Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Implementation of the Glycolate Destruction Process with Sodium Permanganate in the Defense Waste Processing Facility (DWPF) - 20141

The Savannah River Site (SRS) seeks to replace formic acid with glycolic acid as a chemical reductant in the Defense Waste Processing Facility (DWPF), where borosilicate glass is mixed with high-level radioactive waste, melted at high temperatures, then poured into stainless steel canisters for safe storage. Prior research and development have demonstrated the feasibility and advantages of the new nitric-glycolic acid flowsheet over the current nitric-formic acid flowsheet to chemically adjust the radioactive sludge slurry waste in the Sludge Receipt and Adjustment Tank (SRAT) prior to vitrification. Use of glycolic acid reduces hydrogen and ammonia generation during the reduction process, thus reducing flammability hazards and purge requirements in the DWPF processing vessels. In addition, glycolic acid will support the new Salt Waste Processing Facility (SWPF) by allowing for receipt of higher volumes of waste due to reduction of flammable gases, increased boil-up rates in the vessels, and easing the processing of future sludge batches containing high levels of mercury. However, during DWPF operations, trace amounts of glycolate are anticipated to be entrained in the recycle stream and sent to the Concentration, Storage, and Transfer Facilities (CSTF) via the Recycle Collection Tank (RCT). The RCT receives condensate from the Slurry Mix Evaporator Condensate Tank (SMECT) and Off-gas Condensate Tank (OGCT) that may contain unreacted glycolate. A literature review found the potential for hydrogen generation due to thermolysis of glycolate in caustic CSTF conditions. Savannah River National Laboratory (SRNL) conducted several tests on simulant and radioactive waste from various tanks at SRS and confirmed that glycolate added to waste at concentrations of approximately 1000 mg/L and higher generates hydrogen through thermolysis. There are potential operating scenarios in the future where glycolate concentration could exceed 1000 mg/L in the 2H Evaporator Drop Tank, the highest accumulation point for DWPF organics received via recycle. These findings presented a need to develop another process to mitigate the impact of glycolic acid to the CSTF. Several DWPF compatible options were evaluated for their ability to destroy glycolate in the DWPF recycle stream under various processing conditions, thereby mitigating its introduction to the CSTF. Downselection testing identified sodium permanganate as the most promising and simplest option to oxidize glycolate. It has been demonstrated to be effective in various RCT simulant compositions, operating temperatures, oxidant addition rates, solution pH, and initial glycolate concentrations. A feasibility study identified existing tanks within the facility that could be used for receiving and storing the commercially available sodium permanganate, as well as feeding it to the RCT for processing. The use of existing equipment as well as the ability to purchase the pre-mixed chemical reduces implementation and operational complexity. The downstream impacts of the sodium permanganate reaction were also evaluated and demonstrated to have minimal impact on other chemical species present in the RCT and CSTF, as well as on the materials of construction of the RCT and CSTF vessels and associated piping and instrumentation. Future work is in progress to validate the glycolate destruction process with testing in actual radioactive RCT waste before implementation in DWPF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acquisition/expulsion system for earth orbital propulsion system study. Volume 2: Cryogenic design

Detailed designs were made for three earth orbital propulsion systems; (1) the space shuttle (integrated) OMS/RCS, (2) the space shuttle (dedicated) OMS (LO2), and (3) the space tug. The preferred designs from the integrated OMS/RCS were used as the basis for the flight test article design. A plan was prepared that outlines the steps, cost, and schedule required to complete the development of the prototype DSL tank and feedline (LH2 and LO2) systems. Ground testing of a subscale model using LH2 verified the expulsion characteristics of the preferred DSL designs.

Source record↗

GLYCOLIC-FORMIC ACID FLOWSHEET SLUDGE MATRIX STUDY

Testing was completed to demonstrate the viability of the newly developed glycolic acid/formic acid flowsheet on processing in the Defense Waste Processing Facility's (DWPF) Chemical Process Cell (CPC). The Savannah River National Laboratory (SRNL) initiated a sludge matrix study to evaluate the impact of changing insoluble solid composition on the processing characteristics of slurries in DWPF. Four sludge simulants were prepared to cover two compositional ranges in the waste. The first was high iron/low aluminum versus low iron/high aluminum (referred to as HiFe or LoFe in this report). The second was high calcium-manganese/low nickel, chromium, and magnesium versus low calcium-manganese/high nickel, chromium, and magnesium (referred to as HiMn or LoMn in this report). These two options can be combined to form four distinct sludge compositions. The sludge matrix study called for testing each of these four simulants near the minimum acid required for nitrite destruction (100% acid stoichiometry) and at a second acid level that produced significant hydrogen by noble metal catalyzed decomposition of formic acid (150% acid stoichiometry). Four simulants were prepared based on the four possible combinations of the Al/Fe and Mn-Ca/Mg-Ni-Cr options. Preliminary simulant preparation work has already been documented. The four simulants were used for high and low acid testing. Eight planned experiments (GF26 to GF33) were completed to demonstrate the viability of the glycolic-formic flowsheet. Composition and physical property measurements were made on the SRAT product. Composition measurements were made on the condensate from the Mercury Water Wash Tank (MWWT), Formic Acid Vent Condenser (FAVC), ammonia scrubber and on SRAT samples pulled throughout the SRAT cycle. Updated values for formate loss and nitrite-tonitrate conversion were found that can be used in the acid calculations for future sludge matrix process simulations with the glycolic acid/formic acid flowsheet. Preliminary results of the initial testing indicate: (1) Hydrogen generation rate was very low throughout all SRAT cycles. (2) The mercury concentration of the SRAT product was below the 0.8 wt% limit in all runs. (3) Nitrite in the SRAT product was <100 mg/kg for all runs. (4) Foaminess was not an issue using the nominal antifoam addition strategy in these tests. (5) The high aluminum sludges (LoFe, HM type sludges) were much more viscous than the Hi Fe sludges. At 100% acid stoichiometry, the SRAT products from the high aluminum sludges were very viscous but at 150% acid stoichiometry, the SRAT products from the high aluminum sludges were very thin. This makes the glycolic acid/formic acid flowsheet an improvement for processing more viscous sludges. (6) The pH of the SRAT products was from 2.7-3.1 for the 150% acid stoichiometry runs and 5.1-6.1 for the 100% acid stoichiometry runs, significantly lower than is typical of the baseline nitric acid/formic acid flowsheet.

08 HYDROGEN↗

Fracture control method for composite tanks with load sharing liners

The experimental program was based on the premise that the plastic sizing cycle, which each pressure vessel is subjected to prior to operation, acts as an effective proof test of the liner, screening out all flaws or cracks larger than a critical size. In doing so, flaw growth potential is available for cyclic operation at pressures less than the sizing pressure. Static fracture and cyclic life tests, involving laboratory type specimens and filament overwrapped tanks, were conducted on three liner materials: (1) 2219-T62 aluminum, (2) Inconel X750 STA, and (3) cryoformed 301 stainless steel. Variables included material condition, thickness, flaw size, flaw shape, temperature, sizing stress level, operating stress level and minimum-to-maximum operating stress ratio. From the empirical data base obtained, a procedure was established by which the service life of composite tanks with load sharing liners could be guaranteed with a high degree of confidence.

Bixler, W. D.↗

Ion thruster system (8-cm) cyclic endurance test

This report describes the qualification test of an Engineering-Model 5-mN-thrust 8-cm-diameter mercury ion thruster which is representative of the Ion Auxiliary Propulsion System (IAPS) thrusters. Two of these thrusters are scheduled for future flight test. The cyclic endurance test described herein was a ground-based test performed in a vacuum facility with a liquid-nitrogen-cooled cryo-surface and a frozen mercury target. The Power Electronics Unit, Beam Shield, Gimal, and Propellant Tank that were used with the thruster in the endurance test are also similar to those of the IAPS. The IAPS thruster that will undergo the longest beam-on-time during the actual space test will be subjected to 7,055 hours of beam-on-time and 2,557 cycles during the flight test. The endurance test was successfully concluded when the mercury in the IAPS Propellant Tank was consumed. At that time, 8,471 hours of beam-on-time and 599 cycles had been accumulated. Subsequent post-test-evaluation operations were performed (without breaking vacuum) which extended the test values to 652 cycles and 9,489 hours of beam-on-time. The Power Electronic Unit (PEU) and thruster were in the same vacuum chamber throughout the test. The PEU accumulated 10,268 hr of test time with high voltage applied to the operating thruster or dummy load.

Dulgeroff, C. R.↗

Determining the Release of Radionuclides from Tank Waste Residual Solids: FY2015 Report

Methodology development for pore water leaching studies has been continued to support Savannah River Site High Level Waste tank closure efforts. For FY2015, the primary goal of this testing was the achievement of target pH and Eh values for pore water solutions representative of local groundwater in the presence of grout or grout-representative (CaCO 3 or FeS) solids as well as waste surrogate solids representative of residual solids expected to be present in a closed tank. For oxidizing conditions representative of a closed tank after aging, a focus was placed on using solid phases believed to be controlling pH and E h at equilibrium conditions. For three pore water conditions (shown below), the target pH values were achieved to within 0.5 pH units. Tank 18 residual surrogate solids leaching studies were conducted over an E h range of approximately 630 mV. Significantly higher Eh values were achieved for the oxidizing conditions (ORII and ORIII) than were previously observed. For the ORII condition, the target Eh value was nearly achieved (within 50 mV). However, E h values observed for the ORIII condition were approximately 160 mV less positive than the target. E h values observed for the RRII condition were approximately 370 mV less negative than the target. Achievement of more positive and more negative E h values is believed to require the addition of non-representative oxidants and reductants, respectively. Plutonium and uranium concentrations measured during Tank 18 residual surrogate solids leaching studies under these conditions (shown below) followed the general trends predicted for plutonium and uranium oxide phases, assuming equilibrium with dissolved oxygen. The highest plutonium and uranium concentrations were observed for the ORIII condition and the lowest concentrations were observed for the RRII condition. Based on these results, it is recommended that these test methodologies be used to conduct leaching studies with actual Tank 18 residual solids material. Actual waste testing will include leaching evaluations of technetium and neptunium, as well as plutonium and uranium.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Peroxide Decomposer Module Catalyst Testing to Support Preparations for Increased Demand - 19052

The Hanford Site Effluent Treatment Facility's (ETF) mission is to receive, treat, and dispose of liquid effluents from on-site programs and projects. Its roles in the management and mitigation of tank waste volume is integral to the overall Hanford tank farms mission, as tank space is limited. ETF's role will become even more essential as the Direct-Feed Low Activity Waste process comes online at the Waste Treatment and Immobilization Plant (WTP). In order to accommodate the additional liquid effluent streams, the ETF will undergo a number of facility and equipment upgrades. Included in this is the reinstatement of the Peroxide Decomposer Module (PDM) into the ETF's main treatment train. The PDM is used to remove any residual hydrogen peroxide not fully consumed in the preceding ultraviolet/oxidation (UV/OX) treatment stage for organic destruction. Future waste stream estimates have been shown to contain organic content requiring excess hydrogen peroxide addition. Restoration of the PDM will ensure the ETF can accommodate the higher anticipated levels of organic content in these new influent streams. Due to low organic content levels in the current influents and some operability issues with the PDM, it has not been in operation since 1998. One aspect of the repair and upgrade of the PDM is the usability of manganese dioxide on alumina catalyst, Sud-Chemie T-2525, which was purchased in 2008 but has remained in storage since. The manufacturer of the catalyst states there is no known shelf life for the product and no current data to indicate the catalyst's performance after long-term storage. To determine the usability of the stored catalyst, a laboratory test was developed. The testing of this stored catalyst was based on testing methods and information collected from initial catalyst product testing performed in 2008. This test involved spiking the catalyst with 200 ppm hydrogen peroxide and then testing the resulting solution to determine the extent of peroxide destruction. Initial testing results of the Sud-Chemie T-2525 catalyst indicated reduced performance, so additional catalyst materials were selected for inclusion in the testing. These materials included Carulite{sup R} 200 catalyst, LayneOx{sup R}, natural manganese ore - pyrolusite (Pro-Ox{sup R}), and EnviCat{sup R} 2531 SPH 4-6. With the expansion of the test scope, fines generation testing was added to provide additional data for product selection, as excessive fines cause plugging in the PDM. The resulting test data are compared to the 2008 catalyst product testing data in order to evaluate performance of each product to determine whether the Sud-Chemie T-2525 is still viable and to determine the best candidate for its replacement. This testing provides essential information to the engineering and operations organizations managing the facility and equipment upgrades for the ETF. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FLUIDIZED BED STEAM REFORMING (FBSR) OF HIGH LEVEL WASTE (HLW) ORGANIC AND NITRATE DESTRUCTION PRIOR TO VITRIFICATION: CRUCIBLE SCALE TO ENGINEERING SCALE DEMONSTRATIONS AND NON-RADIOACTIVE TO RADIOACTIVE DEMONSTRATIONS

Over a decade ago, an in-tank precipitation process to remove Cs-137 from radioactive high level waste (HLW) supernates was demonstrated at the Savannah River Site (SRS). The full scale demonstration with actual HLW was performed in SRS Tank 48 (T48). Sodium tetraphenylborate (NaTPB) was added to enable Cs-137 extraction as CsTPB. The CsTPB, an organic, and its decomposition products proved to be problematic for subsequent processing of the Cs-137 precipitate in the SRS HLW vitrification facility for ultimate disposal in a HLW repository. Fluidized Bed Steam Reforming (FBSR) is being considered as a technology for destroying the organics and nitrates in the T48 waste to render it compatible with subsequent HLW vitrification. During FBSR processing the T48 waste is converted into organic-free and nitrate-free carbonate-based minerals which are water soluble. The soluble nature of the carbonate-based minerals allows them to be dissolved and pumped to the vitrification facility or returned to the tank farm for future vitrification. The initial use of the FBSR process for T48 waste was demonstrated with simulated waste in 2003 at the Savannah River National Laboratory (SRNL) using a specially designed sealed crucible test that reproduces the FBSR pyrolysis reactions, i.e. carbonate formation, organic and nitrate destruction. This was followed by pilot scale testing of simulants at the Science Applications International Corporation (SAIC) Science & Technology Application Research (STAR) Center in Idaho Falls, ID by Idaho National Laboratory (INL) and SRNL in 2003-4 and then engineering scale demonstrations by THOR{reg_sign} Treatment Technologies (TTT) and SRS/SRNL at the Hazen Research, Inc. (HRI) test facility in Golden, CO in 2006 and 2008. Radioactive sealed crucible testing with real T48 waste was performed at SRNL in 2008, and radioactive Benchscale Steam Reformer (BSR) testing was performed in the SRNL Shielded Cell Facility (SCF) in 2008.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design, development, and test of Shuttle/Centaur G-prime cryogenic tankage thermal protection systems

The thermal protection systems (TPS) for the Shuttle/Centaur were designed to provide fail-safe thermal protection during prelaunch, launch ascent, and on-orbit operations as well as during potential abort, where the Shuttle and Centaur would return to earth. The TPS selected used a helium-purged polyimide foam beneath three radiation shields for the liquid-hydrogen (LH2) tank and radiation shields only for the liquid-oxygen (LO2) tank. A double-walled vacuum bulkhead separated the two tanks. The LH2 tank had one 1.9 cm-thick layer of foam on the forward bulkhead and two layers on the larger-area sidewall. Full scale tests of the flight vehicle in a simulated Shuttle cargo bay gave total prelaunch heating rates of 29.5 and 12.9 kW for the LH2 and LO2 tanks, respectively. Calorimeter tests on a representative sample of the LH2 tank sidewall TPS indicated that the measured unit heating one would rapidly decrease from the prelaunch rate of about 300 W/sq m to a desired rate less than 4 W/sq m once on-orbit.

Macneil, Peter N.↗

Modeling of Electric Water Heaters for Demand Response: A Baseline PDE Model

Demand response (DR)control can effectively relieve balancing and frequency regulation burdens on conventional generators, facilitate integrating more renewable energy, and reduce generation and transmission investments needed to meet peak demands. Electric water heaters (EWHs) have a great potential in implementing DR control strategies because: (a) the EWH power consumption has a high correlation with daily load patterns; (b) they constitute a significant percentage of domestic electrical load; (c) the heating element is a resistor, without reactive power consumption; and (d) they can be used as energy storage devices when needed. Accurately modeling the dynamic behavior of EWHs is essential for designing DR controls. Various water heater models, simplified to different extents, were published in the literature; however, few of them were validated against field measurements, which may result in inaccuracy when implementing DR controls. In this paper, a partial differential equation physics-based model, developed to capture detailed temperature profiles at different tank locations, is validated against field test data for more than 10 days. The developed model shows very good performance in capturing water thermal dynamics for benchmark testing purposes

Balancing service, demand response, electric water↗

Effect of Phosphate, Fluoride, and Nitrate on Gibbsite Dissolution Rate and Solubility

Laboratory tests have been completed with simulated tank waste samples to investigate the effects of phosphate, fluoride, and nitrate on the dissolution rate and equilibrium solubility of gibbsite in sodium hydroxide solution at 22 and 40{degrees}C. Results are compared to relevant literature data and to computer model predictions. The presence of sodium nitrate (3 M) caused a reduction in the rate of gibbsite dissolution in NaOH, but a modest increase in the equilibrium solubility of aluminum. The increase in solubility was not as large, though, as the increase predicted by the computer model. The presence of phosphate, either as sodium phosphate or sodium fluoride phosphate, had a negligible effect on the rate of gibbsite dissolution, but caused a slight increase in aluminum solubility. The magnitude of the increased solubility, relative to the increase caused by sodium nitrate, suggests that the increase is due to ionic strength (or water activity) effects, rather than being associated with the specific ion involved. The computer model predicted that phosphate would cause a slight decrease in aluminum solubility, suggesting some Al-PO4 interaction. No evidence was found of such an interaction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Melt-Spun PAN Precursor for Cost-Effective Carbon Fibers in High Pressure Compressed Gas Tankage

The objective of this program was to synthesize melt-spinnable polyacrylonitrile (PAN) precursor that will lead to carbon fiber 25% less expensive than carbon fiber produced from conventional PAN precursor when produced in large volumes. The carbon fiber produced from this precursor needs to achieve ≥ 700 ksi tensile strength with this cost reduction to replace the incumbent fiber. In this program, the technology for producing precursor and then converted carbon fiber (CF) capable of meeting the 700 ksi target was to be demonstrated at a small scale in tows, containing ≥ 100 filaments. If this program moved on to a “Phase 2”, the processes would be scaled up to produce and test Type IV compressed gas storage tanks capable of meeting the 700-bar ultimate targeted FOA performance level. Precursor fiber production typically contributes a large fraction (~50%) to finished CF manufactured cost. Presently, all high strength CFs are manufactured from solution spun PAN precursor, accomplished at low temperatures using large amounts of environmentally unfriendly solvents that impart major impact to line speed and costs involved with handling and reclaiming the solvents and associated “waste streams” required in spinning and extracting those solvents. PAN melt spinning was demonstrated by the company BASF in CF precursor production and used in production of some other acrylic fibers, but significant production challenges remain for meeting the established CF metrics. Melt spinning requires use of plasticizers to suppress the melt temperature of the predominantly PAN formulation to a point sufficiently below the temperature of significant cross-linking. Fortunately, BASF and this team’s earlier work had demonstrated acrylic formulations melt spun with combinations of plasticizing solvents at much lower solvent levels. This project team made significant progress in understanding technical issues and identifying formulation pathways in earlier work in this area where >250ksi strength was achieved. The goal of this program was to pursue a more comprehensive approach with a larger, more diverse team having greater equipment design and overall production capabilities to push rapidly beyond the science to resolve remaining “engineering” issues associated with establishing stable, continuous processes for precursor fiber leading to enhanced, cost-effective CF and composite tank production.

36 MATERIALS SCIENCE↗

Ultrasonic Examination of Double-Shell Tank 241-AW-105 Examination Completed April 2009.

AREVA Federal Services LLC (AFS), under a contract from Washington River Protection Solutions (WRPS), has performed an ultrasonic examination of selected portions of Double-Shell Tank 241-AW-105. PNNL is responsible for preparing a report(s) that describes the results of the AFS ultrasonic examinations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Weld leaks rapidly and safely detected

Test method detects leaks that occur during hydrostatic pressure testing of welded joints in metal tanks. A strip of aluminum foil and a strip of water-soluble paper are placed over the weld. A voltage applied between the tank wall and the foil strip is monitored to detect a decrease in ohmic resistance caused by water leakage into the paper layer.

Source record↗

Draw forming of scale shuttle external tank dome gores

The process for manufacturing external tank dome gores is discussed. The test fixture and test procedure are described. The characteristics of the draw forming die are analyzed. The specific subjects included are: (1) forming, (2) trimming, (3) cleaning, and (4) heat treatment.

Garfield, G.↗