Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗

Multilane Automated Driving With Optimal Control and Mixed-Integer Programming

Road vehicle lane changes often initiate traffic disturbances and can therefore impact road networks’ energy and time efficiency. Furthermore, unexpected changes in traffic conditions may also render lane changes counterproductive for the lane-changing vehicle. Vehicle-to-vehicle connectivity combined with anticipative control could address these challenges via improved lane change decisions by automated vehicles. In a move toward this objective, receding horizon control cast as a mixed-integer quadratic program is used to plan lane changing and acceleration in a coupled optimization. A long-term pacing module, based on Pontryagin’s minimum principle from optimal control theory, sets terminal and input references for receding horizon control to target a user’s expected travel time. To remove nonlinear vehicle dynamics from the receding horizon controller, lane change commands are passed to a pure pursuit steering module whose response is approximated by a second-order linear model. Here, comparison against a rule-based reactive algorithm in arterial and highway scenarios shows an 8.9%–13.7% reduction in energy consumption and a 5.2%–10.3% reduction in the travel time, along with navigational improvements.

33 ADVANCED PROPULSION SYSTEMS↗

Space science at NASA - Retrospect and prospect

Following a brief overview of past accomplishments in space science, a status report is given concerning progress toward recovering from the Challenger accident and a number of trends are described which are likely to have a major influence on the future of the NASA Space Science program. Key changes in process include a trend toward a program centered on the use of large, long-lived facilities, the emergence of strong space capabilities outside the U.S., and steps being taken toward the diversification of NASA's launch capability. A number of recent planning activities are also discussed. Major considerations which will specifically need to be taken into account in NASA's prgram planning include the need for provision of a spectrum of flight activities and the need to recognize likely resource limitations and to do more realistic program planning.

Rosendhal, Jeffrey D.↗

Habitation Concepts and Tools for Asteroid Missions and Commercial Applications

In 2009 studies were initiated in response to the Augustine Commission s review of the Human Spaceflight Program to examine the feasibility of additional options for space exploration beyond the lunar missions planned in the Constellation Program. One approach called a Flexible Path option included possible human missions to near-Earth asteroids. This paper presents an overview of possible asteroid missions with emphasis on the habitation options and vehicle configurations conceived for the crew excursion vehicles. One launch vehicle concept investigated for the Flexible Path option was to use a dual launch architecture that could serve a wide variety of exploration goals. The dual launch concept used two medium sized heavy lift launch vehicles for lunar missions as opposed to the single Saturn V architecture used for the Apollo Program, or the one-and-a-half vehicle Ares I / Ares V architecture proposed for the Constellation Program. This dual launch approach was studied as a Flexible Path option for lunar missions and for possible excursions to other destinations like geosynchronous earth orbiting satellites, Lagrange points, and as presented in this paper, asteroid rendezvous. New habitation and exploration systems for the crew are presented that permit crew sizes from 2 to 4, and mission durations from 100 to 360 days. Vehicle configurations are presented that include habitation systems and tools derived from International Space Station (ISS) experience and new extra-vehicular activity tools for asteroid exploration, Figure 1. Findings from these studies and as presented in this paper indicate that missions to near-Earth asteroids appear feasible in the near future using the dual launch architecture, the technologies under development from the Constellation Program, and systems derived from the current ISS Program. In addition, the capabilities derived from this approach that are particularly beneficial to the commercial sector include human access to geosynchronous orbit and the Lagrange points with new tools for satellite servicing and in-space assembly.

Smitherman, David↗

Evaluation of nonmetallic thermal protection materials for the manned space shuttle. Volume 1, task 1: Assessment of technical risks associated with utilization of nonmetallic thermal protection system

Technical problems of design and flight qualification of the proposed classes of surface insulation materials and leading edge materials were reviewed. A screening test plan, a preliminary design data test plan and a design data test plan were outlined. This program defined the apparent critical differences between the surface insulators and the leading edge materials, structuring specialized screening test plans for each of these two classes of materials. Unique testing techniques were shown to be important in evaluating the structural interaction aspects of the surface insulators and a separate task was defined to validate the test plan. In addition, a compilation was made of available information on proposed material (including metallic TPS), previous shuttle programs, pertinent test procedures, and other national programs of merit. This material was collected and summarized in an informally structured workbook.

Wilkinson, W. H.↗

Achieving Maximum Integration Utilizing Requirements Flow Down

A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.

Archiable, Wes↗

The dish-Rankine SCSTPE program (Engineering Experiment no. 1)

Activities planned for phase 2 Of the Small Community Solar Thermal Power Experiment (PFDR) program are summarized with emphasis on a dish-Rankine point focusing distributed receiver solar thermal electric system. Major design efforts include: (1) development of an advanced concept indirect-heated receiver;(2) development of hardware and software for a totally unmanned power plant control system; (3) implementation of a hybrid digital simulator which will validate plant operation prior to field testing; and (4) the acquisition of an efficient organic Rankine cycle power conversion unit. Preliminary performance analyses indicate that a mass-produced dish-Rankine PFDR system is potentially capable of producing electricity at a levelized busbar energy cost of 60 to 70 mills per KWh and with a capital cost of about $1300 per KW.

Pons, R. L.↗

The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

Bronstein, L.↗

Guidance system operations plan for manned CM earth orbital missions using program Skylark 1. Section 2: Data links

A computer program to define the digital uplink and downlink for use in manned command module orbital missions is presented. The subjects discussed are: (1) digital uplink to command module, (2) CMC digital downlink, (3) downlist formats, (4) description of telemetered qualities, (5) flagbits, and (6) effects of Fresh Start (V36) and Hardware Restart on flagword and channel bits.

Hamilton, M. H.↗

Lower payload costs through refurbishment and module replacement.

Payload benefits to be derived from refurbishment can be related to individual spacecraft programs directly and for planning purposes to the entire shuttle mission model. In the case of the large space telescope program, cost savings obtained through the use of the shuttle for maintenance operations have been estimated to be in the range from 30 to 40%. This saving is realized over an operational lifetime of 15 years by reducing, through refurbishment on orbit, the number of flight units along with 'optimized' reliability goals commensurate with periodic maintenance revisits at one-year intervals. Shuttle-era payload implications are discussed together with a pressurized on-orbit maintenance configuration, an earth observation satellite, and some typical teleoperator-serviced spacecraft.

Murphy, J. T.↗

International Space Station Freedom Program (SSFP) flight test demonstrations - Results and future plans

SSFP flight test demonstrations conducted to verify and quantify the performance of selected technologies needed for the development of the Space Station are described. Attention is focused on the performance of thermal systems, the effects of atomic oxygen on materials, and the difficulties of on-orbit crew mobility for assembly and operations utilizing either extravehicular robots or methods. Consideration is given to challenges in system development, a technology assessment summary for the areas of thermal systems, materials, EVA activities, and the results of flight demonstrations.

Simon, William E.↗

Telescope optical systems program overview

Telescope Optical Systems is a new focused program of technology development that will shape and enable the new 'telescope' missions being studied and planned by NASA. The program structure contains six major elements: systems, optics, materials, structures, controls, and integration and test. Activities in each element will address key technology issues that support a wide range of user needs. Program goals, technology needs, and technology performance objectives are summarized in outline form.

Hirschbein, Murray S.↗

Pathways to International Coordination in Space Weather

The United Nations Committee for the Peaceful Uses of Outer Space(UN-COPUOS) in its 2022 Space Weather Expert Group report, called upon the World Meteorological Organization (WMO), the InternationalSpace Environment Service (ISES) and the Committee on Space Research (COSPAR) to take a leadership role in improving the global coordination of space weather activities in consultation and collaboration with other relevant actors and international organizations. The three organizations have established a framework for trusting partnership while minimizing duplication of efforts and have agreed on three distinct domains in which the particular expertise and strengths of each of the three were identified: Research and Development (COSPAR), Facilitating Integration (WMO), andServices (ISES). The next stage in building a pathway to improved coordination is to lay the same foundation with other relevant organizations and actors engaged in space weather. We will present outcomes of the first International Space Weather Coordination Forum intending to shape the future of international collaboration on space weather with the ultimate aim of increasing the community’s ability to mitigate space environment threats. We will discuss approaches to alignments of bottom-up initiatives and community-driven roadmaps with national/regional strategic planning activities and funding programs. We will also review opportunities for taking advantage ofInternational Space Weather Action Teams (ISWAT) for planning pilot projects to demonstrate the value of collaboration and coordination.

Maria M Kuznetsova↗

The Relationship of Hydrology in the Green River to Colorado Pikeminnow Populations

The Federally listed Colorado Pikeminnow (CP) (Ptychocheilus Lucius) has been declining in the Green River Basin over the last 20 years. Muth et al. (2000) recommended flows and temperatures to benefit endangered fish species downstream of Flaming Gorge Dam on the Green River. The recommendations identified a range of flows during the base flow period (flows that occur after the annual snowmelt runoff period, usually from early summer to the following spring) that were intended to benefit CP. The recommendations indicated that the mean flow for the summer–winter period should be established each year on the basis of anticipated hydrologic conditions, but adjustments could be made if hydrologic conditions change. Flow should gradually decline from peak flow to base flow, with the base flow reached by early to middle summer (depending on hydrologic conditions) and maintained through February. The rate of decline should depend on rates of decline in Yampa River flows and the recommended rates of decline for dam releases. No specific recommendations were made for base flow variation in Reach 1, but variation around the annual mean base flow should be restricted to achieve recommended levels of variation in Reach 2 (middle Green River) (Table 5.5 in Muth et al. 2000). Implementation of the flow and temperature recommendations served as the proposed action for an EIS on Flaming Gorge Dam operations. A Biological Assessment of the impacts on endangered species of implementing the recommendations was prepared and a Biological Opinion that called for development of a study plan to examine the effects of implementation. Projects to address this evaluation were identified in the Green River Study Plan and have been conducted since then. The purpose of the Study Plan was to identify and recommend to the Recovery Program those monitoring or research projects necessary for implementation and evaluation of the flow and temperature recommendations. Those projects included studies to evaluate the anticipated effects of implementing the recommendations (including potential adverse effects identified in the 2006 Biological Opinion) and studies to examine recognized uncertainties of the recommendations. A new recovery program summer base flow study plan was approved in September of 2020 to evaluate stable and elevated summer base flows below Flaming Gorge Dam intended to benefit CP spawning and rearing success. Anecdotal observations suggest CP production may have been higher in years prior to flow restrictions for endangered fish. Based on long-term CP monitoring data in the Green River, Bestgen and Hill (2016) concluded that CP would benefit from higher summer baseflows (1,700-3,000 ft 3 /sec) with flows above or below associated with lower abundance of age-0 CP. Therefore, flexibility in the ROD is currently being utilized to establish higher stable summer base flows in an attempt create more advantageous conditions for spawning and rearing CP. These fish recovery flows are restrictive to WAPA in the summer months, therefore it is necessary to conduct an analysis of historic river data relationships to CP abundance to better understand if the recommended fish flows (elevated and stable base flows) are necessary for fish recovery.

54 ENVIRONMENTAL SCIENCES↗

Apollo Expeditions to the Moon

The Apollo program is described from the planning stages through Apollo 17. The organization of the program is discussed along with the development of the spacecraft and related technology. The objectives and accomplishments of each mission are emphasized along with personal accounts of the major figures involved. Other topics discussed include: ground support systems and astronaut selection.

Cortright, E. M.↗

Advanced crew station concepts, displays, and input/output technology for civil aircraft of the future

Current efforts on a new Cockpit Avionics Research program are described. The major thrusts of the program presented include: a comparative analysis of advanced display media and development of promising selected media, development of flight display generation techniques, and identification and development of promising I/O technology. In addition, the advanced integrated display concepts described include a 'tunnel in the sky' display and a traffic situation display with associated keyboard. Finally, the Cockpit Avionics Research program is summarized, future research plans are presented, and the need for an expanded program is discussed.

Hatfield, J. J.↗