Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned in Implementation of Radiological Investigations of Small-Scale Sites in Port Hope, Ontario - 16534

The Port Hope Area Initiative is a $1.28 billion project for the remediation of historic low-level radioactive waste resulting from the operation of Eldorado Nuclear Limited and its private-sector predecessors between 1932 and 1988 in Port Hope and Port Granby, Ontario, approximately 100 km east of Toronto. Included in the project is the investigation of all 4,800 privately and publicly owned properties in Port Hope in order to identify and remediate an estimated 375 properties containing LLRW exceeding clean-up criteria. This paper discusses the progress of the investigations, the development of clean-up criteria, methodologies used to identify historic LLRW, and lessons learned to date. This paper will be of greatest interest to future project managers of similar investigations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Options for the Treatment of Nitrate Salt Wastes at Los Alamos National Laboratory - 16541

This paper summarizes the methodology used to evaluate options for treatment of the remediated nitrate salt waste containers at Los Alamos National Laboratory. The method selected must enable treatment of the waste drums, which consist of a mixture of complex nitrate salts (oxidizer) improperly mixed with sWheat Scoop{sup R}, an organic kitty litter and absorbent (fuel), in a manner that renders the waste safe, meets the specifications of waste acceptance criteria, and is suitable for transport and final disposal in the Waste Isolation Pilot Plant located in Carlsbad, New Mexico. A Core Remediation Team was responsible for comprehensively reviewing the options ensuring a robust, defensible treatment recommendation. The evaluation process consisted of two steps. First, a pre-screening process was conducted to cull the list on the basis for a decision of feasibility of certain potential options with respect to the criteria. Then, the remaining potential options were evaluated and ranked against each of the criteria in a consistent methodology. Numerical scores were established by consensus of the review team. Finally, recommendations were developed based on current information and understanding of the scientific, technical, and regulatory situation. A discussion of the preferred options and documentation of the process used to reach the recommended treatment options are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microbial Influence on Iodine Speciation at the 200 West Hanford Site - 16549

A waste product from nuclear fission, the radioisotope iodine-129 ({sup 129}I) is of environmental concern due to its long half-life (∼16 million years), mobility, and hazardous potential to humans through bioaccumulation in the thyroid gland. The Hanford Site in Richland, Washington, contains two separate {sup 129}I contaminant plumes over 1,500 acres with concentrations of ∼3.5 pCi/L in groundwater samples, exceeding the federal drinking water standard of <1 pCi/L. Consequently, understanding the mechanisms and contributors to iodine speciation is important in order to develop appropriate remediation strategies for iodine in non-aqueous environments such as the vadose zone, the subsurface environment located directly above groundwater. A lack of current remedial techniques is due to the complexity of microbial influence and presence of dissolved organics that impact the transport and speciation of {sup 129}I. Although, iodide (I{sup -}) is thermodynamically favored in the geological support material, based on current pH and Eh ranges at the Hanford Site, groundwater sampling of monitoring wells within the 200 West Area have found the dominant species to be iodate (IO{sub 3}{sup -}) (70.6%) while organo-iodine (25.8%) and iodide (3.6%) were found in far lower quantities. Enrichments of Lower Ringgold sediment from the 200 West Hanford site allowed the isolation of microbial species metabolically involved in the speciation of iodine. Through a series of batch studies and spectrophotometric assays, isolates were found to couple nitrate (NO{sub 3}) reduction with iodate (IO{sub 3}), where iodate reduction was not observed in the absence of nitrate. Additionally, isolates able to oxidize iodide were also identified. Currently, analytical techniques are being developed to further understand the kinetics and enzymatic activity for both of these redox reactions. Ongoing research involves these isolates and their influence on iodine speciation in the presence of organics such as humic acid or lignocellulose. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving the Safety Culture by Strengthening Leadership Skills - 16563

As a primary contractor for the U.S. Department of Energy (DOE), CH2M HILL Plateau Remediation Company (CH2M) is managing a team of approximately 1,400 employees at the Hanford Site in Southeast Washington. The work on this 10-year, $5.7 billion contract ranges from design and construction to decommissioning and cleanup. In 2013, CH2M began the second half of its contract and expanded its leadership development program to focus on succession planning and strengthening the leadership skills of its employees. The goal is to create and sustain qualified leaders to lead the Hanford cleanup mission today and into the future. CH2M launched the Leadership Impact Initiative, a training program modeled from best practices used at other CH2M projects, including the Idaho Cleanup Project. Based on the results of a CH2M HILL Plateau Remediation Company site-wide safety culture survey, the company developed an improvement strategy focused on leadership development with emphasis on the front-line leadership. The strategy stresses core leadership principles and skill development to help managers more effectively engage the workforce. The two-day workshop gives employees the opportunity to build leadership on the job in an audience of their peers. CH2M expanded the workshops to include employees from all levels of the organization, including bargaining unit employees. The workshops are reinforced at quarterly all-manager meetings, communications among team members and regular sharing of lessons learned and experiences in the field. The Leadership Impact Initiative advances CH2M's vision of quality leadership and project delivery anchored by health and safety performance excellence. Since 2013, CH2M hosted more than 25 Leadership Impact Initiative workshops, reaching approximately 500 participants. Meanwhile, the company achieved the best safety record since the start of its contract, and results from its 2015 safety culture survey show improvements in the safety climate. A DOE assessment of the CH2M worker health and safety culture for the Voluntary Protection Program (VPP) found the workshop was a contributing factor to the contractor achieving VPP Star and VPP Star of Excellence Status. This paper summarizes the strategy behind the leadership development program, the outcomes and its relevance for other companies, particularly those on DOE Environmental Management decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

After School Matters Program at the Hanford Site - 16569

CH2M HILL Plateau Remediation Company (CH2M), a prime contractor for environmental remediation at the U.S. Department of Energy Hanford Site in southeast Washington State, partnered with the nonprofit After School Matters (ASM) organization to provide outreach to local elementary school students in 2013-2014. The program emphasizes building relationships between youths and adults through academic tutoring, homework assistance, mentoring and physical fitness development. The program assists students from families where adults are often unemployed or underemployed. This project not only gives employees an opportunity to mentor and teach local youths, it also helps them prepare the next generation of leaders and experts. A substantial number of employees will be eligible for retirement within the next ten years, and their extensive institutional knowledge will go with them. Visiting schools and sharing this knowledge and experience gives students insights into career opportunities they might not otherwise consider. This program proved so successful, another Hanford Contractor involved their workers, expanding the program to a second elementary school. Also, the program caught the eye of a nonprofit organization, 21. Century After-School Program, who invited the team to expand to a third elementary school. The ASM program at the Hanford Site: (1) targets an often overlooked group of students and provides an opportunity to mentor and teach the future generation; (2) positively impacts the students, volunteers and community; (3) has expanded its reach to other contractors and schools. Lessons learned from this community education program provide valuable context for other organizations interested in similar outreach efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Protecting the Columbia River through Removal and Packaging of Radioactive Sludge in Hanford's K Area - 16572

The Columbia River once provided power and cooling water to operations on the Hanford Site; today, more than a million people downstream from Hanford rely on the river for agriculture, fishing and recreation. The Department of Energy and contractor CH2M HILL Plateau Remediation Company (CH2M) is making significant progress in protecting that vital resource. Eight of nine reactors along the river have been cocooned and soil and groundwater remediation is successfully reducing the concentration of contaminants in groundwater. The 100-K area is the last area where significant work remains to protect the river. CH2M has accomplished much in the past ten years, including demolishing the K East reactor fuel storage basin in 2009. Prior to demolition of the basin, highly radioactive sludge from that basin was transferred into containers located in the nearby K West reactor fuel storage basin. Today, the K East reactor is in interim surveillance mode, and work is underway in the K West basin to remove the sludge, which is a mixture of tiny fuel corrosion particles, fuel rod and metal fragments and soil and sand less than 1/4-inch in diameter. CH2M has designed a sludge removal system that will safely and efficiently remove the sludge from the K West basin and deposit it into specially designed containers which will be relocated to a storage facility on Hanford's Central Plateau. Procurement, fabrication and delivery of the sludge removal system is underway, with extensive testing and training planned for 2016 and 2017 ahead of the goal of removing sludge from the river by September 30, 2018. This project must account for many technical and safety considerations that render the project very challenging. Several safety measures have been incorporated as a result of safety evaluations. This paper will describe the issues facing the project team in developing the safety basis requirements and incorporating them into the design of the process equipment and construction of the facility to house the repackaging operations. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conducting Gamma Radiation Surveys on Municipal Roadways in Support of the Port Hope Area Initiative - 16602

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The project aims to remediate approximately 1.7 million cubic metres LLRW through the consolidation of waste within two Long-term Waste Management facilities to be constructed within the municipalities of Port Hope and Clarington. Within the Town of Port Hope, surveys are being conducted at approximately 5000 individual properties to confirm the presence of LLRW, delineate its extent and develop cost estimates for remediation. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and sampling for four signature contaminants. Of the 5000 properties, a number are municipal rights of way, largely municipal roads, that may have been impacted through spillage of LLRW when it was historically transported through the community for disposal and/or through its use as construction backfill. This paper describes the completion of gamma radiation surveys on these municipal rights of way and the challenges that needed to be addressed working on travelled roadways in an active community. To maximize efficiency and minimize inconvenience to motorists the gamma surveys are conducted using a mobile platform that provides high resolution spectral gamma logging coupled to GPS for geo-spatial referencing. The system employs large volume, spectroscopy grade, sodium iodide detectors that permit the collection radiological spectra allowing for effective discrimination of gamma radiation signals emitted from naturally occurring background sources (e.g. potassium 40) from the gamma emissions associated with the specific contaminants of concern (e.g. Ra-226). The system can be deployed on any platform including a backpack. For the majority of the roadways surveyed a small, self-contained, road-legal trailer attached to a motorized tow vehicle (e.g. side-by-side UTV or small pick-up truck) is used as the survey platform. This accommodates the mounting of multiple detectors and allows the surveys to be conducted without the need for closing traffic lanes thus improving productivity and safety while minimizing inconvenience to motorists. Data quality objectives are readily achieved through the use of multiple passes over the same target area providing a geo-spatially rich dataset for post-processing and imaging. Topics covered in the paper include: the logistics of completing high quality gamma surveys on travelled roadways; health, safety and traffic considerations; community outreach and response; and a comparison of isotopically-speciated data vs total gamma readings evaluating the influence of background sources. The lessons learned will be applicable to anyone planning on conducting similar surveys in urban settings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Laboratory Analytical Methods for Uranium Analysis Superior Steel FUSRAP Site - 16606

The Superior Steel Site processed uranium metal in support of the Atomic Energy Commission's fuel-element development program in the 1950's, and was subsequently classified as a Formerly Utilized Sites Remedial Action Program (FUSRAP) Site. Previous investigations at the site identified uranium contamination both inside and outside the buildings associated with historic uranium metalworking activities. The U.S. Army Corps of Engineers (USACE) is currently engaged in the Remedial Investigation (RI) phase in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended. As part of the RI, gamma spectroscopy analysis of environmental samples was performed on-site using a laboratory-grade, high-purity germanium (HPGe) spectrometer. The gamma spectroscopy analysis included isotopes of uranium and their progeny. As a quality assurance measure, a subset of samples already analyzed on-site were sent to a certified, commercial, off-site laboratory for analysis using a suite of analytical methods including gamma spectroscopy, alpha spectroscopy, and mass spectroscopy. As an element of the quality assurance program implemented for the RI, an assessment of the correlations between the various analytical methods employed by both the on-site and off-site laboratory was performed. This assessment revealed inconsistencies between on-site and off-site gamma spectroscopy analytical results, which raised concerns about the appropriateness and suitability of the analytical data. To resolve the data quality concerns and better understand the source(s) of analytical results variability, the Superior Steel RI team (USACE together with its contractor, Amec Foster Wheeler) developed a quality control test whose design objective was to control or practically eliminate sampling and sample preparation variability in order to focus more clearly on analytical variability. This paper discusses the results of this supplemental quality control test, showing the differences in the various analytical methods (both on-site and off-site). It demonstrates in a practical and real world setting how sample preparation and analytical variability, if not controlled and understood can impact data quality and data defensibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Minority Serving Institutions Partnership Program (MSIPP) - 18108

The DOE-EM recognizes that successfully completing its legacy environmental cleanup mission will require maintaining a well-trained, technically skilled, and diverse workforce. Minority representation in critical science and engineering fields is an important part of EM's vision for the future workforce. The Minority Serving Institutions Partnership Program (MSIPP) has been created and designed to increase the numbers of minorities with science and engineering experience in areas important to the success of the DOE-EM mission. MSIPP will provide financial assistance for science, technology, engineering, and mathematics (STEM) activities at Minority Serving Institutions (MSI) engaged in research and related STEM efforts supporting EM's needs. The program offers research internship opportunities at DOE National Laboratories across the DOE complex. MSIPP also encourages research collaborations between MSI Universities and DOE National Laboratories by funding research in areas relevant to DOE-EM needs. Based on current DOE-EM missions, there are two research focus areas: Tank Waste and Site Restoration. Tank Waste includes priority areas of current DOE tank waste and waste processing approaches, alternative DOE tank waste processing options, and tank management and closure. Site Restoration research concentrates in the areas of Soil and Groundwater with priority areas of attenuation-based remedies for the subsurface, deep vadose zone, remediation of mercury and industrial contaminants, and advanced simulation capability for environmental management; and, in the areas of Deactivation and Decommissioning, with priority areas of unique sensor networks for remote monitoring of entombed facilities and tanks, interactions between radiological and chemical contaminants of concern to DOE and facility materials, incombustible fixatives and decontamination agents, acceptability of DeconGel and various contaminant mixtures and robotics, remote systems with plug-and-play interchangeable components, and models for facility decommissioning. This paper gives an overview of the opportunities available to MSI students and universities and outlines the progress this program has made since its inception, and the path forward to further enhance efforts to create a pipeline into the DOE-EM workforce. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of Using Indistinguishable from Background as a Release Criterion at FUSRAP Projects - 18157

The US Army Corps of Engineers (USACE) utilizes the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) approach to site release on Formerly Utilized Sites Remedial Action Program (FUSRAP) projects. Use of Indistinguishable from Background (IFB) as a release criterion is discussed in MARSSIM as Scenario B; however, the discussion is arguably limited and refers the user to other documents. USACE has utilized the IFB approach at select FUSRAP projects. USACE experience is that use of IFB as a release criterion has been difficult to implement at best. There are many challenges in using the IFB approach. These include: release criterion is required per MARSSIM; multiple reference areas need to be established; and data presentation. Potential methods to overcome these challenges are discussed. USACE has utilized alternative statistical approaches as well as the IFB approach discussed in MARSSIM for specific purposes at FUSRAP sites. Alternatives to the IFB approach discussed in this paper include other statistical tests such as the Tukey Kramer test. These alternatives may be better suited to release an area of a property prior to the development of release criteria. USACE has found using the IFB criterion useful in certain specific circumstances. These include post MARSSIM Scenario A final status survey data evaluations and for review of historical data. The challenges, alternatives, and circumstances to use the IFB approach are discussed. Other environmental remediation projects attempting to utilize IFB as a criterion may benefit from the USACE experiences as discussed herein. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Selective Determination of Methylmercury Levels in Mercury-Contaminated Topsoils from Oak Ridge, TN - 18163

Mercury (Hg) is a strong neurotoxin that affects the central and peripheral nervous system. Mercury has several organomercury species that bio-accumulate in many different environments. In early 1950's, elemental mercury was used for manufacturing of various components nuclear weapons systems in the Y-12 Security Complex in Oak Ridge, TN. The mercury released to the environment contaminated the facilities, soil, sediment, surface water, and groundwater within the boundaries of the Y-12 Plant and the downstream environment along the East Fork Poplar Creek. Remediation efforts have been made since then to alleviate the amount of mercury contamination that impacts the soil, water and wildlife at the Y-12 complex and surrounding areas. Yet, mercury levels in the water still exceed both the regulatory limits (51 ng/L) and the remediation goal (200 μg/L). Methylmercury (CH{sub 3}Hg) is the most toxic form of mercury that bio-accumulates exponentially compared to other forms of mercury. It is hypothesized that contaminated soils contain significant levels of methylmercury that contributes to contamination in nearby freshwater ecosystems in Y-12 complex. The objective of this study was to develop analytical method for selective determination of CH{sub 3}Hg from mercury-contaminated soils that contained elevated levels of inorganic mercury, Hg(II). Attempts were made to selectively extract CH{sub 3}Hg from spiked template soils via extraction in dilute hydrochloric (HCl) and nitric acids (HNO{sub 3}). The latter performed better than HCl affording quantitative extraction of CH{sub 3}Hg with minimal extraction of Hg(II). Under same circumstance, only about 5% of Hg(II) extracted from the soil matrix. Coprecipitation efforts were made using Bi(III), Fe(III) and La(III) alone and in conjunction with thiourea and L-cysteine. A combination of La(III) + L-cysteine afforded highest elimination of Hg(II) from solutions. Thiourea was not suitable for coprecipitation of Hg(II) as it also precipitated up to 67% of CH{sub 3}Hg from simulated soil solutions. Cold vapor generation (CVG) interfaced to ICP-MS was optimized for selective determination of CH{sub 3}Hg{sup +}. Calibration curves were established with CH{sub 3}Hg standards in La(III) and 0.1% L-cysteine and 5% (v/v) HNO{sub 3} by CVG-ICP-MS. The method was validated by determination of CH{sub 3}Hg in sediment reference material (SQC1238) and Estuarine sediment (ERM - CC580) containing trace levels of CH{sub 3}Hg in Hg(II) matrix. The procedure was applied to floodplain soils from Oak Ridge, TN. Methylmercury levels were in the range of 0.031 to 0.047 μg/g. The results indicated that CH{sub 3}Hg{sup +} levels were substantially lower inorganic Hg(II), still though CH{sub 3}Hg at these levels could be significant source of persistent mercury contamination in freshwater systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Process for Obtaining TI Waiver for Recalcitrant Radionuclides at DOE Sites - 18225

The current plan for treating radioactive iodine-129 ({sup 129}I) at the 200-UP-1 operable unit (OU) within the Central Plateau at the Hanford Site is to hydraulically contain the groundwater plume using injection wells placed at the leading edge of the plume. In the previous feasibility study for the OU, no treatment technologies were identified that could achieve the federal drinking water standard of 1 pCi/L. In addition to further study to identify viable remediation technology options, efforts were initiated to assess the potential human health and environmental risks associated with using hydraulic containment of {sup 129}I, and to refine transport estimates based on evidence of attenuation. An initial step was to develop and apply a waste-site scale integrated vadose zone-aquifer model. Because viable {sup 129}I remediation technologies for the OU may not be identified in current efforts, a process to facilitate examining the suitability of a technical impracticability waiver for the OU conditions was initiated by defining the monitoring data analysis, documentation, and simulation support that would be needed for obtaining a waiver. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US EPA Superfund Radiation Risk Assessment Update: Superfund Update: Revisions to Risk and Dose Assessment Tools - 18232

The U.S. Environmental Protection Agency (EPA) Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet based calculators for risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical regional screening level calculator. A comprehensive set of revisions to the PRG calculator was finished in November 2014. Additional revisions to the other 5 calculators were made in 2015. A set of further revisions are expected to be finalized prior to December 2016 and will be discussed in this abstract. There are several additional revisions that may be finished prior to WM 2017 and will be presented if finished or discussed in more general terms if still underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Methodology to Assess the Impact of Non-Conventional Waste Streams Following a Radiological Incident - 18271

The Environmental Protection Agency's (EPA's) Waste Estimation Support Tool (WEST) is a Geographic Information System (GIS)-based decision support tool for estimating waste generated from remediation and cleanup activities following a radiological incident. WEST uses the Federal Emergency Management Agency's (FEMA's) Hazus-MH software's infrastructure information combined with image classification capabilities to estimate the quantity of waste and debris that may result from a radiological incident. WEST can be used to create customized decontamination strategies that allow end-users to evaluate different means of decontamination and how those strategies may impact the resulting waste stream in each geographical locality. This capability can potentially reduce the response/recovery time frame and cost. One of the key observations from past applications of WEST is that planning scenarios are site-specific, especially when dealing with chemical, biological, radiological, or nuclear (CBRN) waste management issues. Furthermore, site-specific issues are not limited to resource limitations or response bottlenecks but should also account for differences in an area's geography and urban footprint, a phenomenon observed during the Fukushima response. For instance, a recent WEST case study found that the amount of waste generated per unit of affected area, for a given decontamination approach, is largely a function of the building surface area in the affected area (relative to the ground surfaces). However, differences in the geometry and density of contaminated objects in the landscape may impact the amount and characteristics of the waste stream. Although buildings typically constitute a large portion of the surface area in urban environments, other objects such as vehicles and trees can be just as prominent. For example, seasonal changes in the amount of foliage present can alter the non-structural surface area calculated for an area like New York City by 20-30%. Very little is known about the impact that these non-conventional waste streams have on overall remediation strategies, or to what extent differences in characteristics of urban versus rural environments, traffic activities, or seasonal variations may have on these factors. This paper will present the proposed methodology to incorporate into WEST the impacts that niche, nonconventional waste streams might have from rural and urban environments following a nuclear power plant incident or detonation of a radiological dispersal device or improvised nuclear device. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Cleanup at the Y-12 Nuclear Security Complex - 18304

The Y-12 National Security Complex (Y-12) is one of the nation's most important national security assets. The facility played a key role in producing the world's first atomic bomb during the Manhattan Project and since World War II has been a vital contributor to America's nuclear deterrent capability. Historically, mercury was used extensively in operations at Y-12 in connection with production of components for nuclear weapons. During peak usage - from 1950 to 1963 - approximately 11 million kilograms of mercury were used. Over the years, large quantities of mercury - as much as 330,000 kilograms -- were lost within buildings and to soil and surface water. Today, mercury is considered the greatest environmental risk on the Oak Ridge Reservation and mercury cleanup is a high priority for the Department of Energy's Oak Ridge Office of Environmental Management (OREM). Remediation of Y-12 and East Fork Poplar Creek (EFPC) to mitigate the mercury risk is based on a phased, adaptive management approach. The approach to address surface water includes treatment actions in the short term and research and technology development to evaluate longer-term solutions in the downstream environment. A number of formidable challenges must be addressed in order to assure safe, effective cleanup of mercury contamination at Y-12 and in EFPC. In the long term, understanding how mercury moves in the EFPC system is essential to the development of new technologies and remedial options and strategies for mercury contamination in the creek. OREM has developed and is currently executing a Mercury Technology Development Plan to address these long term needs. As a major component of the short term actions, UCOR has completed the design of the Outfall 200 Mercury Treatment Facility. Outfall 200 is the point at which the west end Y-12 storm drain system discharges to Upper East Fork Poplar Creek (UEFPC). Outfall 200 is consistently the largest single source of mercury to UEFPC. Construction and operation of this facility is critical to reduce mercury in UEFPC, and operation of this facility will be required before demolition of mercury contaminated facilities can begin. Once operational, the Mercury Treatment Facility will have a treatment capacity of 3,000 gallons per minute (gpm), a storm water capture rate of 40,000 gpm, and two million gallons of storm water storage capacity. The headworks with transfer pipeline is designed to capture flow from Outfall 200 and move it to the treatment facility. A contract for construction of the Outfall 200 Mercury Treatment Facility is expected to be awarded in 2018. Early site preparation began in 2017. The early site preparation scope includes utilities relocation, small structure demolition and creek bank secant wall installation. Initial operation of the Mercury Treatment Facility is planned for 2022. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of IAEA MODARIA II Program Working Group 1 on Assessment and Decision Making of Existing Exposure Situations for NORM and Nuclear Legacy Sites - 18308

The International Atomic Energy Agency (IAEA) launched the Modelling and Data for Radiological Impact Assessments (MODARIA) II Programme in October. As part of the IAEA effort to enhance the capabilities of its Member States in assessing radiological impacts of radionuclides released to the environment from sites that were not operated in accordance with current standards, and to ensure protection of the public and the environment, the MODARIA II Programme aims to: (1) test the performance of models developed for predicting the transfer of radionuclides in the environment and assessing radiological impacts to the public and the environment; (2) develop and improve models for particular environments and, where appropriate, to agree on data sets that are generally applicable for use in testing environmental transfer models; and (3) provide an international forum for the exchange of experiences, ideas and research information. The Programme will run for 3 years from 2016 to 2019. The Programme comprises seven working groups covering a wide range of topics (https://wwwns.iaea.org/projects/modaria/modaria2.asp?s=8 and l=129). MODARIA II Working Group 1 (WG1) is focused on dose assessment and decision making regarding existing exposure situations due to naturally occurring radioactive material (NORM) and nuclear legacy sites. WG1 was formed as a combination of two MODARIA I WGs: WG1 focused on application of decision-aiding tools in remediation; and WG3 focused on risk assessment for NORM and radioactively contaminated legacy sites (https://wwwns.iaea.org/projects/modaria/default.asp?s=8 and l=129). It was recognized that the decision-making needs will inform the scope of risk assessments, and the risk insights and structured decision analyses will aid in informed decision-making. Therefore, MODARIA II WG1 is focused on developing methods and toolsets for risk-informed decision-making for NORM and nuclear legacy sites, including demonstration of decision-making processes and tools through case studies. MODARIA II WG1 has 91 registered participants from 33 Member States and IAEA (as of November 2017), some 30 of whom are actively engaged in various collaborative research and development activities within WG1. Members of WG1 participated in the First Technical Meeting of MODARIA II, which was held in Vienna, Austria from 31 October to 4 November 2016. The group then held its First Interim Meeting in Brussels, Belgium from 26 to 30 June 2017, which included a field trip to the legacy Tessenderlo Chemie (TCH) Phosphate Processing Site. At this meeting, the TCH Site and the Pridneprovsky Chemical Plant (PChP) in Ukraine were selected for case studies. The Los Alamos National Laboratory (LANL) Material Disposal Area B in the USA and the Beaverlodge Uranium Mill and Mill Site in northern Canada were selected as examples for sharing of good practices and lessons learned in risk-informed decision-making for environmental remediation and land conveyance. At the Second Technical Meeting held in Vienna on 30 October to 3 November 2017, an additional NORM site for tin processing in Brazil was added to the case studies, with another NORM site in Yunnan, China included for consideration at the Second Interim Meeting of WG1. The Second Interim Meeting will be held in in early to mid-May, 2018. The group has also decided to prepare an Interim Report by October 2018 to document the WG1 discussions and analyses for the period of 2016-2018, which will be finalized at the conclusion of MODARIA II in October 2019. Initial assignments have been discussed for IM1 participants to collect data, conduct modelling and analyses, and prepare draft sections for the Interim Report. This paper will provide an overview of the work plans for WG1. It will also highlight some near-term activities that the group is currently working on. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗