Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Washington”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Report for Treating Hanford LAW and WTP SW Simulants: Pilot Plant Mineralizing Flowsheet

The US Department of Energy is responsible for managing the disposal of radioactive liquid waste in underground storage tanks at the Hanford site in Washington State. The Hanford waste treatment and immobilization plant (WPT) will separate the waste into a small volume of high level waste (HLW), containing most of the radioactive constituents, and a larger volume of low activity waste (LAW), containing most of the non-radioactive chemical and hazardous constituents. The HLW and LAW will be converted into immobilized waste forms for disposal. Currently there is inadequate LAW vitrification capacity planned at the WTP to complete the mission within the required timeframe. Therefore additional LAW capacity is required. One candidate supplemental treatment technology is the fluidized bed steam reformer process (FBSR). This report describes the demonstration testing of the FBSR process using a mineralizing flowsheet for treating simulated Hanford LAW and secondary waste from the WTP (WTP SW). The FBSR testing project produced leach-resistant solid products and environmentally compliant gaseous effluents. The solid products incorporated normally soluble ions into an alkali alumino-silicate (NaS) mineral matrix. Gaseous emissions were found to be within regulatory limits. Cesium and rhenium were captured in the mineralized products with system removal efficiencies of 99.999% and 99.998 respectively. The durability and leach performance of the FBSR granular solid were superior to the low activity reference material (LMR) glass standards. Normalized product consistency test (PCT) release rates for constituents of concern were approximately 2 orders of magnitude less than that of sodium in the Hanford glass [standard].

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Waste Feed Delivery Small Scale Mixing Demonstration Simulant to Hanford Waste (Rev.1)

The Hanford double-shell tank (DST) system provides the staging location for waste that will be transferred to the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Specific WTP acceptance criteria for waste feed delivery describe the physical and chemical characteristics of the waste that must be met before the waste is transferred from the DSTs to the WTP. One of the more challenging requirements relates to the sampling and characterization of the undissolved solids (UDS) in a waste feed DST because the waste contains solid particles that settle and their concentration and relative proportion can change during the transfer of the waste in individual batches. A key uncertainty in the waste feed delivery system is the potential variation in UDS transferred in individual batches in comparison to an initial sample used for evaluating the acceptance criteria. To address this uncertainty, a number of small-scale mixing tests have been conducted as part of Washington River Protection Solutions' Small Scale Mixing Demonstration (SSMD) project to determine the performance of the DST mixing and sampling systems. A series of these tests have used a five-part simulant composed of particles of different size and density and designed to be equal or more challenging than AY-102 waste. This five-part simulant, however, has not been compared with the broad range of Hanford waste, and thus there is an additional uncertainty that this simulant may not be as challenging as the most difficult Hanford waste. The purpose of this study is to quantify how the current five-part simulant compares to all of the Hanford sludge waste, and to suggest alternate simulants that could be tested to reduce the uncertainty in applying the current testing results to potentially more challenging wastes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2011 World Materials Summit: Panel Discussion Report

The 2011 World Materials Summit, held on 10/9-12/2011 in Washington DC, provided a forum for top decision makers and energy experts from aropund the world to focus on the materials research needs for the growing energy economy. Organized jointly by the Materials Research Society (MRS), the European MRS (E-MRS), and the Chinese MRS (C-MRS), the goal of the Summit was to explore how the different regions of the world can work together on the critical issue of clean energy, including its relation to environmental sustainability and water. The participants considered the area of materials research as well as advocacy, economics, outreach, and education. Realizing that the concerns are long-term and that young players will ultimately be the ones who are going to need to solve the energy challenges, the chairs of the Summit inaugurated a Student Congress, a program for graduate students and postdoctoral scholars in fields directly related to energy and environmental science, engineering, and/or policy. The top 45 candidates coming from 18 countries were selected on a competititve basis to participate in the Student Congress. The four-day effort culminated in a 2011 Worlds Materials Summit Declaration delineating materials directions related to global access to clean energy and water in a sustainable way.

36 MATERIALS SCIENCE↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 9)

This Ground Control Annual Plan (GCAP) is a guidance document for short- and long-term planning for the Washington TRU Solutions LLC (WTS) underground ground control operations. Because ground conditions are dynamic, the data collected for the plan and the evaluation of these data are most useful when used or considered immediately after collection. Use of the data becomes more difficult and less certain with time. This plan is updated annually, and each successive document supersedes the previous document. The data, evaluations, and support plans may be updated more frequently. This document is not intended to be used as a final plan for construction. Detailed plans and work instructions are developed specifically for that purpose.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 10)

This Ground Control Annual Plan (GCAP) is a guidance document for short- and long-term planning for the Washington TRU Solutions LLC (WTS) underground ground control operations. Because ground conditions are dynamic, the data collected for the plan and the evaluation of these data are most useful when used or considered immediately after collection. Use of the data becomes more difficult and less certain with time. This plan is updated annually, and each successive document supersedes the previous document. The data, evaluations, and support plans may be updated more frequently. This document is not intended to be used as a final plan for construction. Detailed plans and work instructions are developed specifically for that purpose.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Semiannual VOC, Hydrogen, and Methane Data Summary Report for Reporting Period July 1, 2010 through December 31, 2010

This report was prepared by the U.S. Department of Energy (DOE) Carlsbad Field Office and Washington TRU Solutions LLC (the Permittees) in accordance with Sections 4.6.2.2 and 4.6.5.2 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit Number NM4890139088-TSDF (the Permit). This report documents the Volatile Organic Compound (VOC) Monitoring Program and Hydrogen and Methane Monitoring Program results for the 6-month period of July 1, 2010 through December 31, 2010.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Semiannual VOC, Hydrogen, and Methane Data Summary Report for Report for Reporting Period January 1, 2011 through June 30, 2011

This report is submitted by the U.S. Department of Energy (DOE) Carlsbad Field Office and Washington TRU Solutions LLC (the Permittees) in accordance with Permit Part 4, Permit Conditions 4.6.2.2 and 4.6.5.2 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility, Permit Number NM4890139088-TSDF (Permit). This report documents the Volatile Organic Compound (VOC) Monitoring Program and Hydrogen and Methane Monitoring Program results for the 6-month period of January 1, 2011 through June 30, 2011.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Semi-Annual Voc, Hydrogen, and Methane Data Summary Report for Reporting Period July 1, 2011 through December 31, 2011

This report is submitted by the U.S. Department of Energy (DOE) Carlsbad Field Office and Washington TRU Solutions LLC (the Permittees) in accordance with Permit Part 4, Permit conditions 4.6.2.2 and 4.6.5.2 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit NM4890139088-TSDF (Permit). This report documents the Volatile Organic Compound (VOC) Monitoring Program and Hydrogen and Methane Monitoring Program results for the 6-month period of July 1, 2011 through December 31, 2011.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Subsidence Monument Leveling Survey 2011

Sections 2 through 7 of this report define the result of the 2011 leveling survey through the subsidence monuments at the WIPP site. Approximately 15 miles of leveling was completed through nine vertical control loops. The 2011 survey includes the determination of elevation on each of the 48 existing subsidence monuments and the WIPP baseline survey, and 14 of the National Geodetic Survey’s (NGS) vertical control points. The field observations were completed during September through November 2011 by the Washington TRU Solutions (WTS) Mine Engineering Surveyors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multnomah County Hydrokinetic Feasibility Study: Final Feasibility Study Report

HDR has completed a study of the technical, regulatory, and economic feasibility of installing hydrokinetic turbines under the Morrison, Broadway, and Sellwood bridges. The primary objective of installing hydrokinetic turbines is a demonstration of in-stream hydrokinetic technologies for public education and outreach. Due to the low gradient of the Lower Willamette and the effects of the tide, velocities in the area in consideration are simply not high enough to economically support a commercial installation. While the velocities in the river may at times provide enough energy for a commercial turbine to reach capacity, the frequency and duration of high flow events which provide suitable velocities is not sufficient to support a commercial hydrokinetic installation. We have observed that over an 11 year period, daily average velocities in the Lower Willamette exceeded a nominal cut-in speed of 0.75 m/s only 20% of the time, leaving net zero power production for the remaining 80% of days. The Sellwood Bridge site was estimated to have the best hydrokinetic resource, with an estimated average annual production of about 9,000 kWh. The estimated production could range from 2,500 kWh to 15,000 kWh. Based on these energy estimates, the amount of revenue generated through either a power purchase agreement (PPA) or recovered through net metering is not sufficient to repay the project costs within the life of the turbine. The hydrokinetic resource at the Morrison and Broadway Bridges is slightly smaller than at the Sellwood Bridge. While the Broadway and Morrison Bridges have existing infrastructure that could be utilized, the project is not expected to generate enough revenue to repay the investment. Despite low velocities and energy production, the sites themselves are favorable for installation of a demonstration or experimental project. With high public interest in renewable energy, the possibility exists to develop a hydrokinetic test site which could provide developers and scientists a location to temporarily deploy and test hydrokinetic devices, and also function as an educational tool for the general public. Bridge piers provide an excellent pre-existing anchor point for hydrokinetic devices, and existing infrastructure at the Morrison and Broadway Bridges may reduce installation costs. Opportunity exists to partner with local universities with engineering and environmental interest in renewable energy. A partnership with Portland State University's engineering school could provide students with an opportunity to learn about hydrokinetics through senior design projects. Oregon State University and University of Washington, which are partnered through the Northwest National Marine Renewable Energy Center (NNMREC) to study and test hydrokinetic technology, are also relatively local to the site. In addition to providing an opportunity for both public and private entities to learn technically about in-stream kinetics, this approach will encourage grant funding for outreach, education, and product development, while also serving as a positive community relations opportunity for the County and its partners.

13 HYDRO ENERGY↗

Assessment of Natural Stream Sites for Hydroelectric Dams in the Pacific Northwest Region

This pilot study presents a methodology for modeling project characteristics using a development model of a stream obstructing dam. The model is applied to all individual stream reaches in hydrologic region 17, which encompasses nearly all of Idaho, Oregon, and Washington. Project site characteristics produced by the modeling technique include: capacity potential, principal dam dimensions, number of required auxiliary dams, total extent of the constructed impoundment boundary, and the surface area of the resulting reservoir. Aggregated capacity potential values for the region are presented in capacity categories including total, that at existing dams, within federal and environmentally sensitive exclusion zones, and the balance which is consider available for greenfield development within the limits of the study. Distributions of site characteristics for small hydropower sites are presented and discussed. These sites are screened to identify candidate small hydropower sites and distributions of the site characteristics of this site population are presented and discussed. Recommendations are made for upgrading the methodology and extensions to make the results more accessible and available on a larger scale.

13 HYDRO ENERGY↗

Pacific Northwest National Laboratory Potential Impact Categories for Radiological Air Emissions Monitoring

In 2002, the EPA amended 40 CFR 61 Subpart H and 40 CFR 61 Appendix B Method 114 to include requirements from ANSI/HPS N13.1-1999 Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stack and Ducts of Nuclear Facilities for major emission points. Additionally, the WDOH amended the Washington Administrative Code (WAC) 246-247 Radiation protection-air emissions to include ANSI/HPS N13.1-1999 requirements for major and minor emission points when new permitting actions are approved. A result of the amended regulations is the requirement to prepare a written technical basis for the radiological air emission sampling and monitoring program. A key component of the technical basis is the Potential Impact Category (PIC) assigned to an emission point. This paper discusses the PIC assignments for the Pacific Northwest National Laboratory (PNNL) Integrated Laboratory emission units; this revision includes five PIC categories.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Disposal Facility FY2011 Glass Testing Summary Report [Erratum]

Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 x 10 5 m 3 of glass (Certa and Wells 2010). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 8.9 x 10 14 Bq total activity) of long-lived radionuclides, principally 99 Tc (t 1/2 = 2.1 x 10 5 ), planned for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2011 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pacific Northwest National Laboratory Site Radionuclide Air Emissions Report for Calendar Year 2011

This report documents radionuclide air emissions that result in the highest effective dose equivalent (EDE) to a member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities and Washington Administrative Code (WAC) Chapter 246-247, Radiation ProtectionAir Emissions. The EDE to the PNNL Site MEI due to routine emissions in 2011 from PNNL Site sources was 1.7E 05 mrem (1.7E-7 mSv) EDE. No nonroutine emissions occurred in 2011. The total radiological dose for 2011 to the MEI from all PNNL Site radionuclide emissions was more than 10,000 times smaller than the federal and state standard of 10 mrem/yr, to which the PNNL Site is in compliance.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Hanford-based Options for Sustainable DOE Facilities on the West Coast

Large-scale conventional energy projects result in lower costs of energy (COE). This is true for most renewable energy projects as well. The Office of Science is interested in its facilities meeting the renewable energy mandates set by Congress and the Administration. Those facilities on the west coast include a cluster in the Bay Area of California and at Hanford in central Washington State. Land constraints at the California facilities do not permit large scale projects. The Hanford Reservation has land and solar insolation available for a large scale solar project as well as access to a regional transmission system that can provide power to facilities in California. The premise of this study is that a large-scale solar project at Hanford may be able to provide renewable energy sufficient to meet the needs of select Office of Science facilities on the west coast at a COE that is competitive with costs in California despite the lower solar insolation values at Hanford. The study concludes that although the cost of solar projects continues to decline, estimated costs for a large-scale project at Hanford are still not competitive with avoided power costs for Office of Science facilities on the west coast. Further, although it is possible to transmit power from a solar project at Hanford to California facilities, the costs of doing so add additional costs. Consequently, development of a large- scale solar project at Hanford to meet the renewable goals of Office of Science facilities on the west coast is currently uneconomic. This may change as solar costs decrease and California-based facilities face increasing costs for conventional and renewable energy produced in the state. PNNL should monitor those cost trends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Annual report of monitoring at Barnes, Kansas, in 2011

Barnes, Kansas, is a small rural community (population approximately 150) located in Washington County, in north-central Kansas (Figure 1.1). The city lies in a transition zone between the Flint Hills and the glaciated region. The area's topography consists of gently sloping hills of Pleistocene loess (< 20 ft) overlying a shale unit and interbedded shale, limestone, and siltstone of the Permian Chase Group.

54 ENVIRONMENTAL SCIENCES↗

Field Evaluations of Low-Frequency SAFT-UT on Cast Stainless Steel and Dissimilar Metal Weld Components

This report documents work performed at the Pacific Northwest National Laboratory (PNNL) in Richland, Washington, and at the Electric Power Research Institute's (EPRI) Nondestructive Examination (NDE) Center in Charlotte, North Carolina, on evalutating a low frequency ultrasonic inspection technique used for examination of cast stainless steel (CSS) and dissimilar metal (DMW) reactor piping components. The technique uses a zone-focused, multi-incident angle, low frequency (250-450 kHz) inspection protocol coupled with the synthetic aperture focusing technique (SAFT). The primary focus of this work is to provide information to the United States Nuclear Regulatory Commission on the utility, effectiveness and reliability of ultrasonic testing (UT) inspection techniques as related to the inservice ultrasonic inspection of coarse grained primary piping components in pressurized water reactors (PWRs).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Prediction of Total Dissolved Gas Exchange at Hydropower Dams

Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.

13 HYDRO ENERGY↗