Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FALL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Improbability of Post-Closure Criticality in Array of Transuranic Waste Containers after Compaction by Salt Creep at Waste Isolation Pilot Plant

Based on the rationale presented, post-closure nuclear criticality is improbable when room closure compacts containers disposing transuranic (TRU) waste emplaced at the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt in southeastern New Mexico. As described in the original WIPP certification, a qualitative estimate of the probability of post-closure criticality in TRU waste produced from atomic energy defense activities has been low either because remote-handled TRU waste canisters are neutronically isolated by the bedded salt or because the low fissile mass in an array of contact-handled TRU waste drums cannot be compacted sufficiently by room closure from salt creep. These situations are still valid for the majority of TRU waste that is disposed at WIPP without any disposal constraints, as updated herein. This report also qualitatively evaluates the probability of criticality after disposal of TRU waste in pipe overpack containers (POC) where every POC in a shipment may have the maximum 200 fissile gram equivalent of 239Pu content. The probability of criticality for a disposal room filled with POCs is estimated during four representative phases of repository evolution: (1) a large salt block falls onto POCs in the first 20 years, (2) salt creep closes a disposal room in the first 1000 years without brine seepage and subsequent gas generation, which permits maximum compaction, (3) some brine seepage occurs into the closed room, which initiates consumption of the fiberboard (cellulose) impact absorber in the POC in the second 1000 years, and (4) full brine inundation of a room and consumption of all fiberboard thereafter. Salt-block fall in the first phase does not greatly disrupt three tiers of POCs. The compacted spacing of POCs in the later three repository conditions is calculated through high-fidelity, geomechanical modeling. Criticality evaluation of compacted 200-g 239 Pu spheres at the compacted spacing shows that neither 12-inch nor 6-inch POCs are critical after the first 1000 years, the second 1000 years, or thereafter as the sea of reflector material changes to represent the three repository conditions. Specifically, fiberboard and iron isolates 239 Pu while dry, and brine reduces the reactivity when a room is partially and fully inundated. Because POC behavior bounds behavior of other standard TRU waste containers, post-closure criticality caused by room closure compacting containers is omitted in the performance assessments for the 2019 and 2026 WIPP compliance re-certification applications to the US Environmental Protection Agency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improbability of Post-Closure Criticality in Compacted Criticality Control Overpacks after Room Closure at Waste Isolation Pilot Plant

As part of its periodic re-certification of the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities, the United States Environmental Protection Agency expects a re-evaluation of features, events, and processes, such as post-closure nuclear criticality. Although salt creep beneficially encapsulates the TRU waste in the closed WIPP repository, the spacing between an array of waste packages is disrupted as the salt creep closes disposal rooms and containers lose structural integrity. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality evaluation was updated, however, because of the introduction of criticality control overpack (CCO) containers, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCO containers during two representative conditions: (1) large salt block fall, and (2) gradual disposal room closure from salt creep. Geomechanical models of roof fall demonstrate three tiers of CCO containers are not greatly disrupted. Geomechanical models of gradual room closure from salt creep (without brine seepage and subsequent gas generation to permit maximum room closure) were used to predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Models of spheres or cylinders with 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular compacted spacing demonstrate that an array of CCO containers is not critical when surrounded by salt and magnesium oxide, provided the mass of hydrogenous material shipped in CCO containers (usually plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Xcel Energy’s electric carbon emissions reduction trajectories in the context of 1.5°C and 2°C warming pathways

In 2015 the Paris Agreement established the goals of limiting global average warming to well below 2°C and pursuing efforts to limit warming to below 1.5°C. A large and growing number of scenarios have been developed by the climate research community that explore global energy and emissions pathways that would achieve those goals. We draw on the most recent database of such scenarios to update a previous analysis of Xcel Energy’s emissions reduction goals in light of evolving climate science. We assess the outlook for the role of the US electricity sector in current economy-wide and global emissions pathways and compare it to Xcel Energy’s near-term resource plans to 2030. We find that global scenarios that achieve the 1.5°C goal span a range of US/North America electricity sector emissions reductions by 2030 of about 65-85%. Xcel Energy’s emissions reductions to date have exceeded those of the US electricity sector as a whole, and its projected trajectory to 2030 under current approved resource plans falls within this range. Scenarios achieving the 2°C goal have a wider range of reductions (about 40-85%). In scenarios achieving either goal, electricity sector emissions fall faster than economy-wide emissions, a robust feature of mitigation scenarios, which typically rely on low carbon electricity to achieve climate targets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Biostimulation of Iron Reduction and Uranium Immobilization: Microbial and Mineralogical Controls

This project represented a joint effort between Florida State University (FSU), Rutgers University (RU), and the University of Illinois (U of I). FSU served as the lead institution and Dr. J.E. Kostka was responsible for project coordination, integration, and deliverables. This project was designed to elucidate the microbial ecology and geochemistry of metal reduction in subsurface environments at the U.S. DOE-NABIR Field Research Center at Oak Ridge, Tennessee (ORFRC). Our objectives were to: 1) characterize the dominant iron minerals and related geochemical parameters likely to limit U(VI) speciation, 2) directly quantify reaction rates and pathways of microbial respiration (terminal-electron-accepting) processes which control subsurface sediment chemistry, and 3) identify and enumerate the organisms mediating U(VI) transformation. A total of 31 publications and 47 seminars or meeting presentations were completed under this project. One M.S. thesis (by Nadia North) and a Ph.D. dissertation (by Lainie Petrie-Edwards) were completed at FSU during fall of 2003 and spring of 2005, respectively. Ph.D. students, Denise Akob and Thomas Gihring have continued the student involvement in this research since fall of 2004. All of the above FSU graduate students were heavily involved in the research, as evidenced by their regular attendance at PI meetings and ORFRC workshops.

54 ENVIRONMENTAL SCIENCES↗

Institutional Control Policies and Implementation for the Area 5 and Area 3 Radioactive Waste Management Sites

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) has implemented varying institutional control policies in performance assessment/composite analysis (PA/CA) calculations for the Area 5 and Area 3 Radioactive Waste Management Sites (RWMSs) (Shott et al., 1998; 2000; Bechtel Nevada [BN] and Neptune and Company Inc. [Neptune], 2006). The facilities are within the actively maintained boundaries of the Nevada Test Site (NTS) that are enforced by NNSA/NSO. Under current policies, access required for exposure of the member of public (MOP) or the inadvertent human intruder (IHI) is prohibited. Uncertainties affecting institutional control policies are the duration and effectiveness of the controls during the post-closure period. Implementing a uniform set of institutional control policies for the RWMSs that encompasses waste management and environmental restoration programs and is consistent with the end-state vision for the environmental management programs for the NTS (DOE, 2006) is a primary goal of the maintenance program. The NNSA/NSO Performance Management Plan (DOE, 2002) complies with DOE Policy P455.1, 'Use of Risk-Based End States' (DOE, 2003a). Expected future land uses are a driver in selecting acceptable end state conditions and clean-up goals for the NTS. NNSA/NSO Environmental Management's (EM's) land management assumptions and framework for Environmental Management activities are as follows: The NTS will remain under federal control in perpetuity as an NNSA test site, and the large buffer zone surrounding the NTS (the Nevada Test and Training Range) is assumed to remain under the control of the U.S. Air Force. There are no plans for transfer of any NTS lands to other agencies or public entities. Access will continue to be restricted to the NTS and the surrounding areas. For management purposes, NNSA/NV EM activities have been established based on the source of contamination and type of waste requiring management. Environmental Restoration activities within the State of Nevada fall under the purview of a formal regulatory agreement, the Federal Facility Agreement and Consent Order (FFACO); Environ-mental Restoration activities outside the State of Nevada fall under the purview of each affected State's regulatory framework but are planned and negotiated with the State using the FFACO Corrective Action Strategy framework for applicable activities. Waste Management activities are governed by the Federal Facility Compliance Act and Consent Order (and the Mutual Consent Agreement (MCA)). A Joint Low-Level Waste Oversight Agreement is in place to allow state of Nevada representatives to participate in review and approval processes associated with waste receipt and disposal operations (DOE, 2002). The purpose of this document is to describe institutional control policies implemented in the past PA/CA documentation, to discuss concerns noted in reviews of PA/CA documents, and to describe a new basis for institutional control at NTS disposal facilities. The new basis uses combined controls based on policies identified in the end-state vision (DOE, 2006); policies established through the FFACO, (1996) for Hazard Area 1, the Underground Test Area (UGTA) Project, and newly established NNSA policies for the Nevada Site Office.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A preliminary assessment of the state of harvest and collection technology for forest residues

To meet the 'Twenty in Ten Initiative' goals set in the 2007 State of the Union address, forest resources will be needed as feedstocks for lignocellulosic ethanol production. It has been estimated that 368 million dry tons can be produced annually in the U.S. from logging residues and fuel treatment thinnings. Currently, very little of this woody biomass is used for energy production due to the costs and difficulty in collecting and transporting this material. However, minimizing biomass costs (including harvest, handling, transport, storage, and processing costs) delivered to the refinery is necessary to develop a sustainable cellulosic ethanol industry. Achieving this goal requires a fresh look at conventional timber harvesting operations to identify ways of efficiently integrating energy wood collection and developing cost-effective technologies to harvest small-diameter trees. In conventional whole-tree logging operations, entire trees are felled and skidded from the stump to the landing. The residues (also called slash), consisting of tops and limbs, accumulate at the landing when trees are delimbed. This slash can be ground at the landing with a mobile grinder or transported to another central location with a stationary grinder. The ground material is transported via chip vans, or possibly large roll on/off containers, to the user facility. Cut-to-length harvesting systems are gaining popularity in some locations. In these operations, specialized harvesters that can fall, delimb, and cut logs to length are used. The small diameter tops and limbs accumulate along the machine's track. It can be left in the forest to dry or removed soon after harvest while logs are extracted. Removing slash during the same operation as the wood has been shown to be more efficient. However, leaving residue in the forest to dry reduces moisture content, which improves grinder performance, reduces dry matter loss during storage, and inhibits colonization of fungi that produce harmful spores. In recent years, new machines that are specially designed for collection of small diameter wood have been developed in the U.S. and Europe. Residue bundlers and balers improve transportation and handling efficiency by densifying the material and packaging it so that it can be handled with conventional equipment. An experimental integrated harvester/grinder can fall small diameter trees and feed them into a grinder. The ground material is collected in a bin that can be dumped into a chip van. The harvester head is also capable of delimbing and bucking (cut into sections) small timber to be used for pulp and posts. Limitations of these new technologies are their large capital costs and complexity, leading to high maintenance costs and the need for highly trained operators. To ensure that quality feedstock materials consistently enter the mouth of the refinery, the uniform format supply system concept proposes that feedstock diversity be managed at harvest, much like the current grain supply system. This allows for standardization of key infrastructure components and facilitation of a biomass commodity system. Challenges in achieving a uniform woody biomass supply include, but are not limited to, developing machines for efficient harvest of small-diameter trees in a range of topographies and conditions, developing machines and operating plans for grinding biomass as near to the stump as possible, developing cost-effective drying strategies to reduce losses and mold growth during wood chip storage, and quantifying environmental impacts of slash removal and fuel thinnings to aid landowner decisions and policy development.

09 BIOMASS FUELS↗

Integrated Status and Effectiveness Monitoring Program - Entiat River Snorkel Surveys, 2006-2007.

The USFWS Mid-Columbia River Fishery Resource Office conducted snorkel surveys at 11 sites during the summer 2006 survey period and at 15 sites during fall 2006 and winter 2007 survey periods as part of the Integrated Status and Effectiveness Monitoring Program in the Entiat River. A total of 39,898 fish from 14 species/genera and an unknown category were enumerated. Chinook salmon were the overall most common fish observed and comprised 19% of fish enumerated followed by mountain whitefish (18%) and rainbow trout (14%). Day and night surveys were conducted during the summer 2006 period (August), while night surveys were conducted during the fall 2006 (October) and winter 2007 (February/March) surveys. This is second annual progress report to Bonneville Power Administration for the snorkel surveys conducted in the Entiat River as related to long-term effectiveness monitoring of restoration programs in this watershed. The objective of this study is to monitor the fish habitat utilization of planned in-stream restoration efforts in the Entiat River by conducting pre- and post-construction snorkel surveys at selected treatment and control sites.

13 HYDRO ENERGY↗

Integrated Status and Effectiveness Monitoring Program - Entiat River Snorkel Surveys and Rotary Screw Trap, 2007.

The USFWS Mid-Columbia River Fishery Resource Office conducted snorkel surveys at 24 sites during the summer and fall periods of 2006 survey periods as part of the Integrated Status and Effectiveness Monitoring Program in the Entiat River. A total of 37,938 fish from 15 species/genera and an unknown category were enumerated. Chinook salmon were the overall most common fish observed and comprised 15% of fish enumerated followed by rainbow trout (10%) and mountain whitefish (7%). Day surveys were conducted during the summer period 2007 (August), while night surveys were conducted during the fall 2007 (October) surveys. The USFWS Mid-Columbia River Fishery Resource Office (MCFRO) operated two rotary screw traps on the Entiat River as part of the Integrated Status and Effectiveness Monitoring Program (ISEMP) program from August through November of 2007. Along with the smolt traps, juvenile emigrants were also captured at remote locations throughout the Entiat watershed and its major tributary, the Mad River. A total of 999 wild Oncorhynchus mykiss and 5,107 wild run O. tshawytscha were PIT tagged during the study period. Rotary screw trap efficiencies averaged 22.3% for juvenile O. tshawytscha and 9.0% for juvenile O. mykiss. Rotary screw traps operated 7 days a week and remote capture operations were conducted when flow and temperature regimes permitted. This is third annual progress report to Bonneville Power Administration for the snorkel surveys conducted in the Entiat River as related to long-term effectiveness monitoring of restoration programs in this watershed. The objective of this study is to monitor the fish habitat utilization of planned in-stream restoration efforts in the Entiat River by conducting pre- and post-construction snorkel surveys at selected treatment and control sites.

13 HYDRO ENERGY↗

Water Quality Trends in the Entiat River Subbasin: Final Annual Report to BPA and NOAA Fisheries, 2008.

The Integrated Status and Effectiveness Monitoring Project (ISEMP) program monitors the status and trend of water quality elements that may affect restoration project effectiveness in the Entiat subbasin. As part of this effort, the PNW Research Station (PNW) measures, analyzes and interprets temporal trends in natural stream water pH, dissolved oxygen, specific conductance and temperature. The Entiat River is currently on the Clean Water Act 303(d) list for pH exceedence, and there is insufficient information to determine the spatial and temporal extent or potential causes of this exceedence. In the late spring 2007, PNW deployed data-logging, multiparameter probes at four locations in the Entiat subbasin to measure water quality parameters, focusing on pH. Data collection was seasonally interrupted by river ice in early December. Daily average pH did not exceed the water quality standard of 8.5 at any of the measurements sites. However, instantaneous values did exceed this standard near the mouth of the Entiat River during late summer-fall period. This suggested that in the lowest portion of the river peaks in pH may be occurring because of photosynthesis caused by high rates of periphyton productivity in response to increased sunlight, temperature, and possible nutrient enrichment. Conversely, dissolved oxygen reached annual low levels during this same late summer-fall period, in part because of increased water temperatures and increased biochemical oxygen demand.

13 HYDRO ENERGY↗

Salmon Life Histories, Habitat, and Food Webs in the Columbia River Estuary: An Overview of Research Results, 2002-2006.

From 2002 through 2006 we investigated historical and contemporary variations in juvenile Chinook salmon Oncorhynchus tshawytscha life histories, habitat associations, and food webs in the lower Columbia River estuary (mouth to rkm 101). At near-shore beach-seining sites in the estuary, Chinook salmon occurred during all months of the year, increasing in abundance from January through late spring or early summer and declining rapidly after July. Recently emerged fry dispersed throughout the estuary in early spring, and fry migrants were abundant in the estuary until April or May each year. Each spring, mean salmon size increased from the tidal freshwater zone to the estuary mouth; this trend may reflect estuarine growth and continued entry of smaller individuals from upriver. Most juvenile Chinook salmon in the mainstem estuary fed actively on adult insects and epibenthic amphipods Americorophium spp. Estimated growth rates of juvenile Chinook salmon derived from otolith analysis averaged 0.5 mm d-1, comparable to rates reported for juvenile salmon Oncorhynchus spp. in other Northwest estuaries. Estuarine salmon collections were composed of representatives from a diversity of evolutionarily significant units (ESUs) from the lower and upper Columbia Basin. Genetic stock groups in the estuary exhibited distinct seasonal and temporal abundance patterns, including a consistent peak in the Spring Creek Fall Chinook group in May, followed by a peak in the Western Cascades Fall Chinook group in July. The structure of acanthocephalan parasite assemblages in juvenile Chinook salmon from the tidal freshwater zone exhibited a consistent transition in June. This may have reflected changes in stock composition and associated habitat use and feeding histories. From March through July, subyearling Chinook salmon were among the most abundant species in all wetland habitat types (emergent, forested, and scrub/shrub) surveyed in the lower 100 km of the estuary. Salmon densities within wetland habitats fell to low levels by July, similar to the pattern observed at mainstem beach-seining sites and coincident with high water temperatures that approached or exceeded 19 C by mid-summer. Wetland habitats were used primarily by small subyearling Chinook salmon, with the smallest size ranges (i.e., rarely exceeding 70 mm by the end of the wetland rearing season) at scrub/shrub forested sites above rkm 50. Wetland sites of all types were utilized by a diversity of genetic stock groups, including less abundant groups such as Interior Summer/Fall Chinook.

13 HYDRO ENERGY↗

Big Canyon Creek Ecological Restoration Strategy.

He-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource within the Big Canyon Creek watershed; they are also part of the federally listed Snake River Basin Steelhead DPS. The majority of the Big Canyon Creek drainage is considered critical habitat for that DPS as well as for the federally listed Snake River fall chinook (Oncorhynchus tshawytscha) ESU. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management-Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed this document to direct funding toward priority restoration projects in priority areas for the Big Canyon Creek watershed. In order to achieve this, the District and the Tribe: (1) Developed a working group and technical team composed of managers from a variety of stakeholders within the basin; (2) Established geographically distinct sub-watershed areas called Assessment Units (AUs); (3) Created a prioritization framework for the AUs and prioritized them; and (4) Developed treatment strategies to utilize within the prioritized AUs. Assessment Units were delineated by significant shifts in sampled juvenile O. mykiss (steelhead/rainbow trout) densities, which were found to fall at fish passage barriers. The prioritization framework considered four aspects critical to determining the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the AU, water quantity, and water quality. It was established, through vigorous data analysis within these four areas, that the geographic priority areas for restoration within the Big Canyon Creek watershed are Big Canyon Creek from stream km 45.5 to the headwaters, Little Canyon from km 15 to 30, the mainstem corridors of Big Canyon (mouth to 7km) and Little Canyon (mouth to 7km). The District and the Tribe then used data collected from the District's stream assessment and inventory, utilizing the Stream Visual Assessment Protocol (SVAP), to determine treatment necessary to bring 90% of reaches ranked Poor or Fair through the SVAP up to good or excellent. In 10 year's time, all reaches that were previously evaluated with SVAP will be reevaluated to determine progress and to adapt methods for continued success. Over 400 miles of stream need treatment in order to meet identified restoration goals. Treatments include practices which result in riparian habitat improvements, nutrient reductions, channel condition improvements, fish habitat improvements, invasive species control, water withdrawal reductions, improved hydrologic alterations, upland sediment reductions, and passage barrier removal. The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resource Management Watershed Division (Tribe) developed this document to guide restoration activities within the Big Canyon Creek watershed for the period of 2008-2018. This plan was created to demonstrate the ongoing need and potential for anadromous fish habitat restoration within the watershed and to ensure continued implementation of restoration actions and activities. It was developed not only to guide the District and the Tribe, but also to encourage cooperation among all stakeholders, including landowners, government agencies, private organizations, tribal governments, and elected officials. Through sharing information, skills, and resources in an active, cooperative relationships, all concerned parties will have the opportunity to join together to strengthen and maintain a sustainable natural resource base for present and future generations within the watershed. The primary goal of the strategy is to address aquatic habitat restoration needs on a watershed level for resident and anadromous fish species, promoting quality habitat within a self-sustaining watershed. Seven objectives have been developed to support this goal: (1) Identify factors limiting quality and quantity of steelhead spawning and rearing habitat; (2) Identify targets for optimal conditions within the basin; (3) Identify treatments to address limiting factors and goals for optimal conditions; (4) Prioritize location of restoration activities; (5) Identify information and data gaps; (6) Identify future monitoring strategy to support adaptive management; and (7) Identify opportunities for collaboration with stakeholders.

13 HYDRO ENERGY↗

Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrode material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.

36 MATERIALS SCIENCE↗

Emissions Of Greenhouse Gases From Rice Agriculture

This project produced detailed data on the processes that affect methane and nitrous oxide emissions from rice agriculture and their inter-relationships. It defines the shifting roles and potential future of these gases in causing global warming and the benefits and tradeoffs of reducing emissions. The major results include: 1). Mechanisms and Processes Leading to Methane Emissions are Delineated. Our experiments have tested the standard model of methane emissions from rice fields and found new results on the processes that control the flux. A mathematical mass balance model was used to unravel the production, oxidation and transport of methane from rice. The results suggested that when large amounts of organic matter are applied, the additional flux that is observed is due to both greater production and reduced oxidation of methane. 2). Methane Emissions From China Have Been Decreasing Over the Last Two Decades. We have calculated that methane emissions from rice fields have been falling in recent decades. This decrease is particularly large in China. While some of this is due to reduced area of rice agriculture, the bigger effect is from the reduction in the emission factor which is the annual amount of methane emitted per hectare of rice. The two most important changes that cause this decreasing emission from China are the reduced use of organic amendments which have been replaced by commercial nitrogen fertilizers, and the increased practice of intermittent flooding as greater demands are placed on water resources. 3). Global Methane Emissions Have Been Constant For More Than 20 Years. While the concentrations of methane in the atmosphere have been leveling off in recent years, our studies show that this is caused by a near constant total global source of methane for the last 20 years or more. This is probably because as some anthropogenic sources have increased, others, such as the rice agriculture source, have fallen. Changes in natural emissions appear small. 4). Nitrous Oxide Emissions From Rice Fields Increase as Methane Emissions Drop. Inundated conditions favor anaerobic methane production with high emission rates and de-nitrification resulting in modest nitrous oxide emissions. Under drier conditions such as intermittent flooding, methane emissions fall and nitrous oxide emissions increase. Increased nitrogen fertilizer use increases nitrous oxide emissions and is usually accompanied by reduced organic matter applications which decreases methane emissions. These mechanisms cause a generally inverse relationship between methane and nitrous oxide emissions. Reduction of methane from rice agriculture to control global warming comes with tradeoffs with increased nitrous oxide emissions. 5). High Spatial Resolution Maps of Emissions Produced. Maps of methane and nitrous oxide emissions at a resolution of 5 min × 5 min have been produced based on the composite results of this research. These maps are necessary for both scientific and policy uses.

54 ENVIRONMENTAL SCIENCES↗

In-use vehicle emissions in China: Beijing study

China's economic boom in the last three decades has spurred increasing demand for transportation services and personal mobility. Consequently, vehicle population has grown rapidly since the early 1990s, especially in megacities such as Beijing, Guangzhou, and Tianjin. As a result, mobile sources have become more conspicuous contributors to urban air pollution in Chinese cities. Tianjin was our first focus city, and the study there took us about two years to complete. Building upon the experience and partnership generated through the Tianjin study, the research team carried out the Beijing study from fall 2007–fall 2008. Beijing was chosen to be our second focus city for several reasons: it has the largest local fleet and the highest percentage of the population owning vehicles among all Chinese cities, and it has suffered from severe air pollution, partially due to the ever-growing population of on-road vehicles.

02 PETROLEUM↗

MI Gap Clearing Kicker Magnet Design Review

The kicker system requirements were originally conceived for the NOvA project. NOvA is a neutrino experiment located in Minnesota. To achieve the desired neutrino flux several upgrades are required to the accelerator complex. The Recycler will be used as a proton pre-injector for the Main Injector (MI). As the Recycler is the same size as the MI, it is possible to do a single turn fill ({approx}11 {micro}sec), minimizing the proton injection time in the MI cycle and maximizing the protons on target. The Recycler can then be filled with beam while the MI is ramping to extract beam to the target. To do this requires two new transfer lines. The existing Recycler injection line was designed for 10{pi} pbar beams, not the 20{pi} proton beams we anticipate from the Booster. The existing Recycler extraction line allows for proton injection through the MI, while we want direct injection from the Booster. These two lines will be decommissioned. The new injection line from the MI8 line into the Recycler will start at 848 and end with injection kickers at RR104. The new extraction line in the RR30 straight section will start with a new extraction kicker at RR232 and end with new MI injection kickers at MI308. Finally, to reduce beam loss activation in the enclosure, a new gap clearing kicker will be used to extract uncaptured beam created during the slip stack injection process down the existing dump line. It was suggested that the MI could benefit from this type of system immediately. This led to the early installation of the gap clearing system in the MI, followed by moving the system to Recycler during NOvA. The specifications also changed during this process. Initially the rise and fall time requirements were 38 ns and the field stability was {+-}1%. The 38 ns is based on having a gap of 2 RF buckets between injections. (There are 84 RF buckets that can be filled from the Booster for each injection, but 82 would be filled with beam. MI and Recycler contain 588 RF buckets.) A rough cost/benefit analysis showed that increasing the number of empty buckets to 3 decreased the kicker system cost by {approx}30%. This could be done while not extending the running time since this is only a 1% reduction in protons per pulse, hence the rise and fall time are now 57 ns. Additionally, the {+-}1% tolerance would have required a fast correction kicker while {+-}3% could be achieved without this kicker. The loosened tolerance was based on experience on wide band damping systems in the MI. A higher power wideband damping system is a better use of the resources as it can be used to correct for multiple sources of emittance growth. Finally, with the use of this system for MI instead of Recycler, the required strength grew from 1.2 mrad to 1.7 mrad. The final requirements for this kicker are listed.

43 PARTICLE ACCELERATORS↗

This Letter is a Non-Technical Annual Report of Activities on Project 2007-275-00, Impact of American Shad for the Period February 1, 2008 through January 31, 2009.

This letter is a non-technical annual report of activities on Project 2007-275-00, Impact of American Shad for the period February 1, 2008 through January 31, 2009. A non-technical report is appropriate at this time since data collection is ongoing and results are preliminary. This report is intended to highlight accomplishments during this performance period. Progress on administrative work elements in the statement of work has been captured in the periodic status reports provided through Pisces. During this performance period the USGS accomplished the following tasks: (1) Co-chaired a symposium on American shad in the Columbia Basin at the annual meeting of the Western Division, American Fisheries Society. The USGS gave four presentations from work done during this project. Abstracts of the presentations were attached to the 2007 progress report. (2) Continued parameterization of a bioenergetics model for juvenile American shad. We performed a literature review to determine the applicability of the existing adult salmon bioenergetics parameters to juvenile fall Chinook salmon in support of our modeling investigation of diet overlap between juvenile American shad and fall Chinook salmon. We formulated testable hypotheses to investigate using bioenergetics models and conceptually developed model simulations. Held an in-house workshop to obtain feedback on the physiological parameters we selected for the American shad bioenergetics model and to solicit feedback on our modeling approach to address research questions. (3) Received a Section 10 ESA sampling permit based on the application submitted in the 2007 contract period. With the ESA permit in hand, we obtained scientific collection permits from the states of Washington and Oregon that allowed us to use a variety of fisheries sampling techniques to capture juvenile and adult American shad. (4) Conducted field sampling to meet project objectives. Gillnetting efforts to capture adult American shad near Astoria were discontinued in accordance with our ESA permit after encountering a higher-than-expected number of salmonids. Only 30 PIT-tagged adult pre-spawn American shad were released. Another 53 adults were processed for diet and population characterization. Collection objectives for adult pre-spawn fish were met for areas downstream from Bonneville, John Day, and McNary dams. In October we captured 30 post-spawn adult shad from the McNary Dam forebay for diet analysis. Collection objectives for juvenile American shad were met for all four areas. (5) Began laboratory work to enumerate and accomplish dry-weight analysis of prey items from juvenile and adult shad stomachs. (6) Continued to exchange information and develop relations with others interested in American shad research. As an example, at the request of the U.S. Fish and Wildlife Service, Northeast Fishery Center, Lamar, PA, we provided tissue samples from adult Columbia River American shad for use in genetic comparisons with Hudson River fish. Key findings during this contract period: (1) Determined that prevalence of Ichthyophonus infection among adult American shad was the highest level detected in any population of fish throughout the Pacific region. A manuscript describing results is in preparation. (2) Thiaminase specific activity assessed from Columbia River juvenile and adult American shad is higher than that of forage fish of salmonines in the Great Lakes. The consumption of forage fish high in thiaminase can lead to thiamine deficiency in the predator if the diet of the predators contains little other prey. (3) Adult American shad are feeding during their freshwater migration. Plans for next year: (1) Completing laboratory analysis of the gut contents of juvenile and adult American shad collected. (2) Completing bioenergetics model parameterization and testing hypotheses. (3) Describing the age composition of the adult American shad run during the 2008 spawning migration via aging of scales and otoliths. (4) Providing a draft final report describing project tasks and findings.

13 HYDRO ENERGY↗

Cle Elum and Supplementation Research Facility : Monthly Progress Report October 2008.

FISH PRODUCTION: On October 7th the 2008 spawning season was completed. 823 adults were transferred to the facility for the 2008 season. The overall adult mortality was 6.9% (1.3% pre-spawning mortality and 5.6% encountered after sorting). Wild/natural salmon collected included 278 females, 173 males, and 29 jacks for a total 480 fish for the 2008 brood. Supplemented brood stock collected included 149 adults (85 females, 35 males and 29 jacks). Hatchery control brood collected for research included 194 adults (91 females, 68 males and 35 jacks). Eggs will be inventoried in November with an actual summary of eggs numbers to be submitted for the November report. The estimated egg takes (production) for the 2008 season was 1,375,146 eggs with 1,006,063 comprising of W x W crosses and 250,755 eggs of H x H crosses with 118,328 supplement crosses. Total fish on hand for the 2007 brood is 768,751 with an average fish per pound of 30.6 f/lb. FISH CULTURE: The marking and pit-tagging operation started on October 13th. The pit-tagging portion was completed on October 23rd. A total 40,000 juveniles were pit-tagged (2,000 from each of the production ponds and 4,000 each for the hatchery juvenile ponds 9 & 10). Cle Elum staff began shocking, sorting, counting and splitting eggs in incubation. Shocking eggs will separate live eggs from dead eggs. Eggs are treated with formalin three times a week to control fungus. The focus for the culturists during the month of October entail completing the final spawn (egg take) on the 7th, pond cleaning, keeping the marking trailers supplied with fish and end of month sampling. The adult holding ponds were power washed and winterized for the shut down period. Facility crew members Greg Strom and Mike Whitefoot assisted Joe Blodgett and his crew with fish brood collection on the 22nd of October. Fall Chinook and Coho salmon were seined up and put in tanker trucks from Chandler canal and transported to holding ponds for later spawning. Charlie, Simon and Vernon assisted with sorting and spawning Summer Chinook at the Wells hatchery for the Summer Chinook reintroduction program on the lower Yakima River. WATER PRODUCTION: The current combined well and river water supply to the complex is 12,909 gallons/min. Four river pumps (12,400gpm) and one well pump No.2 (509gpm) are supplying water to the facility main head box and the egg incubation building. ACCLIMATION SITES: Easton had much activity in October, the electrical power panel that's switches commercial power operation to generator power (transfer switch) malfunctioned. Charlie called Wallace Electric as well as ASCO Services to trouble shoot the problem which has yet to be determined. Heaters have been turned on in all service buildings at the acclimation sites. Pacific States Marine Fisheries Commission traveled to Easton to install a pole to mount a satellite and a new ups backup system with new monitors and computers for pit tag data recording and transmitting. Brown and Jackson pumped out the septic tanks at Easton and Clark Flat. AMB Tools performed maintenance on the compressors at the acclimation sites as well as Cle Elum (5 total). VEHICLE MAINTENANCE: Day Wireless performed maintenance on all handheld and vehicle radios. Day Wireless repaired radio communications (static noise) on the 6th also. All vehicles mileages and conditions are reported monthly to Toppenish. Cle Elum staff continues to clean and maintain all facility vehicles weekly. MAINTENANCE BUILDING MAINTENANCE: Kevin of Raincountry was called in response to repairs needed to the water chiller system. Cle Elum staff winterized all irrigation as well as shop grounds. Brown and Jackson pumped out the septic tank at the hatchery on the 22nd. HATCHERY BUILDING MAINTENANCE: The incubation room has been set up for transfer of eggs from isolation buckets to vertical stacks, temperature units are recorded daily. RESENTDENTIAL HOUSING: Residents irrigation has been winterized and fall fertilizer was applied to all grass on facility. Four Seasons performed maintenance on all heating systems and replaced a thermostat on resident house No.391. Alden Plumbing replaced a water faucet in a sink at resident house No.1001. Shaw's Furniture & Appliance replaced three faulty microwaves in residents No.391, 411 and 871. RIVER PUMP STATION MAINTENANCE: All river pumps are in operation and supply river water to the main facility. Approximately 12,400 gallons per minute are being pumped to eighteen raceways. Weekly cleaning and upkeep is performed by Cle Elum staff. WELL FIELD MAINTENANCE: Weekly test holes are measured, recorded and sent to CH2MHILL. Pump No.1 is in operation and the flow meter is recorded weekly. On the 3rd well pumps 5 and 6 were shut down and winterized for the season. Well pump No.2 had fence damage repaired on the 16th. SAFETY AND TRAINING: A safety meeting was held on the 21st. On the 15th ABC Fire Prevention did maintenance on all fire extinguishers.

13 HYDRO ENERGY↗