Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “implementation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Implementation of Improved Transverse Shear Calculations and Higher Order Laminate Theory Into Strain Rate Dependent Analyses of Polymer Matrix Composites

A numerical procedure has been developed to investigate the nonlinear and strain rate dependent deformation response of polymer matrix composite laminated plates under high strain rate impact loadings. A recently developed strength of materials based micromechanics model, incorporating a set of nonlinear, strain rate dependent constitutive equations for the polymer matrix, is extended to account for the transverse shear effects during impact. Four different assumptions of transverse shear deformation are investigated in order to improve the developed strain rate dependent micromechanics model. The validities of these assumptions are investigated using numerical and theoretical approaches. A method to determine through the thickness strain and transverse Poisson's ratio of the composite is developed. The revised micromechanics model is then implemented into a higher order laminated plate theory which is modified to include the effects of inelastic strains. Parametric studies are conducted to investigate the mechanical response of composite plates under high strain rate loadings. Results show the transverse shear stresses cannot be neglected in the impact problem. A significant level of strain rate dependency and material nonlinearity is found in the deformation response of representative composite specimens.

Zhu, Lin-Fa↗

GEWEX America Prediction Project (GAPP) Science and Implementation Plan

The purpose of this Science and Implementation Plan is to describe GAPP science objectives and the activities required to meet these objectives, both specifically for the near-term and more generally for the longer-term. The GEWEX Americas Prediction Project (GAPP) is part of the Global Energy and Water Cycle Experiment (GEWEX) initiative that is aimed at observing, understanding and modeling the hydrological cycle and energy fluxes at various time and spatial scales. The mission of GAPP is to demonstrate skill in predicting changes in water resources over intraseasonal-to-interannual time scales, as an integral part of the climate system.

TIME SCALES↗

Hubble Space Telescope Star Tracker ad Two-Gyro Control Law Design, Implementation, and On-Orbit Performance

The Hubble Space Telescope (HST) normally requires three gyroscopes for three-axis rate control. The loss of the Space Shuttle Columbia on STS-107 resulted in the cancellation of a shuttle-based HST Servicing Mission 4. Therefore, HST must operate using the on-board hardware until an alternate means of servicing can be accomplished. The probability of gyro failure indicates that fewer than three gyros will be operable before any servicing mission can be performe& To mitigate this, and to extend the HST life expectancy, a rate estimation and control algorithm was developed that requires two gyros to measure rate about two axes, with the remaining axis rate estimated using one of three alternate sensors. Three-axis magnetometers (MSS) are used for coarse rate estimation during large maneuvers and during occultations of other sensors. Fixed-Head Star Trackers (FHSTs) are used for rate estimation during safe mode recovery and during transition to science operations. Fine rate estimation during science operations is performed using the Fine Guidance Sensors (FGSs). The FHST mode (T2G) relies on star vectors as measured by the FHSTs to estimate vehicle rate about the axis not measured by the gyros. Since the FHSTs were not designed to estimate body rate, this method involves a unique set of problems that had to be overcome in the final design, such as the effect of FHST break tracks and moving targets on rate estimation. The solutions to these problems, as well as a detailed description of the design and implementation of the rate estimation are presented Also included are the time domain and frequency domain analysis of the T2G control law. A high fidelity HST simulator (HSTSIM) was used to verify T2G performance prior to on-orbit use. Results of these simulations are also presented. Finally, analysis of actual T2G on-orbit test results is presented for design validation.

VanArsdall, John C.↗

Hubble Space Telescope Magnetometer and Two-Gyro Control Law Design, Implementation, and On-Orbit Performance

For f i h years, the science mission of the Hubble Space Telescope (HST) required using at least three of six rate gyros for attitude control. In the past, HST has mitigated gyro hardware failures by replacement of the failed units through Space Shuttle Servicing Missions. Following the tragic loss of Space Shuttle Columbia on STS-107, the desire to have a safe haven for astronauts during missions has resulted in the cancellation of all planned maxu14 missions to HST. While a robotic servicing mission is being currently being planned, controlling with alternate sensors to replace failed gyros can extend the HST Science mission until the robotic mission can be performed and extend science at HST s end of life. A two-gym control law has been designed and implemented using magnetometers (Magnetic Sensing System - MSS), fixed head star trackers (FHSTs), and Fine Guidance Sensors (FGSs) to control vehicle rate about the missing gyro axis. The three aforementioned sensors are used in succession to reduce HST boresight jitter to less than 7 milli-arcseconds rms and attitude error to less than 10 milli-arcseconds prior to science imaging. The MSS and 2-Gyro (M2G) control law is used for large angle maneuvers and attitude control during earth occultation of FHSTs and FGSs. The Tracker and 2-Gyro (T2G) control law dampens M2G rates and corrects the majority of attitude error in preparation for guide star acquisition with the FGSs. The Fine Guidance Sensor and 2-Gyro (F2G) control law d a m p T2G rates and controls HST attitude during science imaging. This paper describes the M2G control law. Details of M2G algorithms are presented, including computation of the HST 3-axis attitude error estimate, design of the M2G control law, SISO hear stability analyses, and restrictions on operations to maintain the h d t h and safety requirement of a 10degree maximum attitude error. Results of simulations performed in HSTSIM, a high-fidelity non-linear time domain simulation, are presented to predict HST on-orbit performance in attitude hold and maneuver modes. Simulation results are compared to on-orbit data from M2G flight tests performed in November and December 2004 and February 2005. Flight telemetry, using a currently available third gyro, shows that HST attitude error with the new M2G control law is maintained below the 10-degree requirement, and attitude errors are under 2 degrees for 95% of the time.

Wirzburger, John H.↗

Hubble Space Telescope Fine Guidance Sensor and Two-Gyro Control Law Design, Implementation, and On-Orbit Performance

For fifteen years, the science mission of the Hubble Space Telescope (HST) required using at least three rate gyros for n Controlling with alternate sensors to replace failing gyros can extend the HST science mission. A two-gyro control law has been designed and implemented using magnetometers, star trackers, and Fine Guidance Sensors (FGSs) to control vehicle rate about the missing gyro axis. The three aforementioned sensors are used in succession to reduce HST boresight jitter to less than 7 milli-arcseconds rms prior to science imaging. The Magnetometer and 2-Gyro (M2G) control law is used for large angle maneuvers and attitude control during earth. occultation of star trackers and FGSs. The Tracker and 2-Gyro (T2G) control law dampens M2G rates and controls attitude in preparation for guide star acquisition with the FGSs. The Fine Guidance Sensor and 2-Gyro (F2G) control law dampens T2G rates and controls HST attitude during science imaging. This paper describes the F2G control law. Details of F2G algorithms are presented, including computation of the FGS-measured star vector using non-linear equations, optimal estimation of HST body rate, design of the F2G control laws and gyro bias observer, SISO and MIMO linear stability analyses, and design of the F2G intramode transition and guide star acquisition logic. Results from an FGS flight spare ground test are presented that define acceptable HST jitter levels for successful guide star acquisition under two-gyro control. HST-specific disturbance and noise models are described that are based upon flight telemetry; these models are used in HSTSIM, a high-fidelity non-linear time domain simulation, to predict HST on-orbit disturbance responses and FGS interferometer Loss of Lock (LOL) characteristics under F2G control. Additional HSTSIM results are presented predicting HST quiescent boresight jitter performance, science maneuver performance, and observer configuration performance during F2G operation. Simulation results are compared to on-orbit data b m F2G flight tests performed in February 2005. Science images and point spread functions from the Advanced Camera for Surveys (ACS) High Resolution Camera (HRC) are presented that compare HST science performance under F2G versus three-gyro control. Images and flight telemetry show that HST boresight jitter with the new F2G control law is usually less than jitter using the three-gyro law, and HST boresight jitter during F2G operation is dependent upon guide star magnitude.

Clapp, Brian R.↗

Partially-Averaged Navier Stokes Model for Turbulence: Implementation and Validation

Partially-averaged Navier Stokes (PANS) is a suite of turbulence closure models of various modeled-to-resolved scale ratios ranging from Reynolds-averaged Navier Stokes (RANS) to Navier-Stokes (direct numerical simulations). The objective of PANS, like hybrid models, is to resolve large scale structures at reasonable computational expense. The modeled-to-resolved scale ratio or the level of physical resolution in PANS is quantified by two parameters: the unresolved-to-total ratios of kinetic energy (f(sub k)) and dissipation (f(sub epsilon)). The unresolved-scale stress is modeled with the Boussinesq approximation and modeled transport equations are solved for the unresolved kinetic energy and dissipation. In this paper, we first present a brief discussion of the PANS philosophy followed by a description of the implementation procedure and finally perform preliminary evaluation in benchmark problems.

Girimaji, Sharath S.↗

Implementation of ALARA radiation protection on the ISS through polyethylene shielding augmentation of the Service Module Crew Quarters

With 5-7 month long duration missions at 51.6 degrees inclination in Low Earth Orbit, the ionizing radiation levels to which International Space Station (ISS) crewmembers are exposed will be the highest planned occupational exposures in the world. Even with the expectation that regulatory dose limits will not be exceeded during a single tour of duty aboard the ISS, the "as low as reasonably achievable" (ALARA) precept requires that radiological risks be minimized when possible through a dose optimization process. Judicious placement of efficient shielding materials in locations where crewmembers sleep, rest, or work is an important means for implementing ALARA for spaceflight. Polyethylene (CnHn) is a relatively inexpensive, stable, and, with a low atomic number, an effective shielding material that has been certified for use aboard the ISS. Several designs for placement of slabs or walls of polyethylene have been evaluated for radiation exposure reduction in the Crew Quarters (CQ) of the Zvezda (Star) Service Module. Optimization of shield designs relies on accurate characterization of the expected primary and secondary particle environment and modeling of the predicted radiobiological responses of critical organs and tissues. Results of the studies shown herein indicate that 20% or more reduction in equivalent dose to the CQ occupant is achievable. These results suggest that shielding design and risk analysis are necessary measures for reducing long-term radiological risks to ISS inhabitants and for meeting legal ALARA requirements. Verification of shield concepts requires results from specific designs to be compared with onboard dosimetry. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

NASA Center JSC↗

Shuttle Payload Ground Command and Control: An Experiment Implementation Combustion Module-2 Software Development, STS-107

This presentation covers the design of a command and control architecture developed by the author for the Combustion Module-2 microgravity experiment, which flew aboard the STS-107 Shuttle mission, The design was implemented to satisfy a hybrid network that utilized TCP/IP for both the onboard segment and ground segment, with an intermediary unreliable transport for the space to ground segment. With the infusion of Internet networking technologies into Space Shuttle, Space Station, and spacecraft avionics systems, comes the need for robust methodologies for ground command and control. Considerations of high bit error links, and unreliable transport over intermittent links must be considered in such systems. Internet protocols applied to these systems, coupled with the appropriate application layer protections, can provide adequate communication architectures for command and control. However, there are inherent limitations and additional complexities added by the use of Internet protocols that must be considered during the design. This presentation will discuss the rationale for the: framework and protocol algorithms developed by the author. A summary of design considerations, implantation issues, and learned lessons will be will be presented. A summary of mission results using this communications architecture will be presented. Additionally, areas of further needed investigation will be identified.

Carek, David Andrew↗

NARC Rayon Replacement Program for the RSRM Nozzle, Phase IV Qualification and Implementation Status

The Space Shuttle NARC Rayon Replacement Program has down-selected Enka rayon as a replacement for the obsolete NARC rayon in the nozzle carbon cloth phenolic (CCP) ablative insulators. Full qualification testing of the Enka rayon-based carbon cloth phenolic is underway, including processing, thmal/structural properties, and hot-fire subscale tests. Required thermal-structural capabilities, together with confidence in erosio/char performance in simulated and subscale hot fire tests such as Wright-Patterson Air Force Base Laser Hardened Materials Evaluation Laboratory testing, NASA-MSFC 24-inch motor tests, NASA-MSFC Solid Fuel Torch - Super Sonic Blast Tube, NASA-MSFC Plasma Torch Test Bed, ATK Thiokol Forty Pound Charge and NASA-MSFC MNASA justified the testing of the new Enka-rayon candidate on full-scale static test motors. The first RSRM full-scale static test motor nozzle, fabricated using the new Enka rayon-based CCP, was successfully demonstrated in June 2004. Two additional static test motors are planned with the new Enka rayon in the next two years along with additional A-basis property characterization. Process variation or "corner-of-the-box" testing together with cured and uncured aging studies are also planned as some of the pre-flight implementation activities with 5-year cured aging studies over-lapping flight hardware fabrication.

Haddock, M. Reed↗

Ka-Band, MEMS Switched Line Phase Shifters Implemented in Finite Ground Coplanar Waveguide

Ka-band MEMS switched line phase shifters implemented in finite ground coplanar waveguide are described in this paper. The phase shifters are constructed of single-pole double-throw (SPDT) switches with additional reference and phase offset transmission line lengths. The one- and two-bit phase shifters are fabricated on high resistivity (HR) silicon with a dielectric constant, Epsilon(sub T) = 11.7 and a substrate thickness, t = 500microns. The switching architectures integrated within the phase shifters consist of MEMS switches that are doubly anchored cantilever beam capacitive switches with additional high inductive sections (MEMS LC device). The SPDT switch is composed of a T-junction with a MEMS LC device at each output port. The one-bit phase shifter described in this paper has an insertion loss (IL) and return loss (RL) of 0.9 dB and 30 dB while the two-bit described has an IL and RL of 1.8 dB and 30 dB respectively. The one-bit phase shifter's designed offset phase is 22.5deg and actual measured phase shift is 21.8deg. The two-bit phase shifter's designed offset phase is 22.5deg, 45deg, and 67.5deg and the actual measured phase shifts are 21.4deg, 44.2deg, and 65.8deg, respectively.

Scardelletti, Maximilian C.↗

Implementation of Real-Time Feedback Flow Control Algorithms on a Canonical Testbed

This report summarizes the activities on "Implementation of Real-Time Feedback Flow Control Algorithms on a Canonical Testbed." The work summarized consists primarily of two parts. The first part summarizes our previous work and the extensions to adaptive ID and control algorithms. The second part concentrates on the validation of adaptive algorithms by applying them to a vibration beam test bed. Extensions to flow control problems are discussed.

Tian, Ye↗

Lessons Learned Implementing DOORS in a Citrix Environment

NASA's James Web Space Telescope (JWST) Project is a large multi-national project with geographically dispersed contractors that all need access to the Projects requirement database. Initially, the project utilized multiple DOORS databases with the built-in partitions feature to exchange modules amongst the various contractor sites. As the requirements databases matured the use of partitions became extremely difficult. There have been many issues such as incompatible versions of DOORS, inefficient mechanism for sharing modules, security concerns, performance issues, and inconsistent document import and export formats. Deployment of the client software with limited IT resources available was also an issue. The solution chosen by JWST was to integrate the use of a Citrix environment with the DOORS database to address most of the project concerns. The use of the Citrix solution allowed a single Requirements database in a secure environment via a web interface. The Citrix environment allows JWST to upgrade to the most current version of DOORS without having to coordinate multiple sites and user upgrades. The single requirements database eliminates a multitude of Configuration Management concerns and facilitated the standardization of documentation formats. This paper discusses the obstacles and the lessons learned throughout the installation, implementation, usage and deployment process of a centralized DOORS database solution.

Bussman, Marie↗

Designing and Implementing a Distributed System Architecture for the Mars Rover Mission Planning Software (Maestro)

Distributed systems allow scientists from around the world to plan missions concurrently, while being updated on the revisions of their colleagues in real time. However, permitting multiple clients to simultaneously modify a single data repository can quickly lead to data corruption or inconsistent states between users. Since our message broker, the Java Message Service, does not ensure that messages will be received in the order they were published, we must implement our own numbering scheme to guarantee that changes to mission plans are performed in the correct sequence. Furthermore, distributed architectures must ensure that as new users connect to the system, they synchronize with the database without missing any messages or falling into an inconsistent state. Robust systems must also guarantee that all clients will remain synchronized with the database even in the case of multiple client failure, which can occur at any time due to lost network connections or a user's own system instability. The final design for the distributed system behind the Mars rover mission planning software fulfills all of these requirements and upon completion will be deployed to MER at the end of 2005 as well as Phoenix (2007) and MSL (2009).

Goldgof, Gregory M.↗

Implementing EVM Data Analysis Adding Value from a NASA Project Manager's Perspective

Data Analysis is one of the keys to an effective Earned Value Management (EVM) Process. Project Managers (PM) must continually evaluate data in assessing the health of their projects. Good analysis of data can assist PMs in making better decisions in managing projects. To better support our P Ms, National Aeronautics and Space Administration (NASA) - Marshall Space Flight Center (MSFC) recently renewed its emphasis on sound EVM data analysis practices and processes, During this presentation we will discuss the approach that MSFC followed in implementing better data analysis across its Center. We will address our approach to effectively equip and support our projects in applying a sound data analysis process. In addition, the PM for the Space Station Biological Research Project will share her experiences of how effective data analysis can benefit a PM in the decision making process. The PM will discuss how the emphasis on data analysis has helped create a solid method for assessing the project s performance. Using data analysis successfully can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces

Counts, Stacy↗

The XML approach to implementing space link extension service management

A feasibility study has been conducted at JPL, ESOC, and ISAS to assess the possible applications of the eXtensible Mark-up Language (XML) capabilities to the implementation of the CCSDS Space Link Extension (SLE) Service Management function.

Space Linki Extension (SLE) eXtensible Markup Lang↗