Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BOOSTER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

NASA'S Space Launch System: Progress Toward the Proving Ground

With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight – using an upgraded version of the vehicle – and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 metric tons. For that flight, the new configuration introduces two major new elements to the vehicle – an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a “payload bay” for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Beyond the second flight, additional upgrades will be made to the vehicle. The Block 1B vehicle will also be able to launch 8.4-meter-diameter payload fairings, larger than any previously flown, and the Spacecraft Payload Integration and Evolution (SPIE) Element will oversee development and production of those fairings. Ultimately, SLS will be evolved to a Block 2 configuration, which will replace the solid rocket boosters on the Block 1 and 1B vehicles with more powerful boosters, and will be capable of delivering at least 130 metric tons to LEO. The Block 2 vehicle will be capable of launching even larger 10-meter diameter fairings, which will enable human mission of Mars. With these fairings, the Block 1B and 2 configurations of SLS will also be enabling for a wide variety of other payloads. For robotic science probes to the outer solar system, for example, SLS can cut transit times to less than half that of currently available vehicles, producing earlier data return, enhancing iterative exploration, and reducing mission cost and risk. In the field of astrophysics, SLS’ high payload volume, in the form of payload fairings with a diameter of up to 10 meters, creates the opportunity for launch of large-aperture telescopes providing an unprecedented look at our universe, and offers the ability to conduct crewed servicing missions to observatories stationed at locations beyond low Earth orbit. This paper will provide a description of the SLS vehicle, and an overview of the vehicle’s capabilities and utilization potential.

Jackman, Angie↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

History of Solid Rockets

Solid rockets are of interest to the space program because they are commonly used as boosters that provide the additional thrust needed for the space launch vehicle to escape the gravitational pull of the Earth. Larger, more advanced solid rockets allow for space launch vehicles with larger payload capacities, enabling mankind to reach new depths of space. This presentation will discuss, in detail, the history of solid rockets. The history begins with the invention and origin of the solid rocket, and then goes into the early uses and design of the solid rocket. The evolution of solid rockets is depicted by a description of how solid rockets changed and improved and how they were used throughout the 16th, 17th, 18th, and 19th centuries. Modern uses of the solid rocket include the Solid Rocket Boosters (SRBs) on the Space Shuttle and the solid rockets used on current space launch vehicles. The functions and design of the SRB and the advancements in solid rocket technology since the use of the SRB are discussed as well. Common failure modes and design difficulties are discussed as well.

Green, Rebecca↗

Use of Shuttle Heritage Hardware in Space Launch System (SLS) Application-Structural Assessment

NASA is moving forward with the development of the next generation system of human spaceflight to meet the Nation's goals of human space exploration. To meet these goals, NASA is aggressively pursuing the development of an integrated architecture and capabilities for safe crewed and cargo missions beyond low-Earth orbit. Two important tenets critical to the achievement of NASA's strategic objectives are Affordability and Safety. The Space Launch System (SLS) is a heavy-lift launch vehicle being designed/developed to meet these goals. The SLS Block 1 configuration (Figure 1) will be used for the first Exploration Mission (EM-1). It utilizes existing hardware from the Space Shuttle inventory, as much as possible, to save cost and expedite the schedule. SLS Block 1 Elements include the Core Stage, "Heritage" Boosters, Heritage Engines, and the Integrated Spacecraft and Payload Element (ISPE) consisting of the Launch Vehicle Stage Adapter (LVSA), the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA), and an Interim Cryogenic Propulsion Stage (ICPS) for Earth orbit escape and beyond-Earth orbit in-space propulsive maneuvers. When heritage hardware is used in a new application, it requires a systematic evaluation of its qualification. In addition, there are previously-documented Lessons Learned (Table -1) in this area cautioning the need of a rigorous evaluation in any new application. This paper will exemplify the systematic qualification/assessment efforts made to qualify the application of Heritage Solid Rocket Booster (SRB) hardware in SLS. This paper describes the testing and structural assessment performed to ensure the application is acceptable for intended use without having any adverse impact to Safety. It will further address elements such as Loads, Material Properties and Manufacturing, Testing, Analysis, Failure Criterion and Factor of Safety (FS) considerations made to reach the conclusion and recommendation.

Aggarwal, Pravin↗

Building Aerodynamic Databases for the SLS Design Process

NASA's new Space Launch System (SLS) will be the first rocket since the Saturn V (1967-1973) to carry astronauts beyond low earth orbit-and will carry 10% more payload than Saturn V and three times the payload of the space shuttle. The SLS configuration consists of a center core and two solid rocket boosters that separate from the core as their fuel is exhausted two minutes after lift-off. During these first two minutes of flight, the vehicle powers its way through strong shock waves as it accelerates past the speed of sound, then pushes beyond strong aerodynamic loads at the maximum dynamic pressure, and is ultimately enveloped by gaseous plumes from the booster-separation motors. The SLS program relies on computational fluid dynamic (CFD) simulations to provide much of the data needed to build aerodynamic databases describing the structural load distribution, surface pressures, and aerodynamic forces on the vehicle.

Aerodynamic↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA's Space Launch System (SLS) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering the first flight hardware to NASA's Kennedy Space Center (KSC). The program is now transitioning to integration, assembly and testing in preparation for launch readiness in late 2019. Core stage prime contractor Boeing concluded welding of the major core stage components for Exploration Mission 1 (EM-1) with the liquid hydrogen flight tank, following completion of the engine section, liquid oxygen tank, and forward skirt. Technicians also completed assembly of the bolted intertank, and all sections are currently in hardware integration. The engine section structural test article was shipped to NASA's Marshall Space Flight Center (MSFC) and began testing in 2017. The core stage pathfinder shipped to NASA's Michoud Assembly Facility (MAF). Booster prime contractor Orbital ATK made significant progress casting motor segments for SLS, with several segments finishing processing and in storage. Forward and aft sections of the boosters are being refurbished at KSC. RS-25 prime contractor Aerojet Rocketdyne completed SLS adaptation testing and qualification of four new EM-1 controllers. The four EM-1 engines are ready and waiting for shipment from NASA's Stennis Space Center (SSC) to Michoud Assembly Facility (MAF) for core stage integration in preparation for green run testing at SSC. The EM-1 Interim Cryogenic Propulsion System (ICPS) became the first major piece of SLS to arrive at KSC. Welding is complete on the EM-1 Launch Vehicle Stage Adapter (LVSA) and the flight Orion Stage Adapter (OSA). SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the moon in preparation for missions deeper into space. This paper will elaborate on 2017 SLS progress and progress envisioned for 2018.

Askins, Bruce R.↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As part of a renewed focus on deep space exploration, NASA and its private sector and international partners are building a new super heavy-lift launch vehicle, the Space Launch System (SLS), as well as the new Orion crew vehicle, and upgrading launch facilities at Kennedy Space Center. Progress made on the Block 1 vehicle, as well as its expected performance metrics and fiscal support from the U.S. administration and Congress, have opened up additional manifest possibilities that the Agency continues to evaluate. Offering a combination of power, payload capacity and departure energy unmatched in contemporary boosters, the SLS family of launch vehicles features the world's most-proven propulsion system: solid rocket boosters and RS-25 main engines with a modified existing cryogenic in-space stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) of payload to trans-lunar injection (TLI). The vehicle's flexible architecture will enable the rocket to evolve over the next decade to meet the most demanding deep space mission requirements. The second configuration, Block 1B, will deliver at least 34 to 40 t to TLI, depending on whether the crewed or cargo variant is selected. Although designed to facilitate human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with affordable access to deep space. For the first integrated mission of SLS and Orion, launching from Kennedy Space Center in fiscal year 2020, SLS Block 1 will send Orion on a 25.5-day mission to a distant retrograde lunar orbit with the primary objective to test and validate new systems and procedures. That first mission, called Exploration Mission-1 (EM-1), also has 13 6U-class CubeSat payloads manifested. Those payloads, which will carry out a variety of scientific experiments and technology demonstrations, will deploy in several locations along the trajectory after Orion has separated from SLS. Contractors and suppliers have made significant progress since last year manufacturing the Block 1 vehicle for EM-1. The upper stage and adapters are complete as are the four RS-25 engines. All other major components are constructed and being outfitted for flight. In fact, hardware for the second flight is currently being manufactured at locations across the United States. This paper will outline hardware, avionics and testing progress toward the first and second flights of SLS. Manifest opportunities for primary, co-manifested and secondary payloads will be discussed. An in-depth look at payload utilization and integration will be provided, as well as lessons learned from installing a secondary payload deployment system for EM-1.

Creech, Steve↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As NASA turns 60 and plans to transition the International Space Station (ISS) and other low-Earth orbit (LEO) activities to commercial enterprises, the Agency's human exploration program turns its focus to deep space. With missions planned to send astronauts back to the Moon and to construct a lunar orbiting Gateway for surface access as well as science experiments and technology demonstrations, NASA requires a vehicle with capabilities for launching more mass and volume than is currently commercially available. To that end, NASA and its private sector partners are building the Space Launch System (SLS) super heavy-lift launch vehicle, which will send the new Orion crew capsule, eventually with a complement of four astronauts, to cislunar space for the first time since the Apollo Program in the 1960s and 1970s. NASA Kennedy Space Center's (KSC's) Exploration Ground Systems (EGS) Program has upgraded and refurbished ground and launch facilities to process, assemble and launch NASA's new deep space exploration system, which is managed by the Exploration Systems Development (ESD) organization in the Human Exploration and Operations Mission Directorate (HEOMD). Offering an unmatched combination of power, payload capacity and departure energy, the evolvable SLS features the world's most proven propulsion system: solid rocket boosters and RS-25 main engines with a modified Delta Cryogenic Second Stage (DCSS) cryogenic upper stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) to trans-lunar injection (TLI). The second variant, Block 1B, will deliver at least 34 t to TLI in its crew configuration and at least 40 t to TLI in its cargo configuration. The Block 1 cargo vehicle will fly with an industry-standard 5 m fairing while the Block 1B cargo configuration will accommodate 8 m-diameter fairings in varying lengths. The Block 2 vehicle will incorporate upgraded boosters and possibly larger fairings for launching Mars-class payloads to deep space. Although designed to enable human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with access to deep space. Three flights of the Block 1 vehicle are now planned; the first vehicle, being built for a test flight known as Exploration Mission-1 (EM-1), is nearing completion at NASA and contractor sites across the United States. In fact, hardware for the second mission has also been built. This paper will provide an overview of the SLS vehicle, with a focus on its payload accommodations and the missions enabled by the unprecedented payload volume and departure energy of SLS. This paper also describes the status of the manufacturing and integration for first flight and beyond.

Exploration Mission-1↗

Laboratory Scale Testing of Ignition Overpressure for Space Vehicle Launch Pad Environments

A scale model of a NASA representative space vehicle is used to develop a refined estimate of the transient pressure loads that are expected to form at the base of the vehicle in the event of a vapor cloud explosion. Flammable vapor clouds are known to form prior to engine startup due to the significant amount of unburned hydrogen that is ejected from the combustion chamber. In the event of a vapor cloud explosion, the vehicle and payload must be able to withstand the resulting overpressure waves. The study comprises an array of pressure sensors located along the base heat shield of the scale model space vehicle as well as the interior wall and throat plug plane of the solid rocket booster. A spark source generator is used to simulate the overpressure wave produced by a vapor cloud explosion while measurements are acquired with and without the effect of a mobile launcher. Time- resolved schlieren images of the simulated vapor cloud explosion reveal the path and impact of both the initial wave and several reflected waves on the various components at the base of the space vehicle. In some instances, the reflected waves superpose to create waves that are higher in amplitude than the initial overpressure wave. A time frequency analysis of the pressure waveforms measured inside the solid rocket booster reveal a ring down tone corresponding to a standing wave that is four times the length of the nozzle.

Tinney, Charles E.↗

Comparison of Space Launch System Aerodynamic Surface Pressure Measurements from Experimental Testing and CFD

A comparison of surface pressure coefficient measurements obtained using pressure-sensitive paint (PSP) measurements with predictions from the computational fluid dynamics (CFD) code FUN3D is presented for the NASA SLS Block 1B crew vehicle. Overall, the flow features over the SLS configuration were captured by both the PSP data and CFD data at freestream Mach numbers (M(sub ∞)) of 0.8 and 1.3. Overall, the flow features over the SLS are captured by the PSP data but the intensities of large pressure gradients are less intense than what was predicted by the CFD data. Several examples of this observation are given including the flow interaction at the booster nose cone edge, core body, and forward booster attachment hardware at M(sub ∞) = 0.8.

FUN3D↗

Space Launch System Liftoff and Separation Dynamics Analysis Tool Chain

A flexible, hierarchical tool chain that is being applied to NASA’s Space Launch System (SLS) for critical dynamics phenomena is described. This tool chain, called CLVTOPS, is used to investigate lateral liftoff movement of the vehicle as it departs and clears the mobile launch tower and separation of the two solid rocket boosters without collision with the core stage and payload. The toolset’s architecture was configured to take advantage of a modern software-engineering approach for maximum flexibility and utilization of open-source simulations and associated tools. As opposed to a “monolithic” approach, scripting languages were used to “bind” together a tool chain to configure and organize input data, execute and produce analysis results, and post-process these results to facilitate a rapid iterative analysis process to quickly address issues and pursue alternatives with emphasis on analysis automation. Key capabilities in the tool chain include processing and mining of very large data sets, a wide range of graphical depictions, and high-fidelity, physics-based simulations. The paper begins with a problem description and the motivation for liftoff and separation dynamics analysis followed by a historical survey of dynamics analyses for previous NASA human-rated launch vehicles. Details of the tool chain and its components are then introduced divided, first, into description of the scripting language architecture used to “bind” the simulation tools, programs, and scripts together and, second, the physics models and simulations. Representative analyses and data products are shown for liftoff and booster separation dynamics that provide in-depth insight to the tool chain’s capabilities. Supporting activities such as simulation tool chain verification, version archiving and data management, and training are addressed. The paper concludes with case examples on how the tool chain can be tailored to related aerospace dynamics analyses, both large and small. These patterns and techniques for SLS dynamics tool construction can be applied for other aerospace simulations.

6DOF↗

Post-Flight Reconstruction Approach for Space Launch System Artemis I Mission

Upon completion of the first Space Launch System flight, NASA personnel will begin post-flight analyses. Telemetry from across the vehicle will be combined with external radar tracking and environmental observation data in order to close validation criteria and generate a best estimated trajectory (BET). This paper will describe the approach taken by the SLS team to integrate flight data from multiple flights sources into BET, pre-flight simulation and testing results, primary sources of uncertainty, and path towards processing flight results. This paper also includes a brief description of algorithms and approaches to estimate as-flown vehicle parameters such as booster specific impulse, booster (and core) thrust multipliers and dry mass.

Evan John Anzalone↗

NASA's Space Launch System Progress Toward the Launch Pad

NASA’s Space Launch System (SLS) took a substantial step toward the launch site in2020 with the move of the Artemis I core stage from the manufacturing site to the test stand as the program plans for a 2021 launch. (Fig. 1) SLS is NASA’s evolvable super-heavy-lift launch vehicle to support deep space exploration. It is based on evolutionary improvement to existing proven propulsion systems. Its twin solid rocket boosters employ a five-segment motor based on the four-segment space shuttle motor. Its four RS-25 main engines will operate at thrust levels higher than those in the space shuttle program. The core stage is anew design that will support propellant tanks for the engines and serve as the attach point for the boosters. Modern streamlined manufacturing processes and materials have been incorporated into the initial configuration with planned onramps for improved performance and/or affordability in subsequent versions. The primary role of SLS is to anchor the transportation for NASA’s Artemis Program to return humans to the Moon and build on the exploration that began during the Apollo Program. This paper will discuss progress to date for the SLS Program and look ahead to important milestones in 2020 and beyond.

John H Honeycutt↗

Space Launch System Liftoff and Separation Dynamics Analysis Tool Chain

A flexible, hierarchical tool chain that is being applied to NASA’s Space Launch System (SLS) for critical dynamics phenomena is described. This tool chain, called CLVTOPS, is used to investigate lateral liftoff movement of the vehicle as it departs and clears the mobile launch tower and separation of the two solid rocket boosters without collision with the core stage and payload. The toolset’s architecture was configured to take advantage of a modern software engineering approach for maximum flexibility and utilization of open-source simulations and associated tools. As opposed to a “monolithic” approach, scripting languages were used to “bind” together a tool chain to configure and organize input data, execute and produce analysis results, and post-process these results to facilitate a rapid, iterative analysis process to quickly address issues and pursue alternatives with emphasis on analysis automation. Key capabilities in the tool chain include processing and mining of very large data sets, a wide range of graphical depictions, and high-fidelity, physics-based simulations. The paper begins with a problem description and the motivation for liftoff and separation dynamics analysis followed by a historical survey of dynamics analyses for previous NASA human-rated launch vehicles. Details of the tool chain and its components are then introduced and divided, first, into description of the scripting language architecture used to “bind” the simulation tools, programs, and scripts together and, second, the physics models and simulations. Representative analyses and data products for liftoff and booster separation dynamics are shown in order to provide in-depth insight into the tool chain’s capabilities. Supporting activities such as simulation tool chain verification, version archiving and data management, and training are addressed. The paper concludes with case examples on how the tool chain can be tailored to related aerospace dynamics analyses, both large and small. The flexibility and versatility of this tool chain in supporting analyses of such a diverse range of aerospace applications demonstrates the feasibility of applying these patterns and techniques for tool construction to other aerospace simulations.

6DOF↗

Coherence Analysis of the Space Launch System using Unsteady Pressure Sensitive Paint

Transonic buffet forces are a major source of unsteady loading on launch vehicles, thus requiring accurate estimation for efficient vehicle design. The state of the art in modeling these unsteady loads utilizes wind-tunnel tests where the fluctuating pressures are measured by pressure transducers (PTs) at discrete locations on a rigid buffet model. These pressures are then integrated over the surface of the vehicle to yield a series of orthogonal centerline loads called buffet forcing functions (BFFs). Typically, the PT layout aims at resolving the pressure correlation along the longitudinal axis of the vehicle. As a result, the distribution of azimuthal correlation and its impact on the estimated BFFs are not well known. To fill these gaps, extremely high-spatial-resolution uPSP data were collected for three different configurations of the Space Launch System in the NASA Ames Research Center 11-Foot Transonic Unitary Plan Wind Tunnel. The spatio-temporal behavior of the pressure correlation on these vehicles is analyzed and flow features of interest are investigated. It is shown that terminal shocks interacting with turbulence are a source of increased azimuthal coherence, especially when the shock develops at a junction. Vortex shedding off the forward attachment hardware that connects the core stage to the solid rocket boosters (SRBs) is the most severe buffet environment on the vehicle. The associated fluctuating pressures are shown to be highly coherent as far as the vehicle tail and up to 40 degrees away from the boosters. For selected areas of the vehicle, factoring the azimuthal coherence into the attenuation of discrete-measurements-based BFFs results in under prediction relative to the BFFs obtained from full integration of the uPSP data.

buffet↗

NASA Space Launch System Prepares for Key Hotfire Test Before Vehicle Integration

NASA this year is working toward the final major integrated hardware and avionics test for its Space Launch System (SLS), the agency’s new super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars and beyond. As the backbone of the Artemis human lunar exploration program, Artemis I SLS operations will then shift to the launch site and integration for the inaugural mission. For this final major test of the first vehicle NASA has built exclusively for deep space exploration since the Saturn V, a NASA/Boeing/Aerojet Rocketdyne team will conduct the final core stage “green run” test at NASA's Stennis Space Center with a dramatic firing of all four core stage engines. This test will validate the operation of the stage structures, main propulsion system, engines, avionics, and software. Following data review, stage inspection, and refurbishment, the stage will be barged to NASA’s Kennedy Space Center to continue integration of the Artemis I launch vehicle. Already underway is assembly of the mission’s five-segment solid rocket boosters. The mission’s upper stage and spacecraft adapters also are staged at the launch site ready for integration. Even as the Artemis I SLS proceeds toward launch later this year, the Artemis II and Artemis III vehicles are coming together, with core stages, engines, boosters, upper stage, and payload accommodations in various stages of manufacturing and/or processing. Planning is also underway for additional core stages and a new, more powerful upper stage that will increase lunar payload mass. SLS is the anchor transportation leg of a plan for sustained human exploration of the Moon, including the first human landing later in the decade. This paper will discuss SLS progress to date and expected 2021 milestones.

Bruce R. Askins↗

The Challenger tragedy was caused by an Apollo mistake, terminating risk analysis

NASA’s view of risk changed between early Apollo and the Space Shuttle. Risk was a known serious problem at the beginning of Apollo and the risk estimates were disturbingly high. To avoid public concern, risk analysis was discontinued. Risk analysis was avoided in Shuttle, leading to an unnecessarily risky design. The immediate cause of the Challenger tragedy was the mistaken decision to launch in cold weather. The fundamental cause was the high risk of the Shuttle design. Before Challenger, management thought and testified that the probability of an accident was 1 in 100,000. After Challenger, Probabilistic Risk Analysis (PRA) found a roughly 1 in 100 chance of a Shuttle failure. The recent Orion design uses the safer Apollo approach, with a hardened capsule, launch abort escape, and the crew placed above the rocket tanks and engines. During Apollo it was estimated that, “assuming all elements from propulsion to rendezvous and life support were done as well or better than ever before, that 30 astronauts would be lost before 3 were returned safely to the Earth.” The chance of astronaut survival was only 10%. After the Apollo 1 tragedy, the awareness of risk led to an intense focus on achieving safety. “The only possible explanation for the astonishing success – no losses in space and on time – was that every participant at every level in every area far exceeded the norm of human capabilities.” During Apollo, a NASA PRA found that the chance of success was “less than 5 percent.” The NASA Administrator felt that “the numbers could do irreparable harm,” and discontinued numerical risk assessment. This led to decreasing understanding of risk. The head of Apollo reliability and safety decided, “Statistics don’t count for anything,” and that risk is reduced by “attention taken in design.” The great and initially unexpected success of Apollo appeared to validate the neglect of PRA. Continuing to neglect the mathematical estimation of risk led Shuttle into a high risk design that produced tragic results. The initial design of the Shuttle emphasized increasing capability and reducing cost without analysis or even mention of risk. A retired NASA official stated, “some NASA people began to confuse desire with reality. … One result was to assess risk in terms of what was thought acceptable without regard for verifying the assessment. … Note that under such circumstances real risk management is shut out.” Not computing risk led to removing launch abort, removing crew escape, selecting less reliable Solid Rocket Boosters, placing the crew compartment next to the rocket boosters, and accepting more stressed shielding tile designs. Accepting these specific risks directly caused the shuttle disasters. The Challenger tragedy is frequently taught as a case of management failure. The focus is on the Challenger launch decision hours before, which is a dramatic example of bad management. However, the true cause of the Challenger disaster occurred decades earlier in the Apollo era. When the easily predictable failures occurred, failure investigations focused on how they might have been avoided. The Shuttle was cancelled after the space station was completed because of its high risk. The ultimate cause of the Shuttle tragedies was the choice by the Apollo-era NASA administrator to avoid a negative public reaction to realistic risk analysis.

Harry W. Jones↗