Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BOOSTER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

An Application of Flexible Multibody Simulations to Space Launch Systems Liftoff Pad Separation and Umbilical Disconnect

A flexible multibody dynamics approach is applied to the Space Launch System (SLS) liftoff Coupled Loads Analysis (CLA), enabling the inclusion of a large array of component nonlinearities with extreme computational efficiency. The nonlinearities include the cryogenic induced preloads due to the large rotations of the aft struts connecting the Core Stage (CS) to the boosters, the contact/separation and potential re-contact at the booster aft skirt to Mobile Launcher(ML) interface, contact/separation and potential re-contact at the ML/extensible columns interfaces, secondary disconnect of the CS umbilicals including the LOX and LH2 Tail Service Mast Umbilicals (TSMUs), and the disconnect of the upper stage umbilical, the Interim Cryogenic Propulsion Stage Umbilical (ICPSU). The ICPSU disconnect involves algorithms simulating the winch motors reeling lanyard ropes, the nonlinear modeling of ropes and hoses, the disconnect and capture of multiple umbilical ground plates by catch-nets (geometrically nonlinear models), and the large rotations of the ML gantry in order to track clearances between the lifting SLS vehicle and umbilicals rotating out of the way. The flexible multibody dynamics framework utilized for these simulations provided a systematic and efficient framework for adding complex nonlinearities at the system level which would have otherwise not been possible in standard CLAs or would have to be treated by separate local analyses thereby not accounting for the coupled system behavior.

Application↗

NASA Space Launch System Completes Key Hot Fire Test and Begins Vehicle Integration

The Moon is again in reach. NASA and its commercial and international partners are on the way back. The team is working to land the first woman and the first person of color on the planetary body. NASA and its partners made significant progress towards that goal in the latter half of 2020 and the first half of 2021, including on the agency’s Space Launch System (SLS) rocket – a key part of the Artemis program. The SLS core stage for the Artemis I mission – the first launch of SLS and an uncrewed Orion capsule – completed the Green Run test series and was successfully mated with the SLS twin solid rocket boosters on the mobile launcher at Kennedy Space Center (KSC). All of the major systems for Artemis I are at KSC for assembly, integration, and launch, targeted for late 2021. Work also continued on SLS hardware for Artemis II, which will be the first flight of crew on Orion and SLS. Work progressed on core stage components, booster segments, and other hardware for Artemis III and future missions. This paper will detail the progress made.

John Honeycutt↗

NASA Space Launch System Completes Key Hot Fire Test and Begins Vehicle Integration

NASA and its commercial and international partners are on the way back to the Moon. Significant progress towards that goal was made in 2021, including on the agency’s Space Launch System (SLS) rocket – a key part of the Artemis initiative. The SLS core stage for the Artemis I mission – the first launch of SLS and an uncrewed Orion capsule – completed its Green Run test series in early 2021 and was successfully mated with the SLS twin solid rocket boosters on the mobile launcher at Kennedy Space Center (KSC). The launch vehicle stage adapter, interim cryogenic propulsion stage, and the Orion stage adapter structural test article and Orion spacecraft mass simulator were also stacked. The flight Orion spacecraft and Orion stage adapter are being prepared for stacking and launch, targeted for late 2021 following a wet dress rehearsal at Launch Complex 39B. SLS hardware for Artemis II, which will be the first flight of crew on Orion and SLS, is also in work. Work progressed on core stage components, booster segments, and other hardware for Artemis III and future missions. This paper will detail the progress made.

John Honeycutt↗

Multiphase Simulations of the SLS Launch Environment

NASA’s Space Launch System (SLS), which will send astronauts back to the Moon in the next few years, is powered by four RS-25 engines and two RSRMV solid rocket boosters (SRBs). During launch the SLS propulsion system generates intense acoustics and other powerful waves, such as ignition overpressure (IOP) which, if unmitigated, have the potential to damage the vehicle and possibly cause loss of mission or crew. To protect the vehicle from these powerful waves, the SLS launch pad design includes an ignition overpressure/sound suppression (IOP/SS) system which sprays 270,000 gallons per minute of water very close to the SRB and RS-25 nozzles. The SRB and RS-25 engine plumes, and the proximity of the IOP/SS water, create a complex multiphase (gas and liquid) environment during the SLS ignition sequence. The interplay among these systems creates challenges related to water spray into/onto engine nozzles, potential debris transport, and additional transient loads due to strong plume-water interactions - all of which the SLS vehicle must be able to withstand. Prior to the Artemis I launch, the SLS multiphase liftoff environment was largely unknown due to differences from the Space Shuttle and other programs. Some data was available from tests of individual systems, but no integrated testing or analysis was available. Even post-launch analysis of Artemis I cannot provide a full understanding of the complex physics involved due to limited (or obstructed) camera views and instrumentation. Computational fluid dynamics (CFD) is being used to investigate the details of the multiphase environment which could not be measured, help comprehend the data gathered from the launch, and ultimately identify phenomena that are a concern for future flights. Project Details Engineers at NASA’s Marshall Space Flight Center (MSFC) have executed simulations using the Loci/STREAM-Volume of Fluid (VoF) multiphase CFD solver to understand this environment. Initial efforts successfully validated the CFD solver on various tests, giving confidence to simulate the SLS multiphase liftoff environment prior to the Artemis I launch. The CFD simulation of the SLS ignition sequence was conducted in three phases. First the IOP/SS water system was simulated for approximately 6 seconds to reach a quasi-steady state. Next, the RS-25 engine plumes were activated and held at full power for 1 second. Lastly, the SRB booster was activated and the simulation was carried out until just prior to vehicle motion. This simulation process mimics the conditions that exist at launch. Results and Impact The SLS ignition sequence simulation results provide deep understanding of the underlying physics occuring during launch. Observations from the simulation include reduction of water splashing into/onto the engine nozzles, change in angling of the dense water sheets, and the origin of the powerful ignition overpressure (IOP) wave. These observations directly inform the SLS program on subjects including plume-water induced side loads, debris transport, and the acoustic launch environment. Additionally, with post launch comparison of CFD observations to flight data, these tools can be applied to launch vehicles and environments other than SLS with confidence. Why HPC Matters The SLS ignition sequence CFD simulations are conducted on meshes up to hundreds of millions of cells on thousands of processors for weeks at a time. These simulations generate terabytes of data that must also be stored and archived for future use on HPC systems. Simply put, the CFD simulations would not be possible without NASA HPC resources. What’s Next Comparisons between the Artemis I flight data and the CFD simulations will be continued to both improve confidence in the CFD results and provide deeper understanding into the SLS multiphase launch environment. This will be used to provide insight for decision making for the first manned SLS flight, Artemis II. Future simulations will target new configurations of the SLS IOP/SS water required to support the more powerful variants of the SLS vehicle, such as Block 1B. Additionally, this capability provides NASA the ability to investigate launch environments for vehicles other than SLS to support other missions.

Travis Rivord↗

Validation of Shadowgraph Spectral Analysis using an SLS Block 2 Wind-Tunnel Model

A flow quantification method has previously been developed that uses high-speed shadowgraph images to extract frequency content of a transonic flow field around a wind-tunnel model. In this method, a classical spectral analysis is performed on a set of shadowgraph image pixels to identify their intensity fluctuation frequencies. The spatial change of the image intensity is related to the second derivative of the density gradient. Examining the change of the density gradient as a function of time can be used to understand the flow field pressure fluctuations. Pressure measurements collected during a Booster Obsolescence Life Extension Forward Attachment Structure Trade Study Test are used to calibrate the shadowgraph-based measurements. The test was performed at the NASA Ames Research Center Unitary Plan Wind Tunnel 11- by 11-foot test section and investigated aerodynamic environment downstream of various booster forward attachment hardware geometries of the Space Launch System Block 2 Cargo configuration. Time-correlated shadowgraph video and model surface pressure measurements were acquired during the test and served as an ideal opportunity to calibrate and validate the shadowgraph image intensity method.

Shadowgraph↗

Validation of Shadowgraph Spectral Analysis using an SLS Block 2 Wind-Tunnel Model

A flow quantification method has previously been developed that uses high-speed shadowgraph images to extract frequency content of a transonic flow field around a wind-tunnel model. In this method, a classical spectral analysis is performed on shadowgraph video pixels to identify their intensity fluctuation frequencies. The spatial change of the image intensity is related to the second derivative of the density gradient. Examining the change of the density gradient as a function of time can be used to understand the flow-field pressure fluctuations. Time-varying pressure measurements collected during a Space Launch System (SLS) unsteady aerodynamic test of an advanced Block 2 booster design are used to calibrate the shadowgraph-based measurements. The test was performed at the NASA Ames Research Center Unitary Plan Wind Tunnel 11- by 11-foot test section and investigated the aerodynamic environment downstream of candidate booster forward attachment hardware geometries of the SLS Block 2 Cargo configuration. Time-correlated shadowgraph video and model surface pressure measurements were acquired during the test and served as an ideal opportunity to calibrate and validate the shadowgraph image intensity method.

Shadowgraph↗

Validation of Shadowgraph Spectral Analysis using an SLS Block 2 Wind-Tunnel Model

A flow quantification method has previously been developed that uses high-speed shadowgraph images to extract frequency content of a transonic flow field around a wind-tunnel model. In this method, a classical spectral analysis is performed on shadowgraph video pixels to identify their intensity fluctuation frequencies. The spatial change of the image intensity is related to the second derivative of the density gradient. Examining the change of the density gradient as a function of time can be used to understand the flow-field pressure fluctuations. Time-varying pressure measurements collected during a Space Launch System (SLS) unsteady aerodynamic test of an advanced Block 2 booster design are used to calibrate the shadowgraph-based measurements. The test was performed at the NASA Ames Research Center Unitary Plan Wind Tunnel 11- by 11-foot test section and investigated the aerodynamic environment downstream of candidate booster forward attachment hardware geometries of the SLS Block 2 Cargo configuration. Time-correlated shadowgraph video and model surface pressure measurements were acquired during the test and served as an ideal opportunity to calibrate and validate the shadowgraph image intensity method.

Shadowgraph↗

Core Stage TVC Systems Engineering Challenges in Reusing Heritage Hardware

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Two actuators are used to move each engine in two planes perpendicular to one another (i.e., pitch and yaw). The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Core Auxiliary Power Unit (CAPU) is derived from the Orbiter Auxiliary Power Unit (APU). The Orbiter and Solid Rocket Booster APU turbines are powered by hot gas produced by catalyzed hydrazine decomposition. On the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. While direct reuse or slight modification of existing hardware may seem to be a triple-win for a program in cost, schedule, and technical risk mitigation, those benefits can only be realized when its degree of application in a new system is carefully and thoughtfully managed. The heritage hardware reuse should be prescribed within the heritage design capability and reuse environments must lie within the envelope of heritage qualification testing. Despite the significant test and flight experience of the Shuttle heritage hardware components, successful integration with the newly designed CS TVC components and incorporation into the stage design proved to be a challenge which required re-qualification of the heritage hardware as well as thorough integrated testing to support flight certification. Examples of the challenges that were overcome include: re-qualifying heritage hardware to survive new shock and vibration environments, certifying performance of extensively modified heritage hardware, regenerating design insight due to lack of available heritage vendor data, showing compliance to modern structural design standards, translation of heritage requirements for analog avionics to modern digital avionics, and interfacing heritage mechanical hardware with newly designed avionics. This paper is the second installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. This paper will discuss several engineering challenges encountered during the development process for SLS CS TVC and how they were successfully overcome to reach flight readiness.

Thrust Vector Control↗

Overview of the SLS Core Stage Thrust Vector Control System Design

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) consists of four independent hydraulic systems. The SLS CS TVC system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Each hydraulic system nominally provides hydraulic power to one RS-25 engine and two actuators. Additionally, each system provides redundant control capability to one actuator on each of its neighboring systems. The RS-25 uses hydraulic power to control propellant valves, and the TVC actuators are used to move the engine in the pitch and yaw gimbal planes. The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Solid Rocket Booster APU turbines are powered by hot gas produced by a catalyzed hydrazine decomposition. The SLS Core Auxiliary Power Unit (CAPU) is derived from the Space Shuttle Orbiter Auxiliary Power Unit (APU); on the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. The remaining hardware in the TVC system (hydraulic Filter Manifold (FM), hydraulic Supply Accumulator (SA), hydraulic Return Accumulator (RA), Hydraulic Reservoir, Exhaust Gas Heat Exchanger (EGHE)) as well as the avionics providing control and telemetry (TVC Actuator Controller (TAC) and CAPU Controller (CAPUC) are new components developed for SLS. This paper is the first installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. In this paper, the overall design architecture of the CS TVC is presented, with a focus on the interfaces between the TVC actuators, the engines, their hydraulic power systems, and the avionics that provide commands from the SLS Vehicle Management (VM) software to effect stable and robust flight control for the integrated SLS launch vehicle.

Thrust Vector Control↗

Overview of the SLS Core Stage Thrust Vector Control System Design

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) consists of four independent hydraulic systems. The SLS CS TVC system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Each hydraulic system nominally provides hydraulic power to one RS-25 engine and two actuators. Additionally, each system provides redundant control capability to one actuator on each of its neighboring systems. The RS-25 uses hydraulic power to control propellant valves, and the TVC actuators are used to move the engine in the pitch and yaw gimbal planes. The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Solid Rocket Booster APU turbines are powered by hot gas produced by a catalyzed hydrazine decomposition. The SLS Core Auxiliary Power Unit (CAPU) is derived from the Space Shuttle Orbiter Auxiliary Power Unit (APU); on the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. The remaining hardware in the TVC system (hydraulic Filter Manifold (FM), hydraulic Supply Accumulator (SA), hydraulic Return Accumulator (RA), Hydraulic Reservoir, Exhaust Gas Heat Exchanger (EGHE)) as well as the avionics providing control and telemetry (TVC Actuator Controller (TAC) and CAPU Controller (CAPUC) are new components developed for SLS. This paper is the first installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. In this paper, the overall design architecture of the CS TVC is presented, with a focus on the interfaces between the TVC actuators, the engines, their hydraulic power systems, and the avionics that provide commands from the SLS Vehicle Management (VM) software to effect stable and robust flight control for the integrated SLS launch vehicle.

Thrust Vector Control↗

Space Launch System: Core Stage Thrust Vector Control Systems Engineering Challenges in Reusing Heritage Hardware

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Two actuators are used to move each engine in two planes perpendicular to one another (i.e., pitch and yaw). The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Core Auxiliary Power Unit (CAPU) is derived from the Orbiter Auxiliary Power Unit (APU). The Orbiter and Solid Rocket Booster APU turbines are powered by hot gas produced by catalyzed hydrazine decomposition. On the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. While direct reuse or slight modification of existing hardware may seem to be a triple-win for a program in cost, schedule, and technical risk mitigation, those benefits can only be realized when its degree of application in a new system is carefully and thoughtfully managed. The heritage hardware reuse should be prescribed within the heritage design capability and reuse environments must lie within the envelope of heritage qualification testing. Despite the significant test and flight experience of the Shuttle heritage hardware components, successful integration with the newly designed CS TVC components and incorporation into the stage design proved to be a challenge which required re-qualification of the heritage hardware as well as thorough integrated testing to support flight certification. Examples of the challenges that were overcome include: re-qualifying heritage hardware to survive new shock and vibration environments, certifying performance of extensively modified heritage hardware, regenerating design insight due to lack of available heritage vendor data, showing compliance to modern structural design standards, translation of heritage requirements for analog avionics to modern digital avionics, and interfacing heritage mechanical hardware with newly designed avionics. This paper is the second installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. This paper will discuss several engineering challenges encountered during the development process for SLS CS TVC and how they were successfully overcome to reach flight readiness.

Thrust Vector Control↗

Liftoff Environments

A Launch Environment, or Liftoff Environment, fundamentally represents a source of loading during the hold-down or liftoff phase of a rocket launch. A launch vehicle is subjected to transient and oscillatory pressure loading on its exterior surfaces induced by engines and boosters during vehicle hold-down and liftoff. These pressure loads are a principal source of structural vibration which may result in the malfunction of vehicle components or the fatigue of exterior skin panels or component brackets. Additionally, the pressure loading gives rise to sound pressure levels inside the crew cabin which may impact the crew's health, safety, or ability to communicate. Liftoff Environments can have a significant impact on the launch vehicle or surrounding structures. For SLS, there are eight primary environments supported by the Liftoff Environments team. These are Liftoff Acoustics (LOA), Hold-down Acoustics (HDA), RS-25 Nozzle Flow Transient (NFT) Acoustics, Booster Ignition Overpressure (IOP) & Duct Overpressure (DOP), Igniter Shock, Core Stage Engine (CSE) Overpressure, Excess Hydrogen (H2) Pop, and Infrasonic Acoustics. These can be split generally into acoustics, which are sustained stationary events, and transients, which are short duration nonstationary events.

Matthew J Casiano↗

Asymmetric Flow State Switching in the Space Launch System Block 2 Liftoff Environment

An in-depth investigation was conducted at the NASA Langley Research Center 14- by 22-Foot Subsonic Tunnel to evaluate flow state switching in the liftoff flow environment of the Space Launch System Block 2 Crew launch vehicle using force measurements, two-component particle image velocimetry, and tuft flow visualization. Multimodal flow states were observed in the gap flow between the centerbody and solid rocket boosters at a range of incoming flow angles and were characterized for the relative strength of state switches. When flow switches occur, the flow is predominantly bimodal, but trimodal flow states are observed with the launch tower downstream of the vehicle. Tuft visualization indicates three-dimensionality during flow state switching, which initiates at one part of the gap and quickly transitions throughout the length of the booster. Due to the long time scales between switches, statistics such as frequency of flow state switches and converged state probabilities cannot be established without significantly increased acquisition times.

Lee J. Mears↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

NASA’s Space Launch System: Artemis I Results and the Path Forward

On Nov. 16, 2022, NASA launched the Artemis I mission on the agency’s new SLS (Space Launch System) rocket. The debut launch of the integrated vehicle sent an uncrewed Orion spacecraft into a distant retrograde (DRO) orbit about the Moon to accomplish multiple mission objectives, including evaluating Orion’s heatshield at lunar return velocities and collecting critical data from the first flight of the new superheavy lift launch vehicle. Post-flight data analyses show that the rocket performed with a high degree of precision and accuracy. In addition to completing testing and launch of the Artemis I SLS in 2022, notable progress was made on hardware for future launch vehicles that will support Artemis missions II, III, IV, and V. The Artemis II core stage is mostly complete, and its RS-25 engines were integrated in the fall of 2023. The Artemis II solid rocket booster motor segments were shipped to the launch site in September 2023. Propellant tanks are being manufactured for additional missions, solid booster segments are being cast and prepared, software is being developed, and production of new RS-25 engines is underway. A more capable upper stage is in development, as well as a large adapter to encapsulate a 10-metric ton (t) co-manifested payload. This paper will provide details on the Artemis I flight as well as cover hardware progress for the future flights as available.

John Honeycutt↗

Validation of Multiphase CFD Predictions of the SLS Launch Environment against Artemis I Flight Data

NASA’s Space Launch System (SLS) is powered by four Aerojet-Rocketdyne RS-25 engines, previously referred to as Space Shuttle Main Engines (SSMEs), with two RSRMV solid rocket boosters (SRBs) derived from the Shuttle booster as seen in Fig. 1. Ignition and the start transient of the SRBs, each of which generate 3.6 million pounds of thrust, create a series of large magnitude pressure waves separate from launch acoustics that have the potential to damage the vehicle if unmitigated. This portion of the SLS launch environment consists of igniter shock (IS), ignition overpressure (IOP), and duct overpressure (DOP).

T. Rivord↗

Asymmetric Flow State Switching on the Space Launch System (SLS) Block 2 Crew Vehicle

An in-depth investigation was conducted at the NASA Langley Research Center 14- by 22-Foot Subsonic Tunnel to evaluate flow state switching in the liftoff flow environment of the Space Launch System Block 2 Crew launch vehicle using side force measurements, two-component particle image velocimetry, and tufts flow visualization. Multimodal flow states were observed in the gap flow between the centerbody and solid rocket boosters at a range of incoming flow angles and were characterized for the relative strength of state switches. When flow switches occur, the flow is predominantly bimodal, but trimodal flow states are observed with the launch tower downstream of the vehicle. Tufts visualization indicates three-dimensionality during flow state switching, which initiates at one part of the gap and quickly transitions throughout the length of the booster. Due to the long time scales between switches, statistics such as frequency of flow state switches and converged state probabilities cannot be established without significantly increased acquisition times.

Lee J. Mears↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗