Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Feasibility Study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Quantum volume hologram

We propose a scheme for parallel spatially multimode quantum memory for light. The scheme is based on a counterpropagating quantum signal wave and a strong classical reference wave as in a classical volume hologram and therefore can be called a quantum volume hologram. The medium for the hologram consists of a spatially extended ensemble of atoms placed in a magnetic field. The write-in and readout of this quantum hologram is as simple as that of its classical counterpart and consists of a single-pass illumination. In addition, we show that the present scheme for a quantum hologram is less sensitive to diffraction and therefore is capable of achieving a higher density of storage of spatial modes as compared to previous proposals. We present a feasibility study and show that experimental implementation is possible with available cold atomic samples. A quantum hologram capable of storing entangled images can become an important ingredient in quantum information processing and quantum imaging.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A review of the solar energy database for the Banat plain

The feasibility studies and the design of photovoltaic systems are generally based on the monthly mean values of solar irradiation. Such data are available for download from several online databases. The aim of this study is to assess the reliability of the data sets provided by different sources to design a photovoltaic system in the Banat region. For this, the monthly mean values of solar irradiation provided by five databases for Timisoara are assessed and compared.

14 SOLAR ENERGY↗

Decreasing the emittance using a multi-period Robinson wigglers in TPS

The Taiwan Photon Source (TPS) has been successfully commissioned. However, the minimum emittance in the TPS lattice is 1.6 nm rad. In the existing TPS storage ring lattice, it is imperative to reduce the emittance to below 1 nm rad. Therefore, a feasibility study for reducing the effective emittance of the TPS storage ring by using a Robinson wiggler was launched; the reduction is necessary to enhance the photon brilliance. In this study, a permanent-magnet multiperiod Robinson wiggler (MRW) was developed for use instead of the single-period Robinson wiggler. In general, the quadruple field of a combined function magnet in the storage ring is approximately few tesla per meter. According to beam dynamic analysis, we found that it is necessary to adopt a high gradient (40 T/m) combined-function MRW magnet to reduce the emittance effectively. Therefore, a high gradient field strength is required in the combined function MRW magnet. In this study, the quadrupole field strength of the MRW magnet was allowed to be approximately 40 T/m at a magnet gap of 20 mm. The period length of the MRW magnet was 300 mm and the period number was 16. The of MRWs is discussed in regard to the possibility of increasing the photon brilliance from IU22.

43 PARTICLE ACCELERATORS↗

Ferritic Alloys as Accident Tolerant Fuel Cladding Material for Light Water Reactors

The objective of the GE project is to demonstrate that advanced steels such as iron-chromium-aluminum (FeCrAl) alloys could be used as accident tolerant fuel cladding material in commercial light water reactors. The GE project does not include fuel development. Current findings support the concept that a FeCrAl alloy could be used for the cladding of commercial nuclear fuel. The use of this alloy will benefit the public since it is going to make the power generating light water reactors safer. In the Phase 1A of this cost shared project, GE (GRC + GNF) teamed with the University of Michigan, Los Alamos National Laboratory, Brookhaven National Laboratory, Idaho National Laboratory, and Oak Ridge National Laboratory to study the environmental and mechanical behavior of more than eight candidate cladding materials both under normal operation conditions of commercial nuclear reactors and under accident conditions in superheated steam (loss of coolant condition). The main findings are as follows: (1) Under normal operation conditions the candidate alloys (e.g. APMT, Alloy 33) showed excellent resistance to general corrosion, shadow corrosion and to environmentally assisted cracking. APMT also showed resistance to proton irradiation up to 5 dpa. (2) Under accident conditions the selected candidate materials showed several orders of magnitude improvement in the reaction with superheated steam as compared with the current zirconium based alloys. (3) Tube fabrication feasibility studies of FeCrAl alloys are underway. The aim is to obtain a wall thickness that is below 400 µm. (4) A strategy is outlined for the regulatory path approval and for the insertion of a lead fuel assembly in a commercial reactor by 2022. (5) The GE team worked closely with INL to have four rodlets tested in the ATR. GE provided the raw stock for the alloys, the fuel for the rodlets and the cost for fabrication/welding of the rodlets. INL fabricated the rodlets and the caps and welded them to provide hermetic seal. The replacement of a zirconium alloy using a ferritic material containing chromium and aluminum appears to be the most near term implementation for accident tolerant nuclear fuels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary Cyber-Informed Dynamic Branch Conditions for Analysis with the Dynamic Simplified Cyber MELCOR Model

Instrumentation and control of nuclear power is transforming from analog to modern digital assets. These control systems perform key safety and security functions. This transformation is occurring in new plant designs as well as in the existing fleet of plants as the operation of those plants is extended to 60 years. This transformation introduces new and unknown exploits involving both digital asset induced safety issues and security exploits. Traditional the open literature of nuclear power risk assessment tools and cyber security assessment methods have not been modified or developed to address the unique nature of cyber failure modes and of cyber security threats. Starting in 2015, Sandia National Laboratories (SNL) embarked on a two year dynamic cyber-risk informed project to facilitate the analysis of unique cyber failure modes and the time sequencing of cyber faults, both malicious and non-malicious, and impose those cyber exploits and cyber faults onto a nuclear power plant accident sequence simulator code to assess how cyber exploits and cyber faults could interact with a plant's digital instrumentation and control (DI and C) system in the absence of digital controls. This will be achieved by coupling SNL's existing dynamic scheduler code (ADAPT), nuclear accident simulator code (MELCOR), and cyber Emulytics code (SCEPTRE) to demonstrate real-time simulation of cyber exploits and their impact on automatic DI and C responses. Studying such potential time-sequenced cyber-attacks and their risks (i.e., the associated impact and the associated degree of difficulty to achieve the attack vector) as they pertain to accident management will provide a risk informed basis for developing effective cyber security controls for nuclear power. This paper will discuss the rationale behind the proposed generic cyber exploits for an abstracted Pressurized Water Reactor that has adopted a unified DI and C System. Other papers related to this project submitted to this conference discuss: - The MELCOR model for this abstracted reactor, called the Dynamic Simplified Cyber (DSC) model, - Modifications to ADAPT to: Extend the framework for multiple simulators, Incorporation of importance measures into dynamic event tree analysis, Sort and reduce the dynamic event tree based upon inputs to or outputs from the tree, and - A feasibility study for using density based clustering methods with dynamic time wrapping to cluster and prune dynamic event trees. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Investigation into the Transportation of Irradiated Uranium/Aluminum Targets from a Foreign Nuclear Reactor to the Chalk River Laboratories Site in Ontario, Canada - 12249

This investigation required the selection of a suitable cask and development of a device to hold and transport irradiated targets from a foreign nuclear reactor to the Chalk River Laboratories in Ontario, Canada. The main challenge was to design and validate a target holder to protect the irradiated HEU-Al target pencils during transit. Each of the targets was estimated to have an initial decay heat of 118 W prior to transit. As the targets have little thermal mass the potential for high temperature damage and possibly melting was high. Thus, the primary design objective was to conceive a target holder to dissipate heat from the targets. Other design requirements included securing the targets during transportation and providing a simple means to load and unload the targets while submerged five metres under water. A unique target holder (patent pending) was designed and manufactured together with special purpose experimental apparatus including a representative cask. Aluminum dummy targets were fabricated to accept cartridge heaters, to simulate decay heat. Thermocouples were used to measure the temperature of the test targets and selected areas within the target holder and test cask. After obtaining test results, calculations were performed to compensate for differences between experimental and real life conditions. Taking compensation into consideration the maximum target temperature reached was 231 deg. C which was below the designated maximum of 250 deg. C. The design of the aluminum target holder also allowed generous clearance to insert and unload the targets. This clearance was designed to close up as the target holder is placed into the cavity of the transport cask. Springs served to retain and restrain the targets from movement during transportation as well as to facilitate conductive heat transfer. The target holder met the design requirements and as such provided data supporting the feasibility of transporting targets over a relatively long period of time. A suitable transport cask was selected and a device for housing irradiated targets for loading, unloading and transportation has been designed, built and validated. The device was successful in meeting all design requirements for this feasibility study. Experiments were conducted with a custom test facility to confirm that the design met the maximum temperature requirements during shipping. Results from tests showed that the peak temperature in the apparatus was 300 deg. C. By compensating for experimental considerations, such as reduced thermal conductivity of the test cask versus that of the actual cask the expected maximum target temperature reduces to 231 deg. C. This is below the designated peak value of 250 deg. C. It can therefore be concluded, based on the content of this paper and from a heat-removal standpoint, the feasibility of transporting targets from a foreign nuclear reactor to Canada is possible, although further testing with irradiated targets and a full size cask would be a recommended next step. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Polyvalent fuel treatment facility (TCP): shearing and dissolution of used fuel at La Hague facility

Although many used nuclear fuel types have already been recycled, recycling plants are generally optimized for Light Water Reactor (LWR) UO{sub x} fuel. Benefits of used fuel recycling are consequently restricted to those fuels, with only limited capacity for the others like LWR MOX, Fast Reactor (FR) MOX or Research and Test Reactor (RTR) fuel. In order to recycle diverse fuel types, an innovative and polyvalent shearing and dissolving cell is planned to be put in operation in about 10 years at AREVA's La Hague recycling plant. This installation, called TCP (French acronym for polyvalent fuel treatment) will benefit from AREVA's industrial feedback, while taking part in the next steps towards a fast reactor fuel cycle development using innovative treatment solutions. Feasibility studies and R/Development trials on dissolution and shearing are currently ongoing. This new installation will allow AREVA to propose new services to its customers, in particular in term of MOX fuel, Research Test Reactors fuel and Fast Reactor fuel treatment. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Investigation of the Workability and Response of Ti-6Al-4V Titanium alloys at Lower Elevated Temperature and Higher Strain Rate

Titanium and its alloys have a wide range of applications in various industries such as aerospace, medical, automotive and even commercial products. However, formability of titanium alloys has always been an issue. This study presents the results of an investigation on the workability and response of Ti-6Al-4V deformed at different strain rates and lower elevated temperatures with different initial microstructures. Compression tests of cylindrical specimens were performed at various temperatures (300 deg. C, 400 deg. C, 450 deg. C, 500 deg. C) and at different strain rates (0.001 s{sup -1}, 0.02 s{sup -1} and 0.1 s{sup -1}). The effects of strain rate, temperature and initial microstructure on the workability of the Ti alloy were investigated. Based on these experimental results, workability maps for the respective initial microstructures were developed. Results showed that temperature played an important role in the formability of Ti-6Al-4V titanium alloys unlike strain rate. In addition, feasibility study on Multi-Directional Forging (MDF) was performed and positive results were obtained. It was demonstrated that Ti-6Al-4V titanium alloys can undergo severe plastic deformation at lower elevated temperature (400-500 deg. C) and at a higher strain rate of 0.1 s{sup -1}.

36 MATERIALS SCIENCE↗

Putney Basketville Site Biomass CHP Analysis

The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response Center for Program Analysis developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The Putney, Vermont, Basketville site, formerly the location of a basket-making facility and a paper mill andwoolen mill, was selected for a feasibility study under the program. Biomass was chosen as the renewable energy resource based on abundant woody-biomass resources available in the area. Biomass combined heat and power (CHP) was selected as the technology due to nearby loads, including Putney Paper and Landmark College.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Near-Net Shape Fabrication Using Low-Cost Titanium Alloy Powders

The use of titanium in commercial aircraft production has risen steadily over the last half century. The aerospace industry currently accounts for 58% of the domestic titanium market. The Kroll process, which has been used for over 50 years to produce titanium metal from its mineral form, consumes large quantities of energy. And, methods used to convert the titanium sponge output of the Kroll process into useful mill products also require significant energy resources. These traditional approaches result in product forms that are very expensive, have long lead times of up to a year or more, and require costly operations to fabricate finished parts. Given the increasing role of titanium in commercial aircraft, new titanium technologies are needed to create a more sustainable manufacturing strategy that consumes less energy, requires less material, and significantly reduces material and fabrication costs. A number of emerging processes are under development which could lead to a breakthrough in extraction technology. Several of these processes produce titanium alloy powder as a product. The availability of low-cost titanium powders may in turn enable a more efficient approach to the manufacture of titanium components using powder metallurgical processing. The objective of this project was to define energy-efficient strategies for manufacturing large-scale titanium structures using these low-cost powders as the starting material. Strategies include approaches to powder consolidation to achieve fully dense mill products, and joining technologies such as friction and laser welding to combine those mill products into near net shape (NNS) preforms for machining. The near net shape approach reduces material and machining requirements providing for improved affordability of titanium structures. Energy and cost modeling was used to define those approaches that offer the largest energy savings together with the economic benefits needed to drive implementation. Technical feasibility studies were performed to identify the most viable approaches to NNS preform fabrication using basic powder metallurgy mill product forms as the building blocks and advanced joining techniques including fusion and solid state joining to assemble these building blocks into efficient machining performs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design of NSLS-II High Order Multipole Correctors

Feasibility studies for two families of corrector magnets for NSLS-II are presented. The first family of magnets are generalizations of figure eight quadrupoles using rotationally symmetric breaks in the return yoke to fit in available space. Properties specific to figure eight magnet are identified. The second type of magnet is a combined sextupole/dipole trim.

43 PARTICLE ACCELERATORS↗

Present Status And Future Prospects Of Polarized Ion Sources

Recent progress in polarized ion sources development is reviewed. New techniques for production of polarized H{sup -} ion (proton), D{sup -} (D{sup +}) and {sup 3}He{sup ++} ion beams are discussed. Feasibility studies of these techniques are in progress at BNL and other laboratories. Polarized deuteron beams will be required for the polarization program at the Dubna Nuclotron and at the deuteron Electric Dipole Moment experiment at BNL. Experiments with polarized {sup 3}He{sup ++} ion beams are a part of the experimental program at the future Electron Ion Collider.

43 PARTICLE ACCELERATORS↗

Improving Remedial Effectiveness at U.S. Department of Energy through Optimization Review and Performance Basis

The U.S. Department of Energy (DOE), Office of Environmental Management (EM) conducted its first Remediation Process Optimization (RPO) review in 2004, following the methodology and guidance issued by the Interstate Technology and Regulatory Council (ITRC). The intent of this paper is to briefly summarize the following: (1) the overall benefits of the review process toward improving remedial effectiveness and efficiency at DOE, (2) the types and objectives of completed reviews, and (3) how RPO facilitates technology transfer and is complementary to performance-based environmental management (PBEM). Contract reform began in 1993, at the U.S. Department of Energy (DOE) as a result of the Government Performance and Results Act, followed by recommendations from oversight groups. The precedence of using management and operating (M and O) contracts at DOE facilities, exempt from open competition by definition, shifted to performance basis. Since 1994, DOE has competed over 70% of its then existing M and O contracts; most now contain specific performance objectives, measures, and targets that focus on results in mission critical areas. In 2001, DOE's Office of Environmental Management (EM) integrated performance-based contracting as a core business process. EM resolved to manage cleanup as a project, encourage innovative contracting strategies, as well as incentives to accelerate risk reduction and cleanup. DOE's efforts to implement performance-based environmental management (PBEM) were further realized by establishing a centralized Office of Acquisitions and the Consolidated Business Center, which support all EM procurements. In 2004, EM began conducting Remediation Process Optimization (RPO) reviews at select field sites, following the methodology published in the 2004 ITRC guidance. To date, EM has completed nine RPO reviews, including: pump and treat system optimization, monitoring program optimization, in situ barrier performance improvement, remedial design review, as well as strategic planning for feasibility studies and Records of Decision. At a higher level, RPO reviews provide EM valuable insight as to how environmental contracts can be improved toward defining better cleanup goals, incentive fees, implementing emerging technologies, and measuring performance against appropriate metrics. As DOE works toward improving its PBEM approach, alliances with other federal agencies have proven valuable in sharing evaluation methods, contracting strategies, software, cost and performance reports, and lessons learned. (authors)

54 ENVIRONMENTAL SCIENCES↗

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of Friction Stir Welding in Nuclear Fuel Plate Fabrication

The friction bonding process combines desirable attributes of both friction stir welding and friction stir processing. The development of the process is spurred on by the need to fabricate thin, high density, reduced enrichment fuel plates for nuclear research reactors. The work seeks to convert research and test reactors currently operating on highly enriched uranium fuel to operate on low enriched uranium fuel without significant loss in reactor performance, safety characteristics, or significant increase in cost. In doing so, the threat of global nuclear material proliferation will be reduced. Feasibility studies performed on the process show that this is a viable option for mass production of plate-type nuclear fuel. Adapting the friction stir weld process for nuclear fuel fabrication has resulted in the development of several unique ideas and observations. Preliminary results of this adaptation and process model development are discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Frito-Lay North America/NREL CRADA: Cooperative Research and Development (Final Report)

Frito Lay North America (FLNA) requires technical assistance for the evaluation and implementation of renewable energy and energy efficiency projects in production facilities and distribution centers across North America. Services provided by NREL do not compete with those available in the private sector, but rather provide FLNA with expertise to create opportunities for the private sector renewable/efficiency industries and to inform FLNA decision making regarding cost-effective projects. Services include: identifying the most cost-effective project locations based on renewable energy resource data, utility data, incentives and other parameters affecting projects; assistance with feasibility studies; procurement specifications; design reviews; and other services to support FNLA in improving resource efficiency at facilities. This Cooperative Research and Development Agreement (CRADA) establishes the terms and conditions under which FLNA may access capabilities unique to the laboratory and required by FLNA. Each subsequent task issued under this umbrella agreement would include a scope-of-work, budget, schedule, and provisions for intellectual property specific to that task.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of Cryogenic Bolometer for 0{nu}{beta}{beta} in {sup 124}Sn

Cryogenic bolometer detectors, with their high resolution spectroscopy capability, are ideal for neutrino mass experiments as well as for search of rare processes like neutrinoless double beta decay (0{nu}{beta}{beta}) and dark matter. A feasibility study for investigation of 0{nu}{beta}{beta} in {sup 124}Sn at the upcoming underground facility of India based Neutrino Observatory (INO) has been initiated. This paper describes endeavors towards cryogenic tin bolometer development.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗