Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

3-D Gamma-ray Mapping from Unmanned Aerial Systems for Nuclear Decommissioning - 18439

Advanced gamma-ray detection technologies integrated with sophisticated robotic platforms will enable safer and more cost and time-efficient capabilities in support of nuclear decommissioning, waste management, and environmental remediation activities within the United States Department of Energy (U.S. DOE) complex and in the global nuclear power industry. In the Applied Nuclear Physics program at Lawrence Berkeley National Laboratory, we have developed the Nuclear Scene Data Fusion (SDF) capability to map gamma-ray emitting sources in large-scale, 3-D environments in real-time. This powerful capability has been successfully deployed in real-world environments, from a test-bed in Berkeley, CA to the exclusion zone in Fukushima Prefecture, Japan to support environmental remediation and contamination mapping efforts within evacuated communities, and is also currently being further developed in support of decommissioning efforts at the Fukushima Dai-ichi Nuclear Power Plant (FDNPP) in collaboration with the Japan Atomic Energy Agency (JAEA). In this work, we will provide an overview of SDF adapted for gamma-ray mapping onboard an UAS, as well as results from measurements demonstrating point and distributed source mapping. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ATLAS: Story Maps for Communicating Groundwater Cleanup Status - 18510

The U.S. Department of Energy (DOE) manages one of the largest groundwater cleanup efforts in the world in terms of the number of plumes, diversity of contaminants, volume of affected groundwater, and diversity of hydrogeologic settings. The DOE Office of Environmental Management (EM) has been collecting site-specific data on plume sizes, remedial approaches, exit strategies, long-term stewardship requirements, and regulatory drivers at all DOE sites, and summarizing them in a single document to communicate high-level information on groundwater contamination and cleanup status to DOE managers. Recently, EM has sponsored an effort to transfer the document-based information to an online resource for collating information on groundwater plumes that is easily accessible by interested parties. Specifically, Web GIS story maps have been developed to provide a robust geospatial visualization of plumes at DOE sites using an intuitive interface that allows users to explore plume maps, explanatory text, photographs, and video provided within the story maps. This collection of story maps is called ATLAS (Assembly of Tools for Learning Actions and Status), and not only communicates groundwater plume data for each individual site, but also summarizes pertinent metrics across all EM sites. With ATLAS, sites with similar settings, contamination, or remedial approaches can be easily identified, facilitating effective communication among DOE sites and sharing of individual successes and lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Recovery at Former Lithium Production Site at the Miramas in France - 18529

The former Lithium production facility located at Miramas in the South-East of France recently completed a 10-year program of process equipment removal, building demolition and soil remediation to recover mercury (Hg) that had been lost during operations at the site. After over 100 years ago chemical production, all production activities stopped in 2009, and immediately afterwards the clean-up project began. The main project focused on the demolition of all facilities and the decontamination of building materials and soil clean-up, with the goal of remediating the site for future industrial purposes. Prior to starting the decommissioning and clean-up work at the site a detailed site survey was conducted to identify the extent of the contamination of the site. After investigations into available technologies, the decision was made to install on-site treatment processes. This resulted in fewer residual environmental effects (trucking pollution, shipping containers, volume of materials, etc), a reduction in logistic complications, and, importantly, was cost effective compared to sending all untreated material to external processing facilities. This decision resulted in a need to optimize demolition waste management, while ensuring the highest clean-up and safety levels. A variety of treatment processes were investigated and compared and two technologies were finally selected and implemented. The first process was a 'thermal desorption unit (TDU),' which heated excavated soils and captured the vaporized mercury. The second was a washing process that was used to remove surface contamination. After the contaminated areas were excavated, materials were crushed, screened and sorted into different sizes, with each pile being routed to the appropriate process. The smaller-sized particles were treated in the TDU. A batch of around 12 MT was fed into a moisture evaporator and then into a mercury evaporator. The soils were then cooled, sampled to ensure no residual Hg contamination before being mixed with a binding agent, and returned to the excavation site. Larger materials with surface contamination were washed to remove the contamination. The liquid effluents were sent to a tank where the contaminated fines were removed, dried, pressed and sent for processing. If the washed, coarse materials failed to reach acceptable mercury levels, they were crushed again and sent to be treated in the TDU. The washing fluid was recycled for the next batch. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Stored Reducing Capacity to Optimize Operations and Maintenance for In Situ Biological Treatment of Cr(VI) in Groundwater - 18534

Injection of organic carbon substrates to stimulate in situ biologically mediated reduction of dissolved hexavalent chromium (Cr[VI]) from groundwater by reduction of this oxidized form to the essentially insoluble trivalent form (Cr[III]) is an established remedial technology. The key to successful implementation of in situ biological Cr(VI) reduction is the distribution of electrons from the oxidation of the organic carbon substrates throughout the saturated subsurface to establish robust In Situ Reactive Zones (IRZs). Once IRZs are established, reduction of Cr(VI) is often observed to persist over relatively long time frames (months to years) after the injected organic carbon substrates are degraded or flux of non-amended water flows through the IRZ. The longevity of Cr(VI) treatment is attributed to the establishment of residual-reducing capacity created by the storage of electrons in ferrous iron and sulfide-bearing minerals present in the aquifer matrix, and microbial biomass generated by the injection of organic carbon substrates. In this paper, more than 10 years of data collected from operations and maintenance of IRZ systems for remediation of a large-scale Cr(VI) plume were evaluated to examine the factors that influence the longevity of residual-reducing capacity. The durations that residual-reducing capacity has resulted in sustained Cr(VI) treatment were variable, ranging from months to more than 6 years between carbon amendment events. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Management Waste Management Facility Operations Team Commitment to Safety - 18546

The Environmental Management Waste Management Facility (EMWMF) is an above-grade waste disposal facility that is owned by DOE and operated by URS | CH2M Oak Ridge LLC (UCOR), a contractor to DOE's Oak Ridge Office of Environmental Management. The EMWMF landfill is located on the Oak Ridge Reservation (ORR) and has a 2.18 M cubic yard capacity. EMWMF is a key component of the cost-effective ORR cleanup program and accepts remediation waste from across the ORR. Multiple low-level and low-level mixed CERCLA waste streams are disposed at EMWMF, mostly as direct-dumped demolition and remediation debris. EMWMF receives and disposes of a myriad of contaminated waste streams and waste types, including massive structural steel from some of the largest buildings ever constructed, contaminated soils from legacy disposal areas, containers that must be grouted under negative pressure, and special waste that must be tightly controlled. Support activities include managing several million gallons of landfill wastewater per year and driving around 20,000 miles per year to transport leachate to a treatment facility. Even with the wide range of waste accepted and the diversity of support activities, EMWMF Operations has maintained an impressive safety record of no lost workday cases in nearly 16 years of continuous operation and was recently awarded the National Safety Council's Superior Safety Performance Award. This safety record is a testament to the commitment to safety by both workers and management. Several factors are key to the EMWMF Operations safety record. UCOR senior management established safety as a priority and allocates proper funding and resources. EMWMF Operations management embraces safety as an integral part of the work and also 'walks the talk'-emphasizing safety over productivity and showing personal commitment to safety. A stable workforce promotes a culture where safety is valued and helps train new personnel in this culture. The UCOR integrated safety management approach to work control is fully embraced, where worker feedback is highly valued and used to better identify and control job hazards. Finally, job supervisors actively encourage input. Worker concerns, suggestions, and observations are encouraged and positively addressed. As a result, the entire Operations Team is committed to identifying and mitigating hazards. This team commitment to safety results in a culture where safety is not only valued, but is expected. Safety concerns are identified and addressed proactively, and communication is encouraged. This strong safety culture and outstanding safety record have also proven to be good business, with the facility available to receive waste 99.6% of available work hours and outstanding turnaround times on waste shipments. The EMWMF Operations team commitment to safety can be used in other environments to develop an engaged, safety-conscious workforce. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Port Granby Project: Effectiveness of the Radiation Protection Program - 18595

The Port Granby Project is large remediation project currently underway. It is approximately 50% complete. A comprehensive and effective radiation protection program has been developed and implemented for the Port Granby Project. The potential radiation hazards associated with this project include: external (gamma) radiation, radon, inhalation, contamination and ingestion. The radiation protection program is highly effective and has succeeded in managing the significant radiation hazards associated with this remediation project. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

US EPA Superfund Radiation Risk Assessment Update: Superfund Update: Revisions to Risk and Dose Assessment Tools - 19057

The U.S. Environmental Protection Agency (EPA) Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet-based calculators for radiation risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical Regional Screening Level calculator. A comprehensive set of revisions to the PRG calculator was finished in November 2014. Additional revisions to the other 5 calculators were made in 2015. A set of further revisions are expected to be finalized prior to December 2018 and will be discussed in this abstract. A new Radon Vapor Intrusion Screening Level (RVISL) calculator is expected to be finished in 2019, similar to the Vapor Intrusion Screening Level (VISL) for chemical calculator that was finished in 2018. There are several additional revisions that may be finished prior to WM 2019 and will be presented if finished or discussed in more general terms if still underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cameco Corporation's Vision in Motion Project - 19128

Cameco Corporation is a world leader in uranium production. Cameco is also a major supplier of uranium processing services required to produce fuel for the generation of clean energy. These operations are based in Blind River, Cobourg and Port Hope, Ontario and are collectively referred to as the Fuel Services Division. The Fuel Services Division produces uranium trioxide from uranium ore concentrate at the Blind River Refinery. Cameco produces uranium hexafluoride and uranium dioxide at the Port Hope Conversion Facility. Cameco operates a fuel manufacturing facility in Port Hope, Ontario and a metal fabrication facility located in Cobourg, Ontario. The company manufactures fuel bundles utilized in the Candu reactors. Cameco is undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is located in the Municipality of Port Hope (MPH). This undertaking is known as the Vision in Motion (VIM) project. This project is unique and timely opportunity that has been made possible because of the Port Hope Area Initiative (PHAI). The PHAI Port Hope project is being undertaken by Canadian Nuclear Laboratories (CNL) and includes the construction of a long-term waste management facility (LTWMF) in the MPH. VIM entails an extensive remediation and redevelopment of much of the PHCF and includes: - the cleanup and demolition of a number of old or underutilized buildings; - the removal of contaminated soils, building materials and stored wastes; and - modifications to existing buildings at the PHCF with associated landscaping and infrastructure. Overall, the VIM project will allow for environmental remediation, improved site operations, enhancement of site safety and security through site design and improved aesthetics. This paper will discuss the status of this project underway at the Port Hope Conversion Facility. After years of community consultation, planning, and a successful environmental assessment and licensing of the project, the VIM project at the PHCF is now underway. Physical transfer of waste materials began in June 2018. Cameco is committed to seeing the project through to completion and is working with CNL to ensure this happens within the operating time frame of the LTWMF. Cameco keeps the CNSC and MPH well informed of all project related activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative Project Update - 19146

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. With funding of $1.28 billion CAD it is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from various locations within the community. The Port Granby Project will relocate approximately 450,000 cubic metres of historic low-level radioactive waste and marginally contaminated soils, located at an existing waste management facility on the shoreline of Lake Ontario, to a new engineered aboveground mound being built about a kilometre north of the current site. This paper will provide an update on both projects with an emphasis on successes to date and challenges yet be faced. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biofouling of Injection Wells at 200 West Pump and Treat - 19252

Located on the U.S. Department of Energy's Hanford Site in Richland, Washington, the 200 West Pump and Treat Facility (200 West P and T) has a 9,464 L/min capacity designed to capture and treat an 8 km{sup 2} contaminated groundwater plume. The 200 West P and T system was designed and built by CH2M Hill Plateau Remediation Company to capture and treat contaminated groundwater to reduce the mass of carbon tetrachloride, chromium (trivalent and hexavalent), cyanide, nitrate, and trichloroethene. The system was constructed in calendar years 2010 and 2011 and started operation in 2012. Following treatment, the water is reinjected into the aquifer to serve as a recharge source and to provide flow-path control. Fouling of injection wells has occurred since system startup, characterized by reduced capacity and associated increases in dynamic water level during injection. In severe cases, the water level increases 30.5 m in the first 24 hours of injection. Video inspection of injection wells confirms that the accumulation of solids obstruct the well screens. Because replacement of treated groundwater to the aquifer is essential to the overall remedy, a comprehensive program was initiated to understand the nature/cause of well fouling and to identify mitigation strategies. As a result of this program, a sodium hypochlorite feed system was installed on the pipeline to one injection well to determine whether preventing biological growth would prevent well fouling. A residual of 0.5 to 1.0 mg/L as Cl{sub 2} not only halted fouling but also reversed fouling impacts. Current efforts focus on disinfecting the entire volume of injection water. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of Rapid Assay Systems for Real-time Sorting of Excavation Spoil on Contaminated Land - 19258

To optimise segregation at source, and hence minimise waste production, NUVIA have developed and utilised the Gamma Excavation Monitor (GEM) system. The GEM was designed for land remediation projects, to provide a rapid screening tool for excavator buckets of material. Following successful deployment in the UK, including the Olympic Park site in London, and two major Magnox land remediation projects, the first GEM unit was deployed to Canadian Nuclear Laboratories' (CNL) Chalk River Laboratory (CRL) in 2016. The GEM unit was fitted with a plastic scintillator detector; recent developments have included the utilisation of a sodium iodide. The system is initiated by the presence of an excavator bucket above the detector which triggers proximity switches that automatically start the counting routine. At the end of a short count time, typically 10 seconds, the materials category is indicated by means of a traffic light system, based on either the gross gamma activity or a photo-peak. Using this instrument, material determined not to be radioactive can be re-used on-site. In addition to the traffic light system, results are also transmitted wirelessly to a tablet device. These combined features allow operation of the system without the need to have operatives near the mechanical excavator bucket; therefore, eliminating a significant industrial hazard. Deployments of the GEM on the CRL site have included Storm Water Management project, within the CRL controlled area, and the Foundation Road Landfill Project. The use of the GEM in these projects enabled in-situ decisions to be made regarding the segregation and sentencing of soil rather than having to wait for the analysis of samples; saving time and cost to the project. The Building 492 project involved the excavation of soil within a supervised area to prepare for the installation of modular trailer units. For this specific job, the GEM was calibrated to ensure soil met clearance criteria as stipulated in the Nuclear Substances and Radiation Devices Regulations (Canadian Nuclear Safety Commission; SOR/2000-207). A total of 326 loads of soil were monitored during this project and re-assurance sampling conducted by CNL corroborated the results produced by the GEM system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Development of Legacy Waste Scaling Factors for Radioactively Contaminated Soils at Chalk River Laboratories - 19333

The Chalk River Laboratories (CRL) began nuclear operations in 1947. Beginning in 1952 after the NRX accident, the management of excess contaminated liquids from the accident, and later in 1953, other waste liquids, were intermittently dispersed to trenches and pits in the local sand. The local sands proved effective at immobilization of actinides, and most activation and fission products. However there was very limited retention of some more commonly mobile radionuclides. Sand filtration performance and radionuclide migration was studied beginning in 1952. Monitoring data indicated slow migration of most radioactive contaminants away from the trenches and pits due to the adsorbing capacity of the sand substrate. The radionuclide migration continues to be studied today in frequent plume monitoring studies. Because many hard-to measure (HTM) radionuclides may also present as long term dose contributors in post remediation scenarios, or in disposal site performance assessments, the quantification of these HTM radionuclides is important. The use of scaling factors between HTM radionuclides and easy-to-measure (ETM) radionuclides (gamma emitters) for packaged soil wastes would alleviate significant effort in sampling individual waste containers. As part of plume monitoring studies and the environmental remediation process, significant characterization of soils have been performed at the site. The soil sample data from multiple historic waste management areas across site is combined and relationships between HTM radionuclides and ETM or key radionuclides are examined. Additional (secondary) relationships between ETM key nuclides are also explored to evaluate secondary scaling relationships between ETM key radionuclides (e.g., Co- 60/Cs-137), because of the significant decay of the activation product key radionuclide Co-60, (predominantly 10-20 half-lives). The evaluation is yielding consistent scaling factors for legacy soil wastes in the historic waste management areas. Given the hydrogeology of the site, a sandy shallow unconfined aquifer, and the annual precipitation of about 0.85 m/a, this evaluation reveals some expected relationships between fission products and actinides and some unanticipated relationships between more mobile radionuclides and key gamma emitters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geochemical and Solute Transport Modeling of In Situ Biological Treatment of Chromium in Groundwater - 19334

Reactive transport modeling is an ideal tool for developing better site-specific understanding and predictive capability to design and optimize in situ remedial strategies. However, the widespread use of these models for in situ groundwater remediation applications is limited by increased model complexity. This paper discusses the challenges encountered and strategies developed while constructing site-relevant geochemical and solute transport models to describe an in situ groundwater treatment program for chromium. The treatment strategy chosen for the site includes injection of dissolved organic carbon to establish reducing conditions in conjunction with a groundwater recirculation/plume flushing program. The reducing conditions established result in the immobilization of hexavalent chromium as insoluble trivalent chromium hydroxides. Hydrogeochemical models were employed during design to describe and predict long-term treatment performance and secondary effects, such as the generation and attenuation of byproducts (including dissolved arsenic, manganese, and iron), water quality changes (including pH, alkalinity, and TDS), and potential permeability changes. A reactive transport model was developed using PHT3D, calibrated from bench-scale and pilot-scale testing and aquifer hydrologic characterization. A 'hybrid' geochemical/solute transport modeling approach was developed, resulting in substantial reduction in model complexity and computation time. These results present a unique strategy for striking the balance between model sophistication and model complexity - adequately capturing the complex hydrogeological and biogeochemical processes at work within the system - which can be readily applied to other in situ groundwater treatment implementations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Frisker Response to Soil Concentrations (Bq/g) Compared to NaI(Tl) - 19338

The Chalk River Laboratories (CRL) began nuclear operations in 1947. Portions of the site land areas have become radiologically contaminated through the 1952 National Reactor Experimental (NRX) accident and/or waste management activities over the past 70 years of site operations. The Environmental Remediation Projects Group (ERP) characterizes, and performs risk assessment, and remedial actions, as required over these contaminated land areas. ERP work activities are subject to controls established by CRL's Radiation Protection (RP) Group such that RP establishes the radiological controls and monitoring requirements for ERP field work activities. The different methods of monitoring soil contamination between ERP and the RP program present some challenges in the interpretation and comparison of the two sets of results and the soil disposition. ERP utilizes NaI(Tl) scintillation detectors and MARSSIM land scanning techniques to measure soil concentrations between sample locations and in excavated materials. Whereas, RP utilizes surface contamination monitoring equipment in the form of a 15.5 cm{sup 2} open area pancake Geiger-Mueller (GM) tube detector to measure soil contamination levels reported in counts per minute (cpm). This paper presents a method to evaluate the theoretical best responses that could be obtained from surface contamination monitoring instrumentation for a known concentration (1 Bq/g) of various radionuclides. A static efficiency of cpm/Bq{sup -1} g{sup -1} is obtained from these calculations. These contamination monitoring sensitivities are then used in a MARSSIM scanning sensitivity equation and compared to the scanning sensitivity of an NaI(Tl) scintillation detector. The results demonstrate that the sensitivity of the frisker probes to particle radiations (betas for pancake) tend to fall in a range of only a few cpm/Bq{sup -1} g{sup -1}. Rather, the primary static response of the pancake probe to soil contamination is from gamma radiation where a value of 36 cpm/Bq{sup -1} g{sup -1} for Cs-137 was obtained at 2.54 cm distance without the application of scanning statistics. In comparison, a 7.6 cm x 7.6 cm NaI(Tl) detector has a Cs-137 static response factor of 10,000 cpm/Bq{sup -1} g{sup -1} at 15 cm distance without applying scanning statistics. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Soil Sorting Pilot Study Results - Middlesex Municipal Landfill - 19394

The U.S. Army Corps of Engineers (USACE) conducted a pilot scale study of radiological sorting technology at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Middlesex Municipal Landfill (MML) site in Middlesex, New Jersey. Residual uranium ore pieces or 'nuggets' and associated soil contamination are present at the MML site as a result of the nation's early atomic energy program. Study questions and objectives of the MML Pilot Study project were to 1) evaluate the accuracy with which contaminated soils can be separated from uncontaminated soils using a radiologic soil sorting system, 2) determine the optimal full-scale operational process throughput rate that might reasonably be achieved, 3) determine the waste volume reduction that might be expected when operating at full scale, and 4) help establish the feasibility of implementing soil sorting as a potential remedy to other areas of the site. To accomplish the objectives soils were processed through the sorting system in a series of 30 different sorting experimental (test) runs utilizing approximately 917 cubic meters [1200 cubic yards (CY)] of material. The test runs included varying parameters such as belt speeds, soil layer thicknesses, and alarm criteria, all in varying combinations. Test runs also included engineered tests to evaluate point source segregation issues. This paper presents the challenges, results, lessons learned, and recommendations of the radiological soil sorting pilot study. The technical aspects and evaluation of the results of the test runs will also be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 92: Reducing Risk to Enable Endstates

This panel focuses on creative and first-of-a-kind initiatives and approaches to improve DoE's options for achieving success in managing its most difficult wastes. Looking across the Complex, panelists will provide updates to some of the solutions being applied to DoE's challenging waste streams on sites including Hanford, Idaho, Savannah River, and other sites. Presentations proposed include: 1 - Tank Closure Cesium Removal (Mark Keefer, Savannah River Remediation (USA)); 2 - Evolution of Saltstone Disposal Units (Kent Rosenberger, Savannah River Remediation (USA)); 3 - CRESP's Landfill Partnership: Applied Research to Solve Challenging Problems for On-Site Disposal Facilities (Craig Benson, University of Virginia - CRESP (USA)); 4 - Reducing Risk to Enable Endstates (Frederick Hughes, Fluor Idaho, LLC (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 120B: DOE Portsmouth Paducah Project Office (PPPO) Update

This panel focused on the Portsmouth/Paducah Project Office (PPPO) of the US DOE Office of Environmental Management, Lexington, Kentucky, the US DOE Featured Site for Thursday. It showcased recent progress, challenges and planned efforts in radioactive waste management, waste disposition, environmental remediation and D and D at the Portsmouth (Ohio) and Paducah (KY) Gaseous Diffusion Plant Sites, as well as the Depleted Uranium Hexafluoride (DUF6) Conversion Project with facilities at both sites Presentations proposed include: 1 - Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, US DOE Portsmouth/Paducah Project Office (USA)); 2 - Portsmouth (Jeff Bettinger, US DOE Portsmouth/Paducah Project Office (USA)); 3 - Paducah (Jennifer Woodard, US DOE Portsmouth/Paducah Project Office (USA)); 4 - Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, US DOE Portsmouth/Paducah Project Office (USA)); 5 - Portsmouth Deactivation and Demolition Project (Bob Smith, Fluor-BWXT Portsmouth (USA)); 6 - Paducah Deactivation and Remediation Project (Jeff Bradford, Four Rivers Nuclear Partnership - FRNP (USA)); 7 - Seven Lines-One Project (Zack Smith, SNC Lavalin (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EPA's Suite of Tools for Managing Waste Following a Large-Scale Incident - 19420

Large-scale disasters have the potential to generate a significant amount of waste. For example, Hurricane Katrina and the Joplin Missouri tornado resulted in 100 million and 1.5 million cubic yards of waste respectfully. Man-made chemical, biological, radiological or nuclear (CBRN) incidents either by way of terrorism, war, or accidents have the potential to generate as much or more hazardous waste. Recovery is profoundly impacted by waste management issues. The quantification, segregation, transportation, and storage of waste can be an arduous and costly undertaking. Furthermore, these processes are intricately linked with decisions made throughout the recovery timeline. Therefore, the remediation, including waste management, must be holistically considered. Understanding these complex interactions can be facilitated by using models and tools that adhere to the 'system-of-systems' approach. To better understand and predict waste management issues the Environmental Protection Agency's (EPA's) Homeland Security Research Program (HSRP) is developing a suite of tools and resources for planning and recovery purposes. The waste management suite consists of four tools: - Incident Waste Decision Support Tool (I-WASTE): characterizes and produces order-of-magnitude estimates for the weight and volume of waste materials that may require management and/or disposal, as well as identifies and locates potential treatment and disposal facilities. - Waste Estimation Support Tool (WEST): estimates waste generated from remediation and cleanup activities following a wide-area radiological or biological incident; - Waste Storage and Staging Tool: identifies and prioritizes potential locations for staging and storing waste; - Waste Logistics Tool: estimates optimal routes with consideration to cost, time, and logistical requirements (e.g., resource demand, transportation type, access limitations, etc.) associated with transporting large volumes of waste from disaster-stricken areas to intermediate waste staging/temporary storage/on-site processing sites to off-site waste management facilities; and This paper will present EPA's waste management suite of tools, their purpose and application to large-scale incidents, and a case study demonstrating their use in a hypothetical scenario. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗