Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite s White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with landing and turnaround maintenance performed. The Flight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development (R&D). NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of this effort, the X-37 team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff R&D and provides valuable experience to implement the Vision for Space Exploration.

Turner, Susan↗

Psyche Early Project Verification & Validation Planning Development

The Psyche mission to the asteroid (16) Psyche was selected as the fourteenth mission in the Discovery program in January 2017. The Psyche mission will determine if (16) Psyche is the core of a larger differentiated body. As part of the development of this mission a Verification and Validation (V&V) engineer was assigned early in the project’s design Phase B. This paper will discuss some of the strategies that the Psyche team is using to take full advantage of the early planning for V&V on flight projects and specifically how the Psyche mission is approaching these tasks. This paper will discuss the effects of having a V&V mindset on: 1) The Psyche requirements development process, and how focusing not only on how the team will verify these requirements but also on developing the tools necessary to track and monitor that verification feeds back into the requirement development process. 2) The Psyche testbed development, and how using a verification mindset is useful for identifying holes in the testbed development process, including the required testbed speed and how to think about testbed certification early in the process while encouraging trades and developing relationships with the testbed team. 3) Developing new V&V Tools for Psyche, and how developing tools early in the project development process means that they can influence the development of other requirement and scheduling tools. 4) Verification Activity Planning, which is typically done to a preliminary level during Phase B of the project, and is important for understanding the major testing that is needed to ensure that the system as built represents the design. On Psyche we are not only focused on bringing this planning to a preliminary level, we are also developing a V&V focused schedule to help us de-conflict V&V activities that may require similar resources early on in the program’s development. 5) Validation Planning, for which we are working with the testbed and model development teams to ensure that their models can be effectively validated and that the plans to do so are in place. In this paper we will describe how the Psyche mission is approaching each of these V&V areas and identify lessons that can be taken by other space missions trying to decide how much effort should be put into V&V early in the project lifecycle.

Solish, Benjamin↗

YF-17/ADEN system study

The YF-17 aircraft was evaluated as a candidate nonaxisymmetric nozzle flight demonstrator. Configuration design modifications, control system design, flight performance assessment, and program plan and cost we are summarized. Two aircraft configurations were studied. The first was modified as required to install only the augmented deflector exhaust nozzle (ADEN). The second one added a canard installation to take advantage of the full (up to 20 deg) nozzle vectoring capability. Results indicate that: (1) the program is feasible and can be accomplished at reasonable cost and low risk; (2) installation of ADEN increases the aircraft weight by 600 kg (1325 lb); (3) the control system can be modified to accomplish direct lift, pointing capability, variable static margin and deceleration modes of operation; (4) unvectored thrust-minus-drag is similar to the baseline YF-17; and (5) vectoring does not improve maneuvering performance. However, some potential benefits in direct lift, aircraft pointing, handling at low dynamic pressure and takeoff/landing ground roll are available. A 27 month program with 12 months of flight test is envisioned, with the cost estimated to be $15.9 million for the canard equipped aircraft and $13.2 million for the version without canard. The feasiblity of adding a thrust reverser to the YF-17/ADEN was investigated.

Gowadia, N. S.↗

The PLAID graphics analysis impact on the space program

An ongoing project design often requires visual verification at various stages. These requirements are critically important because the subsequent phases of that project might depend on the complete verification of a particular stage. Currently, there are several software packages at JSC that provide such simulation capabilities. We present the simulation capabilities of the PLAID modeling system used in the Flight Crew Support Division for human factors analyses. We summarize some ongoing studies in kinematics, lighting, EVA activities, and discuss various applications in the mission planning of the current Space Shuttle flights and the assembly sequence of the Space Station Freedom with emphasis on the redesign effort.

Nguyen, Jennifer P.↗

Analysis of Eye-Tracking Data with Regards to the Complexity of Flight Deck Information Automation and Management - Inattentional Blindness, System State Awareness, and EFB Usage

In the constant drive to further the safety and efficiency of air travel, the complexity of avionics-related systems, and the procedures for interacting with these systems, appear to be on an ever-increasing trend. While this growing complexity often yields productive results with respect to system capabilities and flight efficiency, it can place a larger burden on pilots to manage increasing amounts of information and to understand intricate system designs. Evidence supporting this observation is becoming widespread, yet has been largely anecdotal or the result of subjective analysis. One way to gain more insight into this issue is through experimentation using more objective measures or indicators. This study utilizes and analyzes eye-tracking data obtained during a high-fidelity flight simulation study wherein many of the complexities of current flight decks, as well as those planned for the next generation air transportation system (NextGen), were emulated. The following paper presents the findings of this study with a focus on electronic flight bag (EFB) usage, system state awareness (SSA) and events involving suspected inattentional blindness (IB).

Dill, Evan T.↗

Proceedings of the Conference on the Design of Leak-tight Fluid Connectors

These technical papers were prepared for presentation at the Conference on Design of Leak-tight Fluid Connectors sponsored by the Society of Automotive Engineers and NASA/George C. Marshall Space Flight Center. This conference was planned to promote the direct exchange of technical information concerning separable, semipermanent and permanent leak-tight fluid connectors for space vehicle use. A conference emphasizing design of separable connectors was previously held on March 24 and 25, 1964. The papers represent a cross section of significant topics on design, testing and instrumentation. This exchange of technical information between government agencies and private industry is certain to benefit the nation's space effort and other fields of technology. The sponsors of the conference extend their thanks to all companies and individuals who have contributed toward this meeting.

Connector↗

What to Expect During In-Flight Operations

Executing human research on ISS has to navigate a unique risk environment. NASA planning efforts focus on an investigation's in-flight success but much of the threats to research objectives are not mitigated. A balanced requirement set affords the ability to remain flexible for each subject's data set while protecting the study's integrity across all subjects.

Kosobud, Beth↗

Galileo spacecraft anomaly and safing recovery

A high-level anomaly recovery plan which identifies the steps necessary to recover from a spacecraft 'Safing' incident was developed for the Galileo spacecraft prior to launch. Since launch, a total of four in-flight anomalies have lead to entry into a system fault protection 'Safing' routine which has required the Galileo flight team to refine and execute the recovery plan. These failures have allowed the flight team to develop an efficient recovery process when permanent spacecraft capability degradation is minimal and the cause of the anomaly is quickly diagnosed. With this previous recovery experience and the very focused boundary conditions of a specific potential failure, a Gaspra asteroid recovery plan was designed to be implemented in as quickly as forty hours (desired goal). This paper documents the work performed above, however, the Galileo project remains challenged to develop a generic detailed recovery plan which can be implemented in a relatively short time to configure the spacecraft to a nominal state prior to future high priority mission objectives.

Basilio, Ralph R.↗

A high-resolution gamma-ray and hard X-ray spectrometer for solar flare observations in Max 1991

A long duration balloon flight instrument for Max 1991 designed to study the acceleration of greater than 10 MeV ions and greater than 15 keV electrons in solar flares through high resolution spectroscopy of the gamma ray lines and hard X-ray and gamma ray continuum is described. The instrument, HIREGS, consists of an array of high-purity, n-type coaxial germanium detectors (HPGe) cooled to less than 90 K and surrounded by a bismuth germanate (BGO) anticoincidence shield. It will cover the energy range 15 keV to 20 MeV with keV spectral resolution, sufficient for accurate measurement of all parameters of the expected gamma ray lines with the exception of the neutron capture deuterium line. Electrical segmentation of the HPGe detector into a thin front segment and a thick rear segment, together with pulse-shape discrimination, provides optimal dynamic range and signal-to-background characteristics for flare measurements. Neutrons and gamma rays up to approximately 0.1 to 1 GeV can be detected and identified with the combination of the HPGe detectors and rear BGO shield. The HIREGS is planned for long duration balloon flights (LDBF) for solar flare studies during Max 1991. The two exploratory LDBFs carried out at mid-latitudes in 1987 to 1988 are described, and the LDBFs in Antarctica, which could in principle provide 24 hour/day solar coverage and very long flight durations (20 to 30 days) because of minimal ballast requirements are discussed.

Lin, R. P.↗

Space Shuttle launch pad rescue plan

The final preparation of the Space Shuttle Orbiter for flight involves the loading of large quantities of hazardous propellants. Additionally, many pyrotechnially operated mechanical joints are armed and ready for flight. The personnel manning at the pad is minimized during these operations to reduce the risk. Upon completion of propellant loading, the flight crew must be boarded onto the vehicle which at this point has tremendous potential energy. Plans have been made to safely and quickly evacuate the crew should some unforeseen contigency occur. Both aided and unaided egress scenarios have been planned. Personnel protective equipment is an important consideration to assure the highest chance for survival. Rapid movement of personnel is enhanced by the use of the slidewire system and specially prepared armored personnel carriers. The end result is a system that provides a reasonable chance of survival should an emergency occur during late countdown at the pad.

Doerr, Donald F.↗

Plug-in Plan Tool v3.0.3.1

The role of PLUTO (Plug-in Port UTilization Officer) and the growth of the International Space Station (ISS) have exceeded the capabilities of the current tool PiP (Plug-in Plan). Its users (crew and flight controllers) have expressed an interest in a new, easy-to-use tool with a higher level of interactivity and functionality that is not bound by the limitations of Excel. The PiP Tool assists crewmembers and ground controllers in making real-time decisions concerning the safety and compatibility of hardware plugged into the UOPs (Utility Outlet Panels) onboard the ISS. The PiP Tool also provides a reference to the current configuration of the hardware plugged in to the UOPs, and enables the PLUTO and crew to test Plug-in locations for constraint violations (such as cable connector mismatches or amp limit violations), to see the amps and volts for an end item, to see whether or not the end item uses 1553 data, and the cable length between the outlet and the end item. As new equipment is flown or returned, the database can be updated appropriately as needed. The current tool is a macroheavy Excel spreadsheet with its own database and reporting functionality. The new tool captures the capabilities of the original tool, ports them to new software, defines a new dataset, and compensates for ever-growing unique constraints associated with the Plug-in Plan. New constraints were designed into the tool, and updates to existing constraints were added to provide more flexibility and customizability. In addition, there is an option to associate a "Flag" with each device that will let the user know there is a unique constraint associated with it when they use it. This helps improve the safety and efficiency of real-time calls by limiting the amount of "corporate knowledge" overhead that has to be trained and learned through use. The tool helps save time by automating previous manual processes, such as calculating connector types and deciding which cables are required and in what order.

Andrea-Liner, Kathleen E.↗

NASA's Space Launch System Progress Report

Exploration beyond Earth will be an enduring legacy for future generations, confirming America's commitment to explore, learn, and progress. NASA's Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is responsible for designing and developing the first exploration-class rocket since the Apollo Program's Saturn V that sent Americans to the Moon. The SLS offers a flexible design that may be configured for the MultiPurpose Crew Vehicle and associated equipment, or may be outfitted with a payload fairing that will accommodate flagship science instruments and a variety of high-priority experiments. Both options support a national capability that will pay dividends for future generations. Building on legacy systems, facilities, and expertise, the SLS will have an initial lift capability of 70 metric tons (mT) and will be evolvable to 130 mT. While commercial launch vehicle providers service the International Space Station market, this capability will surpass all vehicles, past and present, providing the means to do entirely new missions, such as human exploration of asteroids and Mars. With its superior lift capability, the SLS can expand the interplanetary highway to many possible destinations, conducting revolutionary missions that will change the way we view ourselves, our planet and its place in the cosmos. To perform missions such as these, the SLS will be the largest launch vehicle ever built. It is being designed for safety and affordability - to sustain our journey into the space age. Current plans include launching the first flight, without crew, later this decade, with crewed flights beginning early next decade. Development work now in progress is based on heritage space systems and working knowledge, allowing for a relatively quick start and for maturing the SLS rocket as future technologies become available. Together, NASA and the U.S. aerospace industry are partnering to develop this one-of-a-kind asset. Many of NASA's space centers across the country will provide their unique expertise to the Space Launch System endeavor. Unique infrastructure to be used includes the Michoud Assembly Facility for tank manufacturing, Stennis Space Center for engine testing, and Kennedy Space Center for processing and launch. As this panel will discuss, the SLS team is dedicated to doing things differently-from applying lean oversight/insight models to smartly using legacy hardware and existing facilities. Building on the foundation laid by over 50 years of human and scientific space flight--and on the lessons learned from the Apollo, Space Shuttle, and Constellation Programs-the SLS team has delivered both technical trade studies and business case analyses to ensure that the SLS architecture will be safe, affordable, reliable, and sustainable.

Singer, Joan A.↗

Space Shuttle stability and control test plan

The development of a completely automatic flight test program to test different aspects of the Shuttle flight capability during reentries is described. Data from each flight to date has been employed to devise a sequence of maneuvers which will be keyboard-punched into the Orbiter control system by the astronauts during entry phases of flight. Details of the interaction and cooperation of the Orbiter elevons and bodyflap to provide the vehicle with latitudinal and longitudinal directional control and trim are outlined. Uncertainties predicted for the control of the Orbiter during wind tunnel testing prior to actual flights have been adjusted to actual flight data, leading to the identification of actual flight regimes which need further investigation. Maneuvers scheduled for flights 5-9 are reviewed.

Cooke, D. R.↗

Human Research Program Human Health Countermeasures Element Cardiovascular Risks Standing Review Panel (SRP)

The Cardiovascular Risk Standing Review Panel (SRP) evaluated several cardiovascular risks associated with space flight along with the ongoing and emerging plans to study these issues and potentially propose and/or develop countermeasures. The areas of focus included: 1) The risk of cardiac rhythm problems during prolonged space flight, and 2) Issues related to the risk of orthostatic intolerance during re-exposure to gravity. An emerging area of concern is radiation associated vascular injury. The risk of cardiac rhythm disturbances has emerged based on case reports only. No systematic study of this risk has been published. However, concerns about this risk are heightened by the age range of astronauts, the structural changes in the heart that occur during space flight, and the potential shifts in fluids and electrolytes. The current plan is to use prolonged Holter monitor EKG records made as part of the "Integrated Cardiovascular SMO" in space to determine more about the frequency and magnitude of this problem and to link this data to complementary data from the nutrition group on electrolytes. The SRP was supportive of this approach. The SRP also felt that any data related to cardiovascular risk in space should be better coordinated with the medical screening data that all astronauts undergo at regular intervals. Additionally, while there are potential privacy issues related to this suggestion, many of the current barriers to better coordination of experimental and clinical data appear to reflect longstanding cultural traditions at NASA that need rethinking. The risk of orthostatic intolerance during re-exposure to gravity was seen by the SRP as an area supported by a wealth of published physiological evidence. The SRP also felt that moving forward with the planned approach to countermeasures was reasonable and that extensive additional hypothesis testing on the physiology of orthostatic intolerance was not needed at this time. There was support for developing ground based models of limited (e.g. 1/6 th) G environments on Earth that generated a number of ideas for consideration by NASA investigators.

Joyner, Michael↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite's White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with and turnaround maintenance performed. The fight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development. NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This recent partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of the X-37 effort, the team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff research and development and provides valuable experience to implement the exploration vision.

Turner, Susan↗