Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Technology requirements for advanced earth orbital transportation systems. Volume 3: Summary report - dual mode propulsion

The impact of dual-mode propulsion on cost-effective technology requirements for advanced earth-orbital transportation systems is considered. Additional objectives were to determine the advantages of the best dual mode concept relative to the LO2/LH2 concept of the basic study. Normal technology requirements applicable to horizontal take-off and landing single-stage-to-orbit systems utilizing dual mode rocket propulsion were projected to the 1985 time period. These technology projections were then incorporated in a vehicle parametric design analysis for two different operational concepts of a dual mode propulsion system. The resultant performance, weights and costs of each concept were compared. The selected propulsion concept was evaluated to confirm the parametric trending/scaling of weights and to optimize the configuration.

Hepler, A. K.↗

Technology requirements for advanced earth orbital transportation system. Volume 1: Executive summary

Normal technology requirements applicable to Single Stage to Orbit (SSTO) systems were projected to the 1985 time period. These technology projections were then incorporated in a vehicle design analysis of three different operational concepts resulting in four configurations of a Single Stage to Orbit system. The resultant performance, weights and costs of each concept were then compared and a system concept selected. A figure of merit was developed for advanced technology programs based on a cost/performance basis. The selected advanced technology programs were then used to reassess the vehicle to determine the impact on performance, weight and cost. Based on study results, recommendations are provided in technology areas associated with earth orbit transportation systems. The recommendations address advanced space transportation system design considerations, both hardware and software technolgoy program requirements.

Hepler, A. K.↗

Civil helicopter design and operational requirement

Design and operational requirements and other factors that have a restraining influence on expansion of the helicopter market are discussed. The needs of operators, users, pilots and the community at large are examined. The impact of future technology developments and other trends such as use, energy shortages, and civil and military helicopter requirements and development is assessed. Areas where research and development are needed to provide opportunities for lowering life cycle costs and removing barriers to further expansion of the industry are analyzed.

Waters, K. T.↗

Requirements for regional short-haul air service and the definition of a flight program to determine neighborhood reactions to small transport aircraft

An evaluation of the current status and future requirements of an intraregional short haul air service is given. A brief definition of the different types of short haul air service is given. This is followed by a historical review of previous attempts to develop short haul air service in high density urban areas and an assessment of the current status. The requirements for intraregional air service, the need for economic and environmental viability and the need for a flight research program are defined. A detailed outline of a research program that would determine urban community reaction to frequent operations of small transport aircraft is also given. Both the operation of such an experiment in a specific region (San Francisco Bay area) and the necessary design modifications of an existing fixed wing aircraft which could be used in the experiment are established. An estimate is made of overall program costs.

Feher, K.↗

NASTRAN general purpose interface requirements document

This NASTRAN (NASA STRuctural ANalysis) General Purpose Interface Requirements Document (IRD) defines standards for deliverables required of New Capability Contractors (NCCs) and relates these deliverables to the software development cycle. It also defines standards to be followed by NCCs for adding to and modifying the code in the NASTRAN software system and for adding to and modifying the four official NASTRAN manuals: The NASTRAN Theoretical Manual, the NASTRAN User's Manual, The NASTRAN Programmer's Manual, and The NASTRAN Demonstration Problem Manual. It is intended that this General Purpose IRD shall be incorporated by reference in all contracts for a new NASTRAN capability.

Brown, W. K.↗

Geometry requirements for unsteady aerodynamics in aeroelastic analysis and design

Aircraft geometry requirements for unsteady aerodynamic computations are discussed and differences between requirements for steady and unsteady flow are emphasized within the framework of a general potential-flow aerodynamic formulation. Its implementation in a computer program called SOUSSA (Steady, Oscillatory, and Unsteady Subsonic and Supersonic Aerodynamic is detailed.

Yates, E. C., Jr.↗

CAD/CAM data management needs, requirements and options

The requirements for a data management system in support of technical or scientific applications and possible courses of action were reviewed. Specific requirements were evolved while working towards higher level integration impacting all phases of the current design process and through examination of commercially marketed systems and related data base research. Arguments are proposed for varied approaches in implementing data base systems ranging from no action necessary to immediate procurement of an existing data base management system.

Lopatka, R. S.↗

Required attention for synthesized speech perception for three levels of linguistic redundancy

The study evaluates the attention required for synthesized speech perception with reference to three levels of linguistic redundancy. Twelve commercial airline pilots were individually tested for 16 cockpit warning messages eight of which consisted of two monosyllabic key words and eight of which consisted of two polysyllabic key words. Three levels of linguistic redundancy were identified: monosyllabic words, polysyllabic words, and sentences. The experiment contained a message familiarization phase and a message recognition phase. It was found that: (1) when the messages are part of a previously learned and recently heard set, and the subject is familiar with the phrasing, the attention needed to recognize the message is not a function of the level of linguistic redundancy, and (2) there is a quantitative and qualitative difference between recognition and comprehension processes; only in the case of active comprehension does additional redundancy reduce attention requirements.

Simpson, C. A.↗

Impact conditions required for formation of melt by jetting in silicates

It is demonstrated that the process of jetting which occurs when particles collide at oblique angles may produce melt at much lower velocities than are required for melt production in head-on collisions. The minimum velocities of impact required for jetting in aluminum, bronzitite, dunite, and quartz are calculated by the method of shock polars. The analysis, which depends on stated assumptions about attained pressures and the occurrence of jetting, uses shock-velocity particle-velocity equations of state with three shock regimes. The treatment indicates that jetting should arise in bronzitite, dunite, and quartz at relative velocities as low as 1-2 km/sec. At such velocities material which passes near the stagnation point in the jet-forming region is subjected to sufficiently high pressures so that it is probably melted.

Kieffer, S. W.↗

V/STOL aircraft simulation - Requirements and capabilities at Ames Research Center

Ground-based flight simulation contributes greatly to the development of new aircraft and flight management systems and will be especially important in improving the performance, safety, and environmental characteristics of future civil and military V/STOL aircraft. This paper describes existing simulation facilities at Ames Research Center and discusses their capabilities and limitations for V/STOL aircraft investigations. Simulation requirements for NASA research and support of DOD programs are also discussed, including technology development for advanced rotorcraft and civil and military V/STOL aircraft. Current efforts and future plans are described for the upgrading of Ames simulation facilities to meet those requirements. Recent advances in equipment technology and operational methodology are shown to provide significantly improved simulation fidelity through better motion and visual cues and faster system response to pilot inputs.

Wilcox, D. E.↗

Requirements for a geosynchronous information services platform

The requirements projected to the year 2000 for space-based communications facilities, including both personal communications and innovative services, are developed based upon anticipated demographic and economic growth for the seven major regions of the world. Projected growth requirements, when considered in light of operational factors such as orbit/spectrum crowding and the high investment costs of ground-based systems, suggest the need for new system concepts for communications. The concept of complexity inversion (placing high-cost systems in space and providing low-cost ground terminals to users) is examined and compared with the more conventional approach utiliizing land lines and extensive ground installations. The recommendation is made to develop the technology and capability to construct platforms in space, and the applicability of the Shuttle/Spacelab system in constructing large antenna systems in space is briefly considered.

Ness, H. C.↗

Future Orbital Power Systems Technology Requirements

NASA is actively involved in program planning for missions requiring several orders of magnitude, more energy than in the past. Therefore, a two-day symposium was held to review the technology requirements for future orbital power systems. The purpose of the meeting was to give leaders from government and industry a broad view of current government supported technology efforts and future program plans in space power. It provided a forum for discussion, through workshops, to comment on current and planned programs and to identify opportunities for technology investment. Several papers are presented to review the technology status and the planned programs.

Source record↗

Radio science requirements and the end-to-end ranging system

Radio science ranging requirements negotiated between past and present flight projects and the DSN have generally focused on just the DSS and spacecraft hardware. All elements in the end-to-end system are analyzed and considered in terms of the error hierarchy. The end-to-end system is defined and examined as it applies to the generation of radio science ranging requirements. The variability of the performance levels of the system elements is emphasized with respect to the radio science experiment being performed and the DSN-spacecraft frequency band configuration.

Berman, A. L.↗

Visual simulation requirements and hardware

Requirements for any out-of-the-cockpit visual simulation system can easily lead to a set of system specifications which are clearly beyond the visual scene that can be produced by current technology. Therefore, the requirements of any proposed system must be assessed in light of the expected simulated aircraft and missions, experiments on pilot response, and available image generation and display hardware. A review is made of some of the recent experiments, and the results are related to aircraft and missions with particular emphasis on research and development simulators. Recent visual simulation hardware is considered in light of extending the range of applications of piloted aircraft simulators, and a method of design approach is proposed.

Dusterberry, J. C.↗

King 2 2519 ATM residual gyros: Reestablishing 5 year life requirements

The technical expertise required to assess the condition of the residual ATM 2519 Singer gyros is discussed. Past build history records, past performance characteristics, and recommendations for particular tests (which were performed by NASA personnel) are summarized. Test results are analyzed. A study of motor performance data and recommendations concerning gyro spin bearing life was performed. A method of reestablishing potential reliability of the bearing for the 5-year life requirement of the power module is also included.

Kayal, B.↗

The 25 kW power module evolution study. Part 1: Payload requirements and growth scenarios

Payload power level requirements and their general impact on the baseline and growth versions of the 25 kW power module during the 1983 to 1990 period are discussed. Extended duration Orbiter sortie flight, supported by a power module, with increased payload power requirements per flight, and free-flyer payload missions are included. Other payload disciplines considered, but not emphasized for the 1983 to 1986 period include astrophysics/astronomy, earth observations, solar power satellite, and life sciences. Of these, only the solar power satellite is a prime driver for the power module.

Source record↗