Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Material Testing of PH13-8MO H950 Steel for Xue-Wierzbicki Fracture Criterion Determination

Four tensile coupon designs of PH13-8Mo H950 steel were tested to failure using quasi-static rates to obtain data to calibrate the Xue-Wierzbicki failure model for ductile fracture. The tests recorded the force-displacement, location of the first crack, displacement to fracture, area reduction, and crack propagation path. The test method and coupon designs were adopted from Tomasz Wierzbicki’s “Calibration and evaluation of seven fracture models” report. The XueWierzbicki model predicts fracture based on accumulated equivalent plastic strain, stress triaxiality, and deviatoric state parameter. Calibrating the Xue-Wierzbicki failure model required testing four coupon designs to calculate the four free parameters in the model. The coupon designs tested a range of stress triaxialities with two axisymmetric tests, one shear test, and one plane stress test. The data obtained and presented in this report can be used to develop a Xue-Wierzbicki fracture model for PH13-8Mo H950 steel.

36 MATERIALS SCIENCE↗

NorthStar Facility Target Fab and Flow Testing - FY 21

The facility target fabrication and flow testing activity will consist of flow tests using the blower system at LANL to test the disk holder and target, both redesigned by the NorthStar prime contractor. The housing and transition system delivering helium cooling to the disc holder and target will be fabricated and tested at LANL facilities. The tests will include pressure drop versus flow measurements through the target and housing, optical flow diagnostics and fiber optic imaging of the disc stack. The pressure drop measurements will be compared to CFD simulations to verify the latter, the optical flow diagnostics will be used to determine whether modifications made to the housing and target holder allow sufficient flow through the bottom of the housing to adequately cool it and the fiber optics will be used to image the discs during operation as a proof of concept of the diagnostic, to be used at NorthStar facilities during preproduction testing. The work is a Partial Fulfillment of the Deliverable Requirement for NorthStar Facility Target Fab and Flow Testing and Production Target Testing Support by LANL

42 ENGINEERING↗

Benchmark Specification for FFTF LOFWOS Test #13

The Fast Flux Test Facility (FFTF) at the Hanford site in Washington was designed by the Westinghouse Electric Corporation for the U.S. Department of Energy. FFTF was a 400 MW thermal, oxide-fueled, liquid sodium cooled test reactor, built to assist development and testing of advanced fuels and materials for fast breeder reactors. After reaching criticality in 1980, FFTF operated until 1992, providing the U.S. Department of Energy (DOE) with the means to test fuels, materials, and other components in a fast neutron flux environment. In July 1986, a series of unprotected transients (with the plant protection system intentionally disabled) were performed in FFTF as part of the passive safety demonstration program. Among these were thirteen loss of flow without scram (LOFWOS) tests. The goals of this program included confirming the liquid metal reactor safety margins, providing data for computer code validation, and demonstrating the inherent and passive safety benefits of specific design features. The test defined in this benchmark is LOFWOS Test #13, which was initiated at 50% power and 100% flow with the pump pony motors turned off. This benchmark specification is intended to support collaborative efforts within international partnerships on the validation of simulation tools and models in the area of Sodium-cooled Fast Reactor (SFR) safety. Validated tools and models are needed to evaluate SFR inherent safety characteristics and assess the impact of passive design features in response to accident initiators. Comparisons with experimental data and the results of safety analyses from other groups create unique opportunities to improve predictive capabilities of computational codes and methods for SFR modeling and simulation. The conditions of the LOFWOS test along with the feedback from FFTF’s limited free bow core restraint system and the novel passive reactivity control Gas-Expansion Modules (GEMs) pose a very challenging and uniquely valuable benchmark exercise.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Analysis of Respirator Cartridge Performance Testing on the 702-AZ Primary Exhauster for the Hanford AY/AZ Tank Farms during a Waste-Disturbing Event

Washington River Protection Solutions (WRPS) conducted tests using two types of chemical cartridges for use in air-purifying respirators (APR) to determine the period of time that the cartridges would provide adequate performance1 for APRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPC) from vapors exiting the 702-AZ Primary Exhauster for the Hanford AY-AZ tank farms. Unlike prior cartridge testing on the 702-AZ Primary Exhauster, the recent tests were performed during a waste-disturbing event. The Occupational Safety and Health Administration (OSHA) identifies cartridge testing as a valid approach for establishing a cartridge change schedules. Testing is commonly applied in situations where mixtures of COPCs exist, and where other approaches, such as manufacturer recommendations and modeling, are less reliable. The tests were designed and conducted to assure measurement and/or control of the key variables OSHA identified as important to estimate the cartridge service life, including temperature, humidity, COPC concentration, breathing rate, and cartridge adsorption capacity. Testing was conducted from February 10–11, 2017, on a slipstream from the 702-AZ exhauster fed to a respirator cartridge test stand developed by WRPS in collaboration with HiLine Engineering (Richland, Washington). Multipurpose respirator cartridges, SCOTT 7422-SD1 and SCOTT 7422-SC1 (SCOTT Safety, Monroe, North Carolina), were assessed on separate days. Sample media (sorbent tubes) and canisters (e.g., Summa) sampling were used to collect samples of the vapor stream entering and exiting the respirator cartridge and were subsequently analyzed for COPC concentrations. Pacific Northwest National Laboratory was tasked with conducting an independent analysis of the analytical results and making recommendations based on the results for respiratory cartridge performance and service life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Solids Performance Testing in a Scaled TSCR System

The Tank Side Cesium Removal (TSCR) project is a technology demonstration that will pretreat Hanford tank waste supernatant in support of the Direct Feed Low-Activity Waste (DFLAW) mission. The TSCR system employs two key separation technologies: dead-end filtration (DEF) and ion exchange (IX) using crystalline silicotitanate (CST) media. DEF will be used to remove undissolved solids from tank waste to protect the functionality of the IX columns and the IX system will remove Cs-137 from tank waste. The separation technologies (DEF and IX) used in TSCR are technically mature and have also been successfully deployed at the Savannah River site in a similar facility known as the Tank Closure Cesium Removal (TCCR) system. While testing with simulants and real waste has been successfully performed under conditions expected during the initial operation of TSCR, test data is absent for assessing off normal high solids loading that may be in the TSCR waste feed. Normal TSCR treatment operations are expected to handle wastes with solids content on the order of 200 ppm, and off normal solids loading could be much larger than the nominal level. The testing program described in this report was conducted to understand the consequence of operating the TSCR system at elevated solids loadings up to the high-solids limit of 15,000 ppm [i.e., 1.5-wt%] identified in the TSCR design basis. Although the system is not required to make throughput above the nominal solids loading, the testing was intended to provide important information related to potential off normal operations. At off normal levels near the high-solids limit, there are potential implications for TSCR performance in the areas of throughput, DEF pressure drop, filter backflush frequency, and IX column pressure drop. In addition, intrusion of solids into the IX column was postulated to impact the Cs-137 loading behavior by promoting channeling or flow maldistribution in the column; since the magnitude of the postulated effect was unknown, assessing it was also of interest. The testing was performed using representative waste simulants and a prototypic, integrated TSCR system designed and assembled specifically to conduct the high solids performance assessment. Overall, the scaled TSCR testing demonstrated that full-scale unit operations can succeed in fulfilling their processing objectives in the presence of solids up to 3,000 ppm, but there are potential performance challenges to filtration operations at solids loadings as low as ~500 ppm. The severity of the challenge is likely to be dependent on the type and size distribution of solids, of which the current testing only examined a single type and size distribution. To provide some flexibility for future full-scale operations, the results of the testing suggest two possible risk reduction strategies that can be implemented without any changes in TSCR design or configuration. One option would be to enact an administrative limit on the solids loading to protect TSCR from feeds that are likely to require a high DEF swap frequency. Another option is to permit operation of the DEFs at differential pressures greater than 2 psid before swapping filters. The selection of a higher differential pressure target is not anticipated to adversely impact DEF backflushing efficacy and would reduce both swap frequency and the amount of waste sent to AP-108.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification Testing of Body Forces due to a Prescribed Angular Velocity in DYNA3D/Paradyn

This report documents the verification testing and regression testing done on a new feature in DYNA3D/Paradyn, which allows users to prescribe body force loads based upon an angular velocity. This feature is unique in that the direction of the angular velocity vector follows the unit vector formed by two coordinate points associated with two nodes or the average coordinates of two separate small collection of nodes. The angular velocity direction will follow the directional vector defined by these nodes while the angular velocity magnitude is defined by a load curve. A simple single element verification test was performed to determine the correct implementation of this feature, and two separate regression tests were added to the DYNA3D Software Quality Assur ance test suite. The nodal positions, velocities, and accelerations from the solution of the single element verification test compare well to analytically derived values of those nodal quantities. The regression tests serve as good examples of this new feature’s use case and were consequently added to the SQA test suite to ensure that further modifications of the DYNA3D source code do not unintentionally change the generated baseline answers.

42 ENGINEERING↗

High-Burnup Spent Fuel Data Project: Sister Rod Final Phase II Test Plan

The Sibling Pin test campaign is a Department of Energy (DOE) research activity within the Spent Fuel and Waste Science and Technology (SFWST) program that is tasked with characterization of high burnup (HBU) fuel in support of the High Burnup Spent Fuel Data Project. Of the 25 fuel rods in the Sibling Pin inventory, approximately 9 rod lengths have been consumed during the first phase (Phase I) of the test campaign leaving approximately 16 rod lengths for the second phase (Phase II) of testing. This plan outlines the Phase II testing and the motivations for performing these tests. Priorities for Phase II testing are based on previously identified knowledge gaps, lessons-learned from Phase I work, the original objectives of the High Burnup Spent Fuel Data Project and the Sibling Pin test campaign, and input from external stakeholders. The priorities for Phase II testing are to obtain data to characterize the effects of annealing on cladding mechanical properties and fuel rod performance, to quantify the creep behavior of cladding materials and fuel rods and the effects of creep deformations on the performance of cladding and fuel rods, and to gather data to support the final closure of the hydride reorientation and radial hydride induced embrittlement gap for HBU fuel rods.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ultimate FY23 Vacuum Creep Testing Facility Operation Report

This facility operation report covers the refurbishment and initial testing of a vacuum creep frame used to conduct 1300°C tensile and creep tests on Mo- and Nb-based alloys. The report details the refurbishment of the frame and initial operation including 100 h creep experiments compared to similar tests in argon. Unlike the 25 mm dogbone specimens tested in argon, the vacuum load train requires 76 mm dog bone specimens. Testing in vacuum has eliminated concern of O embrittlement in argon and Nb alloy CB103 showed >120% tensile elongation at 1300°C and 1450°C. Also, a window in the vacuum chamber allows the use of digital image correlation (DIC) to measure strain rather than the load train displacement used in the argon frames. Comparison of the displacement and DIC results in the vacuum frame showed significant variation in primary creep deformation, likely due to the machine compliance, but similar secondary creep rates. Recently, ULTIMATE teams have submitted specimens for testing in vacuum. With the relatively low volume of creep testing, the facility performance metric of testing within 4 weeks of receiving specimens has been met.

36 MATERIALS SCIENCE↗

Excerpt from Oxygen Monitor Clean Testing Report Performed in 2010

The Rosemount X-STREAM Series X2GP is a paramagnetic oxygen analyzer with a 0-25% oxygen measurement range. It claims a drift less than 2% of span (0.10% volume oxygen) per week, and a response time of less than 5 seconds (for the analyzer to report 90% of a step change). Our test equipment was set-up such that the same gas was running through each oxygen analyzer at the same time. This allowed Calibration Error, Calibration Drift, and Loss of Power Testing to be run on all monitors at the same time, eliminating any variability between the analyzers from tolerances in the gas cylinder, ambient temperature, ambient pressure, test duration, etc. An APTech pressure regulator was placed on the gas cylinder manifold and a 23 psia Paroscientific pressure transducer measured the regulator’s outlet pressure. This did not give the inlet pressure on any one analyzer but outlet pressure from the manifold before the stream was split. The APTech pressure regulator was used to keep operating conditions consistent. A DWYER rotameter was installed on each oxygen monitor’s outlet piping. With the exception of Variation of Flow Rate Testing, the rotameter was left fully open for all testing. The flow rate through each oxygen monitor was controlled by a Swagelok needle valve that was installed on each analyzer’s inlet piping. Additionally, a filter was installed in the each monitor’s inlet piping to keep particles from the measurement cells and a Swagelok ball valve was installed on each monitor’s outlet piping to isolate each monitor between tests. No pumps were installed. Each of the cylinders used was at a pressure greater than ambient room barometric pressure. This pressure differential was used to move gas through the testing equipment. The flow rate through each analyzer was controlled by the Swagelok needle valve installed on each analyzer’s inlet piping. Finally, for all tests, a Paroscientific Digiquartz Barometer was used to measure ambient room barometric pressure and a Fluke Thermo-hygrometer was used to measure ambient room temperature.

47 OTHER INSTRUMENTATION↗

Load Test of Alum-a-Lift Serial No. 33053261

An Alum-A-Lift A800CSPD-60 (Lift) was procured to support mechanical testing of programmatic equipment. This testing will take place within the Bldg. 131 Hi Bay. The design of the Lift procured for the purposes at LLNL was a modification of a machine that had previously been engineered and sold by Alum-a-Lift, see Fig. 1. The modification was to shorten the boom from a 56 in. length to a 28 in. length. The modified design is illustrated in Fig. 2. The Lift was fabricated and shipped to LLNL, received ~ June 2022. Upon arrival, it was successfully evaluated for “no-load” performance capability. Upon inspection of the documentation provided by Alum-a-Lift, it was noted that the load test was performed to qualify the machine for a lifting capacity of 200 lb. The LLNL requirement was that the capacity of the machine be 400 lb. Conversations with the vendor, Alum-A-Lift, followed this discovery. Rather than send the machine back to the vendor for load testing, discussions concurred that LLNL would load test the machine and Alum-A-Lift would provide the relevant load test placard to be placed on the machine subsequent to the successful load test. This MESN provides documentation of the load test to qualify the Alum-a-Lift to its’ rated capacity of 400 lb.

42 ENGINEERING↗

Water-based Ria Testing in TREAT: Commissioning and Early Results

We have completed a series of reactivity-initiated accident commissioning tests with the static water capsule in the Transient Reactor Test Facility and completed some visual and non-destructive post-irradiation examinations on the fuel rods. The test campaign included a calibration test followed by five tests in the Static Environment Rodlet Transient Test Apparatus capsule. The conditions varied from room temperature and pressure up to 200°C and 2.5 MPa, with energy depositions varying between ~500–1100 J/gUO2. The series of tests allowed for a number of instrumentation qualifications and demonstrations, including cladding thermometry, rodlet plenum pressure, cladding elongation, and an electro-impedance boiling detector. This paper documents the design of the capsule and highlights some results from the commissioning tests and post-transient examination.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope C2 Feed in Support of the LAW Pilot Melter (Final Report)

One of the principal objectives of the DM100 melter tests was to demonstrate that the LAW Sub-Envelope C2 feeds with ± 15% variations in the amounts of waste simulant are suitable for large-scale tests on the LAW Pilot melter. The other principle objective for the DM100 tests was to determine the relative effects of sugar versus waste organics on glass redox state, NOx emissions, sulfur emissions, sulfur retention in the glass, secondary sulfate layer formation, and glass-melt foaming. Additional objectives included measurement of the feed rheological properties and collection of melter emissions data. Screening tests are conducted at the DM100 scale in order to identify and correct potential problems before testing at the larger scale LAW Pilot melter. Testing goals were met in that the results of the DM100 melter test resulted in selection of LAW Sub-Envelope C2 feed suitable for Pilot Melter testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Additively Manufactured Carbon Fiber and Fused Deposition Modeling PLA Interlaminar Shear Testing Report

This test report summarizes the torsional test setup, procedure, and results for interlaminar shear (ILS) failure of additively manufactured carbon fiber (CFAM) material developed at LLNL. In addition, the report also includes testing of fused deposition modeled (FDM) polylactic acid (PLA), including ILS test standard D7078 and the same torsional test mentioned above. The test hopes to characterize ILS properties of CFAM, however substantial further testing and improvements still need to be done to induce a proper failure mode. This testing was performed by Sundi Win as part of her summer internship project in Kinetic Technologies.

36 MATERIALS SCIENCE↗

Low Purge and Mercury Recovery Testing with Sludge Batch 10 Tank 40 Simulant

Researchers at the Savannah River National Laboratory (SRNL) have completed testing as requested by Savannah River Mission Completion (SRMC) to perform experiments to determine the impact of using a lower or inert purge in Sludge Batch (SB) 10 processing under the Nitric-Glycolic Acid (NGA) flowsheet. A key objective of this testing was also to determine the mercury speciation and recovery during each experiment. The testing was performed as part of the SB10 Technical Task Request (TTR) and Task Technical and Quality Assurance Plan (TTQAP). Two sets of tests were performed, and a Run Plan was approved prior to each set of experiments to document the planned testing. Three initial experiments were completed to determine whether a low air purge would be beneficial to CPC processing at higher acid stoichiometry (110%) based on the Koopman minimum acid (KMA) equation (116% Hsu). One of the tests, an inert nitrogen purge experiment, was also completed to demonstrate that excluding oxygen did not introduce any new hazards. The experiments were designed to be identical except for the change in purge gas and purge flowrate from run to run. After reviewing the results from the initial three experiments, six additional tests were proposed by SRNL to support the lower purge study and to look for processing alternatives for improving mercury recovery. These additional six tests were all completed at a very low acid stoichiometry to mimic the pH experienced during processing in DWPF (~7). DWPF is processing SB10 sludge at an acid stoichiometry of 90% based on the Hsu equation. The additional SRNL experiments were performed at an acid stoichiometry of 62.5% KMA stoichiometry (66.3% Hsu) to produce a Sludge Receipt and Adjustment Tank (SRAT) product with a pH of about 7. All experiments used simulants of both SWPF streams, although no entrained solvent was added during any of the experiments

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

T-1072: Beam test for muon strips

Beam test for muon strips is an experiment to measure the efficiency, time resolution and longitudinal position resolution of scintillator strips for a muon system at future colliders. The muon system at future colliders is envisioned as several layers of position-sensitive detectors embedded in the iron flux-return yoke of the solenoidal magnet. The role of the muon system is primarily the identification of muons and track matching to the central tracker, besides serving as the tail catcher for the hadronic showers that penetrate beyond the hadron calorimetry. Previous tests performed at Fermilab with cosmic muons have shown that scintillators with wavelength-shifting (WLS) fibers and a SiPM readout offer promising performance (NIM A 823, 2016, pp.120-125). The purpose of the present beam tests is to determine the performance parameters with better accuracy. The measurement setup is schematically presented in Fig. 1. The length of the tested strips will vary between 1 m and 2 m. The scintillator strip to be tested will be placed horizontally perpendicular to the beam on a platform in the area behind the beam dump of MT6.2. Two fast scintillators S1 and S2 with vacuum PMT readout will be placed in front and after the tested strip in the beam. The distance between S1 and S2 is 1 m. One fast scintillator strip S3 will be placed in beam immediately in front of the tested strip, perpendicular to the tested strip. A rack with a CAMAC crate and two NIM crates will be used for the data acquisition. The data collection will be performed and monitored from a PC with USB connection to the CAMAC Crate controller.

43 PARTICLE ACCELERATORS↗

Proposed New STELLA-2 Tests

In 2025, KAERI and Argonne initiated a collaboration based on software validation using data from tests performed at KAERI’s STELLA-2 facility. STELLA-2 is a large-scale sodium thermal-hydraulic test facility that was originally developed to support KAERI’s development of the PGSFR design concept. KAERI has performed a large number of tests at STELLA-2, providing valuable data to support sodium fast reactor code validation. KAERI will be conducting new tests in 2026, targeting system conditions that were not achieved during previous test campaigns. KAERI has requested from Argonne proposed tests that could be performed during the upcoming test campaign. This report documents Argonne’s proposed tests in fulfillment of KAERI’s request.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Solvari SR, Simplifying Residential Solar to 1 SKU, with Extended Testing

Accelerated weathering and material compatibility testing for polymeric and asphaltic materials. NLR will be testing the durability of the polymeric materials proposed for use in the supporting structures designed by TESCI solar. This will include the bare materials and coupons attached to asphalt shingles. The exposure will be in damp heat and separately heat, humidity and UV light, all followed by mechanical evaluation. Modification 1 is an extension of the first round of testing with both a continuation of some of the same testing and addition of new testing methods and materials. The testing of materials in the condition of A3 looking at mechanical durability will be continued looking at the materials used in the mounting brackets. We will be adding in testing of the silicone adhesive to the module and of the module itself. For the mounting brackets, testing will also be conducted at multiple temperatures and humidity levels to allow for extrapolation to the field.

14 SOLAR ENERGY↗