Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EVA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Active thermal control for an advanced power platform

Effective use of the Shuttle Orbiter during the operational phase will require the provision of electrical power from free-flying power platforms which will interface with the Orbiter. Such platforms present unique requirements for active thermal control based upon the long life and high heat load requirements which will be necessary to provide 25 kW or more of electricity to the Orbiter and payloads. This paper will present key issues in the design of these active thermal control systems (ATCS) and will discuss potential solutions intended to ensure maximum effectiveness of advanced power platforms. Such issues include proper selection of coolant fluid for the power platform and payload loops; selection and development of thermal control surfaces for five-year life; the use of off-the-shelf hardware vs development of unique hardware, central vs decentralized control of the ATCS; system life and reliability as a factor in determining redundancy and the possibility of on-orbit EVA maintenance; and the interfaces between the power platform and the Orbiter and payloads.

Owen, J. W.↗

Space Telescope - Design for orbital maintenance

Maintenance and repair of the Shuttle launched Space Telescope (ST) are examined, noting that except for the basic structure, mirrors, cables, and several noncritical items, the entire ST is replaceable or reparable on-orbit. EVA tasks have been designed to avoid contamination, and to provide a reduction in Orbital Replacement Units, a minimal number of doors and openings, and minimized structural weight associated with free-volume. All removable components have been provided with tool-compatible fittings and releases, and standardization of parts has been compromised with considerations of interface with crew handling. Replacement and repair equipment will be carried as an added parcel on Shuttle flights and are not part of the standard Shuttle components. The necessity of designing for crew-aid at ST workstations is suggested to provide sound data for the design of other space-based equipment.

Fisher, H. T.↗

Lessons learned - Americans in space

Milestones in the learning process during development of spaceflight capability for different NASA missions are traced from the initial launch of the Mercury escape rocket to the advent of the Shuttle. A detached heat shield on the first manned Mercury orbital flight led to a decision for reentry with retrorockets attached, a situation which demonstrated a need for on-line communications with the spacecraft construction engineers. The Gemini program served to develop EVA techniques and docking procedures essential for the Apollo missions. Apollo 8 circled the moon after only one manned test flight of the equipment due to the success of the first flight. Lunar landing simulation training exposed the astronauts to situations beyond the human ability to respond. The training was justified when computer overload required the pilot to retake manual control of some spacecraft functions during the successful first lunar landing. All lessons previously learned were used to safely return the damaged Apollo 13 to earth. The Skylab missions provided an opportunity to maintain rotating teams of flight controllers on a 24-hr/day basis for periods of months. Finally, the six-year hiatus of U.S. manned space activities between the end of the Skylab missions and the first Shuttle flight provided time for incorporating previous lessons into new procedures, training strategies, and data resources.

Kranz, E.↗

The Solarex Block IV module

Several innovative concepts were introduced for the Block IV contract. Semicrystalline silicon manufactured by SEMIX Inc. is the basic cell material. A front metallization pattern combined with a wraparound-style interconnect and in-plane stress relief combine to provide a new method to reliably accomplish series-paralleling. Laminated modules using Ethylene Vinyl Acetate (EVA) as the encapsulant were manufactured for the first time.

Hoelscher, J. F.↗

Open Cherry Picker simulation results

The Open Cherry Picker (OCP) is a manned platform, mounted at the end of the Remote Manipulator System (RMS), which is used to enhance extravehicular activities. The objective of the simulation program described was to reduce the existing complexity of those OCP design features that are mandatory for initial Space Shuttle applications. The OCP development test article consists of a torque box, a rotating foot restraint, a rotating stanchion that houses handholds, and a tool storage section with an interface with payload modules. If the size or complexity of the payload increases, payload handling devices may be added at a later data. The simulations have shown that the crew can control the RMS from the Aft Flight Deck of the Shuttle, using voice commands from the EVA crewman. No need for a stabilizer was evident, and RMS dynamics due to crew-induced workloads were found to be minor.

Nathan, C. A.↗

Open cherry picker simulation results

The simulation program associated with a key piece of support equipment to be used to service satellites directly from the Shuttle is assessed. The Open Cherry Picker (OCP) is a manned platform mounted at the end of the remote manipulator system (RMS) and is used to enhance extra vehicular activities (EVA). The results of simulations performed on the Grumman Large Amplitude Space Simulator (LASS) and at the JSC Water Immersion Facility are summarized.

Nathan, C. A.↗

Aerospace safety advisory panel

Data acquired on the actual flight experience with the various subsystems are assessed. These subsystems include: flight control and performance, structural integrity, orbiter landing gear, lithium batteries, EVA and prebreathing, and main engines. Improvements for routine operations are recommended. Policy issues for operations and flight safety for aircraft operations are discussed.

Source record↗

Technical support package: Large, easily deployable structures. NASA Tech Briefs, Fall 1982, volume 7, no. 1

Design and test data for packaging, deploying, and assembling structures for near term space platform systems, were provided by testing light type hardware in the Neutral Buoyancy Simulator. An optimum or near optimum structural configuration for varying degrees of deployment utilizing different levels of EVA and RMS was achieved. The design of joints and connectors and their lock/release mechanisms were refined to improve performance and operational convenience. The incorporation of utilities into structural modules to determine their effects on packaging and deployment was evaluated. By simulation tests, data was obtained for stowage, deployment, and assembly of the final structural system design to determine construction timelines, and evaluate system functioning and techniques.

Source record↗

Orbiter radiator panel solar focusing test

A test was conducted to determine the solar reflections from the Orbiter radiator panels. A one-tenth scale model of the forward and mid-forward radiator panels in the deployed position was utilized in the test. Test data was obtained to define the reflected one-sun envelope for the embossed silver/Teflon radiator coating. The effects of the double contour on the forward radiator panels were included in the test. Solar concentrations of 2 suns were measured and the one-sun envelope was found to extend approximately 86 inches above the radiator panel. A limited amount of test data was also obtained for the radiator panels with the smooth silver/Teflon coating to support the planned EVA on the Orbiter STS-5 flight. Reflected solar flux concentrations as high as 8 suns were observed with the smooth coating and the one-sun envelope was determined to extend 195 inches above the panel. It is recommended that additional testing be conducted to define the reflected solar environment beyond the one-sun boundary.

Howell, H. R.↗

Space Construction Experiment Definition Study (SCEDS), part 3. Volume 2: Study results

The essential controls and dynamics community needs for a large space structures is addressed by the basic Space Construction Experiments (SCE)/MAST configuration and enhanced configurations for follow-on flights. The SCE/MAST can be integrated on a single structures technology experiments platform (STEP). The experiment objectives can be accomplished without the need for EVA and it is anticipated that further design refinements will eliminate the requirement to use the remote manipulator system.

Source record↗

Roles and needs of man in space

Human capabilities and requirements on space missions are discussed. Utilitarian and humanistic motivations for manned missions are considered, and a general program of development from easy space access and return, to a permanent LEO presence, to the limited self-sufficiency of man in space, is proposed. Man's potential as scientific observer, operator, and engineer/technician is illustrated with examples from the Apollo and Skylab missions. It is shown that future increases in man's space presence will require significant improvements in habitation technology, crew comfort and safety, operational effectiveness and reliability, and man/machine interactions: man-tended systems must be standardized and adapted to (mainly EVA) human servicing; permanently manned systems must be designed to attain levels of comfort, privacy, and overall habitability more like those expected on the ground.

Von Puttkamer, J.↗

41-B tenth Space Shuttle mission

The manned maneuvering unit, two untethered ""spacewalks'', EVA timeline, shuttle pallet satellite, payloads (Palapa-B2, Westar 6), and a rehearsal rendezvous are discussed.

Source record↗

General requirements for Shuttle flight experiments

Requirements and guiding principles for flight space structures experiments are defined. Shuttle mid-deck experiments, Space Technology Experiments Platform (STEP) tests, and the EVA Assembly of Structures Experiment (EASE) are addressed.

Crawley, E. F.↗

Space Station Technology, 1983

This publication is a compilation of the panel summaries presented in the following areas: systems/operations technology; crew and life support; EVA; crew and life support: ECLSS; attitude, control, and stabilization; human capabilities; auxillary propulsion; fluid management; communications; structures and mechanisms; data management; power; and thermal control. The objective of the workshop was to aid the Space Station Technology Steering Committee in defining and implementing a technology development program to support the establishment of a permanent human presence in space. This compilation will provide the participants and their organizations with the information presented at this workshop in a referenceable format. This information will establish a stepping stone for users of space station technology to develop new technology and plan future tasks.

Wright, R. L.↗

Human capabilities

In conclusion, habitability is more than just life support and there is a substantial technology application void. Habitability needs both visibility and responsibility in the space station program to ensure the optimum use of man in space. In the area of work technology, IVA and EVA teleoperators and robotics should be considered as tools and not competitors. A generic work station is a contemporary of the early space stations. Flexibility of a future space station requires this.

Augerson, W.↗