Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Improving The Discipline of Cost Estimation and Analysis

The need to improve the quality and accuracy of cost estimates of proposed new aerospace systems has been widely recognized. The industry has done the best job of maintaining related capability with improvements in estimation methods and giving appropriate priority to the hiring and training of qualified analysts. Some parts of Government, and National Aeronautics and Space Administration (NASA) in particular, continue to need major improvements in this area. Recently, NASA recognized that its cost estimation and analysis capabilities had eroded to the point that the ability to provide timely, reliable estimates was impacting the confidence in planning many program activities. As a result, this year the Agency established a lead role for cost estimation and analysis. The Independent Program Assessment Office located at the Langley Research Center was given this responsibility. This paper presents the plans for the newly established role. Described is how the Independent Program Assessment Office, working with all NASA Centers, NASA Headquarters, other Government agencies, and industry, is focused on creating cost estimation and analysis as a professional discipline that will be recognized equally with the technical disciplines needed to design new space and aeronautics activities. Investments in selected, new analysis tools, creating advanced training opportunities for analysts, and developing career paths for future analysts engaged in the discipline are all elements of the plan. Plans also include increasing the human resources available to conduct independent cost analysis of Agency programs during their formulation, to improve near-term capability to conduct economic cost-benefit assessments, to support NASA management's decision process, and to provide cost analysis results emphasizing "full-cost" and "full-life cycle" considerations. The Agency cost analysis improvement plan has been approved for implementation starting this calendar year. Adequate financial and human resources are being made available to accomplish the goals of this important effort, and all indications are that NASA's cost estimation and analysis core competencies will be substantially improved within the foreseeable future.

Piland, William M.↗

The Proposed NASA Pyroshock Test Criteria Standard - Part I

The National Aeronautics and Space Administration has traditionally left the task of specifying design and test criteria to each of the several NASA Centers. Faced with the wide variety fo resulting criteria used for resolving similar or identical problems, the NASA Office of Chief Engineer initiated a program to develop consistent NASA-wide standards if the various NASA Centers could agree to a set of common requirements.

pyrotechnic shock shock testing pyrotechnic testin↗

Hierarchical Segmentation Enhances Diagnostic Imaging

Bartron Medical Imaging LLC (BMI), of New Haven, Connecticut, gained a nonexclusive license from Goddard Space Flight Center to use the RHSEG software in medical imaging. To manage image data, BMI then licensed two pattern-matching software programs from NASA's Jet Propulsion Laboratory that were used in image analysis and three data-mining and edge-detection programs from Kennedy Space Center. More recently, BMI made NASA history by being the first company to partner with the Space Agency through a Cooperative Research and Development Agreement to develop a 3-D version of RHSEG. With U.S. Food and Drug Administration clearance, BMI will sell its Med-Seg imaging system with the 2-D version of the RHSEG software to analyze medical imagery from CAT and PET scans, MRI, ultrasound, digitized X-rays, digitized mammographies, dental X-rays, soft tissue analyses, moving object analyses, and soft-tissue slides such as Pap smears for the diagnoses and management of diseases. Extending the software's capabilities to three dimensions will eventually enable production of pixel-level views of a tumor or lesion, early identification of plaque build-up in arteries, and identification of density levels of microcalcification in mammographies.

Source record↗

Ensuring US National Aeronautics Test Capabilities

U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD). However, changes in the Aerospace landscape, primarily the decrease in demand for testing over the last 20 years required an overarching strategy for management of these national assets. Therefore, NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD. Test facility utilization is a critical factor for ATP because it relies on user occupancy fees to recover a substantial part of the operations costs for its facilities. Decreasing utilization is an indicator of excess capacity and in some cases low-risk redundancy (i.e., several facilities with basically the same capability and overall low utilization). However, low utilization does not necessarily translate to lack of strategic importance. Some facilities with relatively low utilization are nonetheless vitally important because of the unique nature of the capability and the foreseeable aeronautics testing needs. Unfortunately, since its inception, the customer base for ATP has continued to shrink. Utilization of ATP wind tunnels has declined by more than 50% from the FY 2006 levels. This significant decrease in customer usage is attributable to several factors, including the overall decline in new programs and projects in the aerospace sector; the impact of computational fluid dynamics (CFD) on the design, development, and research process; and the reductions in wind tunnel testing requirements within the largest consumer of ATP wind tunnel test time, the Aeronautics Research Mission Directorate (ARMD). Retirement of the Space Shuttle Program and recent perturbations of NASA's Constellation Program will exacerbate this downward trend. Therefore it is crucial that ATP periodically revisit and determine which of its test capabilities are strategically important, which qualify as low-risk redundancies that could be put in an inactive status or closed, and address the challenges associated with both sustainment and improvements to the test capabilities that must remain active. This presentation will provide an overview of the ATP vision, mission, and goals as well as the challenges and opportunities the program is facing both today and in the future. We will discuss the strategy ATP is taking over the next five years to address the National aeronautics test capability challenges and what the program will do to capitalize on its opportunities to ensure a ready, robust and relevant portfolio of National aeronautics test capabilities.

Marshall, Timothy J.↗

Channel Wall Nozzle Manufacturing and Hot-Fire Testing Using a Laser Wire Direct Closeout Technique for Liquid Rocket Engines

A regeneratively-cooled nozzle for liquid rocket engine applications is a significant cost of the overall engine due to the complexities of manufacturing a large thin-walled structure that must operate in extreme temperature and pressure environments. The National Aeronautics and Space Administration (NASA) has been investigating and advancing methods for fabrication of liquid rocket engine channel wall nozzles to realize further cost and schedule improvements over traditional techniques. The methods being evaluated are targeting increased scale required for current NASA and commercial space programs. Several advanced rapid fabrication methods are being investigated for forming of the inner liner, producing the coolant channels, closeout of the coolant channels, and fabrication of the manifolds. NASA's Marshall Space Flight Center (MSFC) has completed process development and subscale hot-fire testing of a series of these advanced fabrication channel wall nozzle technologies to gather performance data in a relevant environment. The primary fabrication technique being discussed in this paper is Laser Wire Direct Closeout (LWDC). This process has been developed to significantly reduce the time required for closeouts of regeneratively-cooled slotted liners. It allows for channel closeout to be formed in place in addition to the structural jacket without the need for channel fillers or complex tooling. Additional technologies were also tested as part of this program including water jet milling and arc-based additive manufacturing deposition. Each nozzle included different fabrication features, materials, and methods to demonstrate durability in a hot-fire environment. The results of design, fabrication, and hot-fire testing are discussed in this paper.

Gradl, Paul R.↗

Teacher Enhancement Institute

During the 1980's, a period of intense concern over educational quality in the United States, few indicators of U.S. student achievement garnered the interest of policy makers and pundits as successfully as the results of international testing in mathematics and science. This concern was so great that as a part of the Goals 2000 initiative, President George Bush indicated that 'By the year 2000, U.S. students should be first in the world in mathematics and science.' The Clinton Administration is placing a major emphasis, not only on rigorous academic standards and creating a new system for assessing students' progress, but also including professional development as a major focus. The argument being that teachers need more sustained, intensive training to prepare them to teach to higher standards. Executive order 12821 mandates that national laboratories 'assist in the mathematics and science education of our Nation's students, teachers, parents and the public by establishing programs at their agency to provide for training elementary and secondary school teachers to improve their knowledge of mathematics and science'. These and other issues led to the development of ideas for a project that addresses the need for excellence in mathematics, science and technology instruction. In response to these initiatives the NASA/LaRC Teacher Enhancement Institute was proposed. The TEI incorporated systemic reform perspectives, enhanced content knowledge for teachers, and teacher preparation. Emphasis was also placed on recruiting those educators who teach in impoverished urban school districts with at-risk student populations who have been traditionally under represented in science, mathematics, technology and engineering. Participants in the Teacher Enhancement Institute were 37 teachers from grades K-8, teaching in Region 2 in the state of Virginia, as well as 2 preservice teachers from Norfolk State University and one teacher from Dublin, Virginia, where a Science/Mathematics model school has been established. Teachers selected for this project represented school systems where income levels are extremely low, and students served tend not to receive innovative instruction in mathematics and science and their use of technology is limited. The Teacher Enhancement Institute contained several features, that when combined, allowed for a unique experience. Some of these features included local teachers, administrators and school board members as presenters, instruction and use of technology every day, tours of select features of the research facility, briefings by NASA/LaRC scientists, engineers and researchers as well as individuals from the Continuous Electron Beam Accelerator Facility (CEBAF). Another unique feature of this program is to have participants convene on three separate occasions throughout the academic year to discuss strategies for information dissemination and implementation results. Teachers' attitudes towards the use of technology, their ability to develop lessons using technology and their ability to develop lessons using information obtained through TEI were assessed using instruments developed by TEI summer faculty members. Data from these instruments were analyzed and reported in a final report submitted to the director of the Office of Education.

Marshall-Bradley, Tina↗

Astronaut Medical Selection and Flight Medicine Care During the Shuttle ERA 1981 to 2011

The NASA Shuttle Program began with congressional budget approval in January 5, 1972 and the launch of STS-1 on April 12, 1981 and recently concluded with the landing of STS-135 on July 21, 2011. The evolution of the medical standards and care of the Shuttle Era Astronauts began in 1959 with the first Astronaut selection. The first set of NASA minimal medical standards were documented in 1977 and based on Air Force, Navy, Department of Defense, and the Federal Aviation Administration standards. Many milestones were achieved over the 30 years from 1977 to 2007 and the subsequent 13 Astronaut selections and 4 major expert panel reviews performed by the NASA Flight Medicine Clinic, Aerospace Medicine Board, and Medical Policy Board. These milestones of aerospace medicine standards, evaluations, and clinical care encompassed the disciplines of preventive, occupational, and primary care medicine and will be presented. The screening and retention standards, testing, and specialist evaluations evolved through periodic expert reviews, evidence based medicine, and Astronaut medical care experience. The last decade of the Shuttle Program saw the development of the International Space Station (ISS) with further Space medicine collaboration and knowledge gained from our International Partners (IP) from Russia, Canada, Japan, and the European Space Agencies. The Shuttle Program contribution to the development and implementation of NASA and IP standards and waiver guide documents, longitudinal data collection, and occupational surveillance models will be presented along with lessons learned and recommendations for future vehicles and missions.

Johnston, S.↗

NASA Exploration Launch Projects Overview: The Crew Launch Vehicle and the Cargo Launch Vehicle Systems

The U.S. Vision for Space Exploration (January 2004) serves as the foundation for the National Aeronautics and Space Administration's (NASA) strategic goals and objectives. As the NASA Administrator outlined during his confirmation hearing in April 2005, these include: 1) Flying the Space Shuttle as safely as possible until its retirement, not later than 2010. 2) Bringing a new Crew Exploration Vehicle (CEV) into service as soon as possible after Shuttle retirement. 3) Developing a balanced overall program of science, exploration, and aeronautics at NASA, consistent with the redirection of the human space flight program to focus on exploration. 4) Completing the International Space Station (ISS) in a manner consistent with international partner commitments and the needs of human exploration. 5) Encouraging the pursuit of appropriate partnerships with the emerging commercial space sector. 6) Establishing a lunar return program having the maximum possible utility for later missions to Mars and other destinations. In spring 2005, the Agency commissioned a team of aerospace subject matter experts to perform the Exploration Systems Architecture Study (ESAS). The ESAS team performed in-depth evaluations of a number of space transportation architectures and provided recommendations based on their findings? The ESAS analysis focused on a human-rated Crew Launch Vehicle (CLV) for astronaut transport and a heavy lift Cargo Launch Vehicle (CaLV) to carry equipment, materials, and supplies for lunar missions and, later, the first human journeys to Mars. After several months of intense study utilizing safety and reliability, technical performance, budget, and schedule figures of merit in relation to design reference missions, the ESAS design options were unveiled in summer 2005. As part of NASA's systems engineering approach, these point of departure architectures have been refined through trade studies during the ongoing design phase leading to the development phase that begins in 2008. Comprehensive reviews of engineering data and business assessments by both internal and independent reviewers serve as decision gates to ensure that systems can fully meet customer and stakeholder requirements. This paper provides the current CLV and CaLV configuration designs and gives examples of the progress being made during the first year of this significant effort. Safe, reliable, cost-effective space transportation systems are a foundational piece of America s future in space and the next step in realizing the plan for revitalizing lunar capabilities on the passageway to the human exploration of Mars. While building on legacy knowledge and heritage hardware for risk reduction, NASA will apply lessons learned from developing these new launch vehicles to the growth path for future missions. The elements for mission success and continued U.S. leadership in space have been assembled over the past year. As NASA designs and develops these two new systems over the next dozen years, visible progress, such as that reported in this paper, may sustain the national will to stay the course across political administrations and weather the inevitable trials that will be experienced during this challenging endeavor.

Snoddy, Jimmy R.↗

Development of a uninterrupted power system: ac and dc to dc converter

This program covered the design, fabrication and testing of an advanced development model uninterrupted power system. The input and output requirements imposed on the power processor were specified such that the unit is electrically interchangeable with existing power systems used by the Federal Aviation Administration in installations which have a history of failure due to electrical transient conditions. Input power is from either of two single-phase ac power sources or batteries with electronic selection and transfer between power sources. Battery reconditioning is automatic when either ac source is present. The output power is rated at 84OW; the nominal output is 24V at 35A. Within the 84OW limit, the regulated output voltage is adjustable from 22V to 30Vdc. Protection against continuous overloading or short circuit is provided. The unit is packaged in a standard 19-inch rack mount configuration with 7-inch panel height. Controls are on the front panel with power input and output through connectors on the rear surface. Cooling is by free convection from fin areas located on the side and rear panels. The packaged unit weighs 52.8 lbs., which can be reduced significantly if a three-phase ac power source is used.

Cronin, D. L.↗

Satellite freeze forecast system. Operating/troubleshooting manual

Examples of operational procedures are given to assist users of the satellites freeze forecasting system (SFFS) in logging in on to the computer, executing the programs in the menu, logging off the computer, and setting up the automatic system. Directions are also given for displaying, acquiring, and listing satellite maps; for communicating via terminal and monitor displays; and for what to do when the SFFS doesn't work. Administrative procedures are included.

Martsolf, J. D.↗

An intermediary's perspective of online databases for local governments

Numerous public administration studies have indicated that local government agencies for a variety of reasons lack access to comprehensive information resources; furthermore, such entities are often unwilling or unable to share information regarding their own problem-solving innovations. The NASA/University of Kentucky Technology Applications Program devotes a considerable effort to providing scientific and technical information and assistance to local agencies, relying on its access to over 500 distinct online databases offered by 20 hosts. The author presents a subjective assessment, based on his own experiences, of several databases which may prove useful in obtaining information for this particular end-user community.

Jack, R. F.↗

A Fan Concept to Meet the 2017 Noise Goals

The National Aeronautics and Space Administration has established a goal of a 20 EPNdB reduction of aircraft noise by the year 2017. This paper proposes a fan concept for an engine that may meet this noise goal. The concept builds upon technology established during the Advanced Subsonic Technology Program which should show a 10 dB reduction potential. The new concept uses a two stage fan which allows low tip speed while still maintaining a reasonable total pressure rise across the two stages. The concept also incorporates many other noise reduction techniques in addition to low tip speed including a low number of exit guide vanes, swept and leaned guide vanes, a high subsonic Mach number inlet and syncrophased rotors to obtain active noise cancellation. The fan proposed in this paper is calculated to be able to achieve the 2017 noise goal.

Dittmar, James H.↗

A Fan Concept to Meet the 2017 Noise Goals

The National Aeronautics and Space Administration has established a goal of a 20 EPNdB reduction of aircraft noise by the year 2017. This paper proposes a fan concept for an engine that may meet this noise goal. The concept builds upon technology established during the Advanced Subsonic Technology Program which should show a 10 dB reduction potential. The new concept uses a two stage fan which allows low tip speed while still maintaining a reasonable total pressure rise across the two stages. The concept also incorporates many other noise reduction techniques in addition to low tip speed including a low number of exit guide vanes, swept and leaned guide vanes, a high subsonic Mach number inlet and syncrophased rotors to obtain active noise cancellation. The fan proposed in this paper is calculated to be able to achieve the 2017 noise goal.

Dittmar, James H.↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Moving Towards a Common Ground and Flight Data Systems Architecture for NASA's Exploration Missions

The National Aeronautics and Space Administration has embarked on an ambitious effort to return man to the moon and then on to Mars. The Exploration Vision requires development of major new space and ground assets and poses challenges well beyond those faced by many of NASA's recent programs. New crewed vehicles must be developed. Compatible supply vehicles, surface mobility modules and robotic exploration capabilities will supplement the manned exploration vehicle. New launch systems will be developed as well as a new ground communications and control infrastructure. The development must take place in a cost-constrained environment and must advance along an aggressive schedule. Common solutions and system interoperability and will be critical to the successful development of the Exploration data systems for this wide variety of flight and ground elements. To this end, NASA has assembled a team of engineers from across the agency to identify the key challenges for Exploration data systems and to establish the most beneficial strategic approach to be followed. Key challenges and the planned NASA approach for flight and ground systems will be discussed in the paper. The described approaches will capitalize on new technologies, and will result in cross-program interoperability between spacecraft and ground systems, from multiple suppliers and agencies.

Rader. Steve↗

Planning for Plume Diagnostics for Ground Testing of J-2X Engines at the SSC

John C. Stennis Space Center (SSC) is the premier test facility for liquid rocket engine development and certification for the National Aeronautics and Space Administration (NASA). Therefore, it is no surprise that the SSC will play the most prominent role in the engine development testing and certification for the J-2X engine. The Pratt & Whitney Rocketdyne J-2X engine has been selected by the Constellation Program to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage in NASA s strategy of risk mitigation for hardware development by building on the Apollo program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. Accordingly, J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development and testing efforts. In order to leverage SSC s successful and innovative expertise in the plume diagnostics for the space shuttle main engine (SSME) health monitoring,1-10 this paper will present a blueprint for plume diagnostics for various proposed ground testing activities for J-2X at SSC. Complete description of the SSC s test facilities, supporting infrastructure, and test facilities is available in Ref. 11. The A-1 Test Stand is currently being prepared for testing the J-2X engine at sea level conditions. The A-2 Test Stand is currently being used for testing the SSME and may also be used for testing the J-2X engine at sea level conditions in the future. Very recently, ground-breaking ceremony for the new A-3 rocket engine test stand took place at SSC on August 23, 2007. A-3 is the first large - scale test stand to be built at the SSC since the A and B stands were constructed in the 1960s. The A-3 Test Stand will be used for testing J-2X engines under vacuum conditions simulating high altitude operation at approximately 30,480 m (100,000 ft). To achieve the simulated altitude environment, chemical steam generators using isopropyl alcohol, LOX, and RELEASED - Printed documents may be obsolete; validate prior to use. water would run for the duration of the test and would generate approximately 2096 Kg/s of steam to reduce pressure in the test cell and downstream of the engine. The testing at the A-3 Test Stand is projected to begin in late 2010, meanwhile the J-2X component testing on A-1 is scheduled to begin later this year.

SaintCyr, William W.↗

Performance and Stability Analyses of Rocket Combustion Devices Using Liquid Oxygen/Liquid Methane Propellants

Liquid rocket engines using oxygen and methane propellants are being considered by the National Aeronautics and Space Administration (NASA) for in-space vehicles. This propellant combination has not been previously used in flight-qualified engine systems, so limited test data and analysis results are available at this stage of early development. NASA has funded several hardware-oriented programs with oxygen and methane propellants over the past several years with the Propulsion and Cryogenic Advanced Development (PCAD) project, under the Exploration Technology Development Program. As part of this effort, NASA Marshall Space Flight Center has conducted combustion, performance, and combustion stability analyses of several of the configurations on these programs. This paper summarizes these analyses. Test and analysis results of impinging and coaxial element injectors using liquid oxygen and liquid methane propellants are included. Several cases with gaseous methane are included for reference. Several different thrust chamber configurations have been modeled, including thrust chambers with multi-element like-on-like and swirl coax element injectors tested at NASA MSFC, and a unielement chamber with shear and swirl coax injectors tested at The Pennsylvania State University. Configurations were modeled with two one-dimensional liquid rocket combustion analysis codes, the Rocket Combustor Interaction Design and Analysis (ROCCID), and the Coaxial Injector Combustion Model (CICM). Significant effort was applied to show how these codes can be used to model combustion and performance with oxygen/methane propellants a priori, and what anchoring or calibrating features need to be applied or developed in the future. This paper describes the test hardware configurations, presents the results of all the analyses, and compares the results from the two analytical methods.

Hulka, James R.↗

Aeroelastic Airworthiness Assesment of the Adaptive Compliant Trailing Edge Flaps

The Adaptive Compliant Trailing Edge (ACTE) demonstrator is a joint task under the National Aeronautics and Space Administration Environmentally Responsible Aviation Project in partnership with the Air Force Research Laboratory and FlexSys, Inc. (Ann Arbor, Michigan). The project goal is to develop advanced technologies that enable environmentally friendly aircraft, such as adaptive compliant technologies. The ACTE demonstrator flight-test program encompassed replacing the Fowler flaps on the SubsoniC Aircraft Testbed, a modified Gulfstream III (Gulfstream Aerospace, Savannah, Georgia) aircraft, with control surfaces developed by FlexSys. The control surfaces developed by FlexSys are a pair of uniquely-designed unconventional flaps to be used as lifting surfaces during flight-testing to validate their structural effectiveness. The unconventional flaps required a multidisciplinary airworthiness assessment to prove they could withstand the prescribed flight envelope. Several challenges were posed due to the large deflections experienced by the structure, requiring non-linear analysis methods. The aeroelastic assessment necessitated both conventional and extensive testing and analysis methods. A series of ground vibration tests (GVTs) were conducted to provide modal characteristics to validate and update finite element models (FEMs) used for the flutter analyses for a subset of the various flight configurations. Numerous FEMs were developed using data from FlexSys and the ground tests. The flap FEMs were then attached to the aircraft model to generate a combined FEM that could be analyzed for aeroelastic instabilities. The aeroelastic analysis results showed the combined system of aircraft and flaps were predicted to have the required flutter margin to successfully demonstrate the adaptive compliant technology. This paper documents the details of the aeroelastic airworthiness assessment described, including the ground testing and analyses, and subsequent flight-testing performed on the unconventional ACTE flaps.

aeroelasticity↗