Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ORION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

NASA Exploration Toilet on-Orbit Results and Impact on Future Missions

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continued to be made with each on-orbit operation that culminated in additional crew use of the UWMS on ISS. Additional problems were evaluated during troubleshooting and testing with the UWMS hardware using water and pretreat to simulate crew use. This paper summarizes the additional testing, troubleshooting and the results as well as characterizes the additional data obtained and summarizes the interpretation of the data to characterize the hardware’s operational nuances. Use of the hardware by crew is planned and will also be summarized. The paper will also describe the additional portions of the technology demonstration that were completed and the benefits that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

toilet↗

Artemis I Off-Nominal-Trajectory Design and Optimization

In order to achieve the Artemis I mission objectives to human-rate the Orion spacecraft even under off-nominal conditions, trajectories were developed to handle contingency scenarios: alternate missions for contingencies before or during the Trans-Lunar Injection burn, recoveries to return Orion to the nominal trajectory after a delayed or partial burn, and abort trajectories to return the spacecraft to Earth after a critical failure. In addition, disposal trajectories were generated for situations where recovery was not an option. Details are given on the trajectory characteristics, solution families, the generation of the trajectories, and operations considerations.

Artemis I↗

Trajectory Operations of the Artemis I Mission

This paper describes the operational design and execution of the Artemis I trajectory. It was an operationally complex trajectory with powered lunar flybys and insertion into a Distant Retrograde Orbit (DRO). A joint team of trajectory analysts at the NASA Johnson Space Center (JSC) were responsible for the design and operation of nominal and off-nominal in-space trajectories. A process was developed to convert optimized reference trajectories into Orion burn plans that could be uplinked to the vehicle. During the mission, the joint flight controller and engineering team continuously evaluated upcoming translational burns using actual vehicle conditions, monitored the trajectory for opportunities to re-optimize the trajectory in order to reduce propellant usage, and prepared for potential off-nominal scenarios. Overall Orion in-space trajectory performance is compared tomission designs to demonstrate the success of the design and operations work-flows.

Artemis I↗

Soyuz Landing Risk Characterization

INTRODUCTION United States On-orbit Segment (USOS) astronauts have been returning to Earth from the International Space Station (ISS) aboard the Russian Soyuz vehicle since 2003. The energetics associated with Soyuz landings are comparable to our next generation of US space vehicles (Orion, Crew Dragon, and Starliner). Soyuz also lands crew in a similar state of spaceflight deconditioning that is anticipated using the future vehicles. A number of injuries have now been observed during these Soyuz landings. Currently it is unknown how Soyuz landing accelerations and the numbers and types of associated injuries relate to the new occupant protection requirements levied upon future space vehicles. Understanding this relationship will allow better quantification of the risk of injury for future spacecraft designs. METHODS An estimate of injury occurrence during Soyuz landings has been determined using data contained in NASA flight medicine databases and supplemented with data collected from crew members and flight surgeons. At the time of this abstract, 96 USOS astronauts have returned to Earth in the Soyuz (59 US, 31 International Partner, and 6 spaceflight participants). Of that total, data from 80individual crew landings has been collected through this study as of September 2023. Injuries are classified either as contusions/abrasions, Class I (minor, no medical follow-up), Class II (moderate, medical follow-up necessary), Class III (severe), or Class IV (life threatening). Current NASA occupant protection standards are primarily based on the Multi-axial Dynamic Response Index (MDRI), which is a simple lumped-parameter spring, mass, damper model tuned to human impact responses in three orthogonal axes. RESULTS Using what is known about Soyuz landing dynamics from airborne and drop test data, the MDRI predicts essentially no Class IV or III injuries, < 1% Class II injuries, and < 5% Class I injuries. Approximately one-third of all USOS crewmembers for whom data has been gathered have suffered some sort of injury related to landing in the Soyuz vehicle. Most of these injuries fall into the contusion/abrasion category (21.3%) (n.b. This is the percent for whom contusion/abrasion was the worst injury. Those with class I or II injuries typically also received contusions/abrasions). Class I injuries have been sustained by 5.0% of all crew, and Class II injuries have been observed in 3.8%. No Class III or IV injuries have been sustained to date. Forty-three injuries have been documented, with some crewmembers sustaining more than one injury in a single landing. The knee was the most likely area of injury (n=9), followed by the back (n=8), then the arm (n=7). CONCLUSION Soyuz landing dynamics are the most comparable analog environment for the anticipated loads associated with Orion and commercial crew vehicle landings. The MDRI under predicts the percentage of Class II injuries experienced during Soyuz landings, but it is better at predicting Class I injury occurrences. However, if contusions/abrasions are included in the minor injury Class I category, then the MDRI vastly under predicts those injuries as well. Given this data, it is important to re-evaluate the expected injury rates for future vehicles and work toward improving the predictive tools for spaceflight use. Spaceflight deconditioning may account for some of the under prediction, and work is ongoing to assess the relationship between landing injuries and impact tolerance changes due to spaceflight deconditioning. Future work includes expanding this study to involve private space missions on new vehicles to better characterize the effects of time in flight, suit and seat design, and vehicle dynamics.

N Newby↗

NASA Exploration Toilet Hardware Status and Crew Feedback from ISS Artemis-2 Demonstration

The Universal Waste Management System (UWMS), ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continues to be made with each on-orbit operation and will ultimately culminate with nominal US crew use of the hardware on ISS. During 2023, the Artemis-2 Demonstration was started, and this paper discusses issues encountered, on-orbit troubleshooting, subsequent ground failure investigation and proposed repairs as well as near-term plans to resume the Artemis-2 demo. Also discussed is an update to the commercial-off-the-shelf (COTS) Conductivity Monitor which is planned to be flown for the resumption of the demo along with additional UWMS hardware and Toilet Integration Hardware (TIH). An updated design of the commode seat and fecal bag for Artemis-2 UWMS will be demonstrated on ISS and a summary of the hardware is included in the paper. Use of the hardware during the first days of the aborted demonstration by crewmembers and feedback received is summarized as well as hardware updates resulting from that feedback. The paper will also provide an overview of the demo results to date that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

NASA’s Space Launch System: Artemis I Results and the Path Forward

On Nov. 16, 2022, NASA launched the Artemis I mission on the agency’s new SLS (Space Launch System) rocket. The debut launch of the integrated vehicle sent an uncrewed Orion spacecraft into a distant retrograde (DRO) orbit about the Moon to accomplish multiple mission objectives, including evaluating Orion’s heatshield at lunar return velocities and collecting critical data from the first flight of the new superheavy lift launch vehicle. Post-flight data analyses show that the rocket performed with a high degree of precision and accuracy. In addition to completing testing and launch of the Artemis I SLS in 2022, notable progress was made on hardware for future launch vehicles that will support Artemis missions II, III, IV, and V. The Artemis II core stage is mostly complete, and its RS-25 engines were integrated in the fall of 2023. The Artemis II solid rocket booster motor segments were shipped to the launch site in September 2023. Propellant tanks are being manufactured for additional missions, solid booster segments are being cast and prepared, software is being developed, and production of new RS-25 engines is underway. A more capable upper stage is in development, as well as a large adapter to encapsulate a 10-metric ton (t) co-manifested payload. This paper will provide details on the Artemis I flight as well as cover hardware progress for the future flights as available.

John Honeycutt↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Space Launch System Base Aerodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022. The integrated test flight was composed of launch and ascent of SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2022. The SLS total thrust of 8,800,000 lbf was powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, the base flow field had highly complex phenomena and regimes. SLS base aerodynamics covers vehicle base pressure and integrated axial force during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This was the first time in-depth base aerodynamics flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Base Aerodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022. The integrated test flight was composed of launch and ascent of SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2022. The SLS total thrust of 8,800,000 lbf was powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, the base flow field had highly complex phenomena and regimes. SLS base aerodynamics covers vehicle base pressure and integrated axial force during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This was the first time in-depth base aerodynamics flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Developments on Reusable TPS Materials Based Upon Shuttle Tile

The insulating tiles used on the Space Shuttler Orbiter, principally AETB (Alumina Enhanced Thermal Barrier), have been seen by new vehicle developers in the aerospace industry as a fast-track approach for fielding a reusable thermal protection system (TPS) given the extensive use by both the Orbiter program and the current Orion vehicle. NASA has, and is, supporting the industry through technology transfer and commercial crew and payloads programs. However, the reusable TPS community is rapidly encountering challenges rooted in Orbiter’s and Orion’s dependence on legacy material and processes. With the aim of alleviating these issues, improving availability of reusable TPS, and strengthening the nation’s space economy, ongoing efforts at NASA Ames have focused on understanding process-property relationships in AETB as well as novel materials and technologies for reusable TPS. The first portion of this talk will address the effects of raw materials and processing conditions on the properties of AETB-8, including the raw materials used, mixing and casting parameters, and thermal history. Understanding these relationships, and how they extend to aerothermal performance, is instrumental in alleviating supply chain constraints and improving manufacturability. The implications of these finding on development of novel TPS materials and systems will be discussed. AETB will likely continue to fill a niche of relatively high performance with associated costs. There exists, therefore, a gap in developed reusable TPS for a lower cost, moderate performing material system. The later portion of this talk will touch on current development efforts at Ames focusing on reduced cost and ease of integration, which are being pursued in addition to AETB and higher performing systems. In addition to summarizing these efforts, an outlook for these projects and collaborations will be given.

Peter Edward Marshall↗

Introduction To Space Shuttle Rendezvous Guidance, Navigation, and Control

The Rendezvous Intro continues to be used for training and reference purposes almost 17 years after it was first published. While this document does not address Orion rendezvous, some Orion personnel are using it as a reference for rendezvous GNC and trajectory concepts. This edition contains corrections that have been identified since the 3rd edition was published in 2000. In addition, new material has been added that was developed by the author in the 1990s and early part of the first decade of the 21st century. While some of this material is perhaps too detailed for an introduction, it is of value and the author wanted to make it available to JSC personnel. The sections on Lambert targeting guidance have been significantly expanded.

John L Goodman↗

An Orbit Determination Comparison Study and Demonstration for Rendezvous and Docking in a Near Rectilinear Halo Orbit from the Lunar Surface

For the upcoming NASA Artemis III mission and those that follow, both the Human Landing System (HLS) and Orion programs are invested in understanding the impacts of ground tracking performance in supporting rendezvous and docking in a Near Rectilinear Halo Orbit (NRHO). Several critical questions must be answered to ensure mission success and crew safety and an assortment of analysis tools are being incorporated to address them. Two of these tools, LINCOV and MONTE, are currently providing program decision making results through HLS Insight, HLS NASA-collaborations, and Orion/Gateway cross-program analysis. To ensure consistency in the orbit determination performance, a comparison trade-study is performed using a low-lunar orbit to NRHO rendezvous scenario anticipated for the upcoming Artemis missions. An overview of the two analysis tools is provided along with a detailed step-by-step evaluation of the core capabilities and models related to the orbit determination process. This incremental comparison effort reveals both tools produce consistent solutions for the criteria investigated. Given the confidence in the orbit determination process and solutions generated, these results are then applied to demonstrate an integrated, closed-loop system performance where the HLS lander ascends from the lunar surface and successfully inserts into the NRHO relative to the Orion spacecraft in preparation for the final rendezvous and docking phase.

Linear Covariance Analysis↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket Lays Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce R. Askins↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket: Laying Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce Askins↗

NASA Exploration Toilet Hardware Status and Crew Feedback from ISS Artemis-2 Demonstration

The Universal Waste Management System (UWMS), ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continues to be made with each on-orbit operation and will ultimately culminate with nominal US crew use of the hardware on ISS. During 2023, the Artemis-2 Demonstration was started, and this paper discusses issues encountered, on-orbit troubleshooting, subsequent ground failure investigation and proposed repairs as well as near-term plans to resume the Artemis-2 demo. Also discussed is an update to the commercial-off-the-shelf (COTS) Conductivity Monitor (CCM) which is planned to be flown for the resumption of the demo along with additional UWMS hardware and Toilet Integration Hardware (TIH). An updated design of the commode seat and fecal bag for Artemis-2 UWMS will be demonstrated on ISS and a summary of the hardware is included in the paper. Use of the hardware during the first days of the aborted demonstration by crewmembers and feedback received is summarized as well as hardware updates resulting from that feedback. The paper will also provide an overview of the demo results to date that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

Returning to the Moon: NASA's Artemis Missions

With Artemis missions, NASA will establish the first long-term presence on the Moon. NASA’s goal is to land the first woman on the Moon and return them safely to Earth. The exploration and settlement on Moon will enable the next giant leap - sending the first astronauts to Mars. During the next era of human exploration, we will discover life-saving, Earth-changing science and technology along the way. Artemis missions will enable a growing lunar economy by fueling new industries, supporting job growth, and furthering the demand for a skilled workforce. In her seminar, Dr. Agrawal will provide an overview of the Artemis program, its different elements and a brief description of some of the technical advancements that have been made to enable the first Artemis 1 flight. She will then provide an overview of the Orion program whose charter is to multiple spacecraft for Artemis missions and discuss the ongoing activities at NASA Ames in support of Orion and Artemis programs.

Artemis↗

Developments on Reusable TPS Materials Based Upon Shuttle Tile

The insulating tiles used on the Space Shuttler Orbiter, principally AETB (Alumina Enhanced Thermal Barrier), have been seen by new vehicle developers in the aerospace industry as a fast-track approach for fielding a reusable thermal protection system (TPS) given the extensive use by both the Orbiter program and the current Orion vehicle. NASA has, and is, supporting the industry through technology transfer and commercial crew and payloads programs. However, the reusable TPS community is rapidly encountering challenges rooted in Orbiter’s and Orion’s dependence on legacy material and processes. With the aim of alleviating these issues, improving availability of reusable TPS, and strengthening the nation’s space economy, ongoing efforts at NASA Ames have focused on understanding process-property relationships in AETB as well as novel materials and technologies for reusable TPS. The first portion of this talk will address the effects of raw materials and processing conditions on the properties of AETB-8, including the raw materials used, mixing and casting parameters, and thermal history. Understanding these relationships, and how they extend to aerothermal performance, is instrumental in alleviating supply chain constraints and improving manufacturability. The implications of these finding on development of novel TPS materials and systems will be discussed. AETB will likely continue to fill a niche of relatively high performance with associated costs. There exists, therefore, a gap in developed reusable TPS for a lower cost, moderate performing material system. The later portion of this talk will touch on current development efforts at Ames focusing on reduced cost and ease of integration, which are being pursued in addition to AETB and higher performing systems. In addition to summarizing these efforts, an outlook for these projects and collaborations will be given.

Thermal Protection Systems↗