Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator decision support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

A complexity science-based framework for global joint operations analysis to support force projection: LDRD Final Report

The military is undergoing a significant transformation as it modernizes for the information age and adapts to address an emerging asymmetric threat beyond traditional cold war era adversaries. Techniques such as traditional large-scale, joint services war gaming analysis are no longer adequate to support program evaluation activities and mission planning analysis at the enterprise level because the operating environment is evolving too quickly. New analytical capabilities are necessary to address modernization of the Department of Defense (DoD) enterprise. This presents significant opportunity to Sandia in supporting the nation at this transformational enterprise scale. Although Sandia has significant experience with engineering system of systems (SoS) and Complex Adaptive System of Systems (CASoS), significant fundamental research is required to develop modeling, simulation and analysis capabilities at the enterprise scale. This report documents an enterprise modeling framework which will enable senior level decision makers to better understand their enterprise and required future investments.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Space Shuttle Probabilistic Risk Assessment (SPRA) Iteration 3.2

The Shuttle is a very reliable vehicle in comparison with other launch systems. Much of the risk posed by Shuttle operations is related to fundamental aspects of the spacecraft design and the environments in which it operates. It is unlikely that significant design improvements can be implemented to address these risks prior to the end of the Shuttle program. The model will continue to be used to identify possible emerging risk drivers and allow management to make risk-informed decisions on future missions. Potential uses of the SPRA in the future include: - Calculate risk impact of various mission contingencies (e.g. late inspection, crew rescue, etc.). - Assessing the risk impact of various trade studies (e.g. flow control valves). - Support risk analysis on mission specific events, such as in flight anomalies. - Serve as a guiding star and data source for future NASA programs.

Boyer, Roger L.↗

Effectiveness of Advanced Collaboration Tools on Crew Communication in Reduced Crew Operations

The present research examines operational performance and verbal communication in airline flight crews under reduced crew operations (RCO). Eighteen two-pilot crews flew six scenarios under three conditions; one condition involved current-day operations while two involved RCO. In RCO flights, the Captain initially operated the simulated aircraft alone but could request remote crewmember support as off-nominal events occurred and workload was expected to increase. In one of the two RCO conditions, crewmembers were provided with advanced prototype collaboration tools designed to alleviate difficulties in crew coordination. Crews successfully solved all challenging events without accident and analyses of operational performance did not reveal any differences among the three conditions. In RCO flights, crew communication increased when tools were available relative to flights in which they were not; specifically, there were more acknowledgements and decision-making communications. These results suggest the collaboration tools enable higher degrees of crewmember awareness andor coordination during distributed operations.

crew resource management↗

Single Drop Cytometry Onboard the International Space Station

Real-time lab analysis is needed to support clinical decision making and research on human missions to the Moon and Mars. Powerful laboratory instruments, such as flow cytometers, are generally too cumbersome for spaceflight. Here, we show that scant test samples can be measured in microgravity, by a trained astronaut, using a miniature cytometry-based analyzer, the rHEALTH ONE, modified specifically for spaceflight. The base device addresses critical spaceflight requirements including minimal resource utilization and alignment-free optics for surviving rocket launch. To fully enable reduced gravity operation onboard the space station, we incorporated bubble-free fluidics, electromagnetic shielding, and gravity-independent sample introduction. We show microvolume flow cytometry from 10 μL sample drops, with data from five simultaneous channels using 10 μs bin intervals during each sample run, yielding an average of 72 million raw data points in approximately 2 minutes. We demonstrate the device measures each test sample repeatably, including correct identification of a sample that degraded in transit to the International Space Station. This approach can be utilized to further our understanding of spaceflight biology and provide immediate, actionable diagnostic information for management of astronaut health without the need for Earth-dependent analysis.

Daniel J. Rea↗

Control Decision and Control Development of Hanford Tank Farms First Two ISA-84 Safety Instrumented Systems - 17370

Hanford's 242-A Evaporator has had the mission of reducing waste volume in the Hanford Tank Farms since the late 1970's. Until 2014, the Documented Safety Analysis for the 242-A facility considered protection and controls of the collocated worker (workers outside the facility) and the public. In 2010, Tank Farms Nuclear Safety engineers initiated a significant revision of the Documented Safety Analysis to implement DOE-STD-3009, Change Notice 3, which requires the protection of the facility worker in addition to the collocated worker and public. Through the use of an extensive process hazards analysis performed on the facility, it was concluded that it was essential to control conditions in the primary evaporation vessel (C-A-1) such that flammable gasses could not build up to the Lower Flammability Limit, and that another control was necessary to ensure that the C-A-1 vessel could not overflow. Early control decision meetings held during the development of the Documented Safety Analysis revision yielded no simple solution to the protection of workers from a flammable gas deflagration. Controls selected for the waste overflow accident were all mitigative in nature (i.e. the detection of a waste overflow after it already happened). Engineering could not replace the mitigative controls with preventive controls without attempting to credit some of the existing facility interlocks associated with the C-A-1 vessel operations. Software and hard-wired interlocks had been used at the facility to prevent overheating of the waste and overfilling of the C-A-1 vessel. These interlocks were considered useful to the prevention of the flammable gas deflagration and vessel overfilling accidents, but lacked the pedigree and reliability necessary to credit the interlocks as safety significant. It was at this stage of the Documented Safety Analysis control decision and control development that engineering became aware of the DOE's acceptance of the ISA-84 instrumented system standard. It became apparent that the ideal solution was not to attempt to credit existing interlock systems, but to develop a new system of 'safety interlocks' to the ISA-84 standard. A meeting was held with upper management of both engineering and operations to propose the use of safety instrumented systems at the 242-A facility. URS Corporation (now AECOM), who had recently supported the Savanah River site in developing ISA-84 controls, was consulted to support the development of two new instrumented systems for the 242-A facility. In addition to the use of the newly adopted ISA-84 standard, the failure modes and effect analysis process was implemented in a very effective manner to support the development of the new safety instrumented systems. Through a brand new methodology, and through a very dedicated and hard-working engineering, projects, and operations team, the new controls were designed, built, tested, and commissioned. At this time, five successful waste reduction campaigns have been performed at the facility with the new safety instrumented systems. During these waste processing campaigns, trips and spurious trips of the SIS have occurred - all of which acted properly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Reporting: Device Demonstration, Communication Protocols, and Codes and Standards

Energy reporting is the principle that all energy-using devices in buildings should be able to track their own energy use and report this to the local network. Energy reporting can provide building owners with easy access to highly granular energy use data. This report makes the case that energy reporting should become a free basic feature of all devices, and reports on a project intended to move us towards that goal. The project collected a set of demonstration devices with energy reporting features, including products that were modified by the project team or the manufacturer, or are already available for sale. To show these devices operating live at meetings and conferences, the team created a management system that queries the energy reporting devices for their data, stores the data, and displays it in compelling visualizations. The devices covered a wide range, including heating, ventilation, and air conditioning (thermostat and air purifier); lighting (individual bulb, task light, and auto-dimming overhead light); a vehicle charger; a water heater; electronics (notebook personal computer and universal serial bus charger); and three external meters (one integral with a dimming light switch). The demonstration uses a variety of communication protocols. The report reviews existing communication protocols that support energy reporting and describes how to use them with a proposed reference data model for energy reporting. It also assesses ways that energy codes and standards processes can be leveraged to drive energy reporting technology into the market. Energy reporting could ultimately save California on the order of 2.5 terawatt-hours per year and about $0.8 billion per year. Energy reporting is a highly practical technology with minimal (sometimes no) cost to consumers and manufacturers. This report discusses creation of the energy reporting devices themselves, analysis and recommendations for data models and protocols for energy reporting, and energy codes and standards implications of energy reporting technology. While energy reporting does not directly save energy, it provides information for better decision-making to save energy in changing equipment operation, maintenance, and replacement.

devices↗

Digital Architecture Planning Model

As part of the U.S. Department of Energy’s Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA can be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development, including the survey results and conclusions made about the key areas during the literature review, are described in this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Monitoring System for Storm Readiness and Recovery of Test Facilities: Integrated System Health Management (ISHM) Approach

Severe weather events are likely occurrences on the Mississippi Gulf Coast. It is important to rapidly diagnose and mitigate the effects of storms on Stennis Space Center's rocket engine test complex to avoid delays to critical test article programs, reduce costs, and maintain safety. An Integrated Systems Health Management (ISHM) approach and technologies are employed to integrate environmental (weather) monitoring, structural modeling, and the suite of available facility instrumentation to provide information for readiness before storms, rapid initial damage assessment to guide mitigation planning, and then support on-going assurance as repairs are effected and finally support recertification. The system is denominated Katrina Storm Monitoring System (KStorMS). Integrated Systems Health Management (ISHM) describes a comprehensive set of capabilities that provide insight into the behavior the health of a system. Knowing the status of a system allows decision makers to effectively plan and execute their mission. For example, early insight into component degradation and impending failures provides more time to develop work around strategies and more effectively plan for maintenance. Failures of system elements generally occur over time. Information extracted from sensor data, combined with system-wide knowledge bases and methods for information extraction and fusion, inference, and decision making, can be used to detect incipient failures. If failures do occur, it is critical to detect and isolate them, and suggest an appropriate course of action. ISHM enables determining the condition (health) of every element in a complex system-of-systems or SoS (detect anomalies, diagnose causes, predict future anomalies), and provide data, information, and knowledge (DIaK) to control systems for safe and effective operation. ISHM capability is achieved by using a wide range of technologies that enable anomaly detection, diagnostics, prognostics, and advise for control: (1) anomaly detection algorithms and strategies, (2) fusion of DIaK for anomaly detection (model-based, numerical, statistical, empirical, expert-based, qualitative, etc.), (3) diagnostics/prognostics strategies and methods, (4) user interface, (5) advanced control strategies, (6) integration architectures/frameworks, (7) embedding of intelligence. Many of these technologies are mature, and they are being used in the KStorMS. The paper will describe the design, implementation, and operation of the KStorMS; and discuss further evolution to support other needs such as condition-based maintenance (CBM).

Figueroa, Fernando↗

Developing an Operational Capabilities Index of the Emergency Services Sector

In order to enhance the resilience of the Nation and its ability to protect itself in the face of natural and human-caused hazards, the ability of the critical infrastructure (CI) system to withstand specific threats and return to normal operations after degradation must be determined. To fully analyze the resilience of a region and the CI that resides within it, both the actual resilience of the individual CI and the capability of the Emergency Services Sector (ESS) to protect against and respond to potential hazards need to be considered. Thus, a regional resilience approach requires the comprehensive consideration of all parts of the CI system as well as the characterization of emergency services. This characterization must generate reproducible results that can support decision making with regard to risk management, disaster response, business continuity, and community planning and management. To address these issues, Argonne National Laboratory, in collaboration with the U.S. Department of Homeland Security (DHS) Sector Specific Agency - Executive Management Office, developed a comprehensive methodology to create an Emergency Services Sector Capabilities Index (ESSCI). The ESSCI is a performance metric that ranges from 0 (low level of capabilities) to 100 (high). Because an emergency services program has a high ESSCI, however, does not mean that a specific event would not be able to affect a region or cause severe consequences. And because a program has a low ESSCI does not mean that a disruptive event would automatically lead to serious consequences in a region. Moreover, a score of 100 on the ESSCI is not the level of capability expected of emergency services programs; rather, it represents an optimal program that would rarely be observed. The ESSCI characterizes the state of preparedness of a jurisdiction in terms of emergency and risk management. Perhaps the index's primary benefit is that it can systematically capture, at a given point in time, the capabilities of a jurisdiction to protect itself from, mitigate, respond to, and recover from a potential incident. On the basis of this metric, an interactive tool - the ESSCI Dashboard - can identify scenarios for enhancement that can be implemented, and it can identify the repercussions of these scenarios on the jurisdiction. It can assess the capabilities of law enforcement, fire fighting, search and rescue, emergency medical services, hazardous materials response, dispatch/911, and emergency management services in a given jurisdiction and it can help guide those who need to prioritize what limited resources should be used to improve these capabilities. Furthermore, this tool can be used to compare the level of capabilities of various jurisdictions that have similar socioeconomic characteristics. It can thus help DHS define how it can support risk reduction and community preparedness at a national level. This tool aligns directly with Presidential Policy Directive 8 by giving a jurisdiction a metric of its ESS's capabilities and by promoting an interactive approach for defining options to improve preparedness and to effectively respond to a disruptive event. It can be used in combination with other CI performance metrics developed at Argonne National Laboratory, such as the vulnerability index and the resilience index for assessing regional resilience.

99 GENERAL AND MISCELLANEOUS↗

LANL Activities on Mechanistic Approach to Analyzing and Improving Unconventional Hydrocarbon Production

Hydrocarbon production from shale reservoirs is inherently inefficient and challenging since these are low permeability plays. In addition, there is a limited understanding of the fundamentals and the controlling mechanisms, further complicating how to optimize these plays. Herein, we summarize our experimental and computational efforts fully and partially supported by the fundamental shale portfolio to reveal unconventional shale fundamentals and devise development strategies to enhance extraction efficiency with a minimal environmental footprint. Integrating these fundamentals with machine learning, we outline a pathway to improve the predictive power of our models, which enhances the forecast quality of production, thereby improving the economics of operations in unconventional reservoirs. For instance, we have developed science informed workflows and platforms for optimizing pressure-drawdown at a site, which allow operators to make reservoir-management decisions that optimize recovery in consideration of future production. Recently, our work relies on the hybridization of physics-based prediction and machine learning, whereby accurate synthetic data (combined with available site data) can enable the application of machine learning methods for rapid forecasting and optimization. Consequently, the workflow and platform are readily extendable to operations at other sites, plays, and basins.

04 OIL SHALES AND TAR SANDS↗

An Application of a Modified Beta Factor Method for the Analysis of Software Common Cause Failures

This paper presents an approach for modeling software common cause failures (CCFs) within digital instrumentation and control (I&C) systems. CCFs consist of a concurrent failure between two or more components due to a shared failure cause and coupling mechanism. This work emphasizes the importance of identifying software-centric attributes related to the coupling mechanisms necessary for simultaneous failures of redundant software components. The groups of components that share coupling mechanisms are called common cause component groups (CCCGs). Most CCF models rely on operational data as the basis for establishing CCCG parameters and predicting CCFs. This work is motivated by two primary concerns: (1) a lack of operational and CCF data for estimating software CCF model parameters; and (2) the need to model single components as part of multiple CCCGs simultaneously. A hybrid approach was developed to account for these concerns by leveraging existing techniques: a modified beta factor model allows single components to be placed within multiple CCCGs, while a second technique provides software-specific model parameters for each CCCG. This hybrid approach provides a means to overcome the limitations of conventional methods while offering support for design decisions under the limited data scenario.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Financial Planning as a Tool for Efficient and Timely Decommissioning of Nuclear Research Facilities

It is generally recognized in the technical and economical literature that reliable cost evaluations with adequate estimates also of the errors and uncertainties involved are necessary in order for rational and appropriate management decisions to be made on any major plant investment. Such estimates are required for the selection of technologies to be applied and for selection to be made between alternative technologies and designs as well as for the overall financing issues including the one of whether to go ahead with the project. Inadequacies in the cost calculations typically lead to suboptimal decisions and ultimately substantial overruns and/or needs for retrofits. Actually, a very strict discipline has to be applied with adaptation of the approach used with regard to the stage of the planning. Deviations from the expected tend to raise the estimated cost much more frequently than they lower it. The same rationale applies to planning and cost calculations for decommissioning of nuclear research facilities. There are, however, many reasons why such estimations may be very treacherous to carry out. This will be dealt with in the following. The knowledge base underlying the present paper has been developed and accumulated as a result of the research that the Swedish Nuclear Power Inspectorate (SKI) has carried out in support of its regulatory oversight over the Swedish system of finance. The findings are, however, equally applicable and appropriate for implementers in their planning, decision, monitoring and evaluation activities. In the nineteen fifties and sixties, Sweden had a comprehensive program for utilization of nuclear power including uranium mining, fuel fabrication, reprocessing and domestically developed heavy water reactors. Examples of facilities are presented in Figures 1-5. Eventually, the development work lead to the present nuclear program with ten modern light water reactors in operation at present. According to Swedish law, those who benefit from the use of these plants must pay a fee which is accumulated in a fund so that all future costs for decommissioning and waste management can be covered. Each year, estimates on all future costs are submitted to the SKI for review. The Government then decides on the size of the fee, based on the results of the review. In conclusion: it has been concluded in the SKI work - in spite of the difficulties pointed out above - that cost calculations with the precision needed for a system of finance can be achieved even at early stages provided that the various features of the task are adequately dealt with.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Rescue of Unique Liquid IP-2 Portable Tanks at Savannah River Site – 25078

Westinghouse Savannah River Company, the SRS Management and Operations Contractor at the time, procured six large IP-2 portable tanks capable of transporting liquids in 2003 to support the layup of the F Canyon at SRS. F Canyon was one of two full-scale hardened radiochemical separations facilities built at SRS in the 1950s as part of the initial construction of the Site. F Canyon and H Canyon provided actinide separations capabilities for SRS through the end of the Cold War. Following the end of the Cold War era, the decision was eventually made that only one of these radiochemical separations facilities at SRS would still be needed moving forward. As H Canyon was considered better suited for ongoing SRS missions, F Canyon was placed into a layup state in the first decade of the 21st Century, with F Area deactivation completing in 2006. This process resulted in the creation of excess, radioactively contaminated solutions, which required disposition. These solutions included contaminated organic solutions as well as DU-bearing aqueous solutions. The six portable tanks were procured to support the transportation of these solutions.

Fee, Nathaniel C. [Savannah River Nuclear Solution↗

Evaluation of Remediation Technologies for Iodine-129: FY18 Bench Scale Results

At the U.S. Department of Energy’s (DOE’s) Hanford Site, located in southeastern Washington State, 129 I was produced as a byproduct of nuclear fission in the site’s nine Pu production reactors. Currently, there are large dilute 129 I groundwater plumes at Hanford, including a groundwater plume in the 200-UP-1 operable unit (OU) located within the Central Plateau. The interim Record of Decision (ROD) for the 200-UP-1 OU requires that DOE evaluate potential treatment options for I-129 before a final ROD is issued. A remedy evaluation plan was subsequently published and identified the approach for this effort. The laboratory evaluation reported herein is part of the remedy evaluation. This report builds from information gathered in previous literature reviews of potential remedy technologies and provides laboratory testing results for promising candidates in support of determining which candidates warrant additional evaluation through treatability testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Complex Decision-Making Applications for the NASA Space Launch System

The Space Shuttle program is ending and elements of the Constellation Program are either being cancelled or transitioned to new NASA exploration endeavors. The National Aeronautics and Space Administration (NASA) has worked diligently to select an optimum configuration for the Space Launch System (SLS), a heavy lift vehicle that will provide the foundation for future beyond low earth orbit (LEO) large-scale missions for the next several decades. Thus, multiple questions must be addressed: Which heavy lift vehicle will best allow the agency to achieve mission objectives in the most affordable and reliable manner? Which heavy lift vehicle will allow for a sufficiently flexible exploration campaign of the solar system? Which heavy lift vehicle configuration will allow for minimizing risk in design, test, build and operations? Which heavy lift vehicle configuration will be sustainable in changing political environments? Seeking to address these questions drove the development of an SLS decision-making framework. From Fall 2010 until Spring 2011, this framework was formulated, tested, fully documented, and applied to multiple SLS vehicle concepts at NASA from previous exploration architecture studies. This was a multistep process that involved performing figure of merit (FOM)-based assessments, creating Pass/Fail gates based on draft threshold requirements, performing a margin-based assessment with supporting statistical analyses, and performing sensitivity analysis on each. This paper discusses the various methods of this process that allowed for competing concepts to be compared across a variety of launch vehicle metrics. The end result was the identification of SLS launch vehicle candidates that could successfully meet the threshold requirements in support of the SLS Mission Concept Review (MCR) milestone.

Lyles, Garry↗

Successful Demolition of Historic Cape Canaveral Air Force Station Launch Facilities: Managing the Process to Maximize Recycle Value to Fund Demolition

This paper will present the history of the Atlas 36 and Titan 40 Space Launch Complexes (SLC), the facility assessment process, demolition planning, recycle methodology, and actual facility demolition that resulted in a 40% reduction in baseline cost. These two SLC launched hundreds of payloads into space from Cape Canaveral Air Force Station (AFS), Florida. The Atlas-Centaur family of rockets could lift small- to medium-size satellites designed for communications, weather, or military use, placing them with near pinpoint accuracy into their intended orbits. The larger Titan family was relied upon for heavier lifting needs, including launching military satellites as well as interplanetary probes. But despite their efficiency and cost-effectiveness, the Titan rockets, as well as earlier generation Atlas models, were retired in 2005. Concerns about potential environmental health hazards from PCBs and lead-based paint chipping off the facilities also contributed to the Air Force's decision in 2005 to dismantle and demolish the Atlas and Titan missile-launching systems. Lockheed Martin secured the complex following the final launch, removed equipment and turned over the site to the Air Force for decommissioning and demolition (D and D). AMEC was retained by the Air Force to perform demolition planning and facility D and D in 2004. AMEC began with a review of historical information, interviews with past operations personnel, and 100% facility assessment of over 100 structures. There where numerous support buildings that due to their age contained asbestos containing material (ACM), PCB-impacted material, and universal material that had to be identified and removed prior to demolition. Environmental testing had revealed that the 36B mobile support tower (MST) exceeded the TSCA standard for polychlorinated biphenyls (PCB) paint (<50 ppm), as did the high bay sections of the Titan Vertical Integration Building (VIB). Thus, while most of the steel structures could be completely recycled, about one-third of 36B MST and the affected areas of the VIB were to be consigned to an on-site regulated waste landfill. In all, it is estimated that approximately 10,000,000 kg (11,000 tons) of PCB-coated steel will be land-filled and 23,000,000 kg (25,000 tons) will be recycled. The recycling of the steel and other materials made it possible to do additional demolition by using these funds. Therefore, finding ways to maximize the recycle value of materials became a key factor in the pre-demolition characterization and implementation strategy. This paper will present the following: - Critical elements in demolition planning working at an active launch facility; - Characterization and strategy to maximize steel recycle; - Waste disposition strategy to maximize recycle/reuse and minimize disposal; - Recycle options available at DOD installations that allow for addition funds for demolition; - Innovation in demolition methodologies for large structures - explosive demolition and large-scale dismantlement; - H and S aspects of explosive demolition and large scale dismantlement. In conclusion: The Cape Canaveral AFS Demolition Program has been a great success due to the integration of multiple operations and contractors working together to determine the most cost-effective demolition methods. It is estimated that by extensive pre-planning and working with CCAFS representatives, as well as maximizing the recycle credits of various material, primarily steel, that the government will be able to complete what was base-lined to be a $30 M demolition program for < $20 M. Other factors included a competitive subcontractor environment where they were encouraged with incentives to maximize recycle/reuse of material and creative demolition solutions. Also, by overlapping multiple demolition tasks at multiple facilities allowed for a reduction in field oversight. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is organized into the following five major areas: 1) Consent-Based Siting, 2) IWM Facilities and Equipment Concepts and Development, 3) Transportation Capability Analysis and Support, 4) Information Technology Solutions and Support, and 5) System Integration Analysis and Support. This paper discusses the activities ongoing in the IWMP System Integration Analysis and Support area. Two main areas of research in system integration are data and tools development, as well as system analysis assessments. One of the tools being developed in the system integration area is the Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS) tool. It is being developed as a foundational resource for DOE-NE to manage SNF data, along with several compatible analysis tools for time-dependent characterization of SNF and related systems. UNF-ST&DARDS has the unparalleled ability to track SNF through the entire back end of the fuel cycle—from the time the fuel is discharged from a reactor through its disposal in a geological repository. UNF ST&DARDS interfaces with the SCALE code system for nuclear analysis and COBRA-SFS for thermal analysis. Another main tool being developed is the Next Generation System Analysis Model (NGSAM). NGSAM is an agent-based simulation software tool expressly designed to be capable of modeling the waste management system. NGSAM has been developed to enable informed decision-making by providing the capability of analyzing various potential system options for the management of SNF and HLW. Using NGSAM, system architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analysis assessments may investigate the implications of various strategies such as different acceptance rates, acceptance queues, facility capacities and options, standardized canisters, and different assumed system operation start dates. Recently, some system analysis effort has begun to look at how the waste management system might operate for advanced reactor fuel cycles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗