Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

A Newly Designed Stent for Management of Malignant Distal Duodenal Stenosis

PurposeTo evaluate the clinical effectiveness of a newly designed stent for the treatment of malignant distal duodenal stenosis.MethodsFrom March 2011 to May 2013, six patients with malignant duodenal stenosis underwent fluoroscopically guided placement of the new duodenal stent consisting of braided, nested stent wires, and a delivery system with a metallic mesh inner layer. Primary diseases were pancreatic cancer in three patients, gastric cancer in two patients, and endometrial stromal sarcoma in one patient. Duodenal obstructions were located in the horizontal part in two patients, the ascending part in two patients, and the duodenojejunal flexure in two patients. Technical success, defined as the successful stent deployment, clinical symptoms before and after the procedure, and complications were evaluated.ResultsTechnical success was achieved in all patients. No major complications were observed. Before treatment, two patients could not take any food and the gastric outlet obstruction scoring system (GOOSS) score was 0; the other four patients could take only liquids orally (GOOSS score = 1). After treatment, five patients could take soft food (GOOSS score = 2) and one patient could take a full diet (GOOSS score = 3). The mean duration of primary stent patency was 115.7 days.ConclusionsThe newly designed stent is associated with a high degree of technical success and good clinical outcome and may be clinically effective in the management of malignant distal duodenal obstruction.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Converting campus waste into renewable energy – A case study for the University of Cincinnati

Highlights: • A case study to show the benefits of waste-to-energy projects at a university. • Evaluated the technical and economic feasibilities as well as GHG reduction. • A tool for other universities/communities to evaluate waste-to-energy projects. - Abstract: This paper evaluates the implementation of three waste-to-energy projects at the University of Cincinnati: waste cooking oil-to-biodiesel, waste paper-to-fuel pellets and food waste-to-biogas, respectively. The implementation of these waste-to-energy (WTE) projects would lead to the improvement of campus sustainability by minimizing waste management efforts and reducing GHG emissions via the displacement of fossil fuel usage. Technical and economic aspects of their implementation were assessed and the corresponding GHG reduction was estimated. Results showed that on-site implementation of these projects would: (1) divert 3682 L (974 gallons) of waste cooking oil to 3712 L (982 gallons) of biodiesel; (2) produce 138 tonnes of fuel pellets from 133 tonnes of waste paper (with the addition of 20.75 tonnes of plastics) to replace121 tonnes of coal; and (3) produce biogas that would be enough to replace 12,767 m{sup 3} natural gas every year from 146 tonnes of food waste. The economic analysis determined that the payback periods for the three projects would be 16 months for the biodiesel, 155 months for the fuel pellet, and 74 months for the biogas projects. The reduction of GHG emission from the implementation of the three WTE projects was determined to be 9.37 (biodiesel), 260.49 (fuel pellets), and 11.36 (biogas) tonnes of CO{sub 2}-eq per year, respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned in Risk Management on NCSX

The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Research and Technology 2003

The NASA Glenn Research Center at Lewis Field, in partnership with U.S. industries, universities, and other Government institutions, is responsible for developing critical technologies that address national priorities in aeropropulsion and space applications. Our work is focused on research for new aeropropulsion technologies, aerospace power, microgravity science (fluids and combustion), electric propulsion, and communications technologies for aeronautics, space, and aerospace applications. As NASA s premier center for aeropropulsion, aerospace power, and turbomachinery, our role is to conduct world-class research and to develop key technologies. We contribute to economic growth and national security through safe, superior, and environmentally compatible U.S. civil and military aircraft propulsion systems. Our Aerospace Power Program supports all NASA Enterprises and major programs, including the International Space Station, Advanced Space Transportation, and new initiatives in human and robotic exploration. Glenn Research Center leads NASA s research in the microgravity science disciplines of fluid physics, combustion science, and acceleration measurement. Almost every space shuttle science mission has had an experiment managed by NASA Glenn, and we have conducted a wide array of similar experiments on the International Space Station. The Glenn staff consists of over 3200 civil service employees and support service contractor personnel. Scientists and engineers comprise more than half of our workforce, with technical specialists, skilled workers, and an administrative staff supporting them. We aggressively strive for technical excellence through continuing education, increased diversity in our workforce, and continuous improvement in our management and business practices so that we can expand the boundaries of aeronautics, space, and aerospace technology. Glenn Research Center is a unique facility located in northeast Ohio. Situated on 350 acres of land adjacent to the Cleveland Hopkins International Airport, Glenn comprises more than 140 buildings, including 24 major facilities and over 500 specialized research and test facilities. Additional facilities are located at Plum Brook Station, which is about 50 miles west of Cleveland. Plum Brook Station has four large, major, world-class facilities for space research available for Government and industry programs. Knowledge is the end product of our activities. The R&T reports help make this knowledge fully available to potential users the aircraft engine industry, the space industry, the energy industry, the automotive industry, the aerospace industry, and others. It is organized so that a broad cross section of the community can readily use it. Each article begins with a short introductory paragraph that should prove valuable for the layperson. These articles summarize the progress made during the year in various technical areas and portray the technical and administrative support associated with Glenn s technology programs. We hope that this information is useful to all. If additional information is desired, readers are encouraged to contact the researchers identified at the end of each article and to visit Glenn on the World Wide Web at http://www.grc.nasa.gov.

Julian Earls↗

Envision Charlotte Project Final Report

The Envision Charlotte Project (EC Project), supported by partners at the Center for Climate and Energy Solutions, the University of North Carolina at Charlotte’s Center for Sustainably Integrated Buildings and Sites and the City of Charlotte, has successfully demonstrated that existing buildings can benefit from operations improvements and low-cost efficiency upgrades, and that behavioral change campaigns can be effectively designed for measurability, longevity and impact. Support from this grant gave Envision Charlotte and its partners the resources and flexibility to demonstrate a variety of approaches to improve coordination with stakeholders in the implementation of programs to reduce the consumption of energy, water and waste. The project team also gained insights into the motivations and abilities that influence stakeholder engagement in sustainability initiatives at multiple levels. Importantly, as this report describes, strong partnerships between nonprofits, industry partners and research institutions can produce tangible impacts and replicable results in building efficiency. Further, building operators working alongside student researchers can form productive relationships that can advance building energy management goals. Key Findings of the EC Project This project focused on advancing solutions to energy efficiency in U.S. commercial buildings. The Building Re-Tuning™ Training (BRT) developed by the U.S. DOE’s Pacific Northwest National Lab (PNNL), designed to detect energy savings opportunities and implement improvements with resources and online tools, provided the starting point for the curriculum developed by stakeholders in the EC Project. Although the project partners encountered some issues with data consistency, the overall project outcomes fell short of the energy savings stated in the original proposal, and the total participating building targets were lower than anticipated, important findings, outcomes and lessons learned were achieved. EC Project grantees observed that the PNNL BRT, as currently written, was not compatible with the skills of average frontline mechanical personnel in the Charlotte region where the grant program was performed. Frontline staff are not, typically, energy managers, engineers or building commissioning agents, but they can play a key role in building performance. As detailed in this report, the grantees therefore focused on changes to the BRT that improved the level of training and competency of the frontline workers in this region. Among the technical observations related to improving the BRT that were observed in the EC Project: centralized facilities management often has an impact on building performance; operators can be overly reliant on service contracts; individual behaviors matter, and technology cannot be viewed as a crutch; current Building Automation Systems (BAS) are often too complex to support building efficiency optimization, but BAS coupled with appropriate training can support better outcomes; the “perfectly optimized” building is not a near-term possibility, but better education, especially of executives and managers, on the role of behavioral intervention is a promising direction the building science community can and should pursue; a lack of standards and protocols, and competition between proprietary software from service contracts, remain challenges for this industry. These technical observations, in turn, informed the EC Project’s overall findings, which were: Accomplishing building efficiency is a process of education for all involved in the building design, construction and operation supply chain. Building operators, as a professional class, have an opportunity for further training and education that will lead to better on-the-job performance. An updated Building Re-Tuning™ Training curriculum, based on the findings of this report, could be an avenue for these operators’ professional development.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thermal Management and Reliability of Power Electronics and Electric Machines

Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil - by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, and in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines are presented.

30 DIRECT ENERGY CONVERSION↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Solar Heat and Power Co-Generation System. Final Report, CRADA No. TC02152.0

Final Report, CRADA No. TC02152.0. Date Technical Work Ended: October 28, 2013. This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Tassajara Technologies, Inc. (TTI), to develop, fabricate and demonstrate a Solar Heat and Power Co-generation System. The technical objectives of this CRADA were to engineer, design and build a prototype Solar Thermal Process Heat and Power Demonstration System that would be suitable for use at the Arc of Hilo food processing facility. This would be accomplished in two phases. The first phase would entail the building of a prototype at Tassajara facilities. Base design parameters, including the subsystem interactions that would produce reliable performance at the lowest cost per watt of energy generated with the desired balance of power and heat to meet the requirements of the designated food processing applications from Arc of Hilo, would be provided by LLNL. The data and design development would be integrated into the second phase engine prototype and solar thermal system that would be built and delivered, with interface requirements to the Miko Building. This project was originally designated as an eight (8) month project. However, it was ultimately extended by an additional thirty-five (35) months, for total project duration of forty-three (43) months.

14 SOLAR ENERGY↗

Development of a Solar Heat and Power Co-Generation System. Final CRADA Report

Final Report CRADA No. TC02152.0 Date Technical Work Ended: October 28, 2013. This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and Tassajara Technologies, Inc. (TTI), to develop, fabricate and demonstrate a Solar Heat and Power Co-generation System. The technical objectives of this CRADA were to engineer, design and build a prototype Solar Thermal Process Heat and Power Demonstration System that would be suitable for use at the Arc of Hilo food processing facility. This would be accomplished in two phases. The first phase would entail the building of a prototype at Tassajara facilities. Base design parameters, including the subsystem interactions that would produce reliable performance at the lowest cost per watt of energy generated with the desired balance of power and heat to meet the requirements of the designated food processing applications from Arc of Hilo, would be provided by LLNL. The data and design development would be integrated into the second phase engine prototype and solar thermal system that would be built and delivered, with interface requirements to the Miko Building.

14 SOLAR ENERGY↗

Exploration Studies Technical Report - Volume 3: Special Reports, Studies, and Indepth Systems Assessments

The NASA Office of Exploration has been tasked with defining and recommending alternatives for an early 1990's national decision on a focused program of human exploration of the solar system. The Mission Analysis and System Engineering (MASE) group, which is managed by the Exploration Studies Office at the Johnson Space Center, is responsible for coordinating the technical studies necessary for accomplishing such a task. This technical report describes the process that has been developed in a case study approach. The four case studies that were developed in FY88 include: 1. Human expedition to Phobos 2. Human expeditions to Mars 3. Lunar observatory 4. Lunar outpost to early Mars evolution The final outcome of this effort is a set of programmatic and technical conclusions and recommendations for the following year's work. Volume III is a collection of trade study results, indepth systems assessments, and workshop reports which describe aspects of FY 1988 analyses in more depth.

Interplanetary flight↗

Hot Springs and Geysers: Exploring Historical and Modern Impacts of Geothermal Energy Production on Associated Natural Surface Systems and Standardizing Management Practices

Surface thermal features, most notably hot springs and geysers are increasingly being recognized for their importance to ecosystems, indigenous cultures, and in some cases agriculture, recreation, and tourism. Geothermal project development poses a potential risk to these natural features but current regulatory requirements for assessing and managing these risks during exploration, permitting and monitoring are somewhat inconsistent and unpredictable across different geothermal fields. This has resulted in uncertainty and increases in exploration risk for geothermal energy developers that have led to costly project delays, cancellations, or hesitation to commit. Varying regulatory requirements may also influence public perception, fostering confusion, distrust and ultimately opposition to geothermal projects, further contributing to project delays or cancellations. At a time when there is an increasing urgency for reliable baseload clean energy, geothermal is a net-zero, renewable solution that additionally provides access to more equitable and environmentally just clean power. Continued integration of geothermal energy into the national energy roadmap can be facilitated through consistent and predictable permitting, providing regulators the framework they need, developers a clear path forward, and transparency that the public deserves. This project, currently in its beginning phases, seeks to address this important issue by providing a technical basis from which to build a preliminary protocol for assessing and managing potential impacts from new or existing geothermal energy projects to surface thermal features and their associated ecosystems. Development of this preliminary protocol will be informed by (1) a literature review of well-documented case studies in the western U.S. and New Zealand to understand the range of conditions that exemplify geothermal-surface thermal systems; (2) development of generic illustrative conceptual-numerical models to quantify, understand, and predict the first-order controls (e.g., pressure and permeability) on surface flows; and (3) additional independent and scientifically rigorous evaluations of geothermal-surface thermal system case studies from the Basin and Range Province that incorporate publicly available data as well as data provided by industry through data-sharing agreements. Learning from the successes of the process used to develop the Induced Seismicity Management Protocol (ISMP), we ultimately aim to use these initial efforts as a springboard for establishing a surface thermal feature management working group that will work collaboratively to finalize the protocol as well as co-create recommended best practices for implementation. We envision that the working group will primarily be composed of representatives from regulatory entities, government agencies, Tribes, academia, national laboratories, and industry, and will include early and regular engagement with community organizations and environmental groups. This will help ensure broad acceptance and implementation of the protocol, which will facilitate a more consistent, predictable, and standardized regulatory process, and help to ensure that geothermal energy continues to provide a reliable source of clean energy, and a pathway to achieving greater energy equity in the U.S.

Best Practices↗

Electrochemical oxygen pumps. Final CRADA report.

All tasks of the Work Plan of ISTC Project 2277p have been completed, thus: (1) techniques of chemical synthesis were developed for more than ten recipes of electrolyte based on cerium oxide doped with 20 mole% of gadolinium (CeGd)O{sub 2}, doped by more than 10 oxide systems including 6 recipes in addition to the Work Plan; (2) electric conductivity and mechanical strength of CeGd specimens with additions of oxide systems were performed, two candidate materials for the electrolyte of electrochemical oxygen pump (pure CeGd and CeGd doped by 0.2 wt% of a transition metal) were chosen; (3) extended studies of mechanical strength of candidate material specimens were performed at room temperature and at 400, 600, 800 C; (4) fixtures for determination of mechanical strength of tubes by external pressure above 40 atmospheres at temperature up to 700 C were developed and fabricated; and (5) technology of slip casting of tubes from pure (Ce,Gd)O{sub 2} and of (Ce,Gd)O{sub 2} doped by 0.2 wt% of a transition metal, withstanding external pressure of minimum 40 atmospheres at temperature up to 700 C was developed, a batch of tubes was sent for testing to Argonne National Laboratory; (6) technology of making nanopowder from pure (Ce,Gd)O{sub 2} was developed based on chemical synthesis and laser ablation techniques, a batch of nanopowder with the weight 1 kg was sent for testing to Argonne National Laboratory; (7) a business plan for establishing a company for making powders of materials for electrochemical oxygen pump was developed; and (8) major results obtained within the Project were reported at international conferences and published in the Russian journal Electrochemistry. In accordance with the Work Plan a business trip of the following project participants was scheduled for April 22-29, 2006, to Tonawanda, NY, USA: Manager Victor Borisov; Leader of technology development Gennady Studenikin; Leader of business planning Elena Zadorozhnaya; Leader of production Vasily Lepalovsky; and Translator Vladimir Litvinov. During this trip project participants were to discuss with the project Technical Monitor J.D. Carter and representative of Praxair Inc. J. Chen the results of project activities (prospects of transition metal-doped material application in oxygen pumps), as well as the prospects of cooperation with Praxair at the meeting with the company management in the following fields: (1) Deposition of thin films of oxide materials of complex composition on support by magnetron and ion sputtering, research of coatings properties; (2) Development of block-type structure technology (made of porous and dense ceramics) for oxygen pump. The block-type structure is promising because when the size of electrolyte block is 2 x 2 inches and assembly height is 10 inches (5 blocks connected together) the area of active surface is ca. 290 square inches (in case of 8 slots), that roughly corresponds to one tube with diameter 1 inch and height 100 inches. So performance of the system made of such blocks may be by a factor of two or three higher than that of tube-based system. However one month before the visit, J. Chen notified us of internal changes at Praxair and the cancellation of the visit to Tonawanda, NY. During consultations with the project Technical Monitor J.D. Carter and Senior Project Manager A. Taylor a decision was made to extend the project term by 2 quarters to prepare proposals for follow-on activities during this extension (development of block-type structures made of dense and porous oxide ceramics for electrochemical oxygen pumps) using the funds that were not used for the trip to the US.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cluster systems integration

The cluster systems integration program of Skylab is reviewed with attention to its hardware, management interfaces, mission requirements control, and baseline planning documentation. The responsibilities of the interdiscipline and intercenter technical working groups and panels participating in the program are discussed. The five phases of the program are identified as Wet and Dry Workshop studies and Skylab Program Specification; requirements synthesis and the start of formal configuration management; compatibility assessment and control; design verification; and prelaunch and mission support operations. It is indicated that the cluster systems integration is a vital key element in the development and implementation of the Skylab space station.

Hagood, C. C.↗

Effective dialogue: Enhanced public engagement as a legitimising tool for municipal waste management decision-making

Highlights: • A review of public engagement in waste management decision-making is undertaken. • Enhanced public engagement is explored as a means to legitimise waste decisions. • Analytical–deliberative processes are explored as a tool for effective dialogue. • Considerations for integrating public values with technical analysis are outlined. • Insights into the design of appropriate public engagement processes are provided. - Abstract: The complexity of municipal waste management decision-making has increased in recent years, accompanied by growing scrutiny from stakeholders, including local communities. This complexity reflects a socio-technical framing of the risks and social impacts associated with selecting technologies and sites for waste treatment and disposal facilities. Consequently there is growing pressure on local authorities for stakeholders (including communities) to be given an early opportunity to shape local waste policy in order to encourage swift planning, development and acceptance of the technologies needed to meet statutory targets to divert waste from landfill. This paper presents findings from a research project that explored the use of analytical–deliberative processes as a legitimising tool for waste management decision-making. Adopting a mixed methods approach, the study revealed that communicating the practical benefits of more inclusive forms of engagement is proving difficult even though planning and policy delays are hindering development and implementation of waste management infrastructure. Adopting analytical–deliberative processes at a more strategic level will require local authorities and practitioners to demonstrate how expert-citizen deliberations may foster progress in resolving controversial issues, through change in individuals, communities and institutions. The findings suggest that a significant shift in culture will be necessary for local authorities to realise the potential of more inclusive decision processes. This calls for political actors and civic society to collaborate in institutionalising public involvement in both strategic and local planning structures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sulfur Iodine Process Summary for the Hydrogen Technology Down-Selection: Process Performance Package

This document describes the details of implementing a Sulfur-Iodine (S-I) hydrogen production plant to deploy with the Next General Nuclear Power Plant (NGNP). Technical requirements and specifications are included, and a conceptual plant design is presented. The following areas of interest are outlined in particular as a baseline for the various technology comparisons: (1) Performance Criteria - (a) Quantity of hydrogen produced, (b) Purity of hydrogen produced, (c) Flexibility to serve various applications, (d) Waste management; (2) Economic Considerations - (a) Cost of hydrogen, (b) Development costs; and (3) Risk - (a) Technical maturity of the S-I process, (b) Development risk, (c) Scale up options.

08 HYDROGEN↗

International Training to Promote Successful Environmental Remediation Projects - 18636

The International Atomic Energy Agency (IAEA) supports the efforts of its Member States to manage their nuclear and radiological liabilities, including radioactive waste management, decommissioning of facilities, and remediation of contaminated sites. As part of a project addressing Constraints in Decommissioning and Environmental Remediation (the CIDER Project), the IAEA is developing initiatives to further support capacity development specifically to promote implementation of safe, appropriate, and cost-effective environmental remediation (ER) projects. The IAEA sponsors numerous initiatives to provide its Member States training on important topics related to ER. It has become clear in recent years, however, that the existing training should be augmented with more in-depth training to provide for the development of the critical expertise needed to address significant ER challenges. ER projects typically are very complex, requiring the integration of numerous scientific and engineering disciplines, along with effective project planning and management. There are many examples of ER projects where considerable work has been completed, qualified technical staff are available, and adequate funding has been obtained, yet actual progress towards a final solution has been limited. In such cases, it appears that a key barrier is the lack of capacity to develop strategies, make fully informed decisions, plan for and manage activities, and implement successful ER actions. In light of the above, the IAEA has placed a priority on capacity development across the broad spectrum of ER project implementation. Efforts are underway to develop a new training program to develop capacity at the institutional and individual levels to equip course graduates to effectively integrate all areas of expertise in the planning and execution of ER projects. The target audience includes decision-makers; project managers, planners, and implementers; and academics. The core capabilities to be developed via this program include knowledge and skills related to: (1) radiation issues and radionuclide behavior; (2) health and safety protection principles and requirements; (3) identification, evaluation, and selection of ER technologies and approaches; (4) ongoing, constructive dialogue with stakeholders; (5) project planning, management, and communication; (6) cost estimation and funding development; and (7) implementation of appropriate site monitoring activities. The IAEA is collaborating with multiple organizations to develop and implement this training program, to leverage existing training programs and materials, and to coordinate on the development of sustainable training solutions. This paper will present the status of this initiative and work accomplished thus far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation Report for the NDMAS AGR-5/6/7 TRISO Irradiation Monitoring System

The Nuclear Data Management and Analysis System (NDMAS) manages irradiation experiment data collected under the Advanced Gas Reactor (AGR) Fuel Development and Qualification program within the Advanced Reactor Technologies Technology Development Office. The AGR-5/6/7 irradiation experiment combines the fifth, sixth, and seventh planned irradiation campaigns of the U.S. Department of Energy AGR Fuel Development and Qualification Program. These combined irradiation tests will consist of fuel qualification tests (AGR-5/6) and a margin test (AGR-7) for the industrially produced uranium oxycarbide (UCO) tristructural isotropic (TRISO) coated particle fuel developed by the AGR program. The objective of the AGR-5/6/7 irradiation experiment is to establish the performance of UCO TRISO fuel fabricated using engineering-scale equipment in a production environment under and beyond normal operating conditions (PNL-5245). Experimental irradiation measurements for this experiment (i.e., thermocouple temperature, gas flow rate, fission product release rate, gross gamma count, and Advanced Test Reactor (ATR) operational parameters) are captured automatically to the NDMAS database. Data derived from numerical simulation or other mathematical analyses (i.e., fast fluence, burnup, temperature, and fission product release to birth ratio) are captured to the database when provided by the researchers. The NDMAS database is a relational database accessed via structured query language and managed with Microsoft SQL Server. While select users can directly access the database, that is not the most convenient way to interact with the data. The NDMAS team constructs numerous tables that combine related datasets, and delivers those data to researchers via graphs and spreadsheets on a Microsoft SharePoint-based website. For the AGR-5/6/7 experimental data, a new subsite has been developed, along with a set of web pages. These pages will be used by members of fuel irradiation team for monitoring irradiation conditions according to specification (SPC-1749), by the physics modelers to access necessary model inputs, and by the nuclear engineering community to view and access data such as fuel temperatures, fission product release from capsules, and ATR operational parameters. The deliverable represented in this document is a SharePoint website containing tables of the AGR-5/6/7 measured and calculated data, graphs displaying the data, and links to source documents and references.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An IAEA Initiative to Provide Effective Stakeholder Support Services for International Decommissioning and Environmental Remediation - 17341

The International Atomic Energy Agency (IAEA) has initiated a collaborative effort to promote stakeholder support activities through a stakeholder engagement advisory program (SEAP) as part of Phase II of the Constraints to Implementing Decommissioning and Environmental Remediation (CIDER II) program. CIDER II is a collaborative project involving a broad range of Member States, large and small, with ongoing and/or planned decommissioning and environmental remediation (D and ER) programs. The intent of this sub-group of CIDER II is to facilitate better sharing of information and knowledge in areas of stakeholder communication, engagement and participation, and a framework for directly using stakeholder input in the decision making process. The goal is to support trust building in D and ER decisions for radioactive contamination and facilities. A main premise of the CIDER II program is that stakeholder acceptance is necessary for successful D and ER decisions to be made. This paper introduces some of the major challenges to implementing such a broad scale of support for stakeholder engagement, and approaches to overcoming those challenges. Major challenges include the need to address D and ER decision making in different countries with their different languages, cultures, religions, management structures, and politics. For example, in some cases it might be important strategically to first garner support from upper levels of social, management or political hierarchies, including for example, approaching community leaders, and allowing those leaders to directly address their community. Other sites might have more success, for example, if stakeholder interaction starts with the community members. A specific project strategy also probably depends on who makes the request for stakeholder support services. Once the CIDER II SEAP gains traction, there will be a need to prioritize requests from Member States for assistance in connection with specific D and ER projects. A prioritization tool will be developed based on stakeholder engaged structured decision making (SDM). The projects in which support will initially be focused will span a wide range of D and ER problems, types of stakeholder groups, and technical issues such as potential risk to human health and the environment. A database management system will also be designed to capture information from the different proposed projects and will be expanded to house implemented projects for future reference. The case study database will be an integral part of a web-based system that also contains technical approaches for stakeholder involvement depending on the situational environment. A community of practice will be formed that will involve technical experts in stakeholder engagement and structured decision making, and informed representatives from Member States. This will address the need for SEAP to build capacity and provide education for solving D and ER problems. The web-based system will include technical tools for use by the projects, such as: identification of stakeholder groups; social network analysis (how stakeholders are connected); case study forms; best practice forms; information sheets; and 4tools that will directly support optimization of stakeholder guided solutions to D and ER problems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗