Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge, and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS&M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness.

54 ENVIRONMENTAL SCIENCES↗

FRAMEWORK FOR STRUCTURAL ONLINE HEALTH MONITORING OF AGING AND DEGRADATION OF SECONDARY PIPING SYSTEMS DUE TO SOME ASPECTS OF EROSION

This paper describes the current state of research related to critical aspects of erosion and selected aspects of degradation of secondary components in nuclear power plants (NPPs). The paper also proposes a framework for online health monitoring of aging and degradation of secondary components. The framework consists of an integrated multi-sensor modality system, which can be used to monitor different piping configurations under different degradation conditions. The report analyses the currently known degradation mechanisms and available predictive models. Based on this analysis, the structural health monitoring framework is proposed. The Light Water Reactor Sustainability Program began to evaluate technologies that could be used to perform online monitoring of piping and other secondary system structural components in commercial NPPs. These online monitoring systems have the potential to identify when a more detailed inspection is needed using real time measurements, rather than at a pre-determined inspection interval. This transition to condition-based, risk-informed automated maintenance will contribute to a significant reduction of operations and maintenance costs that account for the majority of nuclear power generation costs. Furthermore, of the operations and maintenance costs in U.S. plants, approximately 80% are labor costs. To address the issue of rising operating costs and economic viability, in 2017, companies that operate the national nuclear energy fleet started the Delivering the Nuclear Promise Initiative, which is a 3 year program aimed at maintaining operational focus, increasing value, and improving efficiency. There is unanimous agreement between industry experts and academic researchers that identifying and prioritizing inspection locations in secondary piping systems (for example, in raw water piping or diesel piping) would eliminate many excessive in-service inspections. The proposed structural health monitoring framework takes aim at answering this challenge by combining long range guided wave technologies with other monitoring techniques, which can significantly increase the inspection length and pinpoint the locations that degraded the most. More widely, the report suggests research efforts aimed at developing, validating, and deploying online corrosion monitoring techniques for complex geometries, which are pervasive in NPPs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NuScale Power Module Instrumentation

The safe and efficient operation of any nuclear power plant (NPP) depends on accurate and timely measurement of the primary system temperature, pressure, level, flow, and neutron flux. Integral pressurized water reactor (iPWR) or small modular reactors (SMRs) present unique challenges to instrumentation and control (I&C) sensors and their maintenance strategies. More specifically, the calibration and response time of these sensors may have to be verified periodically to ensure that they maintain their required degree of accuracy and speed of response. A review of technical reports and safety analysis documentation of the NuScale Power Module (NPM) by Analysis and Measurement Services Corporation (AMS), together with NuScale engineers, confirms that the I&C sensors within the NPM will need to be testable as installed to verify their static and dynamic performance at plant operating conditions. Sensor placement and installation as well as the process conditions expected in natural circulation integral SMRs like the NPM are very different from those in large scale NPPs with conventional primary system loop piping. In particular, reactor coolant system (RCS) flows are more complex and flow rates much lower, the average containment temperature is higher, nuclear radiation levels in some areas are greater, and the accessibility of sensors for hands-on maintenance is very limited. These challenges among others related to I&C sensors can be overcome by adapting existing I&C sensor test methods, developing new techniques for non-conventional I&C sensors, and incorporating online monitoring (OLM) technologies into the I&C architecture of the plant to verify the calibration and response time of sensors within the NPM prior to startup, during operation, and during subsequent refueling outages. These methods and technologies will be demonstrated and validated through a research and development (R&D) grant recently awarded to AMS by the U.S. Department of Energy (DOE) to facilitate timely deployment of the first NuScale SMR in the United States and to enable efficient I&C maintenance strategies during the life of the plant. Lastly, this paper presents the R&D plan for the DOE project with a focus on temperature measurement needs of NuScale.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Evaluating the Incident Energy of Arcs in Photovoltaic DC Systems: Comparison Between Calculated and Experimental Data

Solar Photovoltaic (PV) systems have permeated the energy generation world at a very high rate, some of the safety codes and standards are still lagging in accurately assessing the hazards and risks associated with PV array arcing energies. Safety professionals and maintenance workers using NFPA 70E have utilized the Doan, Stokes & Oppenlander or Enrique models, meant to determine arc energies in DC power systems using the maximum power method. These methods may lead to overestimating the energy available in PV systems. Since PV modules/arrays are non-linear, current limited DC devices, some of these calculation methods may overestimate the arcing energy available to small PV arrays. This paper will validate current arc energy models for PV systems by comparing experimental and calculated data. This data will help modify the current NFPA 70E models related to smaller solar arrays. Understanding where the real safety threshold for DC arc flash in PV systems exists will help maintenance and safety professionals better prepare for a variety of work related activities. This paper will analyze real arc data taken for PV systems <1000VDC and <60amps and compare this to the calculated models in 70E. Using these comparisons, it may be possible to reduce the safety hazard severity and thus relax the PPE requirements for installation and maintenance crews.

14 SOLAR ENERGY↗

Development and Application of a Risk Analysis Toolkit for Plant Resources Optimization

This report summarizes the R&D activities of the Risk Informed Asset Management (RIAM) project during fiscal year 2020 (FY20). This project focuses on the development of methods designed to optimize plant operations (e.g., maintenance/replacement schedule, optimal maintenance posture) provided system/component health/cost data. This project development lives in cooperation with the Plant Health Management (PHM) project which focuses on the development of methods that integrate component health data and propagate such information at the system level to evaluate most relevant sources of risk. This year’s activities for the RIAM project focused on the continuation of schedule optimization algorithms developed in FY19. While in FY19 we focused on both deterministic and stochastic capital budgeting methods, in FY20 we moved forward by implementing two versions of schedule optimization methods. The first one reformulates the capital budgeting problem in a distributionally robust form which allows the user to rely on data directly rather than proposing a distribution from the data itself. The second version reformulates the capital budgeting explicitly using risk measures as variables to maximize/minimize. Lastly, we focused on the development of methods designed to identify the optimal maintenance posture based on the Pareto Frontier analysis. Rather than performing a tradeoff analysis (i.e., identify the absolute best posture), the Pareto Frontier analysis performs a trade space exploration approach (i.e., identify value and costs of several postures and have the analyst perform the task of imposing desired value and cost constraints). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space.

97 MATHEMATICS AND COMPUTING↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters: Preprint

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

industry support↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

converter↗

Application of Margin-Based Methods to Assess System Health

Health management of complex systems such as nuclear power plants is an essential task to guarantee system reliability. This task can be greatly enhanced by constantly monitoring asset status and performances and process such data (through anomaly detection, diagnostic, and prognostic computational algorithms) to identify asset degradation trends and faulty states. While such information and data are typically available for many of the assets, they are not propagated from the asset to the system level in order to identify the most critical assets and prioritize maintenance and surveillance activities. The main reason is driven by the fact that current reliability modeling techniques are inadequate to process such information/data. This is due to the nature of these techniques which are based on the concept of failure rate/probability that do not serve an operational context where quantitative asset health information is available. Simply stated, current reliability techniques serve a run-to-failure operational setting and not a predictive maintenance one where the goal is to perform maintenance and surveillance activities only when they are needed based on asset health. The risk informed asset management (RIAM) project is focusing on the development of a different kind of reliability modeling techniques designed to adequately serve a predictive operational setting. Such reliability techniques move aways from a failure rate/probability to a margin-based mindset where margin is here used as a metric to quantify asset health based only on current and past operational experience of the asset under consideration. In addition, margin-based reliability techniques are able to propagate asset health information from the component to system level and provide importance measure to each asset. This report summarizes a recent activity performed in collaboration with plant modernization pathway designed to integrate monitoring data into margin-based reliability models. Such activity focuses on a specific system of an existing nuclear power plant where large amount of historic monitoring data is used to monitor asset and system health.

97 MATHEMATICS AND COMPUTING↗

Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws, Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience in Remote Demolition of the Activated Biological Shielding of the Multi Purpose Research Reactor (MZFR) on the German Karlsruhe Site - 12208

In 2009, WAK Decommissioning and Waste Management GmbH (WAK) became owner and operator of the waste treatment facilities of Karlsruhe Institute of Technology (KIT) as well as of the prototype reactors, the Compact Sodium-Cooled Fast Reactor (KNK) and Multi-Purpose Reactor (MZFR), both being in an advanced stage of dismantling. Together with the dismantling and decontamination activities of the former WAK reprocessing facility since 1990, the envisaged demolishing of the R and D reactor FR2 and a hot cell facility, all governmentally funded nuclear decommissioning projects on the Karlsruhe site are concentrated under the WAK management. The small space typical of prototype research reactors represented a challenge also during the last phase of activated dismantling, dismantling of the activated biological shield of the MZFR. Successful demolition of the biological shield required detailed planning and extensive testing in the years before. In view of the limited space and the ambient dose rate that was too high for manual work, it was required to find a tool carrier system to take up and control various demolition and dismantling tools in a remote manner. The strategy formulated in the concept of dismantling the biological shield by means of a modified electro-hydraulic demolition excavator in an adaptable working scaffolding turned out to be feasible. The following boundary conditions were essential: - Remote exchange of the dismantling and removal tools in smallest space. - Positioning of various supply facilities on the working platform. - Avoiding of interfering edges. - Optimization of mass flow (removal of the dismantled mass from the working area). - Maintenance in the surroundings of the dismantling area (in the controlled area). - Testing and qualification of the facilities and training of the staff. Both the dismantling technique chosen and the proceeding selected proved to be successful. Using various designs of universal cutters developed on the basis of wall saws, both the activated steel liner and the inner reinforcing layer were cut remotely in one process. This allowed for the efficient execution of the following remote concrete removal steps using mining techniques. The electro-hydraulic demolition excavator that was purchased and then modified turned out to be an ideal tool carrier system with rapid-exchange coupling. Due to the high availability, no major delays occurred. This also was a result of the consistently implemented maintenance and repair concept. With the excavator installed in a modifiable scaffolding suspended from a rotating carrier ring, all dismantling areas could be reached and treated in spite of the small space. Thanks to an optimum organization of work-flows, routine change of dismantling work, and maintenance or repair, the iterative radiological measurement campaigns could be integrated in the whole activity without the dismantling work being disturbed significantly. The ventilation system with pressure grading and pre-filtration units ensured a low contamination level in the dismantling area. It was also possible to manage the dust formed by the milling of concrete surfaces. As it was possible to further cut metal parts and crushed concrete later on, residue flows were optimized. The planned overall period for testing, dismantling the bio-shield and removing the equipment was 36 months. The final duration was 39 months. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Direct Feed Low Activity Waste Program Throughput Optimization Through Modeling - 18587

The Direct Feed Low Activity Waste (DFLAW) program at Hanford allows for the early treatment of tank wastes years earlier than previously planned. Operational Research (OR) modeling is being used to provide invaluable insight into how complex and integrated processes will operate. The DFLAW OR models are used to help optimize the design and operation of the integrated system. The DFLAW OR models include the processes and real-life complexities involved in the day-to-day operation of the systems and equipment, and can predict key performance characteristics including throughput, mission timescale, equipment and labor utilization, lag storage and capacity requirements. The DFLAW OR models also have the in-built capability to simulate random events such as equipment failures. Adding random variability to models introduces a real-life element to model results. For example, OR modeling breakdown analysis of equipment failure and restoration times may inform specific improvements to a design and plant operation, including areas where the provision of spare (duty/standby) equipment would prove beneficial; the optimum number and capacity of lag storage tanks (for waste intermediate storage, reagents, etc.); operational issues, including scheduling constraints, labor resource constraints, effect of shift schedules (e.g. days only, extended shifts, 24/7),, maintenance strategies, including planned maintenance, equipment upgrades, on-hand spare part stockholding, etc. At Hanford, standalone OR models to date, have been used to help identify key operational issues and improve the design and operation of individual systems within the Tank Farms, Low Activity Waste Pretreatment System (LAWPS), Low Activity Waste (LAW) Vitrification and Effluent Management Facility (EMF) and Integrated Disposal Facility (IDF), logistics and infrastructure, 222-S laboratory [References 1 and 2] including: - Identification of critical spares including transfer pumps; - Underpin size and number of lag storage tanks to maintain continuous LAW feed to the LAW melters; - Underpin sample turnaround times at the 222-S Laboratory (e.g. feed prequalification and evaporator campaign samples) and determine how targets can be achieved without impacting waste feed delivery to LAWPS and the LAW Vitrification Facility; - Determine operational strategy required at IDF including shift schedules and sizes and the number of ILAW transporters that can support DFLAW throughput; - Identification of lag storage management strategies for glass formers, reagents, other consumables due to delivery distance and delays due to bad weather; and - Truck delivery badging needs to support 24/7 operation and management of shift in/out times required to reduce congestion. An Integrated DFLAW OR model has been developed and combines the standalone OR models such that integrated throughput and availability can be assessed from a program perspective. The Integrated OR model will provide a more detailed understanding of the interactions between Tank Farms, LAWPS, LAW VIT and IDF such that key bottleneck areas can be identified and ensure improvements are focused. Examples of future improvements that may be considered include identification of critical spare parts, required on-site maintenance capabilities, shift scheduling, and craft and labor availability. The methods, results and insights derived by DFLAW OR modeling efforts are expected to provide useful applications to other projects that involve combinations of mechanical handling, chemical processing, waste treatment/packaging or environmental remediation operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Big Data Framework with Machine Learning for D and D Applications - 19108

The nuclear industry is experiencing a steady increase in maintenance costs even though plants are maintained under high levels of safety, capability and reliability. Nuclear power plants are expected to run every unit at maximum capacity at all times, efficiently utilizing assets with minimal downtime. Surveillance and maintenance of nuclear decommissioning infrastructure provides lot challenges with respect to maintenance or decommissioning of the buildings. There is a need for a framework to analyze the huge amount of data generated by the sensors on the nuclear reactor components as well as structures, to monitor the conditions of these building over a period of time. Emerging technologies such as big data analytics have become a requirement in the nuclear industry to improve structural health monitoring and diagnostics. FIU will make use of existing mature technologies in the areas of imaging, robotics, big data, and machine learning/deep learning to assess the structural integrity of aging facilities at DOE sites. As these facilities await decommissioning, there is a need to understand the structural health of these structures. Many of these facilities were built over 50 years ago and in some cases these facilities have gone beyond the operational life expectancy. In other cases, the facilities have been placed in a state of 'cold and dark' and they are sitting unused, awaiting decommissioning. Finally, some older facilities are one-of-a-kind operational/production facilities supporting critical DOE missions and cannot be shut down. In any of these scenarios, the structural integrity of these facilities may be compromised, so it is imperative that adequate inspections and data collection/analysis be performed on a continuous and ongoing basis. The primary goals of the research include collecting various formats of data such as structured, unstructured and streaming data from the various sensors deployed in buildings, collect videos/pictures from various imaging sources, ingest them using a Hadoop distributed file system and process the data using Spark to perform batch processing and real time analytics. Research and development on various machine learning/deep learning algorithms will also be performed to analyze the heterogeneous data collected from nuclear decommission infrastructure. FIU will design the big data framework to ingest, store and process huge amounts of heterogeneous data collected from many sources and optimize the algorithms to provide insights into the data and predict anomalies observed when compared against baseline conditions. Various modules of this framework will include heterogeneous data sources, message broker, Hadoop distributed file system, Spark for stream and batch processing, machine learning/ deep learning, Cassandra - persistent data store and visualization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Hot Lab Concept for Advanced D and D Application - 19175

Hot Labs are used in the nuclear industry for various purposes: maintenance of nuclear reactor, sampling and testing of fuel, inspection activities and decommissioning. Despite their vast use, their current designs and operations do not meet entirely today's needs and requirements of the operations nor tomorrow's. This paper will give an overview of the research and investigations performed around Hot Cells design and concept in order to integrate new operability modes and functions. The overall idea is to bring modularity, flexibility and adaptability to the Hot Lab nuclear industry. Taking the key principles of Model Based System Engineering, an interoperable data model, the most advanced digital technologies (Building Information Modelling - BIM, Virtual Reality / Augmented Reality, Artificial Intelligence), and looking at all the life-cycle of such a facility, a concept design of a new type of Hot Lab has been developed. Four mains aspects are implemented during this study: Implement the principles of the Industry 4.0; use modular and flexible solutions; explore the concept of in service maintenance and predictive maintenance; optimise the decommissioning and dismantling process by taking into account the entire life-cycle of the facility. The design was developed as a case study taking several assumptions to adapt to any project. The design developed demonstrates that modularity and flexibility can be brought in without compromising the core safety functions of such a facility. This Hot Lab concept brings the current Hot Lab to the next level as the design has been adapted to meet the current operational needs, implement novel ideas and consider its entire life-cycle. This paper will demonstrate how decommissioning and dismantling operations can become more efficient and safer with such a concept. In addition, the Model Based System Engineering approach used from the beginning of the design phase allows to have an optimum architecture during its entire lifetime. It also allowed to flag new topics to be further developed for the benefit of the nuclear industry as a whole. A first example would be the development of the Control System using digital tools and artificial intelligence to run remotely controlled equipment inside the Hot Lab. Assystem is an international engineering group. As a key participant in the nuclear industry for over 50 years, the Group supports its clients in managing their capital expenditure throughout their asset life-cycles. Assystem can offer support in project management, design, digital engineering, industrial control systems, security and safety and industrial digitalisation. Assystem's Imagine program is an internal program intending to serve as an incubator for the development of innovations. The Innovative Hot Lab project integrates one of the four innovation projects Assystem choose to develop and invest in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Erosion Control Measures at Oak Ridge Reservation Landfills Oak Ridge, Tennessee - 19190

URS-CH2M Oak Ridge LLC (UCOR) manages the cleanup of the 2,200-acre East Tennessee Technology Park (ETTP) for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The ETTP was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. In disposing of low-level radioactive and other wastes from demolition activities, the UCOR approach relies on the availability of onsite facilities to streamline disposal, reduce costs and enhance cleanup schedules while confining shipments and related hazards onsite. The sanitary/industrial waste facility, known as the Oak Ridge Reservation Landfill Facility (ORRLF) is a solid waste operation that receives and disposes of sanitary/industrial, construction/demolition and classified, special waste; and spoil materials types of waste generated at the U.S. Department of Energy (DOE) Oak Ridge facilities. ETTP is the primary generator; however, the landfill accepts waste from Y-12 National Security Complex (Y-12), Oak Ridge National Laboratory and other DOE prime contractors in the Oak Ridge area. ORRLF's mission is to receive nonhazardous, non-radioactive, and non-Resource Conservation and Recovery Act of 1976 (RCRA)-regulated solid wastes. Approved operations include receiving, compacting, and covering wastes; leachate management, site drainage; erosion control and prevention, inspections, maintenance and recording keeping. The Oak Ridge Reservation has three separate State of Tennessee-permitted active landfills (Landfill IV, Landfill V, and Landfill VII) that meet different disposal needs -- classified industrial waste, industrial waste that includes office trash and cafeteria waste, and construction and demolition debris,. As with a typical landfill, strategic waste placement and covering involves moving a lot of soil, usually resulting in large areas of exposed land. After increased sediment was noted in streams following heavy rains, a concerted erosion prevention and sediment control effort began in 2017. While not uncommon for landfills, the ORRLF staff knew they could do better in controlling sediment. In response, the ORRLF staff developed an approach of aggressive revegetation, ditch improvements and other erosion controls. Staff developed a list of all the areas that needed the most attention and requested resources. UCOR management arranged funding for needed improvements. The oldest of the three landfills is Industrial Landfill IV, which opened in 1989 and has an expected remaining 60 years of life. Therefore, how the landfills are maintained/managed today directly affects the compliance posture, the capacity, and the infrastructure in the future. A systematic, aggressive and multi-pronged approach was taken to address the major concerns first, then continue with longer-term, and/or lower priority projects. Buy-in was obtained from both craft and supervision, resulting in approaches like 'Ditch of the Month'. In addition, management support at the highest levels has provided resources and recognition that further fuels progress. After working on the site for the past year, what used to be exposed brown hills looks more like a golf course now. Now that the grass is established and other erosion controls are in place, the amount of sediment leaving the site has been reduced, and the appearance of the landfills is improved. Vegetation dissipates the kinetic energy from rain droplets while the root system helps hold the soil in place, and wire-reinforced silt fences and straw wattles have greatly improved erosion control. Improved ditches reduce the runoff velocities allowing sediments to fall out of suspension in the stormwater before they reach the receiving waters, and structures are in place to let finer sediment settle in ponds rather than going downstream. In addition, the project has added more stone to roadways to minimize tracking dirt down the road as an average of 20 to 40 trucks per day enter and leave the site. Ongoing landfill erosion and sediment control must be funded and maintained continually. The lack of attention to either resource will negatively affect the condition of the landfill fairly quickly. Constant compliance commitment is necessary to ensure protection to the environment, the operator/workers and the public. Operations must include sediment control, pond maintenance and clean out, road maintenance and construction, erosion prevention, seeps repair, leachate management, landfill expansion, mowing and grounds upkeep and much more. Knowledgeable/experience staff is also crucial. Knowing how to build lifts, create leachate drainage windows, respond to high rains events, compact waste will impact operations today and future operations into the closure / post closure periods. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Non-Nuclear Plowshare and Vela Uniform Sites - 20447

The Plowshare Program was initiated by the Atomic Energy Commission, a predecessor agency to the US Department of Energy (DOE), to investigate peaceful uses of nuclear devices. 'Vela Uniform,' part of the broader Project Vela, was designed to use nuclear and other explosions to increase the capability of the United States to detect nuclear tests through seismicity. There were underground nuclear tests conducted off the Nevada National Security Site (NNSS) as part of the Plowshare Program (e.g., the Gnome-Coach, New Mexico, Site) and the Vela Uniform Program (e.g., Project Shoal, Nevada, Site) at which the DOE Office of Legacy Management (LM) has been conducting long-term surveillance and maintenance since fiscal year (FY) 2006. There are many additional locations, particularly for the Plowshare Program, that were considered for nuclear tests or used for non-nuclear tests off the NNSS. Some were only named on paper, but at 30 sites, field work such as drilling test wells and conducting tests using conventional explosives was done. A Plowshare nuclear explosion had been proposed at Project Chariot but was canceled in 1962. In 1992, the discovery of soils contaminated with radionuclides from tracer experiments led to a cleanup by the DOE Office of Environmental Management (EM) of the Project Chariot, Alaska, Site, which was completed in 1994. Following the cleanup of the Project Chariot site, EM was concerned that there might be environmental liabilities at other Plowshare or Vela Uniform sites where field investigations were done, even if the nuclear test was never conducted. The EM Program at the Nevada Site Office began examining records and visiting selected locations that were evaluated for Plowshare and Vela Uniform non-nuclear tests. In total, 161 Plowshare and 14 Vela Uniform sites or proposed projects were identified. The Desert Research Institute (DRI) created summaries of the work carried out at these sites and developed a collection of unclassified documents for them. Preliminary investigations had been conducted at these sites by both LM and EM since the early 2000's. In 2016, in preparation for accepting responsibility for the sites, LM started a program to determine if there were any environmental or safety liabilities associated with them. In 2019, LM formally accepted responsibility for these sites off the NNSS where non-nuclear explosive tests were conducted or where underground nuclear tests were proposed as part of the Plowshare and Vela Uniform programs but were never conducted. LM responsibilities will include maintaining institutional knowledge of the sites, responding to public inquiries, and addressing any concerns at each site. To minimize risk associated with site management, LM has archived all historical records compiled by DRI and has performed limited investigations at sites identified by the prior studies as having a higher potential liability. Preserving records related to site operations reduces the risk of doing unnecessary site investigations in the future caused by the loss of institutional knowledge. During the investigations, some maintenance needs were identified and will be addressed by the end of FY 2021. At the end of FY 2021, investigations, maintenance, and archiving activities will be complete. Remnants of test activities found at sites include craters, mud pits, debris, and open boreholes. Open boreholes are being plugged and abandoned in accordance with state regulatory standards. Other issues are being addressed in accordance with land owner requests and preferences as well as state regulations. Archiving activities include the development of project summaries identifying key operational details and current condition to allow site managers to be easily briefed. The LM experience at non-nuclear Plowshare and Vela Uniform sites applies to other programs where there is the potential for liability associated with the non-nuclear aspects of nuclear programs. This may include support activities or early phases of planned nuclear projects. Preserving institutional knowledge enables land managers to adequately address any concerns associated with operations and lowers risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEVELOPMENT AND APPLICATION OF RISK ANALYSIS TOOLKIT FOR PLANT RESOURCE OPTIMIZATION

This paper presents the development of methods and tools that are being designed to optimize plant operations (e.g., maintenance/replacement schedules and optimal maintenance postures for plant components) in a manner that is more cost effective than current approaches and makes better use of available component health and cost data. These methods include both data- and model-based optimization methods. Model-based optimization methods directly include reliability and cost models to determine an optimal plant operational strategy. We consider gradient-based and evolutionary (based on genetic algorithms) optimization methods. The second class of methods target more specific use cases (e.g., project schedule optimization) and are not based on reliability models directly, but they require specific component reliability and cost data. This class of methods is based on variants of the knapsack problem with an aim to determine an optimal project schedule that maximizes the overall NPV. This paper also presents multi-objective methods designed to identify an optimal maintenance posture based on a Pareto frontier analysis. Rather than dictating the “right” tradeoff (i.e., identify the absolute best posture), we show how it is possible to perform a trade space exploration approach (i.e., identify value and costs of several postures and let the analysis account for desired value and cost metrics). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space. For all these methods we present detailed applicative examples that show their validity from a decision-making perspective.

97 - MATHEMATICS AND COMPUTING↗

System Engineers and Decisions: It?s All about Knowledge

In order to guarantee that a system meets adequate levels of reliability and availability, system performances are continuously monitored and analyzed thanks to the technological advancements driving the Industry 4.0 revolution. An Industry 4.0 approach is typically based on advanced statistical, big data mining, machine learning, and internet-of-things methods designed to detect anomalies in the behavior of system, detect the most likely failure modes, and provide indications to system engineers on when maintenance activities should be performed before system performance are deemed unacceptable (which can be generated by diagnostic and prognostic methods). However, these analyses, which are designed to automatize and increase the efficacy of the system maintenance program, require large amount of data which can come in various forms: numeric, textual, images, sounds etc. Such data constitutes the historic knowledge benchmark to track system performances and support system engineer decisions. Here we claim that data is not sufficient to support this kind of analyses when applied to systems characterized by complex architectures and behaviors. Robust system engineer decisions require the ability to understand the system operational context that lies behind the observed data elements. In this respect, system models are in fact necessary to “put data in context” and capture relationships between data elements. Industry 4.0 methods require in fact contextual knowledge as a basis upon which hypotheses can be generated and assumptions tested. In our view, for complex systems, model-based system engineering (MBSE) models can afford this contextual knowledge, as they are typically used to describe systems architecture and dynamic behaviors. System knowledge is here intended as the blending of collected data and system architecture which takes the form of a “knowledge graph”. A knowledge graph is a database which consists of a large set of nodes (in our case an entity can be either a data or an MBSE element) which are linked to each other. The types of nodes and links follow a pre-defined topology, sometimes also refers as an ontology, that is designed to fit the actual decisions that needs to be performed. We show here how a knowledge graph can be defined to support system engineer maintenance decisions and how the same graph can be built based on system MBSE models and pre-processed data from numeric (through anomaly detections and diagnostic methods) and textual elements (through technical language processing TLP).

97 - MATHEMATICS AND COMPUTING↗