Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power System Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100): Six-Month Progress Update [Slides]

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation provides a six-month progress update on the study, including presentation of four initial scenario frameworks defined with extensive stakeholder input.

14 SOLAR ENERGY↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) (Six-Month Progress Update) [Slides]

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation was delivered in a public webinar on July 21, 2022, providing a high level summary of the progress in the first six months of the study, including presentation of four initial scenario definitions based on extensive stakeholder input.

14 SOLAR ENERGY↗

Revealing Decision Conservativeness Through Inverse Distributionally Robust Optimization

This paper introduces Inverse Distributionally Robust Optimization (I-DRO) as a method to infer the conservativeness level of a decision-maker, represented by the size of a Wasserstein metric-based ambiguity set, from the optimal decisions made using Forward Distributionally Robust Optimization (F-DRO). By leveraging the Karush-Kuhn-Tucker (KKT) conditions of the convex F-DRO model, we formulate I-DRO as a bi-linear program, which can be solved using off-the-shelf optimization solvers. Additionally, this formulation exhibits several advantageous properties. We demonstrate that I-DRO not only guarantees the existence and uniqueness of an optimal solution but also establishes the necessary and sufficient conditions for this optimal solution to accurately match the actual conservativeness level in F-DRO. Furthermore, we identify three extreme scenarios that may impact I-DRO effectiveness. Our case study applies F-DRO for power system scheduling under uncertainty and employs I-DRO to recover the conservativeness level of system operators. Numerical experiments based on an IEEE 5-bus system and a realistic NYISO 11-zone system demonstrate I-DRO performance in both normal and extreme scenarios. An extended version of this paper with additional analyses is available at li2024revealing.

distributionally robust optimization↗

Remotely powered line monitor

Improved devices, apparatuses, systems, and methods involving the use of field probes with voltage-controlled variable impedance elements and surface-launched acoustic wave devices, including surface acoustic wave (SAW) devices and SAW sensor-tag wireless interface devices to measure voltage and current in current carrying conductors (CCCs) via measurement of the electric fields and magnetic fields around said CCCs are disclosed. The devices, apparatuses, systems, and methods taught in the present invention include a remotely powered line-mounted measurement unit that requires no connection to electrical ground for operation, and that has no internal energy source, no energy harvesting or power conditioning circuitry, no discrete energy storage components, and no radio. The devices, apparatuses, systems, and methods taught in the present invention also provide for determining the phase (leading or lagging) of the current relative to the voltage in AC power systems, and also provide for measurement of temperature of the conductor.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Power Systems Measurements: A Literature Review

In 2020, a literature survey was performed as part of a project aimed at producing guidance for the Department of Energy in the form of a Roadmap. The topic of the Roadmap was measurement. That was viewed as being generally underrepresented in consideration of sensing and measurement or instrumentation and measurement. Sensing is just the beginning of a process, and the instrument is just the container for the process. Measurement, the experimental process, has acquired a considerable body of theory over the last few decades, theory that is not widely taught and disseminated. The results of the survey can be said broadly to reflect that lack of appreciation. Specifically, the review found that there is support for the development of a more “capable” PMU. New algorithms and new documentary standards will be needed. Some of the findings are: (1) Point-on-wave technology adds new capability to the existing suite of measurements, and could allow for improved operation and protection (2) Power quality analysis has historically been concerned with assessment of how non-sinusoidal the delivered voltage shows promise in signature recognition, a departure from the modeling that has historically characterized power system measurements. (3) The PMU is assed as being a remarkable measurement system, but its performance is held back by the lack of understanding of the measurement theory underpinning its operation. (4) The PMU is being considered for application in the distribution system. There is a danger that it will be seen only in the light of the successful PMU implementation in transmission, and the two have different requirements. These various expansions of measurements will no doubt benefit from a better appreciation of the theoretical aspects of measurement. In this, and other, regards, our survey of the literature has identified gaps as well as possibilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Evaluation of Co-Simulation for Modeling Coupled Natural Gas and Electricity Networks

Reliance on natural gas for power generation has increased the coupling between gas and power networks. While this coupling can bring operational and economic benefits, it can also yield challenges, as the constraints in one system can impact the other. Co-simulation can capture the constraints and interactions between these systems, but so far, there has been limited comparison of co-simulation results to those of an integrated model. In this work, we develop a new co-simulation framework using the HELICS platform and the SAInt tool for modeling transient gas and AC optimal power flow. We evaluate this co-simulation framework against a fully integrated version of the SAInt power and gas simulators, thus providing a benchmarking of the co-simulation approach. We compare results across the two approaches for two test networks and a network representing the Belgian power and gas networks, testing both normal operating conditions and cases with compressor disruptions. In each of the cases tested, we find nearly identical results from the two approaches across various metrics of interest, such as nodal pressure, gas flow rates, and active power generation. This alignment suggests that co-simulation can yield comparable results to fully integrated models for modeling coupled gas and electricity networks.

03 NATURAL GAS↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Applying Utility's Advanced Grid Technologies to Improve Resiliency of a Critical Load

The US DOE Office of Electricity's Energy Storage Program's joint R&D work with the Cordova Electric Cooperative (CEC) has deployed several advanced grid technologies that are providing benefits today to Cordova Alaska's electricity users. Advanced grid technologies deployed through DoE co-funded R&D include a 1MW Battery Energy Storage System (BESS), and enhanced monitoring including Phasor Measurement Units (PMU's) to help better understand the operational impacts of the added BESS. This paper will highlight key accomplishments to-date in deploying and using advanced grid technologies, and then outline the next phase of work that will use these technologies to implement an operating scheme to reconfigure the utility's distribution system and utility resources including BESS to provide emergency back-up power to a critical load: the Cordova Community Medical Center (CCMC). This paper will include additional insights on the use of utility resources to support critical loads via case study examples by the National Rural Electric Cooperative Assoc. (NRECA).

BESS↗

Optimization Formulations for Storage Devices with Disjoint Operating Modes

Optimizing State of Charge for Storage Resources Storage of generated energy has existed as a contributing resource within the power sector for more than a century in the case of pumped hydro storage. Even though most regional transmission organizations/independent system operators do not currently optimize state of charge (SOC) for storage, the SOC is an essential aspect of the operating characteristics of storage. This paper investigates the impact on computational performance of optimizing storage with explicit representation of SOC. To investigate the model, the paper considers two contexts, stand-alone and large-scale. Analysis of the stand-alone context helps to explain why the combination of features in the storage model results in a difficult problem. Numerical results for large-scale test cases verify that new tighter valid inequalities can improve the computation compared with the standard model in the literature.

Business & Economics↗

Ultra High-Temperature Magnetic Bearing System for s-CO 2 Turbines/Expanders. Phase II Final Report

The goal of this project is to design and construct of a prototype of ultra-high temperature permanent magnet (UHT–PM), which provides the force to pull the spinning shaft towards the target position in the magnetic bearing (MB) clearance circle. This project will develop a PM biased MB system, that is actively cooled to the 550°C maximum operating temperature limit of PMs. The MB test environment will include 700°C, 40krpm and 4,000 psi requirements to advance the supercritical carbon dioxide (sCO 2 ) and other types of Brayton power cycle systems. The proposed novel MBs combine PMs for supplying the bias field and electromagnets for supplying the control field, both in UHT conditions. The choice of material is the UHT Sm-Co PMs (US patent 6,451,132) due to their significantly better thermal stability. The 6-pole homopolar design permits uninterrupted force delivery via a redundant control capability (US patent 7,429,811) even if 3 poles were to fail. The Phase I efforts was to focus on development and demonstration of component technologies and detailed design of full scale components and a demonstrator test rig for use in Phase II. UHT–PMs were produced and used in the MB actuator. The operating environment of the EEC-T550 Sm-Co magnet material could be extended by implementing active cooling. Electromagnetic coils imbedded in the MB provide forces to stabilize the shaft position at the target via sensing and control stages. Shaft position sensors enable to identify the present position of the spinning shaft relative to its desired target position in the MB clearance circle (air gap). Auxiliary bearings will be installed to provide a backup support system in the event that power to the MB fails or there is a fault in a device providing current to the MB coils. For control, reliability and safety reasons the sensors and auxiliary bearings are typically located as close as possible to the MBs, which exposes them to the same environmental conditions. Development of only the actuator for the UHT environment is an inadequate approach to complete integration of the MB system in the turbine/expander. Therefore the UHT sensor and auxiliary bearing were designed and developed along with the actively cooled, UHT-PM actuator development. Although shaft position sensors are commercially available (Kaman) they may cost up to $10k per channel, and a full 5 axis magnetic suspension is best implemented with up to 20 sensors. Once successfully completed, this project will significantly extend the operating environment capability for turbomachinery applications such as nuclear power, concentrated solar thermal, fossil fuel, geothermal, and shipboard propulsion. The further advancement of UHT-PM-MB will also strengthen the US position in PM technology, which is presently heavily dominated by China. The UHT Sm-Co magnet material that will be utilized in the proposed work has been developed exclusively by the project proposer. Many actuators, motors, generators and other MB applications will greatly benefit from the proposed work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

CSP Gen3: Liquid-Phase Pathway to SunShot

The United States Department of Energy (DOE) established the Concentrating Solar Power Generation 3 (CSP Gen3) program to promote the development of advanced CSP systems capable of producing electricity at a levelized cost of energy (LCOE) less than $60/MWh, based on criteria published in the CSP Gen3 Roadmap and a subsequent funding opportunity announcement (Gen3 FOA). This report documents the progress and potential of the “Liquid Pathway” to meet these objectives. The Liquid Pathway proposes the use of low-cost molten chloride salts for energy storage, mated with an operationally flexible solar receiver that employs liquid-metal sodium for heat capture and transfer to the storage salt. This approach leverages molten-salt technology from the current state-of-the-art CSP power towers embodied by plants such as Gemasolar, Crescent Dunes, Noor III, and the DEWA 700 CSP project. Furthermore, the design builds on the knowledge gained over decades of use of liquid-metal sodium as a high-temperature heat transfer fluid (HTF) in solar tests and nuclear-power applications. The commercial representation of the proposed Gen3 design incorporates a high-efficiency sodium receiver operating at ~740°C, with a liquid-liquid heat exchanger feeding a two-tank, molten-chloride salt storage system. Chloride salt is dispatched to a supercritical CO 2 (sCO 2 ) power cycle to provide electric power to the grid. The design integration is a conceptual match for the current sodium receiver → solar salt storage → steam-Rankine power cycle promoted by developer Vast Solar, which may facilitate commercial acceptance and development.

14 SOLAR ENERGY↗

Quantifying System Strength From Grid-Forming Resources Using Frequency Scan Approach: Preprint

Current industry practices for quantifying the system strength contribution from grid-forming (GFM) resources to ensure stability of power systems dominated by inverter-based resources (IBRs) are primarily based on iterative electromagnetic transient (EMT) time-domain simulation studies. While feasible, these approaches are resource-intensive, lack scalability and intuition, and might not evaluate the system strength contribution over the entire frequency range of interest. This paper introduces a novel, frequency-domain approach to quantify system strength support provided by a GFM resource using frequency scans. The proposed method uses transfer functions from the grid voltage magnitude (V) and phase (?), respectively, to the reactive (Q) and active power (P) output of a GFM resource for quantifying its contribution to system strength. These transfer functions provide a direct measure of the ability of a GFM resource to behave as a stiff voltage source behind a reactance over a specified frequency range, enabling robust quantification of its system strength contribution. The key innovation of this work is the development of a frequency domain system strength metric called the dynamic short-circuit ratio (dSCR) that is suitable for IBR-dominated power systems and is directly related with the familiar short circuit ratio (SCR) metric. The new metric, dSCR, enables the assessment of system strength contributions from both synchronous machines and converter-based GFM resources using a unified benchmark, which is not possible with the traditional SCR metric. The paper also demonstrates how impedance scans could identify if an unstable condition observed during weak grid conditions is a result of the lack active or reactive power support or both. By leveraging the proposed frequency-domain dSCR metric for quantifying system strength contribution from GFM IBRs, the paper demonstrates targeted mitigation strategies for weak grid instabilities without resorting to repeated, time-consuming time-domain simulations. The result is a scalable and efficient approach to remediate stability challenges in power systems with high shares of IBRs and accelerating the integration of GFM technologies for system strength support in power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing Solar Photovoltaic Integration in the Western United States: Resource Adequacy Considerations

This study examines the impact of reserve margin-based reliability assessment, as commonly used in capacity expansion models, on planning resource-adequate power systems under high penetrations of solar photovoltaics (PV). As a generation resource, PV is operationally different from the conventional dispatchable resources for which most capacity expansion models were designed. The question this study attempts to answer is whether large amounts of PV on a system (in this case, the Western Interconnection of North America) would bias the results of conventional reserve margin-based capacity expansion modeling towards an over- or under-provisioning of resource adequacy. This analysis used NREL’s Resource Planning Model (RPM) for capacity expansion modeling and NREL’s Probabilistic Resource Adequacy Suite (PRAS) for resource adequacy assessment. RPM uses a reserve margin requirement to enforce resource adequacy. PRAS, a collection of tools for studying the resource adequacy of power systems and the adequacy contributions of individual resources on a probabilistic basis, was used to compute multiple resource adequacy metrics across a number of simulated scenarios and system representations with differing regional detail. In all cases, including high PV penetrations (up to 33% annual generation from PV, interconnection-wide), RPM was able to produce resource-adequate systems as measured by normalized expected unserved energy and loss-of-load expectation results from PRAS. The accuracy of reserve margin approaches depends heavily on the underlying assumptions informing the capacity credit assigned to variable and energy-limited resources, particularly when such resources are abundant in the modeled system. RPM’s standard methodology for estimating variable and flexible resources’ capacity contributions, which is based on the top 100 hours of net load, did not appear to systematically undervalue or overvalue variable generation relative to a more rigorous equivalent firm capacity assessment using PRAS, although both over- and under-valuations were observed in specific scenarios. In the worst cases, the top 100 hour method underestimated the equivalent firm capacity of PV by two percentage points, and overestimated the equivalent firm capacity of PV by five percentage points. Calculating capacity contributions based on the top 10 hours of net load systematically underestimated equivalent firm capacities at more modest PV penetrations, but was often a better approximation of equivalent firm capacity than the existing 100-hour approach in scenarios with higher PV penetrations.

14 SOLAR ENERGY↗

Microgrid Energy Management System Integration with Advanced Distribution Management System

The Integrated Distribution Management System (IDMS) project was initiated to demonstrate the interactive operation of microgrid systems and the distribution systems with which they interconnect. The key technologies for this are the microgrid management system and the utility distribution management system. The IDMS project successfully demonstrated that a utility’s advanced distribution management system/distributed energy resources management system (ADMS/DERMS) could effectively manage microgrids to provide visibility and control functionalities as well as use the microgrid as a dispatchable resource to support the utility grid. The DERMS accomplishes this by determining active and reactive power needs at the point of common coupling (PCC) using advanced applications like volt/VAR watt optimization (VVWO) and load relief (LR) with the underlying core applications state estimation (SE) and load flow (LF). The ADMS/DERMS can use the microgrid as a resource to resolve and prevent violations in the grid and to optimize the operational working state of the grid. The IDMS project demonstrated that a utility-operated ADMS with embedded DERMS functionality can flexibly manage a variety of microgrids and other aggregated distributed energy resources (DER) in concert with the wider distribution grid. Microgrids can provide grid services in any number of different ways to meet the operational needs of the distribution utility. The manner of aggregation — microgrid or virtual power plant — is not necessarily relevant to the utility as long as the grid services from the aggregated DER are available and can be managed by its ADMS/DERMS for the stability and reliability of the grid. The IDMS project demonstrated this integrated ADMS concept by combining hardware/software-in-the-loop testing with commercial products from different vendors and a utility’s network model. The project integrated the Schneider Electric EcoStruxure™ ADMS with DERMS with the Schweitzer Engineering Laboratories (SEL) POWERMAX ® Microgrid Control System, and the simulated resources with energy company PECO’s model of a utility-owned microgrid, establishing an operational relationship in which the utility manages the operational functionality of a microgrid at the PCC and that provides the utility with the capability to control the comprehensive power system, inclusive of the macrogrid and microgrid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sorption-based atmospheric water harvesting device

A water-harvesting system can operate with a material that can take up and release water with minimum energy requirements and powered by low-grade energy sources, such as sunlight, in order to potentially allow its deployment into households, especially those located in sunny regions. A water-harvesting method and system can include vapor adsorption using a porous metal-organic framework. In certain embodiments, the porous metal-organic framework can include metal-organic framework in ambient air with low relative humidity, typical of the levels found in most dry regions of the world.

42 ENGINEERING↗

Sorption-based atmospheric water harvesting device

A water-harvesting system can operate with a material that can take up and release water with minimum energy requirements and powered by low-grade energy sources, such as sunlight, in order to potentially allow its deployment into households, especially those located in sunny regions. A water-harvesting method and system can include vapor adsorption using a porous metal-organic framework. In certain embodiments, the porous metal-organic framework can include metal-organic framework in ambient air with low relative humidity, typical of the levels found in most dry regions of the world.

42 ENGINEERING↗