Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load balancing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,486 records · Page 83

When do different scenarios of projected electricity demand start to meaningfully diverge?

Resource adequacy studies look at balancing electricity supply and demand on 10- to 15-year time horizons while asset investment planning typically evaluates returns on 20- to 40-year time horizons. Projections of electricity demand are factored into the decision-making in both cases. Climate, energy policy, and socioeconomic changes are key uncertainties known to influence electricity demands, but their relative importance for demands over the next 10-40 years is unclear. The power sector would benefit from a better understanding of the need to characterize these uncertainties for resource adequacy and investment planning. In this study, we quantify when projected United States (U.S.) electricity demands start to meaningfully diverge in response to a range of climate, energy policy, and socioeconomic drivers. Here we use a wide yet plausible range of 21st century scenarios for the U.S. The projections span two population/economic growth scenarios (Shared Socioeconomic Pathways 3 and 5) and two climate/energy policy scenarios, one including climate mitigation policies and one without (Representative Concentration Pathways 4.5 and 8.5). Each climate/energy policy scenario has two warming levels to reflect a range of climate model uncertainty. We show that the socioeconomic scenario matters almost immediately – within the next 10 years, the climate/policy scenario matters within 25-30 years, and the climate model uncertainty matters only after 50+ years. This work can inform the power sector working to integrate climate change uncertainties into their decision-making.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Systems Analysis of Biomass and Coal Co-firing Power Plants with Deep Carbon Capture Toward Net-zero Emissions

Achieving a net-zero emission economy in the United States requires integrating diverse low-carbon and negative-emission technologies into the existing fossil fuel-dominant power fleet. Potential technologies from the low-carbon portfolio include renewable power, fossil power with carbon capture and storage (CCS), bioenergy with CCS (BECCS), and direct air capture (DAC). Renewable power is a clean energy source but has to pair with costly battery storage to provide dispatchable electricity. Fossil power with CCS offers dispatchable electricity yet still relies on DAC to offset residual emissions, even when deploying deep CCS with more than 90% CO2 capture. Coal-biomass co-firing with CCS, a subset of BECCS, is a reliable energy production technology that can be retrofitted from existing electricity generation units (EGUs). Power plant retrofit maximizes the use of the current U.S. coal power fleet without the need for large-scale deployment of new renewable power, battery storage, or DAC. Retrofitting coal-biomass co-firing with deep CCS in EGUs is a promising option, but not a universal solution. Biomass co-firing at a power plant introduces economic challenges and indirectly poses pressure on land and water resources. Meanwhile, retrofitting deep CCS affects plant efficiency and raises electricity generation costs. Overall, the technical feasibility and economic viability of plant retrofits vary across EGUs, as they are contingent upon the regional availability of biomass, unit-specific characteristics, site-specific fuel supply costs, and adjacent CO2 storage potential. Government incentives like 45Q can improve the retrofit viability, though the impact requires further quantification. A comprehensive analysis at the unit level is essential to address the question regarding the fate of the U.S. coal-fired electricity generation fleet toward the net-zero emission goal. This study conducts a systematic techno-economic-environmental assessment of EGUs to identify the viability of biomass co-firing and deep CCS retrofits in the U.S. coal-fired power fleet. Specifically, it characterizes the techno-economic performance of deep carbon capture, estimates life cycle greenhouse gas (GHG) emissions, and conducts a fleet-level assessment on retrofit viability. The key objectives are (1) to estimate the unit-specific performance and retrofitted cost under various biomass co-firing levels and CO2 capture rates; (2) to determine the possibility of reaching net-zero emission at the fleet level; (3) to quantify the cumulative capacities that are suitable for plant retrofits under current and future biomass supply scenarios; and (4) to improve the understanding of policy impacts on such retrofits to help the power sector’s transition to a net-zero economy. Techno-economic Model of Deep Carbon Capture. This study develops the performance and economic models for Monoethanolamine-based post-combustion CO2 capture at 95–99% capture rates. The process is simulated in Aspen Plus, analyzing the performance of carbon capture technology by varying the plant sizes, solvent lean loading, CO2 concentrations, and flue gas inlet temperature. Based on the key inputs and output parameters of CO2 capture, a reduced-order performance model of deep carbon capture is formulated. In addition, an engineering-economic model integrating the performance metrics is developed to estimate the capital as well as operation and maintenance (O&M) costs. Capital cost estimations follow the framework of the Integrated Environmental Control Model (IECM) and incorporate data regressions from three technical reports by IECM, the National Energy Technology Laboratory (NETL), and the National Renewable Energy Laboratory. The O&M cost estimation utilizes the actual inventory consumption rate and labor requirements. Both performance and cost models are embedded into IECM v13.0-beta, a fossil-fuel power plant modeling tool. Life Cycle Assessment of Power Plants. This study estimates the GHG emissions of power plants through life cycle assessment (LCA). The LCA scope includes fuel supply, combustion-based power generation, and CO2 transport and storage. The fuel-based life cycle module is designed following the framework of the NETL Unit Process Library and CO2U LCA Guidance Toolkit. The module is then incorporated into IECM v13.0-beta. The process-based LCA is applied to estimate the GHG emissions of coal and biomass supply, coal- and coal-biomass co-firing power plant operation, as well as CO2 pipeline transport and geographical sequestration. An uncertainty analysis is conducted to quantify the variability and uncertainty associated with the LCA using the Latin Hypercube Sampling (LHS) method. Fleet-level Assessment. This study evaluates the technical and economic feasibility of selected coal-fired EGUs, examines the role of tax credits in retrofit viability, and assesses the competitiveness of retrofitted units against other low-carbon options. Unit screening identifies EGUs for the study, focusing on new, efficient baseload units with air pollution controls. The power plant databases are then established to organize unit-specific information on performance and operating conditions from the relevant public databases. Biomass for co-firing retrofits is selected based on home and neighboring county availability, ensuring sustained operation with at least a 5% co-firing level. The CO2 storage site is determined by state-level storage potential, with ArcGIS Pro and NETL CO2 Saline Storage Cost Model used to identify the optimal balance between the nearest transport distances and affordable storage costs. The latest IECM v13.0-beta is then employed to configure and evaluate the eligible EGUs with or without the deployment of deep CCS and biomass co-firing. A supply curve is established to illustrate the cumulative installed capacity suitable for retrofits at different cost levels. A sensitivity analysis on tax credits for carbon sequestration is performed. Finally, a unit-level cost comparison is conducted among retrofitted plants, renewable power with battery storage, and abated fossil fuels with DAC. Expected Results. This study evaluates the technical, economic, and environmental metrics of each EGU across an array of CO2 capture rates and biomass co-firing level scenarios. Unit-level comparisons will identify critical factors influencing technical performance. The supply curves with and without tax incentives will provide insights into the impact of tax credits on biomass co-firing and CCS deployment. The cost comparisons with renewables and DAC-retrofit will assess the competitiveness of the retrofitted units. Life cycle emissions from each unit will be assessed to identify the scenarios under which net-zero emissions can be achieved. These analyses are expected to determine the total coal-fired capacity suitable for serving as a low-carbon energy source with or without tax incentives. The study results are novel in identifying optimal unit-specific strategies for producing carbon-neutral power, whether through retrofitting EGUs with deep CCS, biomass co-firing, DAC, or installing renewable power with battery. The findings will provide insight into nationwide efforts to ensure reliable, affordable, and low-carbon electricity. It also will inform investment decisions and policies in the deployment of deep carbon capture and negative emission technologies for a net-zero energy future.

Biomass Co-firing↗

Characterization of the fatigue threshold behavior of UHMWPE

Ultra-high-molecular-weight-polyethylene (UHMWPE) has been the material of choice for bearings in total joint replacements (TJRs) for decades as a result of its excellent wear resistance, chemical inertness, energetic toughness, low friction, and biocompatibility. Utilization of this polymer in orthopedic devices requires oxidation, wear, and fatigue resistance. Balancing these important properties by tailoring processing techniques and modulating microstructural features has been an ongoing endeavor in the field. Research into the clinical applications of UHMWPE has primarily focused on the challenges of wear and oxidation while studies into the realm of fatigue have been more limited. Literature gaps exist in fully understanding the fatigue crack initiation near notches or propagation of small existing flaws in UHMWPE used in TJRs. In particular, the characterization of the fatigue thresholds and near-threshold fatigue behavior of orthopedic grade UHMWPE has yet to be thoroughly explored. In this work, we characterized the fatigue crack arrest threshold of clinically-relevant UHMWPE formulations. Correlations between the fatigue thresholds and bulk mechanical properties as well as microstructural properties were examined across these medical resins. The important role played by crosslinking in influencing the fatigue performance of UHMWPE is highlighted in this study. In addition, it is established that J-integral fracture toughness is the best predictor of fatigue thresholds and could possibly be used as a stand-in metric for fatigue performance if thresholds cannot be directly ascertained. Finally, this study corroborates that the true constitutive parameters best describe the mechanical behavior of UHMWPE.

Cross-linking↗

Grid-Integrated Production of Fischer-Tropsch Synfuels from Nuclear Power

Idaho National Laboratory (INL) investigates the relative economic profitability of an integrated energy system (IES) coupling an NPP with a synfuel production process at selected case study locations across the United States. In the synfuel IES, a high-temperature steam electrolysis (HTSE) plant is thermally and electrically coupled with an NPP to produce zero-carbon hydrogen. The synthetic fuel is produced from this H 2 combined with a CO 2 supply using the reverse water gas shift process followed by the Fischer-Tropsch (FT) reaction. This analysis considers a system in which the CO 2 is sourced from regional CO 2 emitters via the construction and operation of pipeline-based CO 2 supply networks. Locating the FT plant at the same site as the NPP and HTSE plants enables the NPP to provide zero-carbon heat and power to the HTSE plant and zero-carbon power to the FT plant as well as avoid the requirement for long-distance H 2 product transport from the HTSE plant to the FT plant. Hydrogen storage is used to enable the NPP to dispatch power to the electrical grid (instead of the HTSE plant) when grid demand increases, thus enabling the FT plant to continue to operate in a steady-state production mode. The ability to cease hydrogen production for several hours within each day enables the NPP to provide power to the grid to balance the electricity market during peak periods and maximize revenues for the nuclear synfuel IES. The FT process design considered has a 99% carbon conversion efficiency. The use of nuclear energy and nuclear energy-derived hydrogen enables synfuel production to achieve this high level of carbon utilization. Additionally, the life-cycle carbon emissions of the nuclear-based synfuel production process are very low, with WTW emissions of approximately 25 gCO 2 e/MJ, including steam credits (generated from FT process excess heat), and approximately 7 gCO 2 e/MJ, if steam credits are excluded. This compares favorably with the WTW emissions of 90.5 gCO 2 e/MJ for a compression-ignition, direct injection (CIDI) vehicle with a fuel economy of 31.6 miles per gallon gasoline equivalent (MPGGE), using low-sulfur diesel produced using conventional petroleum production and refining processes. Several NPPs in various regions of the U.S. are considered as case study analyses. Supply locations and transportation via pipeline of the CO 2 feedstock to the NPP site are analyzed through the National Energy Technology Laboratory (NETL) CO 2 Transport Cost model. The team finds that the amount of CO 2 generated by different sectors is sufficient for the synfuel production process at all locations considered. The CO 2 transportation costs are functions of the distance of the source to the NPP location, the CO 2 capture cost at the source, and the quantity of CO 2 transported. Historical electricity prices for the NPP case study locations are collected and analyzed. Monthly average prices, price range, and duration of negative-price periods vary among these locations. For each location, an auto-regressive moving average (ARMA) model is trained on historical electricity price data. ARMA validation is done to ensure the synthetic price distributions represent one of historical prices with high fidelity. Synthetic time series from these ARMA models are used in a coupled dispatch and system optimization in the Holistic Energy Resource Optimization Network (HERON) to compute the differential net present value (NPV) of the IES. The team finds that this econometric is positive, ranging from $14M–1.3bn (2020) depending on the location. The optimal synfuel IES configuration to obtain this increase in NPV often maximizes the size of the synfuel production process with regards to the size of the NPP. However, the team shows that the NPP still plays a stabilizing role for the grid: In periods of high prices and high loads, more electricity from the NPP is sent to the grid. A high variability of electricity prices and extreme maximum prices tend to drive up electricity production. While it requires significant investment, the synfuel IES could increase the economic profitability for the existing fleet of LWRs across the country while still maintaining the grid stabilizer role of NPPs. During its lifetime, the main costs for the nuclear synfuel IES are the carbon feedstock transportation costs, followed by the capital expenses (CAPEX) and operation and maintenance (O&M) costs while the revenue comes first from the IRA H 2 production tax credit (PTC) and then from the sales of synfuel products. The profitability of the synfuel IES is most sensitive to the value of the hydrogen PTC and the synfuel products as well as the cost of the carbon feedstock, highlighting the importance of governmental incentives regarding hydrogen, carbon emissions, and synfuel in driving the deployment of future nuclear synfuel IESs.

08 HYDROGEN↗

Using CESM-RESFire to understand climate–fire–ecosystem interactions and the implications for decadal climate variability

Large wildfires exert strong disturbance on regional and global climate systems and ecosystems by perturbing radiative forcing as well as the carbon and water balance between the atmosphere and land surface, while short- and long-term variations in fire weather, terrestrial ecosystems, and human activity modulate fire intensity and reshape fire regimes. The complex climate–fire–ecosystem interactions were not fully integrated in previous climate model studies, and the resulting effects on the projections of future climate change are not well understood. Here we use the fully interactive REgion-Specific ecosystem feedback Fire model (RESFire) that was developed in the Community Earth System Model (CESM) to investigate these interactions and their impacts on climate systems and fire activity. We designed two sets of decadal simulations using CESM-RESFire for present-day (2001–2010) and future (2051–2060) scenarios, respectively, and conducted a series of sensitivity experiments to assess the effects of individual feedback pathways among climate, fire, and ecosystems. Our implementation of RESFire, which includes online land–atmosphere coupling of fire emissions and fire-induced land cover change (LCC), reproduces the observed aerosol optical depth (AOD) from space-based Moderate Resolution Imaging Spectroradiometer (MODIS) satellite products and ground-based AErosol RObotic NETwork (AERONET) data; it agrees well with carbon budget benchmarks from previous studies. We estimate the global averaged net radiative effect of both fire aerosols and fire-induced LCC at –0.59±0.52 W m –2 , which is dominated by fire aerosol–cloud interactions (–0.82±0.19 W m –2 ), in the present-day scenario under climatological conditions of the 2000s. The fire-related net cooling effect increases by ~170 % to –1.60±0.27 W m –2 in the 2050s under the conditions of the Representative Concentration Pathway 4.5 (RCP4.5) scenario. Such considerably enhanced radiative effect is attributed to the largely increased global burned area (+19 %) and fire carbon emissions (+100 %) from the 2000s to the 2050s driven by climate change. The net ecosystem exchange (NEE) of carbon between the land and atmosphere components in the simulations increases by 33 % accordingly, implying that biomass burning is an increasing carbon source at short-term timescales in the future. High-latitude regions with prevalent peatlands would be more vulnerable to increased fire threats due to climate change, and the increase in fire aerosols could counter the projected decrease in anthropogenic aerosols due to air pollution control policies in many regions. We also evaluate two distinct feedback mechanisms that are associated with fire aerosols and fire-induced LCC, respectively. On a global scale, the first mechanism imposes positive feedbacks to fire activity through enhanced droughts with suppressed precipitation by fire aerosol–cloud interactions, while the second one manifests as negative feedbacks due to reduced fuel loads by fire consumption and post-fire tree mortality and recovery processes. These two feedback pathways with opposite effects compete at regional to global scales and increase the complexity of climate–fire–ecosystem interactions and their climatic impacts.

54 ENVIRONMENTAL SCIENCES↗

A System Approach to Deep Heating Savings Through Measurement, Management, and Motivation

Across multi-tenant commercial office and multifamily buildings, centrally metered fuel use represents a substantial fraction of whole-building energy use. Energy audit practitioners understand that improving heating distribution efficiency is typically more of an opportunity than combustion efficiency and that differing thermal comfort preferences between tenants are the bane of operators across these building typologies. There is an unmet market need for retrofit technologies that allow for the delivery of the right amount of heat to the right spaces, at the right time. The Energy Management and Information System (EMIS) package fills this gap through enhanced controls and metering, incorporating low-cost sensors and wireless communication infrastructure to provide a platform for ongoing commissioning and tenant feedback, including heat cost allocation. With support from the US DOE Building Technologies Office, Steven Winter Associates, Inc. (SWA) partnered with Sentient Buildings, E Source, building owners, and utility and policy stakeholders, to demonstrate a market viable EMIS that achieves a reduction in space heating energy use by reducing heating load, improving control, and positively impacting behavior while providing an acceptable financial return. In this study, EMIS packages were implemented in two New York City multifamily rental buildings. Both buildings conducted basic mechanical work (e.g., repairing steam traps) to ensure the heating system was operating well before any tenant feedback was layered in. Heating Energy Use Reports (HEUR) were created to provide tenants with social comparisons and energy savings tips to influence their behavior; these were provided monthly to all tenants in both buildings. Additionally, one building allocated heating costs to a portion of the tenants. Heat cost allocation (HCA) has a long history in the European Union (EU), although it is not common in the US or in steam-heated buildings. SWA leveraged existing EU best practices and stakeholder feedback to develop a Heat Cost Allocation algorithm that was considered equitable and intuitive. Energy use and tenant behavior impacts were tracked throughout the study. The basic mechanical repair work saved between 11-20% of heating energy. Those savings rose to 17-24% with the addition of tenant feedback. While it may not be possible to precisely determine the impact of COVID-19 on research studies like this, there may have been additional savings realized had the study taken place in a period of normal occupancy patterns. These types of central heating systems have been a blind spot for utilities, who have traditionally had little visibility into detailed behind-the-meter gas usage. Heating energy savings stayed consistent during the coldest months, indicating the potential for utilities to utilize EMIS packages for peak gas demand reductions or demand response programs. Tenant comfort was also improved. Post installation, room temperatures more closely matched thermostat set points. Perhaps due to this greater level of control, the vast majority of tenants being billed for heating were accepting of the allocation costs. And tenants receiving heat cost allocations were more likely to reduce their thermostat setpoints than tenants receiving behavioral feedback without financial impacts were. Variation in building specifics makes it difficult to provide precise energy and financial savings estimates. But within the range of expected conditions, the study identified a few key variables that can have the greatest impact on financial returns: the cost of fuel, the ability and willingness to allocate heating costs to tenants, and a well-functioning heating system as a starting point. This study focused on two multifamily buildings, but additional use cases, such as commercial buildings and affordable housing, should be explored to better understand the full market potential. While this type of upgrade has the potential for deep energy reductions and cost savings, future projects should take into account the balance of costs and benefits between owners and tenants, especially in the affordable, regulated, or other low-to-moderate income (LMI) segments of the market. Rent credits, utility allowances, or a shared savings program are possible options to accelerate adoption of this strategy in these market segments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Collider-quality electron bunches from an all-optical plasma photoinjector

We present an approach for generating collider-quality electron bunches using a plasma photoinjector. The approach leverages recently developed techniques for the spatiotemporal control of laser pulses to produce a moving ionization front in a nonlinear plasma wave. The moving ionization front generates an electron bunch with a current profile that balances the longitudinal electric field of an electron beam-driven plasma wave, creating a uniform accelerating field across the bunch. Particle-in-cell (PIC) simulations of the ionization stage show the formation of an electron bunch with 220 pC charge and low emittance (ɛ 𝑥 = 171 nm rad, ɛ 𝑦 = 76 nm rad). Quasistatic PIC simulations of the acceleration stage show that the bunch is efficiently accelerated to 24 GeV over 2 m with a final energy spread of less than 1% and emittances of ɛ 𝑥 = 189 nm rad and ɛ 𝑦 = 80 nm rad. This high-quality electron bunch meets the requirements outlined by the Snowmass process for intermediate-energy colliders and compares favorably to the beam quality of proposed and existing accelerator facilities. The results establish the feasibility of plasma photoinjectors for future collider applications making a significant step toward the realization of high-luminosity, compact accelerators for particle physics research.

43 PARTICLE ACCELERATORS↗

IACMI Project 4.7: Pultruded Textile Carbon Fiber for Spar Caps (Final Report)

The primary objective of this project was to demonstrate the potential to significantly reduce the cost of wind turbine blades with carbon fiber reinforced polymer (CFRP) structure. Applicability of textile carbon fibers (TCF) were evaluated for use in pultruded spar cap (SC) elements as a path to cost reduction for utility scale wind turbine blades. In earlier work for the Department of Energy (DOE) Wind Energy Technologies Office (WETO), a collaboration of Sandia National Laboratory (SNL), Oak Ridge National Laboratory (ORNL), and Montana State University has demonstrated potential for pultruded TCF to compete with infused fiberglass and commercially available carbon fiber pultruded sections for spar cap construction. In the design cases evaluated, the TCF sections fared well when compared on cost per unit composite stiffness and cost per unit composite compressive strength for those designs [1]. Both stiffness and compressive strength tend to be key factors in the design of blade composite Spar Cap which carry the bulk of the blade structural loads in bending. Spar Cap design tends to distribute largely symmetric tensile and compressive stresses to opposite sides of the spar structure, but since carbon fiber composite compressive strength is typically 20-50% lower than tensile strength, the compressive loading reaches failure levels well before the tensile loading. Stiffness is critical in containing the large tip deflection in high wind loading situations. However, materials and process development were very limited in the earlier study and the work in this project was expanded to make the comparative information more representative of what will be required in order to make further inroads towards implementation. Similar to that study, this project team confirmed that the primary materials of interest for pultruded spar cap elements should be thermoset (TS) resins reinforced by carbon fibers, utilizing as high a percentage of TCF as practical to benchmark cost and performance against commercial carbon fibers. To make the closest comparison possible and eliminate specific test article size, resin selection, and equipment/operational nuance effects, the team planned to pultrude sections with 100% commercially available carbon fiber (Panex 35 carbon fiber from Zoltek) as well as samples utilizing high fractions of TCF. The resin system chosen was based on formulations recommended by large wind industry supplier Hexion and consisted of Hexion resin RSL-4597, curing agent CCA-138, and internal mold release additive 117, along with common kaolin filler ASP400P from BASF. As commonly deployed in spar cap configurations, the team had a mold built to pultrude a rectangular spar cap element of 100mm width and 3mm thickness. The extremely limited number of samples produced for the earlier study were produced with a “generic” epoxy utilized for a variety of applications by the pultruder contracted to produce test articles for demonstration purposes. More importantly, those samples were produced at a fiber fraction only slightly over 50%. Based on feedback from our industrial advisory team for that project and strongly recommended by this project team, the consensus is that it is highly desirable to obtain fiber fractions of 65-68% for significant penetration in wind blade spar cap. Although this requirement has yet to be exhaustively confirmed in readily available information, this was established as a project goal and informally decided we needed to exceed 60% fiber fraction to gain serious industry consideration. Previous TCF pultrusion trials have been challenged by the lack of robust TCF packages, resulting in non-uniform tension across and between tows, as well as excess labor and waste for removal of interleaved paper. The non-uniform tension and associated intermingling of tows in textile acrylic fiber tows and associated difficulties created from broken filaments in carbon fiber conversion inhibit the ordered packing necessary to enhance fiber fraction elevation. (These “cross-overs” are not considered undesirable for textile applications and there is some sense that they might be advantageous for those applications). In addition to work that is ongoing at the acrylic fiber manufacturers to improve their formats, The Institute of Advanced Composites Manufacturing Innovation (IACMI) Project 6.12 (report PA16-0349-6.12-01) [2] has developed and demonstrated a more robust packaging and creeling approach that at least partially addresses these issues, thus improving control of the TCF feed into the pultrusion unit. It was hoped that these and other improvements currently being implemented would allow us to achieve fiber fractions at least approaching these fiber fraction targets. During this project, sections utilizing 100% commercially available carbon fiber reinforcement were produced as a baseline, as well as sections reinforced with about 94% TCF and the balance being commercially available fiber for comparison. The most important finding was that similar to results reported in the earlier WETO-funded project and results from tests of TCF reported at IACMI meetings, this work demonstrated that sections pultruded with TCF in an epoxy resin frequently utilized in actual spar cap production had stiffness and compressive strengths largely comparable to similar sections pultruded with a commercially available carbon fiber also frequently utilized in the wind industry. Although the amount of that data is limited, some of the tensile strength results were actually closer than would have been expected based on fiber strength results provided by the TCF and commercial fiber producers. The actual test data are reported and discussed in detail in Section 5. The pultruded sections dominated by TCF reinforcement were approximately 8-10% lower in fiber fraction than for the sections produced using commercial fiber alone, making direct comparison difficult. The COVID-19 project has provided significant insight into the current state-of-the-art with various TCF product forms. The data obtained in this project will guide the planned improvements at the precursor level, especially in attaining uniform tensioning and payout to facilitate enhanced fiber fractions and overall processability of the TCF composites. The project team is providing guidance to stakeholders concerning the attributes, needs, and potential demand for TCF in wind blade spar caps. Results achieved in this project are consistent with findings in the related work cited [1] and support this guidance and the high potential for this product type. TCF precursor-producing partners continue to express interest in enhancing their product forms and the team looks forward to working with these improved materials as they become available.

42 ENGINEERING↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗