Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STARTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Self-Powered Autonomous Sensing System for Arctic Ocean using a Frequency-multiplied Cylindrical Triboelectric Nanogenerator

An autonomous sensing system for collecting environmental observations in the Arctic region is critical for the estimation and prediction of climate change. Ocean waves are a great source of energy for these sensing systems but there has been limited research done on small-scale energy harvesting applications in the Arctic Ocean (subsea or surface). The available wave energy in the Arctic Ocean is lower than the typical ocean wave energy due to the low wave frequency, height, and operating months. Although the available wave energy depends on the specific location in the Arctic Ocean, the wave height decreases everywhere during the winter (Jan-March) [1]. Our target location in this work is the Beaufort and Chukchi Seas, which are ice covered for about 195 days per year leaving only a few months (June-November) for wave energy harvesting [2]. During these few months, the average wave frequency is 0.2 Hz and the most common wave frequency is around 0.15 Hz. Many energy harvesting methods are unsuitable for use in the Arctic Ocean because of to the cold temperature, low wave frequency, and low wave height. Triboelectric nanogenerators (TENG) are one of the few energy harvesting methods that excel in these conditions. Zhong et al. [3] designed a stacked pendulum-structured TENG for low-frequency ocean wave energy and reported the device generated a peak power density of 11.2 W/m3 under the low wave frequency of 0.2 Hz. The autonomous sensing system we developed for the Arctic Ocean, the Arctic-TENG, is based on a frequency-multiplied cylindrical TENG (FMC-TENG) which is an optimized TENG configuration for Arctic Ocean conditions due to the high power density under low-frequency wave conditions [4]. Figure 1 shows an FMC-TENG with multiple pairs of free-standing triboelectric-layer mode materials (Aluminum and FEP). The mass and magnet attached to the rotor store gravitational potential energy which is released as kinetic energy when the potential energy overcomes the repulsive magnetic force generated by the opposing magnet attached to the stator. This force unbalance triggers a sudden rotation and swinging motion of the mass which increases the angular velocity of the system and therefore enhances the output power of the TENG system. The main components of the Arctic-TENG are a 3D-printed rotor and stator, electric and dielectric material adhesive tape, and bearings. All these materials were cold-soaked and tested at -40 °C in a chest freezer. Both the 3D-printed parts and adhesives were confirmed to have a minimal effect from the cold temperature. Multiple bearings were tested and the starting torque of each one was compared both at room temperature and -40 °C. The bearing with the lowest starting torque at -40 °C was selected for use in the Arctic-TENG. The Arctic-TENG was tested using an out-of-water motor-driven wave simulator (Figure 2). The wave simulator allows for controlled testing at a wave height of 0.2 m and frequencies between 0.1 Hz to 0.5 Hz. This wave simulator was used for both room temperature and -40 °C testing. The Arctic-TENG generated significantly more power at -40 °C compared to room temperature for each frequency tested. The system stored energy in a supercapacitor via a power management circuit, and the amount of energy stored per day was calculated at different wave frequencies. Based on the conditions at the proposed deployment location (days of non-ice-covered ocean and wave frequency), the amount of stored energy per year from Arctic-TENG was calculated to be enough energy for two transmissions every day. Durability testing was completed on the Arctic-TENG at room temperature to determine the lifetime. The rotor of the Arctic-TENG was attached to a DC motor and spun continuously for several millions of cycles without degradation of the electrical output, demonstrating the feasibility for long-term operation.

Jung, Hyunjun↗

Time-Localization of Forced Oscillations in Power Systems

In power systems forced oscillations occur, and identification of these oscillations is important for the proper operation of the system. Two of the parameters of interest in analyzing and addressing forced oscillations are the starting and ending points. To obtain estimates of these parameters, this paper proposes a time-localization algorithm based on the geometric analysis of the sample cross-correlation between the measured data and a complex sinusoid at the frequency of the forced oscillation. Results from simulated and measured synchrophasor data demonstrate the algorithm's ability to accurately estimate the starting and ending points of forced oscillations.

Forced oscillatitons, synchrophasors, power system↗

Design of a Non-PLL Grid-Forming Inverter for Smooth Microgrid Transition Operation

This paper develops a controller for a grid-forming (GFM) inverter that is capable of operating as either a GFM or grid-feeding source that can improve the operation of a microgrid during on-off grid transitions through use of a novel synchronization approach. Furthermore, this controller avoids use of a phase-locked loop (PLL) and the inverter is able to synchronize with the grid with self-generated voltage and frequency. This prevents the inverter from replicating any grid voltage disturbances in its output—a key disadvantage of many grid-connected inverters that use a PLL. To enable fast synchronization, active synchronization control is adopted both during inverter start-up and microgrid reconnection operation and a method of coordinating synchronization of the inverter with a microgrid controller and grid interconnection circuit breaker is presented. Simulation results for multiple microgrid transition operations and unplanned islanding events demonstrate that the developed non-PLL grid-connected GFM inverter controller and synchronization method are effective in synchronizing the inverter and microgrid to the grid, avoiding phase jump during microgrid transition operation, and improving microgrid islanding transients versus a traditional configuration.

27 ARPA - Advanced Research Projects Agency-Energy↗

Power Hardware-In-the-Loop Hydropower and Ultracapacitor Hybrid Testbed

Widespread deployment of a proof-of-concept technological solution for power system performance improvement can be accelerated through onsite demonstration and pilot projects. Digital real-time simulation with power hardware-in-the-loop in controlled lab environment is the precursor to de-risk the timely and efficient execution of field demonstration and pilot projects. However, the detailed process of development, characterization, and calibration of such high fidelity simulation testbed needs to be documented in a reproducible and publicly accessible manner to leverage across broader research and development communities. This paper presents such a laboratory testbed to study black start capability of a run-of-river hydro + ultracapacitor hybrid system. Beside the high-fidelity model of the islanded grid with hydropower unit, the testbed includes the energy storage, grid following inverter, and grid emulator hardware. Several aspects such as storage characterization, control and various parameter settings necessary to capture frequency transients during load restoration are described in a comprehensive manner, which led to an effective and timely execution of black start field demonstration with an actual hydropower plant.

13 HYDRO ENERGY↗

Performance Index Assessment for the PV Fleet Performance Data Initiative

We report on 250 PV systems throughout the United States, comprising 157 MWdc of system capacity and more than 10,000 monthly performance index (PI) values. Loss factors were isolated including first-year start-up issues, snowfall, soiling and inverter downtime. Inverter availability was found to contribute significant system energy loss during the first six months of operation, with an average of 8% loss occurring during this period, and 2.3% on average thereafter. Other start-up issues beyond inverter downtime, such as partial string outage, contributed additional underperformance in the first year of operation across the fleet. Winter performance was also found to be below summer performance on average, likely due to snowfall. A relationship was found between monthly snowfall accumulation in centimeters and monthly under-performance, indicating a 6%-40% loss in months with measured snowfall, depending on climate. After correcting for availability, snow and startup loss, over 90% of systems were performing within 10% of monthly expectation based on satellite resource data and PVWatts production estimates.

loss factors↗

Advances in Coring Procedures of Silicon Photovoltaic Modules

We describe advances on procedures used for the coring of silicon photovoltaic modules. These procedures involve coring specific locations, starting from the back of the modules, and removing selected parts of the cell structure, while preserving the front tempered glass. The standard coring procedures had to be modified from case to case due to the different cell structures and measurement requirements. We provide examples of the characterization of the cored samples by scanning electron microscopy and energy-dispersive X-ray spectroscopy. Finally, we describe a simple process to create small openings at specific locations on the back of photovoltaic modules to allow for efficiency-related measurement of individual cells and groups of cells.

41 EE - Solar Energy Technologies Office (EE-4S)↗

ITER Central Solenoid Module Fabrication

The fabrication of the modules for the ITER Central Solenoid (CS) has started in a dedicated production facility located in Poway, California, USA. The necessary tools have been designed, built, installed, and tested in the facility to enable the start of production. The current schedule has first module fabrication completed in 2017, followed by testing and subsequent shipment to ITER. The Central Solenoid is a key component of the ITER tokamak providing the inductive voltage to initiate and sustain the plasma current and to position and shape the plasma. The design of the CS has been a collaborative effort between the US ITER Project Office (US ITER), the international ITER Organization (IO) and General Atomics (GA). GA’s responsibility includes: completing the fabrication design, developing and qualifying the fabrication processes and tools, and then completing the fabrication of the seven 110 tonne CS modules. The modules will be shipped separately to the ITER site, and then stacked and aligned in the Assembly Hall prior to insertion in the core of the ITER tokamak. A dedicated facility in Poway, California, USA has been established by GA to complete the fabrication of the seven modules. Infrastructure improvements included thick reinforced concrete floors, a diesel generator for backup power, along with, cranes for moving the tooling within the facility. The fabrication process for a single module requires approximately 22 months followed by five months of testing, which includes preliminary electrical testing followed by high current (48.5 kA) tests at 4.7K. The production of the seven modules is completed in a parallel fashion through ten process stations. The process stations have been designed and built with most stations having completed testing and qualification for carrying out the required fabrication processes. The final qualification step for each process station is achieved by the successful production of a prototype coil. Fabrication of the first ITER module is in progress. The seven modules will be individually shipped to Cadarache, France upon their completion. This paper describes the processes and status of the fabrication of the CS Modules for ITER.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Semiglobal Safety-Filtered Extremum Seeking With Unknown CBFs

We introduce a safe extremum-seeking (Safe ES) algorithm which achieves the minimization of an unknown objective function while ensuring that an unknown, yet measured, control barrier function (CBF) remains above an arbitrarily small negative value for all time. In other words, “practical safety” is maintained during the entire period of convergence to the constrained extremum. Our design is based on quadratic program (QP) CBF style filters for safety, which is applied in an average and estimated sense. Using nonsmooth analysis tools, we guarantee semiglobal practical asymptotic (SPA) stability of the global constrained optimum, practical convergence to the safe set if starting in a condition violating the CBF, and practical safety for all time—semiglobally—if starting in safe set. The safety result of the paper is analogous with modern notions of SPA stability, guaranteeing that, for any small violation of safety, there exist design coefficients which guarantee that such a small violation is not exceeded. The paper outlines a set of sufficient conditions on the barrier and objective functions, and by way of a Lyapunov argument, we demonstrate that nonconvex constrained optimization problems can be solved. We present these results in the setting of a static map and a dynamical system. A simulation example illustrates the results.

97 MATHEMATICS AND COMPUTING↗

Status of the 11 T Nb$_{3}$Sn Dipole Project for the LHC

The planned upgrade of the LHC collimation system includes additional collimators in the LHC lattice. The longitudinal space for the collimators could be obtained by replacing some LHC main dipoles with shorter but stronger dipoles compatible with the LHC lattice and main systems. A joint development program with the goal of building a 5.5 m long two-in-one aperture Nb_3Sn dipole prototype suitable for installation in the LHC is being conducted by FNAL and CERN magnet groups. As part of the first phase of the program, 1 m long and 2 m long single aperture models are being built and tested, and the collared coils from these magnets will be assembled and tested in two-in-one configuration in both laboratories. In parallel with the short model magnet activities, the work has started on the production line in view of the scale-up to 5.5 m long prototype magnet. The development of the final cryo-assembly comprising two 5.5 m long 11 T dipole cold masses and the warm collimator in the middle, fully compatible with the LHC main systems and the existing machine interfaces, has also started at CERN. This paper summarizes the progress made at CERN and FNAL towards the construction of 5.5 m long 11 T Nb_3Sn dipole prototype and the present status of the activities related to the integration of the 11 T dipole and collimator in the LHC.

43 PARTICLE ACCELERATORS↗

Heat Treatment Studies of Nb3Sn Wires for Superconducting Planar Undulators

A project aiming to fabricate a full-length 2.8-m long Nb 3Sn superconducting undulator for the storage ring was started last year at the ANL APS. These Nb 3 Sn undulators operate at a maximum magnetic field on the conductor of about 5 T. To address instabilities at this field, two Nb 3 Sn wires with small subelement size were used. Specifically, Restacked Rod Processed wires of 0.6mmin diameter and with 144 and 150 superconducting subelements respectively, over 169 total. The equivalent subelement diameter, DS, of thesewires is35 mu m. At these smallDS values, the critical current density is known to deteriorate, and the Residual Resistivity Ratio is very sensitive to heat treatment. A delicate balance has therefore to be found to obtain parameters within operation specifications. In this paper we showperformance results from different heat treatments.

critical current density↗

Lessons Learned From the Prototypes of the MQXFA Low-Beta Quadrupoles for HL-LHC and Status of Production in the US

With the successful test of the first two pre-series magnets the US HL-LHC Accelerator Upgrade Project has started production of the MQXFA magnets to be used in Q1/Q3 inner triplet elements of the HL-LHC. This good start comes after the test of two prototypes with limited performance, and it demonstrates the importance of learning from past issues. Therefore, in this paper we want to share the most important lessons learned so far, focusing on those which may be more interesting for similar projects. Additionally, we will present the status of MQXFA fabrication in the US.

43 PARTICLE ACCELERATORS↗

Investigations Towards Ultra-Low Cost Nb 3 Sn SRF Fabrication via Melt Casted Bronze Route Processing

Here, a novel approach to fabricating Nb 3 Sn SRF cavities and other RF components using an ultra-low-cost melt casting fabrication process has been investigated. This simple, low cost melt casting technique has the potential to be used to fabricate nearly any superconducting Nb3Sn structure using either the Bronze Route (BR), Internal Tin (IT), External Tin (ET) processes as well as normal conducting pure copper (Cu) cavities. Most of the heat treated samples that were examined using SEM/EDX seemed to show a reasonable correlation of T c onset and transition width (ΔT c ) of the ingots initial/starting Sn content to the desired stoichiometric Nb 3 Sn phase, where the lower starting Sn content coupons resulted in lower T c 's with broader transition widths and the higher starting Sn coupons resulted in higher T c 's with narrower ΔT c ’s. The best samples had T c onsets ~17-18 K and ΔT c 's < 2 K. Two samples were further tested for RF surface resistance (R s ) and Quality Factor (Q) at JLAB. Here, these RF measurements were performed at 7.4 GHz using a calorimetric technique and showed two transitions, one at ~ 8 K and another at ~ 14 K; values of R s were at least two orders of magnitude higher than similar high quality Nb 3 Sn films directly deposited substrates by JLAB and with another superconducting transition close to the superconducting transition temperature of niobium. Substantial improvements in the processing variables ranging from higher quality of the initial ingots with higher Sn content, to better electropolishing and reaction heat treatment regimens will be necessary to realize improved RF performance metrics.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Advancing Sustainability in Data Centers: Evaluation of Hybrid Air/Liquid Cooling Schemes for IT Payload Using Sea Water

Abstract-The growth in cloud computing, Big Data, AI and high-performance computing (HPC) necessitate the deployment of additional data centers (DC's) with high energy demands. The unprecedented increase in the Thermal Design Power (TDP) of the computing chips will require innovative cooling techniques. Furthermore, DC's are increasingly limited in their ability to add powerful GPU servers by power capacity constraints. As cooling energy use accounts for up to 40% of DC energy consumption, creative cooling solutions are urgently needed to allow deployment of additional servers, enhance sustainability and increase energy efficiency of DC's. The information in this study is provided from Start Campus' Sines facility supported by Alfa Laval for the heat exchanger and CO 2 emission calculations. The study evaluates the performance and sustainability impact of various data center cooling strategies including an air-only deployment and a subsequent hybrid air/water cooling solution all utilizing sea water as the cooling source. Here we evaluate scenarios from 3 MW to 15+1 MW of IT load in 3 MW increments which correspond to the size of heat exchangers used in the Start Campus' modular system design. This study also evaluates the CO 2 emissions compared to a conventional chiller system for all the presented scenarios. Results indicate that the effective use of the sea water cooled system combined with liquid cooled systems improve the efficiency of the DC, plays a role in decreasing the CO 2 emissions and supports in achieving sustainability goals.

97 MATHEMATICS AND COMPUTING↗

Generalized Circuit Representation for a Synchronous Machine

In this letter, a generalized circuit representation for a synchronous machine is presented. This circuit represents voltage and current relationship and can be used for dynamic and harmonic analysis. A distinct feature of the circuit is the use of Laplace transform variable s , which simplifies both calculus and frame conversion. Two derivation approaches are presented. Here, the first approach starts from a steady-state circuit representation, while the second approach starts from the dq-frame dynamic model of a synchronous generator. Both arrive at the same representation.

42 ENGINEERING↗

Newton-Raphson AC Power Flow Convergence Based on Deep Learning Initialization and Homotopy Continuation

Power flow forms the basis of many power system studies. With the increased penetration of renewable energy, grid planners tend to perform multiple power flow simulations under various operating conditions and not just selected snapshots at peak or light load conditions. Getting a converged AC power flow (ACPF) case remains a significant challenge for grid planners especially in large power grid networks. This paper proposes a two-stage approach to improve Newton-Raphson ACPF convergence and was applied to a 6102 bus Electric Reliability Council of Texas (ERCOT) system. The first stage utilizes a deep learning-based initializer with data re-training. Here a deep neural network (DNN) initializer is developed to provide better initial voltage magnitude and angle guesses to aid in power flow convergence. This is because Newton-Raphson ACPF is quite sensitive to the initial conditions and bad initialization could lead to divergence. The DNN initializer includes a data re-training framework that improves the initializer's performance when faced with limited training data. The DNN initializer successfully solved 3,285 cases out of 3,899 non-converging dispatch and performed better than random forest and DC power flow initialization methods. ACPF cases not solved in this first stage are then passed through a hot-starting algorithm based on homotopy continuation with switched shunt control. The hot-starting algorithm successfully converged 416 cases out of the remaining 614 non-converging ACPF dispatch. In conclusion, the combined two-stage approach achieved a 94.9% success rate, by converging a total of 3,701 cases out of the initial 3,899 unsolved cases.

Deep learning↗

Modeling Load Dynamics to Support Resiliency-based Operations in Low-Inertia Microgrids

Microgrids have repeatedly demonstrated the ability to provide uninterrupted service to critical end-use loads during normal outages, severe weather events, and natural disasters. While their ability to provide critical services is well documented, microgrids present a more dynamic operational environment than grid-connected distribution systems. The dynamics of a microgrid are commonly driven by the high inertia of rotating generators, which are common in many microgrids. In such high-inertia systems, the impact of end-use load dynamics are often not examined. However, with the increased penetration of inverter-based generation with little or no inertia, it is necessary to consider the impact that the dynamics of the end-use loads have on the operations of microgrids, particularly for a resiliency-based operation. These operations include, but are not limited to, switching operations, loss of generating units, and the starting of induction motors. This paper examines the importance of including dynamic models of the end-use load when evaluating the operations of low inertia microgrids, and shows that by properly representing their behavior, it is possible to cost effectively size equipment while supporting resilient operations of critical end-use loads.

Tuffner, Francis K.↗

Constrained tree growth and gas-exchange of seawater-exposed forests in the Pacific Northwest, USA

1. Rising sea levels under climate change may have significant impacts on coastal vegetation dynamics, yet the response of coastal forest growth, gas-exchange, and survival to seawater intrusion remains poorly documented. 2. We conducted a dendroecology study across six sites in western Washington, USA, to examine how tree growth, gas exchange (indexed by basal area increment, BAI, and wood d13C, respectively), and survival varies with seawater exposure through two approaches. First, tree core samples were collected at a site where seawater exposure started only four years prior to sampling, which allowed a cause-and-effect test of the impacts of seawater exposure on trees, and second, samples were collected at five additional sites where we compared downstream to upstream trees under current sea-level conditions. 3. At the seawater intrusion site, BAI and carbon isotope discrimination (?) decreased significantly (p < 0.01) in the year of intrusion (2014) and stayed unchanged thereafter. Four years later (2018), the percentage of recently standing dead trees in the forest was 73.0% basal area. Across the regional assessment, percentage of standing dead trees was significantly greater in downstream than upstream forests at five of the six sites (averaged 37.7±11.0% and 4.3±2.1% basal area for downstream and upstream, respectively). Growth was significantly lower (p < 0.01) at the downstream than upstream for five sites, and ? was lower for all needle-leaf trees (three sites) on the downstream compared to the upstream, but no difference was observed between downstream and upstream for broad-leaf trees (three sites). 4. Synthesis Combined, both the cause-and-effect manipulative study and the regional assessment demonstrate that seawater exposure drives reductions in growth, decreased ? of needle-leaf trees, increased mortality, and greater climate sensitivity, regardless of whether the seawater exposure is recent or long-term.

Costal forests, tree growth, tree-ring, tree morta↗