Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

GATEWAY Demonstrations: Exterior LED Lighting Projects at Princeton University

This report focuses on four exterior solid-state lighting projects that have been completed at Princeton since 2008, when the University adopted a comprehensive sustainability plan. Through these initial projects – which include a parking garage, a pedestrian path, and two parking lot installations – the school’s facilities engineering staff learned important lessons about SSL technology and gained experience in dealing with the rapidly changing landscape of lighting manufacturers and their suppliers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

GATEWAY Report Brief: Exterior Lighting at Princeton University

Summary of GATEWAY report focuses on four exterior solid-state lighting projects that have been completed at Princeton since 2008, when the University adopted a comprehensive sustainability plan. Through these initial projects – which include a parking garage, a pedestrian path, and two parking lot installations – the school’s facilities engineering staff learned important lessons about SSL technology and gained experience in dealing with the rapidly changing landscape of lighting manufacturers and their suppliers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Conceptual planning for Space Station life sciences human research project

The Life Sciences Research Facility dedicated laboratory is currently undergoing system definition within the NASA Space Station program. Attention is presently given to the Humam Research Project portion of the Facility, in view of representative experimentation requirement scenarios and with the intention of accommodating the Facility within the Initial Operational Capability configuration of the Space Station. Such basic engineering questions as orbital and ground logistics operations and hardware maintenance/servicing requirements are addressed. Biospherics, calcium homeostasis, endocrinology, exercise physiology, hematology, immunology, muscle physiology, neurosciences, radiation effects, and reproduction and development, are among the fields of inquiry encompassed by the Facility.

Primeaux, Gary R.↗

Recommendation of a More Effective Alternative to the NASA Launch Services Program Mission Integration Reporting System (MIRS) and Implementation of Updates to the Mission Plan

Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.

recommendation↗

The Little Engine That Could: No Project is too Small for Sustainable Remediation Moab Uranium Mill Tailings Removal Project - 16427

Executive Order 13693, 'Planning for Federal Sustainability in the Next Decade', mandates the reduction of energy use and cost and greenhouse gas emissions, and the search for renewable or alternative energy solutions. DOE EM manages the Moab Uranium Mill Tailings Remedial Action Project in Utah that involves relocating a 16-million-ton uranium mill tailings pile and associated contaminated materials at the former Atlas mill site to a permanent disposal cell constructed near Crescent Junction, Utah, predominantly by rail. Project personnel strive to support the Executive Order in making preparations for the impacts of climate change. Meeting the goals of the Executive Order in light of the remote location and limited resources of the Project sites often requires an innovative approach and perseverance. The Moab Project is a 'Small Site' within EM and has a comparatively short-term completion date. As a result, large-scale sustainability projects, such as retrofits or remodels, do not offer a cost benefit over this period. Instead, less dramatic process changes are achievable. The Project purchases renewable wind energy through the local power provider to reduce Scope 2 (purchased electricity) greenhouse gas emissions. Toward its ambitious goal of achieving zero landfill waste, the Project has diverted over 50 percent of its nonhazardous solid waste from the local landfill through composting and recycling efforts. In particular, electronics must meet various sustainable criteria prior to purchase, and be recycled through donations and certified recyclers, diverting it from the waste stream. The Project has received multiple Green Buy Awards from DOE by reaching leadership goals for purchasing energy-efficient, water-efficient, bio-based, and recycled-content products. In fiscal year 2014, in response to President Obama's June 2014 memorandum, 'Sustainable Practices for Designed Landscapes and Supporting Pollinators on Federal Landscapes', the Project decided to take a proactive approach and work with a local pollinator group, hosting two beehives in a revegetation area on the Moab site. An increase in plant growth and blossoming plants in the revegetation area has been observed and is believed to be related to the added pollinators. The Project has previously seeded disturbed areas mainly with native drought-resistant species to reduce water usage. Storm water collected in sediment basins at the Crescent Junction site is used for dust control and compaction of mill tailings in the disposal cell. The Project worked with the U.S. Army Corps of Engineers and the U.S. Fish and Wildlife Service to gain support for re-contouring a remediated area adjacent to the Colorado River, which borders the Moab site on the east, to allow the area to flood at a lower river stage. This re-contouring promotes more varied vegetation growth and river water that tops the west bank brings soil nutrients to inundated areas of the site. Ponded floodwater has been pumped into revegetation plots for irrigation, reducing freshwater usage. Innovation in sustainable practices comes in many different fashions. The Moab Project demonstrates that no project is too small to implement sustainable practices. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

Hall, Wayne↗

2015 Summary Report on Industrial and Regulatory Engagement Activities

The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway of the Light Water Reactor Sustainability(LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and suppliers. The goal of this engagement strategy is to develop a shared vision and common understanding across the nuclear industry of the need for II&C modernization, the performance improvement that can be obtained, and the opportunities for collaboration to enact this vision. The primary means of engaging the nuclear operating companies is through a Utility Working Group (UWG), composed of utility representatives that participate in formal meetings and bi-monthly phone calls to provide input on nuclear plant needs and priorities for II&C technologies. Two working groups were initiated during FY 2015 to provide a means for UWG members to focus on particular technologies of interest. The Outage Improvement Working Group consists of eight utilities that participate in periodic conference calls and have access to a share-point web page for acccess to project materials developed in the Advanced Outage Control Center pilot project. In the area of computer-based procedures and automated work packages, the II&C Pathway has worked with the Nuclear Information Technology Strategic Leadership (NITSL) to set up a monthly conference call with interested utility members to discuss various aspects of mobile worker technologies. Twenty one technical and project reports were delivered to the UWG during FY 2015, reflecting the work of the II&C Pathway pilot projects during the year. Distribution of these reports is one of the primary means of transferring to the nuclear industry the knowledge and experience gained during the development of advanced II&C technologies in support of LWR sustainability. Site visits to discuss pilot project activities and future plans were made to Arizona Public Service, Exelon, Duke Energy, Pacific Gas & Electric, SCANA, Southern Nuclear, South Texas Project, STARS Alliance, Tennessee Valley Authority, and Xcel. Discussions were also held on the pathway goals and activities with major industry support organizations during FY 2102, including the Institute of Nuclear Power Operations (INPO), the Nuclear Information Technology Strategic Leadership (NITSL), the Nuclear Energy Institute (NEI), and the Electric Power Research Institute. The Advanced II&C Pathway work was presented at five major industry conferences and Informal discussions were held with key NRC managers at industry conferences. In addition, discussions were held with NRC senior managers on digital regulatory issues through participation on the NEI Digital I&C Working Group. Meetings were held with major industry suppliers and consultants, to explore opportunities for collaboration and to provide a means of pilot project technology transfer. In the international area, discussions were held with Electricite’ de France (EdF) concerning possible collaboration in the area NPP configuration control using intelligent wireless devices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Alternative D and D Planning Tool - 12466

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began cleanup of the East Tennessee Technology Park (ETTP). UCOR's $2.2 billion contract has an initial five-year term and a four-year option period for completing the cleanup of ETTP and performing surveillance and maintenance and waste management operations at both the Oak Ridge National Laboratory and the Y-12 National Security Complex. ETTP D and D work includes disposition of large, complex, contaminated, Manhattan Project-era facilities such as the K-25 and K-27 uranium enrichment facilities. At ETTP, UCOR views the D and D process as a 'Waste Factory' with waste production lines from the point-of-generation to the point-of-disposal. Safely transforming vertically-standing buildings into horizontally-lying waste in a disposal facility is the primary cleanup objective. Whereas a factory produces widgets, D and D produces waste-lots of waste. In support of the Waste Factory view, UCOR is developing a systems planning tool to help better plan how to effect cleanup by improving waste planning, uniting waste generator with waste dis-positioner, and represent the 'waste factory' in a computer model that allows the D and D and waste management teams to better understand available disposal paths, waste uncertainties and potential consequences, driving variables, and sensitivity to changes. Any model of reality represents a compromise. Part of the Waste Factory Model's value may be in providing standardization and relative direction for assisting decision making as opposed to absolute cost or schedule answers. From that relative direction, management can commission detailed planning and estimating. Also, the model's output credibility is tied directly to its input quality. That is why, as discussed above, the Waste Factory Model's key informational component will be the standardized waste streams (e.g., Structure/Debris disposed at EMWMF) and associated standardized unit costs. The model development process generally, and the development team's collaboration, specifically, is most important. Building-in this integrity up-front, transparently, will help ensure that the model outputs are known, understood, and credible (no mysterious 'black-box' components). The Waste Factory Model is envisioned to help improve understanding of a given project's waste implications; help reveal and suggest the important few variables out of the trivial many; reveal likely process bottlenecks, and help focus risk mitigation and assumption management efforts to better manage the projected total cost. In the long term, the UCOR team's goal is to incorporate an information feedback loop to help improve the accuracy of key model attributes, such as the standardized cost information. This way, by design, the model output should improve over time and thus help the model mature into both a credible scenario tool and a standardized project planning resource. The initial model capabilities may be narrow, but with time and effort it may prove to be a timely and cost-effective tool. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks.

54 ENVIRONMENTAL SCIENCES↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the $\textit{Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems}$ (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks

58 GEOSCIENCES↗

Towards Persistent Space Observations through Autonomous Multi-Agent Formations

Sensing platforms must advance in scale and sophistication in order to support increasingly ambitious missions across Earth and space science; intelligence, surveillance, and reconnaissance (ISR); and planetary exploration. Distributed, persistent observation platforms have the potential to play a pivotal role in next generation missions through improved area coverage, enhanced situational awareness, and faster identification of trends and changes. The Multi-Agent Clusters for Persistent Observations from Space (MACPOS) project at NASA Langley Research Center is developing key technologies for the autonomous, heterogeneous formations that will comprise such platforms. Research thrusts include dynamic formation negotiation for self-assembling clusters of agents, distributed motion planning, and coordinated trajectory execution. Adaptive leader-follower formation negotiation allows agents to cluster and break off as necessary to adapt to both nominal and new mission objectives. Coordinated motion planning and execution maintain the formation while ensuring safe separation distances among agents and obstacles in the environment. These capabilities align MACPOS with NASA’s initiative for space and surface in-situ assembly through fundamental technology development for autonomous multi-agent systems. This paper presents an overview and early progress for the MACPOS project. We describe the system architecture for both individual agents and the overall fleet. Design considerations are given for the planning, control, and metrology subsystems. Finally, we discuss planned project milestones and the expected course of development.

Matthew P Vaughan↗

State Energy Offices’ Engagement in Electric Distribution Planning to Meet State Policy Goals

NASEO and Berkeley Lab released a new publication on State Energy Offices’ Engagement in Electric Distribution Planning to Meet State Policy Goals. State and Territory Energy Offices develop plans, programs, policies, and projects that have a substantial impact on electric distribution systems. They also can participate in distribution system planning (DSP) processes to help ensure that utilities – consumer- and investor-owned – meet the state’s future energy needs. This paper recognizes the wide spectrum of roles that State Energy Offices can play in DSP processes, including planning for distributed energy resources and grid modernization. It highlights various examples of non-regulatory activities by State Energy Offices including planning, conducting studies, convening stakeholder processes, and implementing programs that inform and contribute to distribution system planning. It also provides examples of State Energy Offices’ engagement in proceedings before their respective public utility commissions. As State Energy Offices face myriad challenges associated with meeting state policy goals, preparing for anticipated rates of distributed energy resource deployment, addressing concerns regarding grid reliability and resilience, and recommending and making long-term investment decisions, the examples provided through this guide can serve as a resource in navigating those challenges.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing Fault Management Development

As the complexity of space missions grows, development of Fault Management (FM) capabilities is an increasingly common driver for significant cost overruns late in the development cycle. FM issues and the resulting cost overruns are rarely caused by a lack of technology, but rather by a lack of planning and emphasis by project management. A recent NASA FM Workshop brought together FM practitioners from a broad spectrum of institutions, mission types, and functional roles to identify the drivers underlying FM overruns and recommend solutions. They identified a number of areas in which increased program and project management focus can be used to control FM development cost growth. These include up-front planning for FM as a distinct engineering discipline; managing different, conflicting, and changing institutional goals and risk postures; ensuring the necessary resources for a disciplined, coordinated approach to end-to-end fault management engineering; and monitoring FM coordination across all mission systems.

McDougal, John M.↗

New England Wind Energy Education Project (NEWEEP) (Final Technical Report)

Project objective is to develop and disseminate accurate, objective information on critical wind energy issues impacting market acceptance of hundreds of land-based projects and vast off-shore wind developments proposed in the 6-state New England region, thereby accelerating the pace of wind installation from today's 140 MW towards the region's 20% by 2030 goals of 12,500 MW. Methodology: This objective will be accomplished by accumulating, developing, assembling timely, accurate, objective and detailed information representing the 'state of the knowledge' on critical wind energy issues impacting market acceptance, and widely disseminating such information. The target audience includes state agencies and local governments; utilities and grid operators; wind developers; agricultural and environmental groups and other NGOs; research organizations; host communities and the general public, particularly those in communities with planned or operating wind projects. Information will be disseminated through: (a) a series of topic-specific web conference briefings; (b) a one-day NEWEEP conference, back-to-back with a Utility Wind Interest Group one-day regional conference organized for this project; (c) posting briefing and conference materials on the New England Wind Forum (NEWF) web site and featuring the content on NEWF electronic newsletters distributed to an opt-in list of currently over 5000 individuals; (d) through interaction with and participation in Wind Powering America (WPA) state Wind Working Group meetings and WPA's annual All-States Summit, and (e) through the networks of project collaborators. Sustainable Energy Advantage, LLC (lead) and the National Renewable Energy Laboratory will staff the project, directed by an independent Steering Committee composed of a collaborative regional and national network of organizations. Major Participants - the Steering Committee: In addition to the applicants, the initial collaborators committing to form a Steering Committee consists of the Massachusetts Renewable Energy Trust; Maine Public Utilities Commission; New Hampshire office of Energy & Planning, the Connecticut Clean Energy Fund;, ISO New England; Utility Wind Interest Group; University of Massachusetts Wind Energy Center; Renewable Energy New England (a new partnership between the renewable energy industry and environmental public interest groups), and Lawrence Berkeley National Laboratory (conditionally). The Steering Committee will: (1) identify and prioritize topics of greatest interest or concern where detailed, objective and accurate information will advance the dialogue in the region; (2) identify critical outreach venues, influencers and experts; (3) direct and coordinate project staff; (4) assist project staff in planning briefings and conferences described below; (5) identify topics needing additional research or technical assistance and (6) identify and recruit additional steering committee members. Impacts/Benefits/Outcomes: By cutting through the clutter of competing and conflicting information on critical issues, this project is intended to encourage the market's acceptance of appropriately-sited wind energy generation.

14 SOLAR ENERGY↗

Supersonics--Airport Noise

At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.

Bridges, James↗

Energy-water analysis of the 10-year WECC transmission planning study cases.

In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

13 HYDRO ENERGY↗