Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “design guidelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Satellite services handbook. Interface guidelines

Satellite interfaces for on orbit servicing, both manned and unmanned are identified, and is intended to be used by designers of space vehicles, both foreign and domestic. A primary concern is for design of interfaces with the astronaut in the loop, especially extravehicular activity, but also intravehicular activity and operations that are remote but have man-in-the-loop. The main emphasis is on servicing in low earth orbits from the Space Shuttle and also from the Space Station or other platforms.

Source record↗

The human role in space. Volume 3: Generalizations on human roles in space

The human role in space was studied. The role and the degree of direct involvement of humans that will be required in future space missions, was investigated. Valid criteria for allocating functional activities between humans and machines were established. The technology requirements, ecnomics, and benefits of the human presence in space were examined. Factors which affect crew productivity include: internal architecture; crew support; crew activities; LVA systems; IVA/EVA interfaces; and remote systems management. The accomplished work is reported and the data and analyses from which the study results are derived are included. The results provide information and guidelines to enable NASA program managers and decision makers to establish, early in the design process, the most cost effective design approach for future space programs, through the optimal application of unique human skills and capabilities in space.

Source record↗

Multiple-Purpose Subsonic Naval Aircraft (MPSNA): Multiple Application Propfan Study (MAPS)

Study requirements, assumptions and guidelines were identified regarding carrier suitability, aircraft missions, technology availability, and propulsion considerations. Conceptual designs were executed for two missions, a full multimission aircraft and a minimum mission aircraft using three different propulsion systems, the UnDucted Fan (UDF), the Propfan and an advanced Turbofan. Detailed aircraft optimization was completed on those configurations yielding gross weight performance and carrier spot factors. Propfan STOVL conceptual designs were exercised also to show the effects of STOVL on gross weight, spot factor and cost. An advanced technology research plan was generated to identify additional investigation opportunities from an airframe contractors standpoint. Life cycle cost analysis was accomplished yielding a comparison of the UDF and propfan configurations against each other as well as against a turbofan with equivalent state of the art turbo-machinery.

Engelbeck, R. M.↗

Instrumentation and calibration issues for Space Station Freedom and future space projects

Space-based instrumentation calibration for long duration and remote space missions is discussed. The traditional approach, in which instrumentation was an afterthought in the space program design process and calibration was not even addressed until after design was completed, are discussed. Current issues and approaches to calibration are discussed, and guidelines are developed to instrumentation calibration for the Space Station Freedom and beyond.

Bushman, David M.↗

Vehicle health management technology needs

Background material on vehicle health management (VHM) and health monitoring/control is presented. VHM benefits are described and a list of VHM technology needs that should be pursued is presented. The NASA funding process as it impacts VHM technology funding is touched upon, and the VHM architecture guidelines for generic launch vehicles are described. An example of a good VHM architecture, design, and operational philosophy as it was conceptualized for the National Launch System program is presented. Consideration is given to the Strategic Avionics Technology Working Group's role in VHM, earth-to-orbit, and space vehicle avionics technology development considerations, and some actual examples of VHM benefits for checkout are given.

Hammond, Walter E.↗

Studying the Impact of IBR Modeling on the Commonly Applied Transmission Line Protective Elements

It is a well-accepted fact that detailed inverter-based resource (IBR) models are needed for electromagnetic transient (EMT) studies, especially for protection studies and protection designs. However, it is not clear which modeling aspects should be included in the EMT model to accurately represent the IBR fault responses. Therefore, this paper addresses this gap by evaluating the impact of key modeling aspects (DC source, inverter model, power control, current/voltage control, and current limiting) on the response of protective relay elements both qualitatively and quantitatively. Both grid-following (GFL) and grid-forming (GFM) IBR models are comprehensively evaluated through a simplified real-world transmission network by varying the IBR modeling aspects, fault locations, and types. The insights and findings from this paper will benefit the power system protection community because this work provides modeling requirements and guidelines for IBR modeling so that correct IBR models will be used for protection scheme settings design.

grid-following inverter↗

Boom Softening and Nacelle Integration on an Arrow-Wing High-Speed Civil Transport Concept

During the last cycle of concept design and wind-tunnel testing, the goal of the low-boom- shaped HSCT concepts (the B-935, the LB-16, and the LB- 1 8) was to meet mission requirements and generate shaped, ground-level pressure signatures with nose shock strengths of 1.0 psf or less. The wind-tunnel tests of these concepts produced results that were partially successful and encouraging although not fully up to expectations. In spite of this, however, these conceptual designs were overly optimistic and not acceptable because: the wing planforms had excessive area; the wing structural aspect ratio was too high; one concept had aft-fuselage rather than under-the-wing engines; and the gross takeoff weights were unrealistically low because of engines that were early, high-tech versions of later, revised, more-realistic engines. The need for reducing the ground-level overpressure shock strengths still existed; a need to be met within more restrictive guidelines of mission performance and gross takeoff weight limitations. Therefore, it was decided that the next conceptual design cycle would focus on decreased nose shock strengths, "boom softening," in the signatures of the Boeing and the McDonnell Douglas baseline concepts rather than low-boom concepts with shaped-signature designs. Overly-optimistic results were not the only problem with these low-sonic-boom concepts. Papers given at the 1994 Sonic-Boom Workshop had demonstrated that the problem of successful nacelle integration on HSCT concepts had only been partially solved. Wind-tunnel pressure signature data, from the HSCT-11B (a.k.a. the LB-18) wind-tunnel model, showed that the Langley HSCT design and analysis method had been successful in reducing the nacelle-volume disturbances in the flow field. This was due.to the engine nacelles mounted behind the wing trailing-edge on the aft fuselage so that no nacelle-wing interference-lift flow-field disturbances were generated. While acceptable from a sonic-boom research point of view, this concept was unacceptable from several practical and structural considerations. Preliminary wind-tunnel pressure signature data from the LB-16 wind-tunnel model, which had the engine nacelles mounted under the wings (the usual location), indicated that the application of the Langley nacelle-integration method had been only partially successful in the reduction of the nacelle-volume with nacelle-wing interference-lift pressure disturbances. So, "boom softening" had to also address the task of successful integration of the engine nacelles, with the engines in the required under-the-wing location. Unless this problem was solved, low-sonic-boom and low-drag modifications to the wing planform, the airfoil shape, and the fuselage longitudinal area distribution could be nullified if the nacelle disturbances added increments to the nose-shock strengths that were removed through component tailoring. In this paper, an arrow-wing boom-softened HSC7 concept which incorporated modifications to a baseline McDonnell Douglas concept is discussed. The analysis of the concept's characteristics will include estimates of weight, center of gravity, takeoff field length, mission range, and predictions of its ground-level sonic-boom pressure signature. Additional modifications which enhanced the softened-boom performance of this concept are also described as well as estimates of the performance penalties induced by these modifications.

Mack, Robert J.↗

Spacecraft Water Exposure Guidelines (SWEGs)

As the protection of crew health is a primary focus of the National Aeronautics and Space Administration, the Space and Life Sciences Directorate (SLSD) is vigilant in setting potable water limits for spaceflight that are health protective. Additional it is important that exposure limits not be set so stringently that water purification systems are unnecessarily over designed. With these considerations in mind, NASA has partnered with the National Research Council on Toxicology (NRCCOT) to develop spacecraft water exposure guidelines (SWEGs) for application in spaceflight systems. Based on documented guidance (NRC, 2000) NASA has established 28 SWEGs for chemical components that are particularly relevant to water systems on the International Space Station, the Shuttle and looking forward to Constellation.

John T James↗

Field Programmable Gate Array Reliability Analysis Guidelines for Launch Vehicle Reliability Block Diagrams

Field Programmable Gate Arrays (FPGAs) integrated circuits (IC) are one of the key electronic components in today's sophisticated launch and space vehicle complex avionic systems, largely due to their superb reprogrammable and reconfigurable capabilities combined with relatively low non-recurring engineering costs (NRE) and short design cycle. Consequently, FPGAs are prevalent ICs in communication protocols and control signal commands. This paper will identify reliability concerns and high level guidelines to estimate FPGA total failure rates in a launch vehicle application. The paper will discuss hardware, hardware description language, and radiation induced failures. The hardware contribution of the approach accounts for physical failures of the IC. The hardware description language portion will discuss the high level FPGA programming languages and software/code reliability growth. The radiation portion will discuss FPGA susceptibility to space environment radiation.

Al Hassan, Mohammad↗

AC Resistance Reduction Using Orthogonal Air Gaps in High-Frequency Inductors: Preprint

This paper presents a relatively simple technique to reduce winding losses due to fringing fields in high-frequency inductors. In high-frequency power electronics, ac inductor winding losses are affected by skin and proximity effects, including uneven current distribution due to fringing magnetic fields around airgaps. It is well known how fringing effects can be mitigated using distributed airgaps, at the expense of non-standard core or winding geometry. In planar magnetics, the orthogonal-airgap approach proposed in this paper combines airgaps in core segments parallel with the windings with conventionally placed airgaps in segments perpendicular to the windings. The approach is developed using a 1D analytical framework and validated by 2D finite-element simulations. Analytical guidelines are presented to optimize the airgaps to achieve minimum ac resistance. As a case study, a planar inductor is designed for an 8~kW SiC-based buck converter operating at 250~kHz. It is shown how the orthogonal airgaps result in more than 45\% reduction in ac resistance and substantially reduced inductor losses compared to the design using standard airgaps. The results are verified by loss measurements on an experimental converter prototype.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Adaptive Protection and Validated Models to Enable Deployment of High Penetrations of Solar PV (PV-MOD)

The availability and validation of various PV models in commercial tools differ, with some models not yet thoroughly validated for advanced inverter functionalities and reliable performance under weak system conditions. Many existing models do not fully incorporate new inverter control functions, which can affect system stability. The increasing deployment of solar PV and other inverter-based resources (IBRs), including distributed energy resources (DERs), is influencing the reliable operation of protection schemes in distribution systems and microgrids. Emerging adaptive protection schemes (APS) offer new opportunities for protecting these systems during varying configurations and DER operating conditions, though their demonstration and validation remain limited. Adaptive protection schemes face similar challenges, as they are typically designed for specific configurations. There is a growing need for tools and methodologies to streamline the deployment of adaptive protection for safe and reliable DER integration. The project main objective was to develop and validate high-fidelity generic models of solar PV facilities for stability, protection, EMT, and QSTS analyses. This objective was achieved, and these models can now be integrated into commercial software tools, enabling utilities, vendors, and developers to study high-penetration PV systems more confidently. The project also demonstrated advanced applications of these models, including the design and deployment of adaptive protection schemes in high-penetration field applications and microgrids, supporting grid safety and reliability. Several milestones were reached by the end of the project. A sophisticated inverter test plan was developed, and inverters representative of the North American marketplace were selected. EPRI and NREL tested various inverters, conforming to IEEE standards. Improvements were made to existing generic models of IBR units, IBR plants, and aggregated feeders for various analyses. The first generic electromagnetic transient (EMT) model for a solar PV plant was developed, conforming to IEEE Std 2800™-2022 and validated against laboratory measurements of a 2.2 MVA large-scale battery energy storage system (BESS) inverter. That model was then used to produce reference responses illustrating examples of validated and verified IBR plant models that pass or fail tests for technical minimum capability and performance as specified in the IEEE standard. The developed, tested, and validated generic models can be used for transmission planning, stability assessments, expansion planning, and evaluating potential future IBR interconnection requirements. They can also support interconnection screens and conformity assessments of IBR plants, including solar PV. The project significantly contributed to the ongoing standardization and model-based representation and verification of IBR responses. The project further addressed challenges of common distribution protection schemes with increasing deployment of DER by developing, validating, and demonstrating adaptive protection schemes (APS) that can improve the reliable and safe integration of DER into distribution systems. New APS were designed using improved DER models for three common distribution systems: a radial feeder, a meshed network, and a microgrid. Modeling and hardware-in-the-loop (HIL) testing of the APS were conducted, successfully showing their effectiveness and selectivity. Proof-of-concept field demonstration was achieved for two APS, i.e., one on a radial feeder and another one in a microgrid. Field demonstration could not be achieved for the APS on a meshed network, primarily due apprehension of one utility partner and also due to limited access to the protective algorithms in the network protectors. Guidelines developed from the lessons learned in the project lay out the general process followed in the design, installation, and commissioning of APS for various distribution systems. Distribution utility partners’ apprehension about field demonstration of the new APS were addressed—with varying success—by taking a stepped risk-management approach of modeling of a wide range of sensitivities first, performing in-depth proof-of-concept testing in the laboratory including HIL next, and finally deliberately implementing and commissioning the actual protection equipment and algorithms into parts of—or in parallel operation to—the three real distribution systems. Future work should include pilot projects that further show the acceptable performance of the developed APS before these schemes be rolled out more widely. Inclusion of both utility and original equipment manufacturers (OEMs) in future projects could increase chances of successful field demonstration. Despite challenges in achieving the field demonstration goal of the project for all three APS, the research significantly contributed to the innovation of adaptive protection solutions for scalable and reliable DER integration into distribution systems. This project significantly enhances the understanding of the impact of using appropriate inverter models on distribution and transmission (T&D) systems. By addressing the limitations of existing generic models, the project introduces high-fidelity models for stability, protection, electromagnetic transient (EMT), and quasi-static time series (QSTS) analyses. These models, integrated into commercial software tools, enable utilities, vendors, and developers to confidently study high-penetration PV systems. The project also demonstrates advanced applications, including adaptive protection schemes (APS) for distribution systems and microgrids, ensuring grid safety and reliability. The technical effectiveness and economic feasibility of the methods are evident through the development and validation of sophisticated inverter test plans and the selection of representative inverters. Testing by EPRI and NREL on retail, commercial, and utility-scale inverters, conforming to IEEE standards, underscores the robustness of the models. Improvements to existing generic models for various analyses further enhance their validity and applicability. The project also identifies gaps in common distribution protection schemes and designed new APS using improved DER models, demonstrating their effectiveness through modeling and hardware-in-the-loop (HIL) testing. The project’s benefits to the public are manifold. By advancing the standardization and model-based representation of IBR response, it supports transmission planning, stability assessments, and future IBR interconnection requirements. The generic models can facilitate better communication between transmission planners and developers, supporting expected IBR plant capability and performance. Additionally, the development of APS for radial feeders, meshed networks, and microgrids supports the integration of distributed energy resources (DERs) into distribution systems, enhancing grid reliability and safety. The project’s emphasis on thorough testing and simplicity in design ensures practical and scalable solutions for DER integration.

14 SOLAR ENERGY↗

Comparative Analysis of Report-Back of Research Results Strategies for Personal Chemical Exposure Data

Background. Report-back of research results (RBRR) is ethically supported and highly requested by participants yet lacks broadly transferable guidelines for RBRR. Effective RBRR must be responsive to target audience needs and may not be addressed by a ‘one-size-fits-all’ approach. Objective. Within a subset of our 19 studies on RBRR, we had the unique opportunity to carry out a comparative analysis of RBRR strategies across cohorts with similar development and evaluation methods, yet distinct in life stage, geography, number and type of chemicals assessed, and community contexts. Methods. We highlight key outcomes from three environmental health studies: an ongoing New York, NY cohort (Fair Start; n=486) and a Detroit, MI cohort (CLEAR; n=34) assessing exposure to ambient urban pollution during pregnancy, and a longitudinal cohort in Houston, TX (Houston-3H) following Hurricane Harvey (n=312). Focus group and survey data were analyzed to identify lessons learned and explore how RBRR supports understanding of environmental health. Results. Commonalities emerged in RBRR development, design, organization, and data visualization, as well as in how RBRR can contribute to an understanding of health-environment connections. Differences included preferences for individual versus community level findings, as well as distinguishable contextual considerations. For pregnancy cohorts, messaging was framed with cultural sensitivity, and to avoid unintended consequences of parental guilt due to prenatal exposures. In the post-disaster Houston-3H study, participants requested additional transparency regarding sampling design and study rationale. Significance. All RBRR case studies reported chemicals without known regulatory or health guidelines, so results were contextualized within the study population. Participants across cohorts requested multi-study comparisons to better understand their results beyond their communities. While foundational RBRR elements (e.g. plain language, graphic organizers) may supersede cohort-specific differences, RBRR should be personalized to encompass perceptions of health across different life-stage, cultural, and environmental contexts.

Vogel, Taylor J.↗

Influence of Planetary Protection Guidelines on Waste Management Operations

Newly outlined missions in the Space Exploration Initiative include extended human habitation on Mars. During these missions, large amounts of waste materials will be generated in solid, liquid and gaseous form. Returning these wastes to Earth will be extremely costly, and will therefore likely remain on Mars. Untreated, these wastes are a reservoir of live/dead organisms and molecules considered to be "biomarkers" i.e., indicators of life). If released to the planetary surface, these materials can potentially confound exobiology experiments and disrupt Martian ecology indefinitely (if existent). Waste management systems must therefore be specifically designed to control release of problematic materials both during the active phase of the mission, and for any specified post-mission duration. To effectively develop waste management requirements for Mars missions, planetary protection guidelines must first be established. While previous policies for Apollo lunar missions exist, it is anticipated that the increased probability of finding evidence of life on Mars, as well as the lengthy mission durations will initially lead to more conservative planetary protection measures. To facilitate the development of overall requirements for both waste management and planetary protection for future missions, a workshop was conducted to identify how these two areas interface, and to establish a preliminary set of planetary protection guidelines that address waste management operations. This paper provides background regarding past and current planetary protection and waste management issues, and their interactions. A summary of the recommended planetary protection guidelines, anticipated ramifications and research needs for waste management system design for both forward (Mars) and backward (Earth) contamination is also provided.

Hogan, John A.↗

Modeling Guidelines for Code Generation in the Railway Signaling Context

Modeling guidelines constitute one of the fundamental cornerstones for Model Based Development. Their relevance is essential when dealing with code generation in the safety-critical domain. This article presents the experience of a railway signaling systems manufacturer on this issue. Introduction of Model-Based Development (MBD) and code generation in the industrial safety-critical sector created a crucial paradigm shift in the development process of dependable systems. While traditional software development focuses on the code, with MBD practices the focus shifts to model abstractions. The change has fundamental implications for safety-critical systems, which still need to guarantee a high degree of confidence also at code level. Usage of the Simulink/Stateflow platform for modeling, which is a de facto standard in control software development, does not ensure by itself production of high-quality dependable code. This issue has been addressed by companies through the definition of modeling rules imposing restrictions on the usage of design tools components, in order to enable production of qualified code. The MAAB Control Algorithm Modeling Guidelines (MathWorks Automotive Advisory Board)[3] is a well established set of publicly available rules for modeling with Simulink/Stateflow. This set of recommendations has been developed by a group of OEMs and suppliers of the automotive sector with the objective of enforcing and easing the usage of the MathWorks tools within the automotive industry. The guidelines have been published in 2001 and afterwords revisited in 2007 in order to integrate some additional rules developed by the Japanese division of MAAB [5]. The scope of the current edition of the guidelines ranges from model maintainability and readability to code generation issues. The rules are conceived as a reference baseline and therefore they need to be tailored to comply with the characteristics of each industrial context. Customization of these recommendations has been performed for the automotive control systems domain in order to enforce code generation [7]. The MAAB guidelines have been found profitable also in the aerospace/avionics sector [1] and they have been adopted by the MathWorks Aerospace Leadership Council (MALC). General Electric Transportation Systems (GETS) is a well known railway signaling systems manufacturer leading in Automatic Train Protection (ATP) systems technology. Inside an effort of adopting formal methods within its own development process, GETS decided to introduce system modeling by means of the MathWorks tools [2], and in 2008 chose to move to code generation. This article reports the experience performed by GETS in developing its own modeling standard through customizing the MAAB rules for the railway signaling domain and shows the result of this experience with a successful product development story.

Ferrari, Alessio↗

Design of an ATR Loop 2A Test Train: Phase 2 of the EPRI/INL Pilot Project for Irradiation of Alloys X-750 and XM-19

The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. The pilot project is a three phase project consisting of baseline material characterization (Phase I), experiment design and irradiation thermal and neutronics analyses (Phase II), and post irradiation examination (Phase III). The intent of this Phase II portion of the pilot project is to estimate thermal and neutronic characteristics of the planned experiments and to provide design details of the experiment assemblies themselves. The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19.

Source record↗

ANSI/AIAA S-081A, Pressure Vessel Standards Implementation Guidelines

The stress rupture specification for Composite Overwrapped Pressure Vessels (COPV) is discussed. The composite shell of the COPV shall be designed to meet the design life considering the time it is under sustained load. A Mechcanical Damage Control Plan (MDCP) shall be created and implemented that assures the COPV will not fail due to mechanical damage due to manufacturing, testing, shipping, installation, or flight. Proven processes and procedures for fabrication and repair shall be used to preclude damage or material degradation during material processing, manufacturing operations, and refurbushment.Selected NDI techniques for the liner and/or boss(es) shall be performed before overwrapping with composite. When visual inspection reveals mechanical damage or defects exceeding manufacturing specification levels (and standard repair procedures), the damaged COPV shall be submitted to a material review board (MRB) for disposition. Every COPV shall be subjected to visual and other non-destructive inspection (NDI), per the inspection plan.

Greene, Nathanael J.↗