At least 1,531 records · Page 85

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Tank Waste LDR Organics Data Summary for Sample-and-Send (Rev.1A)

The presence of organic chemicals regulated under the Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDR) adds complexity to treating and disposing of the low activity fraction of Hanford tank waste if a low temperature treatment method such as grouting is used (SRNL-STI-2020-00228). The complexity arises from the fact that the baseline vitrification method is considered by the Washington State Department of Ecology (Ecology) as providing adequate thermal treatment for organics; a status not automatically extended to a lowtemperature process, such as solidifying the waste in a cementitious waste form. In addition, the Environmental Protection Agency (EPA) LDR program is intended to ensure that wastes are properly treated prior to disposal. Proper treatment makes hazardous waste less harmful to groundwater by reducing the mobility and/or toxicity of the hazardous constituents in the waste. EPA guidance indicates that stabilization/solidification of waste for organics could be considered impermissible dilution under the LDR dilution prohibition. In addition, waste storage activities at Hanford have required transferring and blending waste within the tank system and these activities have potentially altered the concentrations of the hazardous constituents. The LDR dilution prohibition found in 40 Code of Federal Regulations (CFR) 268.3 states that “… no generator, transporter, handler, or owner or operator of a treatment, storage, or disposal facility shall in any way dilute a restricted waste or the residual from treatment of a restricted waste as a substitute for adequate treatment …”. Hence, if LAW is to be treated using low temperature stabilization (such as cementation), then it is important to demonstrate both how past storage activities have contributed to the removal (by vacuum evaporation), or destruction (by in situ decomposition) of the LDR organics and how future retrieval and waste feed preparation will contribute to their removal (by filtration and ion exchange). Demonstrating these processes helps validate that cementation without additional organic treatment does not necessarily represent impermissible dilution. To aid in implementing cementitious solidification of Low Activity Waste (LAW), WRPS has been developing a regulatory and processing LDR treatment variance strategy termed “Sampleand-Send” that relies, in part, on demonstrating that in situ decomposition reactions along with historic evaporation of tank waste has destroyed or removed most of the LDR organics possibly associated with Hanford Tank Waste (SRNL-STI-2020-00582, SRNL-STI-2021-00453, SRNL-STI-2022-00391). Under the Sample-and-Send concept, Hanford tank waste would be retrieved, processed through a Tank-Side Cesium Removal-like system, and staged as a candidate feed that would then be sampled to confirm the waste acceptance criteria is met for solidification in an LAW cementitious treatment facility. If it can be shown that LDR organics are at concentrations below the waste acceptance criteria (WAC) for cementitious stabilization and have been sufficiently removed (by historic evaporation or by filtration and ion exchange during Cs removal), destroyed (by historic in situ decomposition), or are not soluble in LAW above the WAC then additional organic treatment is not needed prior to creating a cementitious final waste form and the concept of Sample-and-Send would be proposed to establish a non-rulemaking site-specific treatment variance using the specified method of treatment “STABL” to remove sampling requirements of the waste form after treatment. Waste not meeting the WAC could either be routed to the Hanford Waste Treatment and Immobilization Plant for LAW vitrification, or further processed by evaporation or chemical oxidation before solidifying in a cementitious waste form. A key component in implementing the Sample-and-Send strategy is identifying which of the 207 LDR organic compounds associated with the RCRA Part A permit application waste codes for the Double Shell Tanks (DSTs) and Single Shell Tanks (SSTs) and any applicable Underlying Hazardous Constituents (UHCs) from 40 CFR 268.48 should be considered as potentially present and thus subject to regulation. In addition, it is also necessary to understand the solubility volatility, and reactivity of these compounds in LAW to identify which of the potentially present LDR organic compounds are not soluble above regulatory levels or are likely to have been removed by historic evaporation or destroyed by in situ decomposition reactions. If there are potentially present LDR organic compounds that have not been removed or destroyed and are soluble above regulatorily significant concentrations then a treatability variance may be needed for these species to eliminate any concerns pertaining to impermissible dilution. The spreadsheet accompanying this calculation report contains the data and logic computations needed to screen the list of 207 LDR organics associated with Hanford tank waste to identify those potentially present and to indicate which compounds may need to be included in a treatability variance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Small Modular Reactor Suitability for Use On or Near Air Force Space Command Installations

This is the final report of the Small Modular Reactor (SMR) Suitability study by Sandia National Laboratories and the Scitor Team (Scitor Corporation and Landrey & Company). SMRs are being considered by the U.S. government as a clean energy option that can meet the economic, environmental and energy security goals of the country. This report was sponsored by the US Department of Energy (DOE) under the SMR Licensing Technical Support program, of which one of the goals is to advance the commercial viability of domestic SMR designs. The study reflects the intent of the memorandum of understanding between the DOE and the Department of Defense (DoD) to enhance national energy security and demonstrate leadership in transitioning the United States (US) to a low carbon economy. This report assesses the suitability of using US-developed light water SMR technology to provide energy for Schriever Air Force Base, CO and Clear Air Force Station, AK, and for broader SMR applications to meet DoD and Federal energy needs. This report also outlines deployment scenarios to optimize the use of an SMR's capacity to meet aggregated DoD and Federal energy needs within selected regions of the US. Finally, the report includes recommendations for follow-on actions by DoD and DOE to further the development of US SMR technology and effectively address viable solutions for national energy security and clean energy goals.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Operation Upshot-Knothole

A thundering boom and sheet of fire announced a dramatic, once in a lifetime event – the firing of a nuclear projectile from a 280 mm cannon. Travelling seven miles downrange, the projectile detonated 500 feet over the Nevada Test Site’s Frenchman Flat with a force of fifteen kilotons. Although the test was successful, the massive cannon, designed for tactical battlefield use, had a critical flaw. It was too large and cumbersome for mobile combat. The cannon test, codenamed Grable, was part of Operation Upshot-Knothole, the fourth test series conducted in Nevada. Beginning with the Annie test on March 17, 1953, and concluding with the Climax test on June 4th, the Operation consisted of three airdrops, seven tower detonations, and the one artillery shot. As with previous Nevada tests, the demarcation between the weapon development series, Upshot, and the DOD effects tests, Knothole, was blurred. All eleven tests generated data in support of weapon development as well as tactical battlefield applications. During Upshot-Knothole, the University of California Radiation Laboratory (UCRL), conducted its first ever tests, Ruth and Ray. Although neither test was successful, these failures, along with another a year later at Operation Castle, provided the new laboratory with design data leading to future successful tests. The Federal Civil Defense Administration (FCDA) participated in a test series with the general goal of preparing for societal recovery from a nuclear attack. Known as Operation Doorstep, the FCDA’s experiments evaluated the effects of a nuclear attack on food supplies, housing and urban structures, and even a copse of trees transplanted from nearby Mt. Charleston. A contingent of the press witnessed test Annie from an outcropping of rocks, subsequently named News Nob. The presence of the news media, along with the FCDA’s participation, marked a fundamental change in the Nevada test program - a change that that now included the general populace, whose survival was, of course, the rationale for testing. The Department of Defense continued and expanded its Desert Rock exercises of troop exercises, helicopter operations, and evaluation of blast damage to military aircraft, tanks, and guns. Annie, Nancy, Badger, Simon, Encore, and Grable involved larger numbers of personnel than the other five shots. Below is an edited and condensed account of Desert Rock activities compiled by the Defense Threat Reduction Agency.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

National Renewable Energy Laboratory Wildland Fire Management Plan (August 2022-August 2025): February-August 2022

The National Renewable Energy Laboratory (NREL) is located in a moderate wildfire risk region. The region has a history of damaging wildland fire activity and is also susceptible to changing environmental conditions (drought, elevated temperatures) that may lead to an increase in wildfire frequency and consequence over time. An integrated, site-wide wildland fire management plan is required by the Department of Energy and is to be consistent with the Federal Wildland Fire Management Policy. The NREL Wildland Fire Management Plan (WFMP) provides an integrated approach to reducing risk to wildland fire at NREL. The goals of the WFMP are to protect human health and safety, protect NREL facilities and research, enhance community protection, diminish risk and consequences of wildland fires, and maintain the health of the ecosystem. The WFMP accomplishes these goals through the use of tools such as fire behavior modeling, fire growth modeling, a structure ignition risk assessment, and through the application of robust fire prevention, emergency management, and environmental programs. The NREL WFMP was developed in a collaborative manner with input from regional stakeholders including cities, counties, local fire departments, and other governmental agencies. The WFMP provides for recommendations to reduce overall wildland fire risk to life safety and property at NREL.

54 ENVIRONMENTAL SCIENCES↗

Reaching Site Closure for Groundwater under Multiple Regulatory Agencies

Groundwater at the Connecticut Yankee Atomic Power Company (CYAPCO) Haddam Neck Plant (HNP) requires investigation of both radionuclides and chemical constituents in order to achieve closure. Cleanup criteria for groundwater are regulated both by federal and state agencies. These requirements vary in both numerical values as well as the duration of post remediation monitoring. The only consistent requirement is the development of a site conceptual model and an understanding of the hydrogeologic conditions that will govern contaminant transport and identify potential receptors. To successfully reach closure under each agency, it is paramount to understand the different requirements during the planning stages of the investigation. Therefore, the conceptual site model, groundwater transport mechanisms, and potential receptors must be defined. Once the hydrogeology is understood, a long term groundwater program can then be coordinated to meet each regulatory agency requirement to both terminate the NRC license and reach site closure under RCRA. Based on the different criteria, the CTDEP-LR (or RSR criteria) are not only bounding, but also requires the longest duration. As with most decommissioning efforts, regulatory attention is focused on the NRC, however, with the recent industry initiatives based on concern of tritium releases to groundwater at other plants, it is likely that the USEPA and state agencies may continue to drive site investigations. By recognizing these differences, data quality objectives can include all agency requirements, thus minimizing rework or duplicative efforts. CYAPCO intends to complete groundwater monitoring for the NRC and CTDEP-RD by July 2007. However, because shallow remediations are still being conducted, site closure under USEPA and CTDEP-LR is projected to be late 2011.

54 ENVIRONMENTAL SCIENCES↗

Superfluid helium testing of a stainless steel to titanium piping transition joint

Stainless steel-to-titanium bimetallic transitions have been fabricated with an explosively bonded joint. This novel joining technique was conducted by the Russian Federal Nuclear Center, working under contract for the Joint Institute for Nuclear Research. These bimetallic transitions are being considered for use in future superconducting radio-frequency cavity cryomodule assemblies. This application requires cryogenic testing to demonstrate that this transition joint remains leak-tight when sealing superfluid helium. To simulate a titanium cavity vessel connection to a stainless steel service pipe, bimetallic transition joints were paired together to fabricate piping assemblies. These piping assemblies were then tested in superfluid helium conditions at Fermi National Accelerator Laboratory test facilities. The transition joint test program will be described. Fabrication experience and test results will be presented.

43 PARTICLE ACCELERATORS↗

Analysis of Exposure during Transportation of Waste to the Nevada National Security Site (NNSS) - 20445

Safety is a priority for the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program. This commitment to safety is integrated into requirements and work procedures at DOE sites across the U.S. that generate low-level radioactive waste, mixed low-level radioactive waste, and classified waste that is transported to the Nevada National Security Site (NNSS) for permanent disposal. Generators of this waste are responsible for ensuring it is packaged and transported in a safe and compliant manner. These generators and their contracted commercial carriers must comply with U.S. Department of Transportation (DOT) regulations; the Nevada National Security Site Waste Acceptance Criteria (NNSSWAC); and other applicable federal, state, and local regulations and requirements. This includes packaging and shipping the waste to meet DOT regulatory radiation dose limits to ensure public safety during transportation. NNSS waste generators have a solid safety record for complying with these stringent regulations as demonstrated by the fact that no shipments exceeding DOT dose rate limits were received at the NNSS Area 5 Radioactive Waste Management Complex (RWMC) during FY 2014 through FY 2018. A 2005 study conducted by the Desert Research Institute validated shipments to the NNSS comply with DOT radiation dose limits. In response to recent Nevada stakeholder requests for an updated study, an analysis was conducted to verify and provide evidence that the public continues to be safe from exposure to radioactive waste shipment to the NNSS. Radiation exposure from radioactive waste shipments in transit to the NNSS was evaluated. Three studies were performed: 1. Confirm compliance of waste shipments to the DOT radiation limits using dose rate surveys taken at the generator site and at the disposal site. 2. Estimate the dose to the public from waste shipments using the dosimetry results for disposal site personnel by comparing time of exposure for various individuals/scenarios. 3. Estimate the truck driver dose using the receipt dose rate surveys and time of exposure, and from dosimetry results. Study 1 confirmed compliance with the DOT dose rate limits for a sample of waste shipments (123 of 1,038) received during fiscal year (FY) 2017. Study 2 showed that the average annual radiation equivalent dose for disposal site personnel during FY 2017 was approximately 6.7% [0.415 mSv (41.5 millirem)] of the annual average dose that a person living in the U.S. receives from all sources [6.2 mSv (620 mrem)]. Maximum dose to a member of the public, a person resting/sleeping in an adjacent truck at a rest area to a waste shipment, was 0.0166 mSv (1.66 mrem), which is less than the dose received from a person taking a round trip from the east coast to the west coast of the continental U.S. on an airplane [0.07 mSv (7 mrem) per round trip]. Study 3 showed that the truck driver who made the most shipments of radioactive waste to the NNSS, who drove the most hours (estimated time of exposure 2,520 hours), during FY 2017 had a total dose of 0.15 mSv (15 mrem), which was obtained from their personal dosimeter. The annual dose recorded for disposal site personnel, the dose estimates for the public, and the truck driver dose were all a small percentage of the average radiation dose a person receives from all sources (e.g., background and medical radiation). At these levels, risk should only be described qualitatively. Radiation exposure from radioactive waste shipments to the NNSS were shown to be compliant with the DOT dose rate limits, safe, and very low (i.e., within background levels). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Information Template for Evaluating the Relative Priority of Remediation Projects that Pose a Risk to Receptors - 18674

The U.S. Department of Energy (DOE) has one of the largest remediation tasks in the world, in terms of the number of sites, the complexity of individual sites, the number of remediation projects at individual sites, and the full range of stakeholders involved. The question of how to decide what projects to initiate, at any point of time and how to prioritize the deployment of resources for these tasks, occurs both within and among sites. The Consortium for Risk Evaluation developed a Risk-informed Prioritization Framework for Oak Ridge Reservation. Our goal was to develop a risk-informed methodology for prioritizing remediation projects for the Department of Energy's Oak Ridge Reservation that can be adapted to other remediation projects elsewhere. The heart of the framework is a template that includes information about each site necessary to make prioritization decisions. The information in the template describes the environment (hazard, pathway, consequences), the receptors (workers, public, ecological) and the risk management considerations (cost, risk reduction effectiveness, capacity, efficiency and sequencing). The questions in the template provide a wide range of information that managers and regulators need to make decisions, and that Tribes and the public need to evaluate the efficacy of remediation decisions. Completing the template will also help identify data gaps, model parameters needed, and the agencies or individuals responsible for obtaining the information. The information presented in the Template will be useful for regulators (DOE, Environmental Protection Agency, states, Tribes), managers and workers at the sites, trustees of natural resources, site neighbors, and the general public, but more importantly, provides an example of information needed to rate the priority of remediation projects. DOE, other federal and state trustees, and regulators were included in all phases of the development, including the scope, overseeing its development, and evaluation of projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biological and Environmental Research Network Requirements

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet be a highly successful enabler of scientific discovery for over 25 years. In November 2012, ESnet and the Office of Biological and Environmental Research (BER) of the DOE SC organized a review to characterize the networking requirements of the programs funded by the BER program office. Several key findings resulted from the review. Among them: 1) The scale of data sets available to science collaborations continues to increase exponentially. This has broad impact, both on the network and on the computational and storage systems connected to the network. 2) Many science collaborations require assistance to cope with the systems and network engineering challenges inherent in managing the rapid growth in data scale. 3) Several science domains operate distributed facilities that rely on high-performance networking for success. Key examples illustrated in this report include the Earth System Grid Federation (ESGF) and the Systems Biology Knowledgebase (KBase). This report expands on these points, and addresses others as well. The report contains a findings section as well as the text of the case studies discussed at the review.

09 BIOMASS FUELS↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 19217

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot Test Remediation of a Fractured Bedrock Aquifer at the Maywood Superfund Site, Maywood, New Jersey - 20073

The U.S. Army Corps of Engineers (USACE) and Cabrera Services are conducting a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Pilot Test treatment of a fractured bedrock aquifer at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) located in Maywood, New Jersey (NJ), USA. The Maywood Chemical Company Superfund Site in Bergen County, NJ is listed on the United States Environmental Protection Agency (USEPA) Superfund National Priorities List (NPL). The National Superfund Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) identification number is NJD980529762. The Maywood Chemical Company Superfund Site (hereafter referred to as the FMSS) consists of 92 designated properties in the communities of Maywood, Lodi and Rochelle Park, NJ. These are collectively known as FMSS 'Vicinity Properties' and include property owned by the federal government (the Maywood Interim Storage Site, or MISS); the Stepan Company (former location of the Maywood Chemical Works, or MCW); 62 residential properties; three properties owned by the state or federal government; four municipal properties; and 21 commercial properties. The Stepan Company property includes contaminated buildings and three remediated U.S. Nuclear Regulatory Commission (NRC) licensed burial pits; the MISS also includes a contaminated building. Contamination on the FMSS is being addressed under three separate actions coordinated by the lead regulator USEPA Region 2. The USACE is addressing thorium (Th) and other wastes at the site defined as 'FUSRAP waste' in the Soils and Buildings and Groundwater Records of Decision (ROD) for the FMSS. Stepan Company is addressing other chemical wastes (non-FUSRAP waste) at the FMSS. The Groundwater ROD [1] was signed into agreement by USACE Division Commander in June 2012 and USEPA Region 2 Administrator in July 2012 and presents the selected remedial actions for Operable Unit (OU) 2 groundwater at the MISS and adjacent properties. The selected remedial action is removal of non-radiologically contaminated soils on the MISS containing arsenic, lithium, and benzene with concentrations above cleanup levels, and monitored natural attenuation (MNA) of arsenic, lithium, and benzene in groundwater. In situ treatment of arsenic in the overburden aquifer using oxidation reduction (redox) alteration will also be performed if needed to meet the groundwater cleanup levels after the source soil is removed. The need for in situ treatment will be determined during the Groundwater ROD review at least three to four years after the contaminated source soil removal is completed. The third action addressing non-FUSRAP chemical wastes will be the responsibility of the Stepan Company as a primary responsible party in this action. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2023 IEDO Peer Review Report

On behalf of the U.S. Department of Energy (DOE) Industrial Efficiency and Decarbonization Office (IEDO), we are pleased to share the report from our 2023 peer review. Peer review provides us with invaluable insight into our office strategy and program direction from a diverse group of external thought leaders. The findings and actionable recommendations from peer review inform our decision making and help us maintain a constant state of evolution and growth.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Capability to Recover Plutonium-238 in H-Canyon/HB-Line - 13248

Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site had previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np- 237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-Canyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase- 3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ∼2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase- 1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Estimation of the Risks of Collision or Strike to Freshwater Aquatic Organisms Resulting from Operation of Instream Hydrokinetic Turbines

Hydrokinetic energy technologies have been proposed as renewable, environmentally preferable alternatives to fossil fuels for generation of electricity. Hydrokinetic technologies harness the energy of water in motion, either from waves, tides or from river currents. For energy capture from free-flowing rivers, arrays of rotating devices are most commonly proposed. The placement of hydrokinetic devices in large rivers is expected to increase the underwater structural complexity of river landscapes. Moore and Gregory (1988) found that structural complexity increased local fish populations because fish and other aquatic biota are attracted to structural complexity that provides microhabitats with steep flow velocity gradients (Liao 2007). However, hydrokinetic devices have mechanical parts, blades, wings or bars that move through the water column, posing a potential strike or collision risk to fish and other aquatic biota. Furthermore, in a setting with arrays of hydrokinetic turbines the cumulative effects of multiple encounters may increase the risk of strike. Submerged structures associated with a hydrokinetic (HK) project present a collision risk to aquatic organisms and diving birds (Cada et al. 2007). Collision is physical contact between a device or its pressure field and an organism that may result in an injury to that organism (Wilson et al. 2007). Collisions can occur between animals and fixed submerged structures, mooring equipment, horizontal or vertical axis turbine rotors, and structures that, by their individual design or in combination, may form traps. This report defines strike as a special case of collision where a moving part, such as a rotor blade of a HK turbine intercepts the path of an organism of interest, resulting in physical contact with the organism. The severity of a strike incidence may range from minor physical contact with no adverse effects to the organism to severe strike resulting in injury or death of the organism. Harmful effects to animal populations could occur directly (e.g., from strike mortality of individuals) or indirectly (e.g., if the loss of prey species to strike reduces food for predators). Although actively swimming or passively drifting animals may collide with any of the physical structures associated with hydrokinetic devices, turbine rotors are the most likely sources for risk of strike or significant collision (DOE 2009). It is also possible that during a close encounter with a HK device no physical contact will be made between the device and the organism, either because the animal avoids the device by successfully changing its direction of movement, or by successfully evading any moving parts of the device. Oak Ridge National Laboratory (ORNL) has been funded by the US Department of Energy (DOE) Waterpower Program to evaluate strike potential and consequences for Marine and Hydrokinetic (MHK) technologies in rivers and estuaries of the United States. We will use both predictive models and laboratory/field experiments to evaluate the likelihood and consequences of strike at HK projects in rivers. Efforts undertaken at ORNL address three objectives: (1) Assess strike risk for marine and freshwater organisms; (2) Develop experimental procedures to assess the risk and consequences of strike; and (3) Conduct strike studies in experimental flumes and field installations of hydrokinetic devices. During the first year of the study ORNL collected information from the Federal Energy Regulatory Commission (FERC) MHK database about geographical distribution of proposed hydrokinetic projects (what rivers or other types of systems), HK turbine design (horizontal axis, vertical axis, other), description of proposed axial turbine (number of blades, size of blades, rotation rate, mitigation measures), and number of units per project. Where site specific information was available, we compared the location of proposed projects rotors within the channel (e.g., along cutting edge bank, middle of thalweg, near bottom or in midwater) to the general locations of fish in the river (shoreline, bottom/midwater/surface of channel) to ascertain potential interactions. In addition, we are collaborating and communicating with scientists at other national laboratories and industry who are also developing information useful to this task. For example, other studies being funded by DOE include evaluations of different in-current (hydrokinetic) turbine designs for their effects on rates and severity of blade strike and likelihood of cavitation. This report summarizes activities completed during the first year of a three-year study.

17 WIND ENERGY↗

Idaho National Laboratory Integrated Safety Management System 2011 Effectiveness Review and Declaration Report

Idaho National Laboratory (INL) performed an annual Integrated Safety Management System (ISMS) effectiveness review per 48 Code of Federal Regulations (CFR) 970.5223-1, 'Integration of Environment, Safety and Health into Work Planning and Execution.' The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and helped identify target areas for focused improvements and assessments for fiscal year (FY) 2012. The information presented in this review of FY 2011 shows that the INL has performed many corrective actions and improvement activities, which are starting to show some of the desired results. These corrective actions and improvement activities will continue to help change culture that will lead to better implementation of defined programs, resulting in moving the Laboratory's performance from the categorization of 'Needs Improvement' to the desired results of 'Effective Performance.'

99 GENERAL AND MISCELLANEOUS↗

Market Assessment for Hydropower Turbine Design Tools Using Integrated Datasets of Dams, Turbines, Owners, and Fish

A Department of Energy funded project titled Biologically Based Design and Evaluation of Hydropower Turbines (BioDE) has developed modeling tools and data that are intended to inform the design and installation of more environmentally friendly hydropower turbines. A market assessment was conducted to identify prospective users of these products within the hydropower industry and regulatory community. The market assessment included the development of a dataset of hydropower turbines and their defining characteristics (both physical and biological) for the purpose of refining program outreach and marketing of BioDE tools and data. A specific objective of the analysis was to identify hydropower owners and operators whose turbines were likely candidates for refurbishing or replacement because of senescence or re-licensing. This report describes a dataset that combines turbine properties, licensing status, fish resources, and ownership information on nearly 5,500 turbines at nearly 2,200 hydropower projects throughout the United States. The data analysis categorizes turbines by design type, geographic region, owner, age, license expiration, fish species presence, and regulatory authority. The ultimate result is the identification of the federal and non-federal owners with the most turbines of various types and the most turbines that have the potential to interact with fish species of concern.

13 HYDRO ENERGY↗

Earth System Grid Federation: Federated and Integrated Climate Data from Multiple Sources. IN: Earth System Modeling, Volume 6

In climate science, the quantity of data in use by 2020 is expected to be in the hundreds of exabytes (EB, where 1 exabyte = 1018 bytes). Current and future heterogeneous climate data will be distributed around the globe and must be harnessed to find solutions to mission-critical problems. Additionally, more requirements and more constraints are needed to expand and integrate new modeling capabilities and tasks, such as climate prediction, uncertainty quantification (UQ) of model performance, test-bed development, and assimilation of more diverse data sets. These data exploration tasks can be complex and time-consuming, and frequently involve numerous resources spread throughout the modeling and observational climate communities. Staff expertise and core competencies must therefore be flexibly applied to multiple projects and programs to accommodate more complex applications and state-of-the-art science analysis, while allowing resources to be adapted to address future areas of interest in climate research.

Climate Project↗