Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FUNCTION TEST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Clicker Remote Resync Job Aid

1. Organize Clickers and Receivers; 2. Make sure Clickers are on and powered (test laser pointer function); 3. Take first receiver and plug it in to USB port in powered on PC; 4. Move mouse controller on Clicker; 5. Check to see if mouse pointer on screen moves and the orange light glows while moving mouse controller

97 MATHEMATICS AND COMPUTING↗

Sierra/SolidMechanics 4.50. Capabilities in Development

This document is a user's guide for capabilities that are not considered mature but are available in Sierra/SolidMechanics (Sierra/SM) for early adopters. The determination of maturity of a capability is determined by many aspects: having regression and verification level testing, documentation of functionality and syntax, and usability are such considerations. Capabilities in this document are lacking in one or many of these aspects.

42 ENGINEERING↗

Updates to Nek5000: RANS wall functions, NRC support, and documentation

As a key part of the U.S. Department of Energy’s Nuclear Energy Advanced Modeling and Simulation program (NEAMS), the next generation of tools for nuclear reactor design are being developed. A primary metric for success of this program is the adoption of those tools by industry stakeholders. To help meet this metric for Nek5000, development efforts this year have focused on the expansion of the available Reynolds-averaged Navier-Stokes (RANS) turbulence models to include wall function models, continued support of the U.S. Nuclear Regulatory Commission in simulating a hydrogen mitigation benchmark experiment, and expansion of the Nek5000 documentation to enhance the code’s usability. The implementation of wall functions is intended to significantly decrease time to-solution for a wide range of problems and it has been identified as an important feature by stakeholders across the nuclear community. The initial implementation of standard and pressure corrected wall functions has been tested in Nek5000 on the classical problems of channel flow and a backward facing step. It has also been tested on a 2D molten salt fast reactor core and a T-junction. The recommended formulation of choosing y + = 30 as a boundary value combined with a Neumann-Neumann formulation of the boundary condition for k and τ produces the most consistent results compared to a wall resolved approach. The collaboration with the NRC is a continuing exercise that has been ongoing for multiple years. This year we have concluded investigations into appropriate inlet conditions, showing that fully developed turbulent conditions are adequate for the full PANDA domain. We have also concluded simulations for an unobstructed jet and are now refocusing to the original obstructed jet case. The expansion of the code documentation has also been an ongoing effort over the past few years to address feedback from the various stakeholders. The documentation now more fully covers many of the available features and closes identified SQA gaps. Finally we report on three training sessions that were offered over the past year in an effort to expand the Nek5000 user base.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

gcamdata: An R Package for Preparation, Synthesis, and Tracking of Input Data for the GCAM Integrated Human-Earth Systems Model

The increasing data requirements of complex models demand robust, reproducible, and transparent systems to track and prepare models’ inputs. Here we describe version 1.0 of the gcamdata R package that processes raw inputs to produce the hundreds of XML files needed by the GCAM integrated human-earth systems model. It features extensive functional and unit testing, data tracing and visualization, and enforces metadata, documentation, and flexibility in its component data-processing subunits. Although this package is specific to GCAM, many of its structural pieces and approaches should be broadly applicable to, and reusable by, other complex model/data systems aiming to improve transparency, reproducibility, and flexibility.

54 ENVIRONMENTAL SCIENCES↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mission definition study for Stanford relativity satellite. Volume 3: Appendices

An analysis is presented for the cost of the mission as a function of the following variables: amount of redundancy in the spacecraft, amount of care taken in building the spacecraft (functional and environmental tests, screening of components, quality control, etc), and the number of flights necessary to accomplish the mission. Thermal analysis and mathematical models for the experimental components are presented. The results of computer structural and stress analyses for support and cylinders are discussed. Reliability, quality control, and control system simulation by computer are also considered.

Source record↗

Orbiter aborts from boost: Presimulation report

A description of a hybrid simulation of the 040C orbiter aborting from boost to specified landing site is provided. The simulation starts when the abort is initiated and continues until a terminal energy state (associated with the selected landing site) is reached. At abort it is assumed that all SRM's are jettisoned with the external tank remaining with the orbiter. The simulation described has six degrees of freedom with the vehicle simulated as a rigid body. A conventional form of autopilot is provided to control engine gimbaling during powered flight. An ideal form of an autopilot is provided to test conventional autopilot function and provide pseudo RCS function during coasting flight. The simulation is proposed to provide means for studies of abort guidance function and to gain information concerning ability to control the abort trajectory.

Backman, H. D.↗

Ice pack heat sink subsystem - phase 1, volume 2

The design, development, and test of a functional laboratory model ice pack heat sink subsystem are discussed. Operating instructions to include mechanical and electrical schematics, maintenance instructions, and equipment specifications are presented.

Roebelen, G. J., Jr.↗

An empirical Bayes approach for the Poisson life distribution.

A smooth empirical Bayes estimator is derived for the intensity parameter (hazard rate) in the Poisson distribution as used in life testing. The reliability function is also estimated either by using the empirical Bayes estimate of the parameter, or by obtaining the expectation of the reliability function. The behavior of the empirical Bayes procedure is studied through Monte Carlo simulation in which estimates of mean-squared errors of the empirical Bayes estimators are compared with those of conventional estimators such as minimum variance unbiased or maximum likelihood. Results indicate a significant reduction in mean-squared error of the empirical Bayes estimators over the conventional variety.

Canavos, G. C.↗

Binary selectable detector holdoff circuit: Design, testing, and application

A very high speed switching circuit, part of a laser radar data acquisition system, has been designed and tested. The primary function of this circuit was to provide computer controlled switching of photodiode detector preamplifier power supply voltages, typically less than plus or minus 20 volts, in approximately 10 nanoseconds. Thus, in actual use, detector and/or detector preamplifier damage can be avoided as a result of sudden extremely large values of backscattered radiation being detected, such as might be due to short range, very thin atmospheric dust layers. Switching of the power supply voltages was chosen over direct switching the photodiode detector input to the preamplifier, based on system noise considerations. Also, the circuit provides a synchronized trigger pulse output for triggering devices such as the Biomation Model 8100 100 MHz analog to digital converter.

Kadrmas, K. A.↗

White Mountain Research Station: 25 years of high-altitude research

The organization and functions of a test facility for conducting research projects at high altitudes are discussed. The projects conducted at the facility include the following: (1) bird physiology, (2) cardiorespiratory physiology, (3) endocrinological studies, (4) neurological studies, (5) metabolic studies, and (6) geological studies.

Pace, N.↗

Tug fleet and ground operations schedules and controls. Volume 2: part 2, addenda

The results of a study to assess the tug safing requirements at postlanding are presented. The study considered the normal (green light) conditions from orbiter landing to completion of preparations for the next launch. Normal tug ground turnaround operations include handling and transportation activities and the performance of inspections, tests, and checkout functions. These activities dictate that hazards to ground personnel, the tug, GSE, facilities, and ecology be reduced to the lowest practical level consistent with program objectives, cost, and schedules. During flight operations, the tug contains energy sources that constitute potential hazards but are required for mission accomplishment. These potential hazards have been reduced to an acceptable level for flight operation by design features and by providing for control of energy sources.

Source record↗