Test beam and irradiation test results of Triple-GEM detector prototypes for the upgrade of the muon system of the CMS experiment
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Not Available
We present a programmable time alignment scheme used in an ASIC for the ATLAS forward muon trigger development. The scheme utilizes regenerated clocks with programmable phases to compensate for the timing offsets introduced by different detector trace lengths. Each ASIC used in the design has 104 input channels with delay compensation circuitry providing steps of ~ 3 ns and a full range of 25 ns for each channel. Detailed implementation of the scheme including majority logic to suppress single-event effects is presented. The scheme is flexible and fully synthesizable. Here, the approach is adaptable to other applications with similar phase shifting requirements. In addition, the design is resource efficient and is suitable for cost-effective digital implementation with a large number of channels.
Not Available
Not provided.
Not Available
Not Available
The Cathode Strip Chamber (CSC) is the primary system for muon detection in the CMS endcap region. Starting in 2026 both the instantaneous luminosity and CMS level 1 latency will be increased significantly, which will exceed the design specifications of the CSC electronics. The large integrated particle flux also increases the potential for chamber aging and performance degradation. This paper presents the studies of CSC electronics and CSC longevity performed at the CERN GIF++ facility.
The high-luminosity phase of the Large Hadron Collider (HL-LHC) will result in ten times higher particle background than measured during the first phase of LHC operation. In order to fully exploit the highly-demanding operating conditions during HL-LHC, the Compact Muon Solenoid (CMS) Collaboration will use Gas Electron Multiplier (GEM) detector technology. The technology will be integrated into the innermost region of the forward muon spectrometer of CMS as an additional muon station called GE1/1. The primary purpose of this auxiliary station is to help in muon reconstruction and to control level-1 muon trigger rates in the pseudo-rapidity region 1.6 ≤ |η| ≤ 2.2. The new station will contain trapezoidal-shaped GEM detectors called GE1/1 chambers. The design of these chambers is finalized, and the installation is in progress during the Long Shutdown phase two (LS-2) that started in 2019. Several full-size prototypes were built and operated successfully in various test beams at CERN. Here, we describe performance measurements such as gain, efficiency, and time resolution of these prototype chambers, developed after years of R&D, and summarize their behavior in different gas compositions as a function of the applied voltage.
New front-end electronics including ASICs and FPGA boards are under development for the ATLAS Monitored Drift Tube (MDT) detector to handle the large data rates and harsh environment expected at high-luminosity LHC runs. A mobile Data Acquisition (miniDAQ) system is designed to perform integration tests of these front-end electronics. In addition, it will be used for surface commissioning of 96 small-radius MDT (sMDT) chambers and for integration and commissioning of new front-end electronics on the present ATLAS MDT chambers. Details of the miniDAQ hardware and firmware are described in this article. Here, the miniDAQ system is also used to read out new front-end electronics on an sMDT prototype chamber using cosmic muons and results obtained are shown.
Not Available
In the view of the luminosity increase foreseen by the High-Luminosity Large Hadron Collider program at CERN, the ATLAS experiment initiated an R&D program to replace its complete inner detector (ID) system. The new Inner Tracker (ITk) system, anticipated to be installed by 2028, will be a new all-silicon based tracker including Strip and Pixel detector technologies. The new detector is designed to meet the requirements of operating under a harsh environment namely, high radiation levels, increased pile-up and data rates while decrease the material budget and maintain or even improve the performance. The Strip project has advanced in several areas the last years while facing challenges moving from pre-production to production. Here, this manuscript gives an overview of the ITk Strip system and describes the advancements and challenges to date.