Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

DOE Advanced Gas Reactor Fuel Development and Qualification Program Overview

Slides discussing the DOE Advanced Gas Reactor Fuel Development and Qualification Program Overview to include focus on LEU UCO TRISO fuel in cylindrical compacts, with data for fuel qualification in support of reactor licensing and a path to establish a domestic commercial TRISO fuel fabrication capability. Timelines from 2004 through 2029. Major program highlights include: Developed fuel performance models based on past observed behavior, Study to understand differences between US and German (“good”) fuel, Developed and improved fuel fabrication and characterization methods, Fabricated lab-scale fuel (AGR-1) with very high quality; excellent in-pile and post-irradiation high-temperature fuel performance, Scale-up coating fabrication (AGR-2) with excellent in-pile performance, AGR-3/4 fuel fabrication and irradiation experiment to assess FP transport behavior, Scale-up matrix fabrication (AGR-5/6/7); & fuel performance evaluation in progress.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Phased Demolition of an Occupied Facility

The U.S. government constructed the K-1401 facility in the late 1940's as a support building for various projects supporting the uranium gaseous diffusion process. In 2004 the U.S. Department of Energy authorized Bechtel Jacobs Company, LLC (BJC) to decontaminate and demolish the facility. The K-1401 facility was used for a variety of industrial purposes supporting the gaseous diffusion process. Many different substances were used to support these processes over the years and as a result different parts of the facility were contaminated with fluorine, chlorine trifluoride, uranium and technetium radiological contamination, asbestos, and mercury. The total facility area is 46,015 m{sup 2} (495,000 sf) including a 6,800 m{sup 2} basement (73,200 sf). In addition to the contamination areas in the facility, a large portion was leased to businesses for re-industrialization when the D and D activities began. The work scope associated with the facility included purging and steam cleaning the former fluorine and chlorine trifluoride systems, decontaminating loose radiologically contaminated and mercury spill areas, dismantling former radiological lines contaminated with uranium oxide compounds and technetium, abating all asbestos containing material, and demolishing the facility. These various situations contributed to the challenge of successfully conducting D and D tasks on the facility. In order to efficiently utilize the work force, demolition equipment, and waste hauling trucks the normal approach of decontaminating the facility of the hazardous materials, and then conducting demolition in series required a project schedule of five years, which is not cost effective. The entire project was planned with continuous demolition as the goal end state. As a result, the first activities, Phase 1, required to prepare sections for demolition, including steam cleaning fluorine and chlorine trifluoride process lines in basement and facility asbestos abatement, were conducted while the tenants who were leasing floor space in the facility moved out. Upon completion of this phase the facility was turned over to the demolition project and the most hazardous materials were removed from the facility. Phase 2 activities included removing the process gas lines from sections C/D/E while decontaminating and preparing sections A and B for demolition. Demolition preparation activities include removing transit siding and universal waste from the area. Phase 3 began with demolition activities in sections A and B1 while continuing process gas line removal from sections C/D/E, as well as conducting demolition preparation activities to these sections. Area B was split into two sections, allowing demolition activities to occur in section B1 while personnel could still access the upper floor in sections C, D, and E. Once demolition began in section B2, personnel entry was only authorized in the basement. This timeline initiated phase 4, and the project completed cleaning the process components from the basement while section B2 demolition began. The final phase, phase 5, began once the basement was cleared. Final demolition activities began on sections C, D, E, and the basement. This material will ship for disposal and is scheduled for completion during FY07. Because the project was able to successfully phase demolition activities, the total facility demolition schedule was reduced by half to 2-1/2 years. The project was able to move portions of the demolition schedule from working in series to working in parallel, allowing the job to deliver facility demolition debris to ship for disposal 'just in time' as the facility was demolished.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial Process and Expected Outcomes for Preliminary Identification of Routes to Yucca Mountain, Nevada

The Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing and implementing a safe, secure and efficient transportation system to ship spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from commercial and DOE sites to the proposed Yucca Mountain repository. The Office of Logistics Management (OLM) within OCRWM has begun to work with stakeholders to identify preliminary national suites of highway and rail routes that could be used for future shipments OLM is striving to develop a planning-basis set of routes that will support long-lead time logistical analyses (i.e., five or more years before shipment). The results will represent a starting point for discussions between DOE and corridor jurisdictions, and for shipping arrangements between DOE and carriers. This fulfills a recommendation of the National Academy of Sciences report on SNF and HLW transportation that 'DOE should identify and make public its suite of preferred highway and rail routes for transporting spent fuel and high level waste to a federal repository as soon as practicable to support State, Tribal and local planning, especially for emergency responder preparedness'. OLM encourages and supports participation of program stakeholders in a process to identify suites of national routes. The principal objective is to identify preliminary suites of national routes that reflect responsible consideration of the interests of a broad cross-section of stakeholders. This will facilitate transportation planning activities to help meet program goals, including providing an advanced planning framework for State and Tribal authorities; supporting a pilot program for providing funding under Section 180(c) of the Nuclear Waste Policy Act; allowing sufficient time for security and operational reviews in advance of shipments to Yucca Mountain; and supporting utility planning and readiness for transportation operations. Concepts for routing and routing criteria have been considered by several state regional groups supported by cooperative agreements with OLM. OCRWM is also working with other Federal agencies, transportation service providers and others involved in the transportation industry to ensure the criteria are consistent with operating practices and regulations. These coordination efforts will ensure the experience, knowledge, and expertise of those involved are considered in the process to identify the preliminary national suites of routes. This paper describes the current process and timeline for preliminary identification and analyses of routes. In conclusion: The path toward developing a safe, secure, and efficient transportation system for shipments of SNF and HLW to Yucca Mountain will require the participation of many interested parties. Real cooperative planning is sometimes challenging, and requires a commitment from all involved parties to act in good faith and to employ their best efforts in developing mutually beneficial solutions. Identifying routes to the proposed repository at Yucca Mountain, and engaging in planning and preparedness activities with affected jurisdictions and other stakeholders, will take time. OCRWM is committed to a cooperative approach that will ultimately enhance safety, security, efficiency and public confidence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decision Support Tool for the Management of Debris from Radiological Dispersal Devices and Other Incidents of National Significance

Unique challenges exist for the handling, transport, and disposal of debris resulting from homeland security incidents, disasters or other national emergencies. Access to guidance to facilitate decision making to ensure the safe and timely disposal of debris is critical to helping restore a community or region and prevent further contamination or spread of disease. For a radiological dispersal device (RDD), proper characterization of the quantity, properties, and level of contamination of debris can have a significant impact on cleanup costs and timelines. A suite of decision support tools (DSTs) is being developed by the U.S. EPA's Office of Research and Development to assist individuals responsible for making decisions associated with handling, transport, and disposal of such debris. The DSTs are location-specific to help identify specific facilities and contacts for making final disposal decisions. The DSTs provide quick reference to technical information, regulations, and other information to provide decision makers with assistance in guiding disposal decisions that are important for the protection of public health, first responders, and the environment. These tools are being developed in partnership with other U.S. government agencies, EPA program offices, industry, and state and local emergency response programs. (authors)

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Endpointtool: An Excel{sup R}-Based Workbook for Hanford Tank Waste Treatment Planning

The EndpointTool is a Microsoft Excel{sup R}-based workbook with a set of macros and worksheets for the evaluation of Hanford Site tank treatment scenarios. This tool enables the user to determine bottlenecks in processes and storage and address regulatory issues. It also provides an avenue to evaluate new technologies, as well as changes in existing technologies and their impact to the current baseline. The EndpointTool tracks 46 radionuclides, 52 species, and 10 properties for each event. Seventeen different processes are modeled, each with its own worksheet that describes that process, has its assumptions, qualifications, and calculations, and holds the historical results of each process event. This enables the user to not only look at the big picture, but to evaluate process parameters such as flowrates, sizing, etc. The user composes an event that is a combination of a sender tank, a process tank, and a receiver tank. Each event involves one of the processes and each process can have up to a total of 81 assumptions and 180 qualifications. The starting point for all tank inventories is the Hanford tank Best-Basis Inventory (BBI). Each tank comprises up to three phases: salt-cake, sludge, and supernatant. Each of these BBI phases has an insoluble solids fraction that was derived from the embedded solubility model. Each composed event must meet a set of qualifications that are dependent on the process, as well as whether the sender tank has any inventory, whether the receiver tank has sufficient space, etc. For example, supernatant events are limited to a maximum solids specified in its assumptions, usually 5 wt%. Above this solids contents, a slurry transfer must be used. Once a qualified event is added to the Event List, the inventories of involved tanks are updated in a status worksheet and the results of that event appear in the timeline and metrics charts. Although the EndpointTool is not a true dynamic model, it provides a useful desktop capability for quite complex process sequences. While only schedule and variances are presently performed, a cost module is in development. In summary: The EndpointTool is a powerful Excel-based planning resource. It is portable and test runs have shown that about 600 Events can effectively represent the processing of all of Hanford tank waste. Since each Event takes approximately 3 seconds to run on a 1.8 GHz CPU with 512 MB ram, a complete run only takes approximately 30 minutes. As a result, extensive scenario planning and process optimization is possible with this tool. Moreover, Event List 'scenarios' can be easily shared among users and scenario planning can then be distributed among a large number of users. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Public Resistance is Waste-Based and What to Do About That - 13412

'Nuclear Communicators' connect a highly advanced sci-tech world with the world of everyday living. One challenge is helping stakeholders fit together three Big Ideas: (1) the valuable nuclear energy resource, (2) nuclear energy's invisible mortal dangers and potential bad-guy threats, and (3) critical scientific and engineering knowledge that is far over the heads of average (grade 8) USA reading levels. This article provides an overview of what does - and does not - work in our public communications. What does not work: 1. Going off topic. Address what concerns people most: how to manage nuclear wastes. 2. Underestimating public intelligence. What works: 1. Doing your homework on community history regarding nuclear materials. 2. Having discussion forums and public meetings with special guests from industry, government, and local leaders. 3. Regular cycles of communication with community groups to build a long-term dialogue. Solutions to some communication challenges require handling four gaps and one jungle: 1. Facts gap - Honest information about waste disposition. 2. Time gap - The timelines associated with waste management include 300 years, 10,000 years, and 703.8 million years. How do we talk about this? 3. Money gap - Who pays for new waste management challenges and technologies? 4. Confidence gap - Link local options to regional, national, and global knowledge. 5. Decision jungle - How can we make waste management rules and infrastructure more logical and transparent? Public communication needs to be grounded in facts for people who want to be credible actors in the new nuclear world. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Siting and Transportation for Consolidated Used Nuclear Fuel Management Facilities: A Proposed Approach for a Regional Initiative to Begin the Dialogue - 13562

The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed in January 2010 to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, and to develop a new national strategy. Over two years, the BRC held dozens of meetings and heard from hundreds of Federal, State, Tribal, and local officials, as well as representatives of trade and labor organizations, technical groups, non-governmental organizations, and other stakeholders. The Commission's final report (issued January 26, 2012) offers a strategy to resolve longstanding challenges to responsible management of the United States' nuclear waste legacy. The Commission recommended Congressional action to rewrite parts of the Nuclear Waste Policy Act (NWPA); however, a comprehensive legislative overhaul will likely take years to fully implement. The nature and characteristics of nuclear waste, the activities that generated it, and the past history of federal efforts to manage the waste make it virtually certain that finding workable solutions will be controversial and difficult. As the BRC report suggests, this difficulty can be made insurmountable if top-down, federally-mandated efforts are forced upon unwilling States, Tribes, and local communities. Decades of effort and billions of ratepayer and taxpayer dollars have been spent attempting to site and operate spent fuel storage and disposal facilities in this manner. The experience thus far indicates that voluntary consent and active partnership of States, Tribes, and local governments in siting, designing, and operating such facilities are critical. Some States, Tribes, and local communities have indicated that, given adequate scientific and technical information, along with appropriate incentives, assurances, and authority, they might be willing to consider hosting facilities for consolidated storage and disposal of spent nuclear fuel. The authors propose a new regional approach to identifying and resolving issues related to the selection of a consolidated storage site. The approach would be characterized by informed discussion and deliberation, bringing together stakeholders from government, the non-governmental (NGO) community, industry, and other sectors. Because site selection would result in regional transportation impacts, the development of the transportation system (e.g., route identification, infrastructure improvements) would be integrated into the issue-resolution process. In addition to laying out the necessary steps and associated timeline, the authors address the challenges of building public trust and confidence in the new waste management program, as well as the difficulty of reaching and sustaining broad-based consensus on a decision to host a consolidated storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NRC Consultation and Monitoring at the Savannah River Site: Focusing Reviews of Two Different Disposal Actions - 12181

Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2011, the NRC staff reviewed DOE performance assessments for tank closure at the F-Tank Farm (FTF) Facility and salt waste disposal at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) as part of consultation and monitoring, respectively. Differences in inventories, waste forms, and key barriers led to different areas of focus in the NRC reviews of these two activities at the SRS. Because of the key role of chemically reducing grouts in both applications, the evaluation of chemical barriers was significant to both reviews. However, radionuclide solubility in precipitated metal oxides is expected to play a significant role in FTF performance whereas release of several key radionuclides from the SDF is controlled by sorption or precipitation within the cementitious wasteform itself. Similarly, both reviews included an evaluation of physical barriers to flow, but differences in the physical configurations of the waste led to differences in the reviews. For example, NRC's review of the FTF focused on the modeled degradation of carbon steel tank liners while the staff's review of the SDF performance included a detailed evaluation of the physical degradation of the saltstone wasteform and infiltration-limiting closure cap. Because of the long time periods considered (i.e., tens of thousands of years), the NRC reviews of both facilities included detailed evaluation of the engineered chemical and physical barriers. The NRC staff reviews of residual waste disposal in the FTF and salt waste disposal in the SDF focused on physical barriers to flow and chemical barriers to radionuclide release from the waste. Because the waste inventory and concentration at both sites is sufficient to generate unacceptable doses to an off-site member of the public or inadvertent intruder in the absence of engineered barriers, the NRC staff review focused on the engineering features DOE plans to put in place to limit radionuclide release. At the FTF, DOE expects that peak doses are delayed beyond a 10,000 year performance period by a combination of (1) the flow-limiting effect of the steel tank liner and (2) chemical conditions created by the stabilizing grout overlying the waste that limit the solubility of key radionuclides for tens of thousands of years. At the SDF, DOE expects that flow will be significantly limited by water shedding along the closure cap lower drainage layer and that radionuclide release will be further limited by radionuclide precipitation or sorption within the high pH, chemically reducing conditions created within the saltstone waste form. Because the performance of both facilities depends on the performance of engineered barriers for thousands of years, the reviews included a detailed evaluation of the expected long-term behavior of these barriers. As previously discussed, NRC staff reviews of DOE waste determinations during consultation are designed to evaluate the three NDAA criteria, whereas the review of an updated PA during monitoring only addresses whether the NRC staff has reasonable assurance that the planned disposal action will meet the performance objectives of 10 CFR Part 61. The NRC staff review of the Waste Determination for the FTF did not include conclusions about whether the planned disposal of residual waste at the FTF would meet the NDAA criteria because of the substantial uncertainties in the degree of waste removal DOE would achieve and other technical uncertainties. The main product of the NRC staff review of the planned FTF disposal action is the recommendation that DOE should conduct waste release experiments to increase support for key modeling assumptions related to: (1) the evolution of pH and Eh in the grouted tank system over time; (2) identification of HRR association with solid phases comprising the residual wastes; and (3) expected solubility of HRRs under a range of environmental or service conditions that the residual wastes in the contaminated zone are expected to be exposed to over time. Implementation of this recommendation is deemed crucial for NRC staff to have reasonable assurance that the performance objectives in 10 CFR Part 61, Subpart C can be met. Given the risk-significance of Tank 18 to the overall PA and the short timeline for closure of this tank, the NRC staff recommended that DOE should initiate discussions with NRC staff regarding implementation of this recommendation for Tank 18 as soon as practical. The NRC staff also recommended that experiments to address this recommendation should be conducted prior to final closure of Tank 18. Results of the Tank 18 residual waste experiments, if conducted, will be evaluated by NRC staff to determine the need for additional data collection, experiments, and modeling for Tank 18, as well as other FTF tanks. Additional information regarding the NRC staff's recommendations in this area, including details on the suggested implementation of other recommendations will be provided in the NRC staff's plan for monitoring the FTF later in FY 2012, after DOE makes a final decision on the waste determination. The NRC staff's review of waste disposal at the SDF is ongoing. When complete, the SDF TER will indicate whether the NRC staff continues to have reasonable assurance that waste disposal at the SDF will meet the performance objectives of 10 CFR Part 61 (NDAA Criterion 3). The TER also will include risk insights that will form the basis of the NRC staff's revised monitoring plan for the SDF. The NRC staff will publish an updated monitoring plan for the SDF later in FY 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Vision for Tank Waste Cleanup (One System Integration) - 12506

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The Cleanup of Hanford's 56 million gallons of radioactive and chemical waste stored in 177 large underground tanks represents the Department's largest and most complex environmental remediation project. Sixty percent by volume of the nation's high-level radioactive waste is stored in the underground tanks grouped into 18 'tank farms' on Hanford's central plateau. Hanford's mission to safely remove, treat and dispose of this waste includes the construction of a first-of-its-kind Waste Treatment Plant (WTP), ongoing retrieval of waste from single-shell tanks, and building or upgrading the waste feed delivery infrastructure that will deliver the waste to and support operations of the WTP beginning in 2019. Our discussion of the 2020 Vision for Hanford tank waste cleanup will address the significant progress made to date and ongoing activities to manage the operations of the tank farms and WTP as a single system capable of retrieving, delivering, treating and disposing Hanford's tank waste. The initiation of hot operations and subsequent full operations of the WTP are not only dependent upon the successful design and construction of the WTP, but also on appropriately preparing the tank farms and waste feed delivery infrastructure to reliably and consistently deliver waste feed to the WTP for many decades. The key components of the 2020 vision are: all WTP facilities are commissioned, turned-over and operational, achieving the earliest possible hot operations of completed WTP facilities, and supplying low-activity waste (LAW) feed directly to the LAW Facility using in-tank/near tank supplemental treatment technologies. A One System Integrated Project Team (IPT) was recently formed to focus on developing and executing the programs that will be critical to successful waste feed delivery and WTP startup. The team is comprised of members from Bechtel National, Inc. (BNI), Washington River Protection Solutions LLC (WRPS), and DOE-ORP and DOE-WTP. The IPT will combine WTP and WRPS capabilities in a mission-focused model that is clearly defined, empowered and cost efficient. The genesis for this new team and much of the 2020 vision is based on the work of an earlier team that was tasked with identifying the optimum approach to startup, commissioning, and turnover of WTP facilities for operations. This team worked backwards from 2020 - a date when the project will be completed and steady-state operations will be underway - and identified success criteria to achieving safe and efficient operations of the WTP. The team was not constrained by any existing contract work scope, labor, or funding parameters. Several essential strategies were identified to effectively realize the one-system model of integrated feed stream delivery, WTP operations, and product delivery, and to accomplish the team's vision of hot operations beginning in 2016: - Use a phased startup and turnover approach that will allow WTP facilities to be transitioned to an operational state on as short a timeline as credible. - Align Tank Farm (TF) and WTP objectives such that feed can be supplied to the WTP when it is required for hot operations. - Ensure immobilized waste and waste recycle streams can be received by the TF when required to support 2016 production of immobilized low-activity waste (ILAW). - Ensure the required baseline and additional funding is provided beginning in fiscal year 2011. - Modify TF and WTP contracts to adequately address this vision. The 2020 Vision provides a summary of strategies and key actions that optimize the approach to startup, commissioning, and turnover of WTP facilities. This vision focuses on the legally enforceable requirement to achieve the Consent Decree milestones of starting radioactive operations in 2019, and achieving initial WTP operations in 2022. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance of B-10 based detectors

Helium-3 gas-filled detectors have been used in nuclear safeguards applications, in homeland security neutron detection modules and in research for over 30 years. With the current shortage of {sup 3}He gas, GE's Reuter-Stokes business developed a {sup 10}B lined proportional counter and a {sup 10}B hybrid detector, in which a small amount of {sup 3}He is added to a 10B detector to enhance the neutron sensitivity. In 2010, GE's Reuter-Stokes successfully developed a commercial alternative to 3He gas-filled detectors for homeland security neutron detection modules based on 10B lined proportional counters. We will present the concept behind the {sup 10}B neutron detection modules, as drop-in replacement to existing 3He neutron detection modules deployed, and the timeline and development needed to get a fully commercial application. To ensure the highest quality, each {sup 10}B neutron detection unit is put through a series of tests: temperature cycles from -40 deg. C to +55 deg. C, vibration testing at levels up to 2.5 g from 10 Hz to 50 Hz in every direction, neutron sensitivity reaching up to 4.5 cps/(ng {sup 252}CF at 2 m), and gamma insensitivity with field reaching 1 Sv/hr. In 2013, GE's Reuter-Stokes developed the B10Plus+{sup R} detector, in which a small amount of {sup 3}He is added to a {sup 10}B lined proportional counter. Depending on the amount of {sup 3}He added, the B10Plus+{sup R} can more than double the neutron sensitivity compared to a {sup 10}B lined proportional counter. {sup 10}B lined proportional counters and B10Plus+{sup R} have excellent gamma rejection and excellent performance even at very high neutron flux. The gamma rejection and high neutron flux performance of these detectors are comparable, if not better, than traditional {sup 3}He proportional counters. GE's Reuter-Stokes business modelled, designed, built and tested prototype coincidence counters using the {sup 10}B lined detectors and the {sup 10}B hybrid detectors. We will present these systems and their applications for non-destructive assay. We will also show other examples of applications where {sup 10}B lined proportional counters and B10Plus+{sup R} detectors can be used. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Previous planning and prioritization for LWR SNF management investigated the risks and uncertainties of deploying facilities such as consolidated interim storage [1, 2, 3, 4]. As part of that work, activities and milestones were collected into success precedence diagrams that charted a path to achieving facility deployment [1]. In that framework, activities are any research, development, design, or decision required to achieve an intermediate goal; milestones are activity endpoints and mark the completion of deliverables. Milestones can be thought of as achievements required to reach the final goal of facility deployment; activities are the means by which milestones are accomplished. In planning, activities and milestones are compiled into comprehensive flow charts that visualize the steps necessary for deployment. This framework has been used to quantify risks, timelines, and costs of deploying SNF management facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Compressible Arch Segments for the Cigeo Access Ramps, Drifts and Vaults - A Field Test - 17011

Andra is currently implementing the detailed engineering phase of the step-wise design development of Cigeo (the French HLW and IL-LLW Deep Geological Repository). Various technical issues are at stake, including the requirements linked to 'Reversibility / Retrievability', at different stages of the repository life cycle (from its construction start-up to its final closure and monitoring). These reversibility requirements have a significant impact on the way Cigeo is designed, will be progressively developed, operated, later closed and monitored. On a shorter term, one must demonstrate that the waste container retrieval operations are technically safe and feasible. In that sense, the structural dimensioning of the ramps and mains, as well as that of the IL-LLW disposal vaults, is critical, since the concrete liner supporting the rock walls must last over a period of some 100 to 150 years (lapse of time during which retrieval operations are likely to take place). The present paper starts with a description of the geomechanical conditions prevailing in the Callovo-Oxfordian (COX) clay-stone formation (aka the argillite). The structural dimensioning of the IL-LLW disposal vault liner, as calculated at the end of the basic engineering phase is indicated. The thickness values obtained so far have led to considering an alternative design in which a compressible material is positioned between the concrete liner intrados and the rock walls: in such situation, the 'creeping effect' of the rock is mitigated, for a time, by the compressible material (nearly a perfect elastoplastic material), hence reducing the stress level exerted inside the concrete liner. This situation enables to significantly reduce the liner thickness and provides potentially significant saving in the construction of the works concerned (preliminary sensitivity results are given). The following part of the paper is then focused on a practical case story: a technological demonstration (still ongoing) of a tunnel boring experiment, implemented underground (in a dedicated drift of the Meuse Haute Marne URL infrastructures, at scale 1:2 of the Cigeo drifts/vaults). In this excavation and construction experiment, the tunnel boring machine (TBM) lays (via an erector) 'classical' concrete arch segments (forming a ring) in a first portion of the drift and 'compressible' ones (the compressible material is positioned on their extrados) in a second portion of the drift. The technical demonstration objective is two-fold: the capacity to lay compressible arch segments with a TBM is checked, their structural behavior (with time) is compared with that of 'classical' ones. The way the compressible material is produced and then fixed on the arch concrete segment is also documented, c/w a description of the complementary testing campaign to be carried out on a test bench (on surface) of a concrete ring (at a scale 1:2 of Cigeo) formed of compressible arch segments. This paper concludes with a timeline of the experiment. Should the results obtained provide some perspectives of technical and economic improvement (i.e. saving vis-a-vis the 'classical' solution) a decision could be taken by Andra to incorporate this alternative solution in the 'design freeze' of Cigeo underground infrastructures. The positive outcomes of this technical test campaign would also pave the way for specifying the Cigeo TBM characteristics (dimensions and handling equipment), scheduled for manufacturing order around 2020. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Cable Car Transfer System for the Cigeo Access Ramps - An Original Approach - 17035

Andra is currently implementing the detailed engineering phase of the step-wise design of Cigeo (the French HLW and IL-LLW Deep Geological Repository). Various technical issues are at stake, including the definition and development of a key component: a funicular ('cable-car') system dedicated to the transfer (down the access ramp and leading to the underground infrastructures) of the shielding casks housing the waste disposal containers (packages). The present paper starts with a brief description of the Cigeo architecture (i.e. the surface utilities, the service and nuclear ramps, the various shafts and finally the underground facilities). A focus is then made on the 'nuclear ramp' dedicated to the transfer of the waste containers lodged inside the casks (those latter weighing some 100 to 130 metric tons each) and its main geometrical characteristics (slope, length, diameter, structure). Then a discussion follows to detail the rationale having led to the choice of a somehow 'sophisticated' funicular transfer system, at the expense of what could be called 'more conventional' and more straightforward transport solutions (like a transfer system by trucks or by rack and pinion trains). A systematic comparison is finally made between the various solutions, explaining and rating the pros and cons of each concept, via a multi-criteria analysis. This technical choice (and the related justification approach) was submitted to an Experts review at the end of the Preliminary Design phase of Cigeo and comforted by their strong support before the design freeze of this solution was integrated in Cigeo. The following part of the paper is then focused on a description of the main technical components and the mechanical performance of the cable-car system, its current state of design and the set of qualification tests (of key safety components) to be implemented before its effective construction. This article concludes with a timeline of the qualification tests and developments to come. The positive outcomes of this future technical test campaign will also pave the way for the future instruction of the Cigeo licensing file, scheduled as of mid-2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Modeling and Simulation Support to Specia Nuclear Material Handling Facility Operations - 16053

Newport News Shipbuilding (NNS) is the sole designer and provider of nuclear powered aircraft carriers and one of only two companies in the United States to build nuclear powered submarines. As part of the upkeep of aircraft carriers, the ships return to NNS once in their lifetime for a complex overhaul and to be refueled. In support of overhaul operations NNS maintains a state of the art Special Nuclear Material (SNM) handling facility. Due to the complex nature of the operations that occur within this facility, during the design and initial operation of the building NNS developed a facility simulation model to provide decision support during the project planning and operational phases. This tool allows users to experiment with process times, process order, equipment utilization, personnel utilization and spatial utilization. By capturing the planned operations, time distributions for operations, equipment sizes and uses and personnel requirements, the tool accurately reflects the planned use of the facility. This realism allows the user to experiment with any aspect of the facility, in a controlled and cost effective space, and determine how changes or potential delays may impact overall facility operations. Thus the model allows for rapid exploration of multiple scenarios to determine likely outcomes, allowing a user to identify risks well ahead of their realization and explore mitigation strategies in a controlled space, to determine the ideal path forward. The tool was successful during the initial operation of the facility in helping to identify and mitigate risks related to the complex operations occurring during SNM handling. The tool is now in use to support planning for the next series of operations that will occur within the facility. The initial operations the model supported occurred during the deactivation of the USS Enterprise, and future operation will focus on the overhaul of Nimitz class aircraft carriers. The NNS planning team is currently using the tool to assess potential risks and challenges that are identified as potentially impacting the schedule and timelines for these overhaul processes. In addition, the NNS development team is working to add new operational steps to the model, capturing work that is occurring near the facility, but which directly impacts the facilities operational abilities. In conjuncture with the engineering planning division, the NNS development team has run over 20 complex scenarios through the tool. The team has provided output from these scenarios to both NNS personnel and government representatives. To date the model has successfully supported the identification of several feasible paths to incorporate new processes, dictated by the work to support a overhaul vs a deactivation. The model also provides a spatial arrangement component that allows users to experiment with different equipment placement within the facility. Due to the fidelity of the model, arranging equipment with the spatial component allows a user to set up the facility in an experimental layout and run the processes inside the facility to determine if the layout will be feasible, or if it would impact operational capabilities. Additionally, the spatial component allows for visual collaboration between stakeholders to ensure all operational personnel are aware of the current and planned layout, and that they do not locate equipment or work stations in locations that would interfere with facility operations. The spatial component, in combination with the simulation component, has resulted in several documented improvements in process. These include: the identification of additional equipment which could be stored outside the facility, without impacting operations, to increase space; confirmation of the ideal placement of a large water tank; and identification of several risks related to planned equipment storage area, allowing the team to develop new plans and avoid realizing the risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrade Your Work Plans for Better Performance - 16103

Most work plans involve at least two basic pieces: a list of things to do and a timeline for doing them. These 'tasks-and-times' plans can be used for managing a project, an organizational change, or the implementation of a strategic objective. But given the high rate of plan failures - often cited as ranging from 35% to over 80% - something must be missing. Three ideas for upgrading work plans have demonstrated higher success rates than the time-and-task method alone. First, maintain a 'GPS Scorecard' of the Goals, Performance metrics, and Schedules for accomplishment. Second, maintain a Performance Circle Register of all key players, and the key deliverables to and from each of them, that will ensure success. Third, implement all three parts of an accountability management system, collectively referred to as 'T3': Tracking, Team assignments, and Talk-times to update status and progress against the plan. Why bother to take the extra steps to strengthen work plans? There are three reasons: (a) Because traveling without a map is risky in times of high change in infrastructure, staffing, and technology; (b) Because 'expectations' do not guarantee delivery as reliably as well-defined agreements; and (c) Because 'accountability' is a management practice, not a personality trait. Together, implementing these three ideas can provide for clarity of purpose, guidance in establishing the productive relationships necessary for success, and a system of supporting accountability for all participants, both on the team and with others inside and outside of the organization. (authors)

99 GENERAL AND MISCELLANEOUS↗

Developing a New National Programme and Implementation Plan for the Management and Disposal of Spent Fuel and Radioactive Wastes in Romania - 16391

The European 'Waste Directive' (2011/70/Euratom) required each Member State to report by August 2015 on their National Programme for management of spent fuel and radioactive wastes. In Romania, the Nuclear Agency (ANDR) was responsible for preparing the National Programme report, and this was done in a step-wise manner that involved the regulators and waste producers. The starting point for the process was an assessment of existing policy against the evolving situation in the nuclear sector in the country, most notably the decision to progress with the construction of two new CANDU reactors. The final agreed National Programme report submitted to the European Commission describes the activities currently undertaken to manage spent fuel and radioactive wastes in Romania. The report also sets out, at a high-level, the additional activities that will need to be taken in the future (and an indicative timeline), including those steps that will be required to implement a new surface repository for short-lived wastes, and a geological repository for spent fuel and long-lived wastes. Additional, on-going work is intended to lead to a revision of Government policy and the development of a more detailed implementation strategy, underpinned by a programme of R and D and robust financing plans. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗