Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RELIABLE OPERATION PERFORMANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)

100% Renewables↗

Orbit transfer rocket engine technology program

An advanced near term (1990's) space-based Orbit Transfer Vehicle Engine (OTVE) system was designed, and the technologies applicable to its construction, maintenance, and operations were developed under Tasks A through F of the Orbit Transfer Rocket Engine Technology Program. Task A was a reporting task. In Task B, promising OTV turbomachinery technologies were explored: two stage partial admission turbines, high velocity ratio diffusing crossovers, soft wear ring seals, advanced bearing concepts, and a rotordynamic analysis. In Task C, a ribbed combustor design was developed. Possible rib and channel geometries were chosen analytically. Rib candidates were hot air tested and laser velocimeter boundary layer analyses were conducted. A channel geometry was also chosen on the basis of laser velocimeter data. To verify the predicted heat enhancement effects, a ribbed calorimeter spool was hot fire tested. Under Task D, the optimum expander cycle engine thrust, performance and envelope were established for a set of OTV missions. Optimal nozzle contours and quick disconnects for modularity were developed. Failure Modes and Effects Analyses, maintenance and reliability studies and component study results were incorporated into the engine system. Parametric trades on engine thrust, mixture ratio, and area ratio were also generated. A control system and the health monitoring and maintenance operations necessary for a space-based engine were outlined in Task E. In addition, combustor wall thickness measuring devices and a fiberoptic shaft monitor were developed. These monitoring devices were incorporated into preflight engine readiness checkout procedures. In Task F, the Integrated Component Evaluator (I.C.E.) was used to demonstrate performance and operational characteristics of an advanced expander cycle engine system and its component technologies. Sub-system checkouts and a system blowdown were performed. Short transitions were then made into main combustor ignition and main stage operation.

Gustafson, N. B.↗

LANL Activities Supporting Electron Accelerator Production of 99 Mo for NorthStar Medical Radioisotopes, LLC

Summary of LANL FY12 Activities are: (1) Preparation, performance, and data analysis for the FY12 accelerator tests at ANL - (a) LANL designed and installed a closed-loop helium target cooling system at ANL for the FY12 accelerator tests, (b) Thermal test was performed on March 27, (c) 24 h production test to follow the accelerator upgrade at ANL; (2) Local target shielding design and OTR/IR recommendations - (a) Target dose rate and activation products were calculated with MCNPX, (b) 206 Pb(γ,2n) 204m Pb vs 204g Pb branching ratio unpublished, will measure using the LANL microtron, (c) OTR system nearing final configuration, (d) IR prototype system demonstrated during the recent thermal test at ANL; (3) Target housing lifetime estimation - Target housing material specifications and design to be finalized following the thermal test, lifetime not believed to be an issue; and (4) Target cooling system reliability - Long duration system characterizations will begin following the thermal test.

42 ENGINEERING↗

Optimization of energy transfer in microwave electrothermal thrusters

Results are presented from preliminary tests conducted to evaluate the performance of a prototype microwave electrothermal thruster. The primary component of the device is a microwave resonant cavity. The device produces stable axial plasmas within a pressurized section of the cavity with the plasma positioned in the inlet region of the nozzle. Plasma stability is enhanced by axial power coupling, an optimal distribution of electric power density within the cavity, and a propellant gas flow which has a large vortical velocity component. The thruster has been operated with a number of propellant gases: helium, nitrogen, ammonia, and hydrogen. Plasmas can be formed in a reliable manner at cavity pressures of 1 kPa and incident power levels ranging from 50 W to 350 W, depending on the gas used, and can be operated at pressures up to 300 kPa at power levels up to 2200 W. Ideal performance results of vacuum Isp and thermal efficiency vs. specific power are presented for each gas. Representative results of this preliminary work are: He - Isp = 625 s, eta-thermal = 90 percent; N2 - Isp = 270 s, eta-thermal = 41 percent; NH3 - Isp = 475 s, eta-thermal= 55 percent; H2 - Isp = 1040 s, eta-thermal = 53 percent.

Sullivan, D. J.↗

Ubiquitous Power Electronics in Future Power Systems: Recommendations to fully utilize fast control capabilities

Power electronics is becoming ubiquitous in power systems because the rapid growth of variable renewable generation such as wind and solar, responsive load, electric vehicles, energy storage, as well as DC transmission. As a result, a high percentage of electricity will be generated, transmitted or consumed by power electronics in the future power system. Such a high penetration of power electronics is changing power system operation landscapes and dynamic characteristics. Two major kinds of impact are reduced system mechanical inertia by inverter-based resources displacing conventional generation and active participation of many distributed energy resources through inverters. This has caused significant reliability challenges for power system operation. The mitigation approach so far has mostly focused on accommodating power electronics inverters as passive devices or creating synthetic inertias to make inverter-based generation behaving as conventional generators. However, the high-speed control capabilities of power electronics present new opportunities for achieving an optimal performance beyond conventional power systems. A lower-inertia system can be more responsive for improving reliability, and distributed small resources can be more adaptive and scalable for better flexibility and resilience. Power electronic inverters are capable of multiple fast control functions. To fully utilized the ubiquitous power electronics in power systems requires technology advancements in the following areas: data and communications to capture the new dynamic behaviors introduced by power electronics; modeling and simulation to understand the behaviors of power electronics and its interactions with other components in the context of power systems; control and optimization methods for fully utilizing the capabilities of power electronics for a new paradigm of performance beyond the traditional inertia-heavy system; and significant upgrades in power electronics hardware to cater to the new control capabilities. If properly controlled and optimized, power electronics can help transform the power system to be responsive, adaptive, and scalable.

Huang, Zhenyu↗

Comparison of Second Wind Triton Data with Meteorological Tower Measurements

With the increased interest in remote sensing of wind information in recent years, it is important to determine the reliability and accuracy of new wind measurement technologies if they are to replace or supplement conventional tower-based measurements. In this study, we present the results of an analysis characterizing the measurement performance of a state-of-the-art SOund Detection And Ranging (sodar) device when compared to a high-quality tower measurement program. Second Wind Inc. (Somerville, MA, USA) provided NREL with more than six months of data from a measurement program conducted near an operating wind farm in western Texas.

17 WIND ENERGY↗

Ground controlled robotic assembly operations for Space Station Freedom

A number of dextrous robotic systems and associated positioning and transportation devices are available on Space Station Freedom (SSF) to perform assembly tasks that would otherwise need to be performed by extravehicular activity (EVA) crewmembers. The currently planned operating mode for these robotic systems during the assembly phase is teleoperation by intravehicular activity (IVA) crewmembers. While this operating mode is less hazardous and expensive than manned EVA operations, and has insignificant control loop time delays, the amount of IVA time available to support telerobotic operations is much less than the anticipated requirements. Some alternative is needed to allow the robotic systems to perform useful tasks without exhausting the available IVA resources; ground control is one such alternative. The issues associated with ground control of SSF robotic systems to alleviate onboard crew time availability constraints are investigated. Key technical issues include the effect of communication time delays, the need for safe, reliable execution of remote operations, and required modifications to the SSF ground and flight system architecture. Time delay compensation techniques such as predictive displays and world model-based force reflection are addressed and collision detection and avoidance strategies to ensure the safety of the on-orbit crew, Orbiter, and SSF are described. Although more time consuming and difficult than IVA controlled teleoperations or manned EVA, ground controlled telerobotic operations offer significant benefits during the SSF assembly phase, and should be considered in assembly planning activities.

Parrish, Joseph C.↗

Component Reliability Testing of Long-Life Sorption Cryocoolers

This paper summarizes ongoing experiments characterizing the ability of critical sorption cryocooler components to achieve highly reliable operation for long-life space missions. Test data obtained over the past several years at JPL are entirely consistent with achieving ten year life for sorption compressors, electrical heaters, container materials, valves, and various sorbent materials suitable for driving 8 to 180 K refrigeration stages. Test results for various compressor systems are reported. Planned future tests necessary to gain a detailed understanding of the sensitivity of cooler performance and component life to operating constraints, design configurations, and fabrication, assembly and handling techniques, are also discussed.

operating constraints fabrication design testing↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Materiel availability modeling and analysis for a complex army weapon system.

Materiel availability (A{sub m}) is a new US Department of Defense Key Performance Parameter (KPP) implemented through a mandatory Sustainment Metric consisting of an Availability KPP and two supporting Key System Attributes (KSAs), materiel reliability and ownership cost. Sandia National Laboratories (Sandia), in conjunction with several US Army organizations, developed the analytical foundation, assumptions, and brigade-level modeling approach to support lifecycle, fleet-wide A{sub m} modeling and analysis of a complex Army weapon system. Like operational availability (A{sub o}), A{sub m} is dependent on reliability, but A{sub m} is also affected by other factors that do not impact A{sub o}. The largest influences on A{sub m} are technology insertion and reset downtimes. A{sub m} is a different metric from A{sub o}. Whereas A{sub o} is an operational measure, A{sub m} is more of a programmatic measure that spans a much larger timeframe, additional sources of downtime, and additional sources of unscheduled maintenance.

36 MATERIALS SCIENCE↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998–2016

This report presents an enhanced performance evaluation of motor-driven pumps (MDP) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2016 for the component reliability as reported in the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The motor-driven pump failure modes considered for standby systems are failure to start, failure to run less than or equal to one hour, and failure to run more than one hour; for normally running systems, the failure modes considered are failure to start and failure to run. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. Highly statistically significant increasing trend was identified in normally running MDP run hours per reactor year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sizing ramping reserve using probabilistic solar forecasts: A data-driven method

Ramping products have been introduced or proposed in several U.S. power markets to mitigate the impact of load and renewable uncertainties on market efficiency and reliability. Current methods often rely on historical data to estimate the requirements of ramping products and fail to take into account the effects of the latest weather conditions and their uncertainties, which could lead to overly conservative or insufficient requirements. This study proposes a k-nearest-neighbor-based method to give weather-informed estimates of ramping needs based on short-term probabilistic solar irradiance forecasts. Forecasts from multiple sites are employed in conjunction with principal component analysis to derive numerical classifiers to characterize system-level weather conditions. In addition, we develop a data-driven method to optimize the model parameters in a rolling-forward manner. By using real-world data from the California Independent System Operator, we design two metrics to evaluate method performance: 1) frequency of shortage and 2) oversupply of ramping product. Our proposed method presents advantages in comparison with the baseline and a set of benchmark methods: without compromising system reliability, it reduces system ramping requirements by up to 25%, therefore improving both system reliability and economics.

14 SOLAR ENERGY↗

Accuracy assessment: The statistical approach to performance evaluation in LACIE

A statistical methodology was developed to check the accuracy of the products of the experimental operations throughout crop growth and to determine whether the procedures are adequate to accomplish the desired accuracy and reliability goals. It has allowed the identification and isolation of key problems in wheat area yield estimation, some of which have been corrected and some of which remain to be resolved. The major unresolved problem in accuracy assessment is that of precisely estimating the bias of the LACIE production estimator. Topics covered include: (1) evaluation techniques; (2) variance and bias estimation for the wheat production estimate; (3) the 90/90 evaluation; (4) comparison of the LACIE estimate with reference standards; and (5) first and second order error source investigations.

Houston, A. G.↗

Performance, reliability and life issues for components of the Planck Sorption Cooler

Continuous-duty hydrogen sorption cryocoolers are being developed for the European Space Agency (ESA) Planck mission. To achieve an acceptable level of performance and robust operation with these hydride refrigerators during flight, detailed investigations have been performed on the sorbent materials and on critical hardware components.

sorption↗

Impacts of PV Module Connector Failures on Cost and Performance of Utility Scale Photovoltaic Systems

The reliability, cost and performance of electrical connectors are a concern in all types of electrical systems, and demands on connectors used on photovoltaic (PV) systems include that connectors maintain electrical conductivity and physical strength, endure ultraviolet sunlight and high ambient temperature, and resist moisture and chemical intrusion over a very long (>25 year) performance period. Connector failures increase operation and maintenance (O&M) costs and reduce plant production, but connector failure can also cause safety and liability problems, which are of greater concern. This work results from a three-year collaboration between Sandia National Laboratories (SNL), the Electric Power Research Institute (EPRI), and the National Renewable Energy Laboratory (NREL) and funded by the U.S. Department of Energy (DOE) Solar Energy Technology Office (SETO) under Agreements #39035 and #38531 "Connector Reliability Across the US Solar Sector." a multi-pronged investigation of PV connector health across the US (see https://energy.sandia.gov/pvconnectors/). This report presents derivation of a Techno-Economic Analysis (TEA) that models failure modes and frequencies (how often failure occurs), estimates O&M costs and lost production associated with connector failures, and then calculates the effect that PV module connectors can have on Levelized Cost of Energy (LCOE). The model is informed with initial data from quantitative assessment of failure rates, root causes and mechanisms, in-situ diagnostics and data collection, lab-based forensics, and interviews with PV connector manufacturers and plant operators. SNL conducted site inspections at multiple utility-scale sites in different climates and subjected field samples of new, used, and degraded connectors to visual and electrical characterization. EPRI conducted metallurgical analysis of the pin and sleeve conductors to study failure-induced morphological and compositional changes. There is in general a shortage of statistically valid data, but data from PVROM database maintained by SNL was sufficient to ascertain failure rates and lost production as well as provide qualitative insight in its curated maintenance records. This report details the structure of the mathematical model but the sources of data to inform the model will continue to evolve. Analysis of a 100 MW PV plant is provided as an example of the use of the model, with results indicating that connectors are responsible for Annualized O&M Costs of $\$$71,933/year; Annualized Unit O&M Costs of $\$$0.72/kW/year; that a Reserve Account of $\$$187,220 should be available to fund repairs related to connectors; that connectors add $\$$1,494,004 to the Net Present Value of the O&M Costs (project life); and that O&M related to connectors adds about $\$$0.00088/kWh to the Levelized Cost of Energy. The impact of this model is to provide a tool to make the US solar sector more robust by quantifying and monetizing the reliability risks to utility-scale PV systems posed by poorly installed, mismatched and/or poorly designed and manufactured connectors. The TEA provides a model incorporating failure statistics, O&M cost data, and lost production into a single figure of merit, informing decisions and enabling practitioners to optimize cost and performance trade-offs. Stakeholders include connector manufacturers, system designers and equipment specifiers, standards bodies, installers and O&M providers, investors and insurance underwriters. This report supports continued growth of PV predicated on assurances that properly installed and maintained PV system connectors are safe and reliable. The project team is proposing future work including accelerated testing of connectors and expanding the approach taken here to other PV system components, such as TEA for rapid shut-down devices.

14 SOLAR ENERGY↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced grid operation and optimized PV penetration utilizing highly distributed sensor data

This task describes R&D activities to establish methods to cost-effectively achieve very high PV penetration scenarios (well beyond 100% of peak load at the feeder level) by leveraging distributed inverters to increase situational awareness and provide local voltage support. The grid performance and reliability objectives (SI vision) of this proposal were selected to enhance feeder planning models that can better characterize and quantify the electric power system including the secondary system servicing customers. The Communication objective was selected to demonstrate how visibility and control of behind-the-meter systems and distributed storage at large scale can be optimized to address system reliability and variability impacts, and to maximize the value of solar in high PV penetration scenarios. The goal of this project was to achieve enhanced grid operation and optimized PV penetration utilizing highly distributed sensor data via three subtasks 1.1-1.3.

14 SOLAR ENERGY↗

A sequential Attacker-Defender game for distribution systems resilience enhancement against extreme weather events

Improving distribution system resilience against frequent extreme weather events is important for reliable power system operations. Especially when dealing with events such as hurricanes that have short-term predictions, proactive pre-event preparedness plays a vital role in system resilience performance. In this paper, we propose a novel approach to construct pre-event resource allocation plans for system operators to cope with upcoming threats through a sequential attacker-defender game framework. The sequential attacker-defender game is designed to model the interaction between the extreme weather and the system operator. In each round of the game, the attacker and the defender sequentially update their current strategies by accounting for the opponent’s action set. The attacker model is formulated as a bi-level problem to identify the severe outage scenarios, and the defender model is formulated as a two-stage optimization problem to determine the allocation of restoration resources including mobile responsive resources and repair crews. Two scale-reduction strategies are proposed to ensure the scalability of the game scheme. Finally, case studies on the IEEE 33-bus and a 7149-node practical utility system validate the effectiveness of the proposed sequential game and the efficiency of the scale-reduction strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗