mercury propellant.

Hyman, J., Jr.↗

Operational Overview for UAS Integration in the NAS Project Flight Test Series 3

The National Aeronautics and Space Administration Unmanned Aircraft Systems Integration in the National Airspace System Project has conducted a series of flight tests intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration. The 2015 Flight Test Series 3, supported two separate test configurations. The first configuration investigated the timing of Detect and Avoid alerting thresholds using a radar equipped unmanned vehicle and multiple live intruders flown at varying encounter geometries. The second configuration included a surrogate unmanned vehicle (flown from a ground control station, with a safety pilot on board) flying a mission in a virtual air traffic control airspace sector using research pilot displays and Detect and Avoid advisories to maintain separation from live and virtual aircraft. The test was conducted over an eight-week span within the R-2508 Special Use Airspace. Over 200 encounters were flown for the first configuration, and although the second configuration was cancelled after three data collection flights, Flight Test 3 proved to be invaluable for the purposes of planning, managing, and execution of this type of integrated flight test.

unmanned aircraft systems↗

Using Systems Engineering to Develop an Integrated Crew Health and Performance System to Mitigate Risk for Human Exploration Missions

New space exploration missions are currently being designed to take humanity beyond Low EarthOrbit (LEO) to cis-lunar space, the lunar surface, and eventually to Mars. These missions carryincreased risks due to a number of factors, including distance from Earth, exposure to deep spacehazards, reduced capacity and ability to resupply and evacuate, and increased communication delays.As distance from Earth grows and mission length increases, a growing proportion of overall missionrisk can be attributed to the “human system.” Almost twenty years ago, the Institute of Medicine in theUnited States recommended the early and complete integration of the human system into thespacecraft and mission design process to mitigate this increased risk inherent in exploration missions.Exploration missions will require increasing levels of crew self-sufficiency that will challenge thecurrent operational paradigms established in LEO. Enabling progressive Earth independence requiresmanagement of the increasingly complex interactions among spacecraft systems and integration of allthe data and functions that affect human health and performance into one coordinated system – theCrew Health and Performance (CHP) system. This system is a critical spacecraft system that isanalogous to other systems such as propulsion, guidance and navigation, or avionics. Design andintegration of the CHP system requires the evidence-based merger of typically disparate disciplinessuch as medicine, human factors, and physiological support system design, using systems engineering(SE) practices. The approach described here enables spacecraft and mission designers to align thescope of a CHP system with mission specific requirements, decrease risk to the crew, and increase theprobability of mission success.

Kerry Mcguire↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Urban Services: Regional Launch Event, 10-11 and 12-13 August 2021 [Slides]

The Integrated Urban Services (IUS) Program virtual launch event was conducted on August 10th and 12th, 2021 and provided education to the 26 cities in the ASEAN Smart Cities Network focused on integrated urban planning and the energy-food-water nexus. Experts representing academia, government, NGOs, and the private sector were invited to share knowledge and key lessons from their experience working on urban development projects in the ASEAN region and around the world. The IUS program, which is funded by the U.S. State Department and implemented by the National Renewable Energy Laboratory, aims to promote systems integration and circular economy principles for resource recovery and reuse at the city scale. This new initiative will help ASEAN cities build resilience in their energy, water, and food provision systems. The objectives of this three-year project are to: Educate stakeholders on the benefits of circular economy approaches such as resource recovery and reuse, and on opportunities to build cost-efficient and resilient models of basic urban service and food provision; Provide technical assistance to two select cities within ASEAN to aid them in implementing regenerative EWF system pilot projects; and Engage the private sector to promote market-based planning and investment to support pilot project implementation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Intelligent Chemical Sensor Systems for In-space Safety Applications

Future in-space and lunar operations will require significantly improved monitoring and Integrated System Health Management (ISHM) throughout the mission. In particular, the monitoring of chemical species is an important component of an overall monitoring system for space vehicles and operations. For example, in leak monitoring of propulsion systems during launch, inspace, and on lunar surfaces, detection of low concentrations of hydrogen and other fuels is important to avoid explosive conditions that could harm personnel and damage the vehicle. Dependable vehicle operation also depends on the timely and accurate measurement of these leaks. Thus, the development of a sensor array to determine the concentration of fuels such as hydrogen, hydrocarbons, or hydrazine as well as oxygen is necessary. Work has been on-going to develop an integrated smart leak detection system based on miniaturized sensors to detect hydrogen, hydrocarbons, or hydrazine, and oxygen. The approach is to implement Microelectromechanical Systems (MEMS) based sensors incorporated with signal conditioning electronics, power, data storage, and telemetry enabling intelligent systems. The final sensor system will be self-contained with a surface area comparable to a postage stamp. This paper discusses the development of this "Lick and Stick" leak detection system and it s application to In-Space Transportation and other Exploration applications.

Hunter, G. W.↗

Methods for evaluating integrated airframe/propulsion control system architectures

Methodology, analysis, and detailed design of integrated control system architectures suitable for high-performance aircraft of the 1990s are presented. A methodology, with supporting analytical tools, has been developed to provide system designers with the capability to specify candidate architectures and accurately predict their reliability and performance in the early stages of design development. The authors address the methodology and supporting tools.

Gerald C Cohen↗

PHEV Distribution Grid Integration and Smart Systems Testing: Cooperative Research and Development Final Report

To continue NREL's mission, which includes preparing technologies and markets with "speed and scale," NREL researchers will collaborate with Toyota on plug-in electric vehicle technology. Toyota will provide a collection of plug-in hybrid electric vehicles ("PHEVs" [and ultimately including PEVs], collectively, the "Vehicles") to conduct infrastructure interaction testing at NREL facilities. NREL will use available resources in the Vehicle Testing and Integration Facility (VTIF), its staff parking garage with numerous commercial Electric Vehicle Supply Equipment ("EVSEs"), and its Energy Systems Integration Facility (ESIF) to safely execute research experiments that highlight potential distribution system power quality challenges related to plug-in electric vehicles. The expected outcome of this project is a better understanding of the correlation of individual vehicle power quality attributes to a system of vehicles on a distribution network. The data collected and the simulations conducted will be used to guide future experiments and project development that aid in the deployment of plug-in electric vehicles ("PEV").

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mach 6.5 air induction system design for the Beta II Two-Stage-to-Orbit booster vehicle

A preliminary, two-dimensional, mixed compression air induction system is designed for the Beta II Two-Stage-to-Orbit booster vehicle to minimize installation losses and efficiently deliver the required airflow. Design concepts, such as an external isentropic compression ramp and a bypass system, are developed and evaluated for performance benefits. The design is optimized by maximizing installed propulsion/vehicle system performance, and the resulting system design operating characteristics and performance are presented. The air induction system design has significantly lower transonic drag than similar designs, and only requires approximately 1/3 of the bleed extraction. In addition, the design efficiently provides the integrated system required airflow, while maintaining adequate levels of total pressure recovery. The excellent performance of this highly integrated air induction system is essential for the successful completion of the Beta II booster vehicle mission.

Midea, Anthony C.↗

Mach 6.5 air induction system design for the Beta 2 two-stage-to-orbit booster vehicle

A preliminary, two-dimensional, mixed compression air induction system is designed for the Beta II Two Stage to Orbit booster vehicle to minimize installation losses and efficiently deliver the required airflow. Design concepts, such as an external isentropic compression ramp and a bypass system were developed and evaluated for performance benefits. The design was optimized by maximizing installed propulsion/vehicle system performance. The resulting system design operating characteristics and performance are presented. The air induction system design has significantly lower transonic drag than similar designs and only requires about 1/3 of the bleed extraction. In addition, the design efficiently provides the integrated system required airflow, while maintaining adequate levels of total pressure recovery. The excellent performance of this highly integrated air induction system is essential for the successful completion of the Beta II booster vehicle mission.

Midea, Anthony C.↗