Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Quantification of margins and uncertainty for risk-informed decision analysis.

QMU stands for 'Quantification of Margins and Uncertainties'. QMU is a basic framework for consistency in integrating simulation, data, and/or subject matter expertise to provide input into a risk-informed decision-making process. QMU is being applied to a wide range of NNSA stockpile issues, from performance to safety. The implementation of QMU varies with lab and application focus. The Advanced Simulation and Computing (ASC) Program develops validated computational simulation tools to be applied in the context of QMU. QMU provides input into a risk-informed decision making process. The completeness aspect of QMU can benefit from the structured methodology and discipline of quantitative risk assessment (QRA)/probabilistic risk assessment (PRA). In characterizing uncertainties it is important to pay attention to the distinction between those arising from incomplete knowledge ('epistemic' or systematic), and those arising from device-to-device variation ('aleatory' or random). The national security labs should investigate the utility of a probability of frequency (PoF) approach in presenting uncertainties in the stockpile. A QMU methodology is connected if the interactions between failure modes are included. The design labs should continue to focus attention on quantifying uncertainties that arise from epistemic uncertainties such as poorly-modeled phenomena, numerical errors, coding errors, and systematic uncertainties in experiment. The NNSA and design labs should ensure that the certification plan for any RRW is supported by strong, timely peer review and by an ongoing, transparent QMU-based documentation and analysis in order to permit a confidence level necessary for eventual certification.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Risk assessment as a framework for decisions.

The risk assessment approach has been applied to support numerous radioactive waste management activities over the last 30 years. A risk assessment methodology provides a solid and readily adaptable framework for evaluating the risks of CO2 sequestration in geologic formations to prioritize research, data collection, and monitoring schemes. This paper reviews the tasks of a risk assessment, and provides a few examples related to each task. This paper then describes an application of sensitivity analysis to identify important parameters to reduce the uncertainty in the performance of a geologic repository for radioactive waste repository, which because of importance of the geologic barrier, is similar to CO2 sequestration. The paper ends with a simple stochastic analysis of idealized CO2 sequestration site with a leaking abandoned well and a set of monitoring wells in an aquifer above the CO2 sequestration unit in order to evaluate the efficacy of monitoring wells to detect adverse leakage.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Simplified Probabilistic Risk Assessment Model for Seismic Initiating Event

ABSTRACT This paper discusses a simplified method to evaluate seismic risk using a methodology built on dividing the seismic intensity spectrum into multiple discrete bins. The seismic probabilistic risk assessment model uses Nuclear Regulatory Commission’s (NRC’s) full power Standardized Plant Analysis Risk (SPAR) model as the starting point for development. The seismic PRA models are integrated with their respective internal events at-power SPAR model. This is accomplished by combining the modified system fault trees from the full power SPAR model with seismic event tree logic. The peak ground acceleration is divided into five bins. The g-value for each bin is estimated using the geometric mean of lower and upper values of that particular bin and the associated frequency for each bin is estimated by taking the difference between upper and lower values of that bin. The component’s fragilities are calculated for each bin using the plant data, if available, or generic values of median peak ground acceleration and uncertainty values for the components. For human reliability analysis (HRA), the SPAR HRA (SPAR-H) method is used which requires the analysts to complete relatively straight forward worksheets that include the performance shaping factors (PSFs). The results are then used to estimate human error probabilities (HEPs) of interest. This work is expected to improve the NRC’s ability to include seismic hazards in risk assessments for operational events in support of the reactor oversight program (e.g., significance determination process).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment

Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

99 GENERAL AND MISCELLANEOUS↗

Controlling O&M Costs of Advanced SMRs using Prognostics and Enhanced Risk Monitoring

Advanced small modular reactors (AdvSMRs) can contribute to safe, sustainable, and carbon-neutral energy production. The economics of small reactors (including AdvSMRs) will be impacted by the reduced economy-of-scale savings when compared to traditional light water reactors. The most significant controllable element of the day-to-day costs involves operations and maintenance (O&M). Enhancing affordability of AdvSMRs through technologies that help control O&M costs will be critical to ensuring their practicality for wider deployment.A significant component of O&M costs is the management and mitigation of degradation of components due to their impact on planning maintenance activities and staffing levels. Technologies that help characterize real-time risk of failure of key components are important in this context. Given the possibility of frequently changing AdvSMR plant configurations, approaches are needed to integrate three elements – advanced plant configuration information, equipment condition information, and risk monitors – to provide a measure of risk that is customized for each AdvSMR unit and support real-time decisions on O&M. This article describes an overview of ongoing research into diagnostics/prognostics and enhanced predictive risk monitors (ERM) for this purpose.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Simulating Pelletization Strategies to Reduce the Biomass Supply Risk at America’s Biorefineries

Demand for cellulosic ethanol and other advanced biofuels has been on the rise, due in part to federal targets enacted in 2005 and extended in 2007. The industry faces major challenges in meeting these worthwhile and ambitious targets. The challenges are especially severe in the logistics of timely feedstock delivery to biorefineries. Logistical difficulties arise from seasonal production that forces the biomass to be stored in uncontrolled field-side environments. In this storage format physical difficulties arise; transportation is hindered by the low bulk density of baled biomass and the unprotected material can decay leading to unpredictable losses. Additionally, uncertain yields and contractual difficulties can exacerbate these challenges making biorefineries a high-risk venture. Investors’ risk could limit business entry and prevent America from reaching the targets. This paper explores pelletizer strategies to convert the lignocellulosic biomass into a denser form more suitable for storage. The densification of biomass would reduce supply risks, and the new system would outperform conventional biorefinery supply systems. Pelletizer strategies exhibit somewhat higher costs, but the reduction in risk is well worth the extra cost if America is to grow the advanced biofuels industry in a sustainable manner.

09 BIOMASS FUELS↗

Report on Internship Project: Risk-Informed Cost Reduction in Nuclear Power Plants

Several Nuclear Power Plants (NPPs) in USA are facing premature closures due to financial difficulties. A significant contributing factor in the NPP electricity generation cost is Operational and Maintenance (O&M) cost. This research aims to reduce O&M cost by developing a framework which creates flexibility in NPP maintenance program. This framework relies on FLEX portable equipment to reduce NPP risk and to substitute and/or backup fixed equipment in different NPP operation modes. Probabilistic Risk Assessment (PRA) methodology is used to quantify the change of plant risk to justify the framework's applicability. The framework enables plant managers to shift maintenance workload from refueling outage period into online maintenance programs. As a result, it is expected to increase NPP capacity factor while also reducing the risk of unexpected outage. These results are expected to increase NPP electricity generation revenue and decrease O&M costs while complying to existing nuclear safety regulations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Addressing Consequence within Operational Risk: An Approach for Understanding an Organization’s Unique Infrastructure Environment

The endeavor of tackling operational risk focused on consequences is challenging even for the most resourced entity but can be advanced though a simplified approach: identifying, binning, and prioritizing the infrastructure environment. While no two entities within a single element of the 16 critical infrastructure sectors are exactly alike when it comes to risk, there is a basic process to move toward a greater understanding of operational risk through becoming more informed about the infrastructure landscape in which the entity exists. The process starts with bringing internal and external stakeholders and subject matter experts together to analyze key areas such as Information Technology (IT) and Operational Technology (OT) components and points of convergence, analyzing internal and external cyber and physical dependencies, accounting for explosive growth in devices and wireless technology, and leveraging the contributions of people inside and outside the operational environment. Attaining a common understanding of the infrastructure landscape as part of addressing consequences within operational risk is not easy to do or resource light, but the process outlined provides the framework to further any entity’s efforts in this space.

99 GENERAL AND MISCELLANEOUS↗

Revisions to US EPA Superfund Risk and Dose Assessment Models and Guidance - 13403

The U.S. Environmental Protection Agency (EPA) Superfund program's six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet based calculators for risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical regional screening level calculator. A revised version of the 1999 guidance document that provides an overview for the Superfund risk assessment process at radioactively contaminated sites, 'Radiation Risk Assessment At CERCLA Sites: Q and A', is being completed that will reflect Superfund recommended guidance and other technical documents issued over the past 13 years. EPA is also issuing a series of fact sheets in the document 'Superfund Radiation Risk Assessment: A Community Tool-kit'. This presentation would go over those changes that are expected to be finished by this spring. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Monte Carlo simulation to quantify CIPS risk

Crud Induced Power Shift (CIPS), caused by the accumulation of boron compounds in corrosion product deposits on high power fuel assemblies, is an important operational issue for Pressurized Water Reactors (PWRs). The Boron-induced Offset Analysis (BOA) computer code has been developed by EPRI in collaboration with Westinghouse to help utility engineers avoid onset of CIPS. The code, used with an established procedure, predicts the maximum boron mass that will be accumulated in the upcoming cycle for a given core design and plant chemistry and operating program. The calculated boron mass above a given threshold predicts the risk of CIPS to the upcoming cycle. BOA has been successful in correctly predicting the risk for onset or lack of CIPS in many cycles. However, like most codes modeling complex physical phenomena, it is subject to uncertainties in several of the inputs used to describe these phenomena. The current BOA procedure results in a single 'best estimate' prediction, which has been judged to provide engineers with a practical way to assess CIPS risk. As such, however, there is a probability that the actual plant CIPS performance may be underestimated. This paper describes a method to assess the probability (with an associated confidence level) of no CIPS, mild to moderate CIPS, or severe CIPS using BOA for a given core design. This is accomplished through the use of a Monte Carlo simulation. The simulation is applied to several plant examples, and the results are evaluated in terms of the likelihood of mild or severe CIPS. A suggested set of criteria for decision making regarding CIPS risk is presented in the conclusion. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Using EPA's Risk Assessment Tools for Superfund When Addressing Removal Actions and Late-Phase Response to Terrorist Attacks - 18228

EPA's Office of Superfund Remediation and Technology Innovation (OSRTI) has three internet based calculators, or risk assessment models, for developing risk based Preliminary Remediation Goals (PRGs) for radioactively contaminated CERCLA sites. These PRG calculators are EPA's recommended methodology for developing risk-based concentrations for remedial actions for soil and water (PRG), inside buildings (BPRG), and outside hard surfaces (SPRG). EPA has three equivalent calculators for dose assessment, which are the Dose Compliance Concentration (DCC) calculator for soil and water, inside buildings (BDCC), and outside hard surfaces (SDCC). The three PRG calculators also include default PRG tables provided for each of the calculators showing concentrations corresponding to 1 x 10-6 when the calculators are run using all of their default parameters. This presentation will provide information on how users may employ these tools beyond their original intended uses in the remedial program, to develop risk based cleanup levels during the late-phase portion of an actual response after a Radiological Dispersal Device (RDD) or Improvised Nuclear Device (IND) terrorist attack or a major accident at a Nuclear Power Plant (NPP), or a simulation during an exercise of an RDD/IND/NPP event, they may want to run the calculator using more site-specific data. This presentation will provide information on how users may employ these tools beyond their original intended uses in the remedial program, and focus on some of the more conservative default parameters that are likely candidates for replacement by site-specific information. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Legacy Facility Risk Reduction - Challenges, Strategies, Partnerships, and Benefits Lawrence Livermore National Laboratory - 18463

As Lawrence Livermore National Laboratory (LLNL) carries out its national security missions, we strive to ensure our facility portfolio meets the latest technologies and addresses challenges presented by its aging infrastructure. Established in 1942 as a Naval Air Station, repurposed in 1952 by the Atomic Energy Commission (AEC), LLNL continues to host a robust National Nuclear Security Administration (NNSA) Research and Development (R and D) mission. As an aging site, many of its facilities have met their life cycle contribution. As process contaminated facilities are decommissioned, new challenges arise in their near-term stewardship and long-term disposition actions, presenting risk reduction opportunities. The challenge has been to determine approaches to steward such risks, stabilize, advocate for long-term mitigation, and take actions to eliminate risks. Encumbered within is the balance of priorities in supporting ongoing and emerging mission and those of past legacy activities. This paper will endeavor to highlight Challenges and Benefits presented by such a paradigm, where we identified Strategies and Partnerships working towards mutual Risk Reduction activities. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Panel Session 6: Interagency Community of Practice in Risk and Performance Assessments

This panel focused on the status of the Inter-agency Performance and Risk Assessment Community of Practice (P and RA COP). Representatives from the P and RA COP and subject matter experts discussed lessons learned and provide feedback on building the P and RA COP to support risk-informed environmental decision making. Each panelist provided a brief presentation followed by open discussion. Presentations proposed include: 1 - Applying Lessons Learned on Engineered Barrier Service Life to Performance Assessment (Craig Benson, University of Virginia - CRESP (USA)); 2 - Decision Analysis in Integrated Risk and Performance Assessment: Challenges (Paul Black, Neptune and Company, Inc. (USA)); 3 - Managing Uncertainty (Roger Seitz, IEI (USA)); 4 - U.S. EPA Superfund Program's Need for Model Comparison for Radioactive Contamination (Stuart Walker, Office of Remediation and Technology Innovation (OSRTI), US EPA (USA)); 5 - CRESP Activities Supporting Performance and Risk Assessments (Kevin Brown, Vanderbilt University - CRESP (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational performance risk assessment in support of a supervisory control system - 251

A supervisory control system is being developed for multiunit advanced small modular reactors to minimize human interventions during normal and abnormal operations. In the supervisory control system, control action decisions are made based on a probabilistic risk assessment that employs event trees and fault trees. Although traditional probabilistic risk assessment tools are implemented, their scope is extended to normal operations, and the application is reversed to assess the success of non-safety related systems and to enable continued operation of the plant. This extended probabilistic risk assessment approach is called operational performance risk assessment (OPRA). OPRA helps to identify available paths, combine control actions for maintaining plant conditions within operational limits, and to quantify the likelihood of success of these operational trajectories to optimize the selection of alternative actions without activating reactor protection system. In this paper, a case study of OPRA in a supervisory control system is demonstrated for the Advanced Liquid Metal Reactor (ALMR) Power Reactor Inherently Safe Module (PRISM) design, specifically the power conversion system. The scenario investigated involved a condition in which the feedwater control valve that was observed to be drifting to the closed position. Alternative plant configurations that would allow the plant to continue to operate at full or reduced power were identified using OPRA. Dynamic analyses were performed with a thermal-hydraulic model of the ALMR PRISM system using Modelica to evaluate the magnitude of safety margins. Successful recovery paths for the selected scenario were identified and quantified using the supervisory control system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High Performance-Multidisciplinary Simulation for Regional Scale Earthquake Hazard and Risk Assessments

Moderate-to-large magnitude earthquakes represent a significant risk around the world and a major issue across the Department of Energy (DOE) mission interests, ranging from DOE's one-of-a-kind mission critical facilities to national energy systems (nuclear power plants, electric/gas distribution systems, and renewable energy production facilities). As a result, for the DOE there is a strong motivation in promoting and developing a risk-informed and performance-based approach for both the assessment of existing facilities and the design of new structures. DOE National Labs have historically made multidisciplinary contributions to the solution of challenging seismic hazard and risk problems and have been at the forefront for the development of design standards for major facilities. The current approach for estimating the ground motion hazard for critical facilities is based upon a Probabilistic Seismic Hazard Analysis (PSHA), whereby measured ground motion data are collected and homogenized into a probabilistic framework to estimate the hazard for future events. However, recent studies have highlighted the site-specific nature of earthquakes and shown the limitations of a purely empirical approach. Moreover, the design of infrastructure systems has been moving toward a performance-based approach, in which specific performance goals are specified at different levels of excitation and for different limit states. Such an approach requires the availability of robust and reliable computational tools for the nonlinear dynamic analysis of complex structural systems. Ongoing research at Lawrence Berkeley National Laboratory (LBNL) and Lawrence Livermore National Laboratory (LLNL) aims at developing an advanced simulation environment at the exascale for a coupled assessment of earthquake hazard (ground motions) and earthquake risk (structural demands)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reducing Risk With ASHRAE Standard 241

ASHRAE Standard 241’s requirements can make indoor spaces more resilient to the spread of airborne infectious diseases. Buildings that comply with ASHRAE Standard 241-2023, Control of Infectious Aerosols,1 will have the capacity to respond during times of elevated risk with systems that provide the necessary equivalent clean airflow for infection control (VECAi). To reduce risk effectively, these systems need to operate properly. This column explores Standard 241’s requirements for operations and maintenance in high-risk times (infection risk management mode or IRMM) and the importance of creating a Building Readiness Plan.

ashrae standard 241, Operations and Maintenance, b↗

The RACER (risk analysis, communication, evaluation, and reduction) stakeholder environmental data transparency project for Los Alamos National Laboratory

The RACER (Risk Analysis, Communication, Evaluation, and Reduction) project was created in 2003, as an effort to enhance the Los Alamos National Laboratory's ability to effectively communicate the data and processes used to evaluate environmental risks to the public and the environment. The RACER project staff consists of members of Risk Assessment Corporation, Los Alamos National Laboratory (LANL), and the New Mexico Environment Department (NMED). RACER staff worked closely with members of the community, tribal governments, and others within NMED and LANL to create innovative tools and a process that could provide information to regulators, LANL and the community about the sources of public health risk and ecological impact from LAN L operations. The RACER Data Analysis Tool (DA T) provides the public with webbased access to environmental measurement data collected in and around the LANL site. Its purpose is to provide a 'transparent' view to the public of all data collected by LANL and NMED regarding the LANL site. The DAT is available to the public at 'www.racernm.com'.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extravehicular Activity on the Lunar Surface: Mapping Mitigation Risk Consequence for Crew Needing Assistance or Rescue

The lunar environment offers unique challenges for human health and safety over the course of performing Extravehicular Activities (EVAs) during early Artemis missions. Driver medical conditions leading to an injured EVA crewmember needing assistance or rescue were analyzed and correlated to established, defined consequence categories. Catastrophic Drivers were identified, and three mitigation strategies were analyzed to determine if there was a potential change in consequence with their application. Risk consequence across the mitigations were compared with each other and the original risk without mitigations. Mitigations were further evaluated in a broader context with prospective preventions to understand the design and risk trade space associated with an early Artemis EVA.

Risk↗