Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Design and Manufacture of the Conduction Cooled Torus Coils for the Jefferson Lab 12GeV Upgrade

The design of the 12-GeV torus required the construction of six superconducting coils with a unique geometry required for the experimental needs of Jefferson Laboratory Hall B. Each of these coils consists of 234 turns of copper-stabilized superconducting cable conduction cooled by 4.6 K helium gas. The finished coils are each roughly 2 × 4 × 0.05 m and supported in an aluminum coil case. Because of its geometry, new tooling and manufacturing methods had to be developed for each stage of construction. The tooling was designed and developed while producing a practice coil at Fermi National Laboratory. This paper describes the tooling and manufacturing techniques required to produce the six production coils and two spare coils required by the project. Project status and future plans are also presented.

43 PARTICLE ACCELERATORS↗

Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to provide various types of new grid-friendly controls.

14 SOLAR ENERGY↗

Mixed-Initiative Planning and Scheduling for Science Missions

The objective of this joint NASA Ames/JPL/SRI project was to develop mixed-initiative planning and scheduling technology that would enable more effective and efficient planning of science missions. The original intent behind the project was to have all three organizations work closely on the overall research and technology development objectives. Shortly after the project began, however, the Ames and JPL project members made a commitment to develop and field an operational mixed-initiative planning and scheduling tool called MAPGEN for the 2003 Mars Exploration Rover (MER) mission [Ai-Chang et al. 2003]. Because of the tremendous amounts of time and effort that went into making that tool a success, the Ames and JPL personnel were mostly unavailable for collaboration on the joint objectives of the original proposal. Until November of 2002, SRI postponed work on the project in the hope that the Ames and JPL personnel would be able to find time for the planned collaborative research. During discussions between Dr. Karen Myers (the SRI institutional PI) and Dr. John Bresina (the project PI) during November of 2002, it was mutually agreed that SRI should work independently to achieve some of the research objectives for the project. In particular, Dr. Bresina identified explanation of plans and planner behavior as a critical area for research, based on feedback from demonstrating an initial prototype of MAPGEN to the operational community. For that reason, our focus from November of 2002 through the end of the project was on designing explanation methods to address this need.

Myers, Karen L.↗

DSN Aperture Enhancement Project Office

All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

DSN Aperture Enhancement Project (DAEP)↗

Heavy ion beam physics at Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams (FRIB) will be the world's premier rare-isotope beam facility. Experiments with the majority (~80%) of the isotope predicted to exist will become available. The FRIB facility is based on a superconducting (SC) heavy ion linac with output energy above 200 MeV/u for any ions at beam power of 400 kW. FRIB includes a target facility for in-flight production of rare isotopes. A three-stage fragment separator will be used to prepare fast rare isotope beams with high-purity for nuclear physics experiments. The installation work of the accelerator and experimental systems is approaching completion and multi-stage beam commissioning activities started in summer 2017 with expected project completion in early 2022. In conclusion, the commencement of operation for users' experiments is planned immediately following the project completion.

43 PARTICLE ACCELERATORS↗

FY2020 Technology Integration Annual Progress Report

The 2020 Technology Integration Annual Progress Report covers 46 multi-year projects funded by the Vehicle Technologies Office. The report includes information on competitively awarded projects, ranging from rural shared mobility demonstration projects to medium- and heavy-duty electric vehicle deployment to statewide alternative fuel resiliency planning. It also includes projects conducted by several of the Vehicle Technologies Office’s (VTO) National Laboratory partners, Argonne National Laboratory, Oak Ridge National Laboratory and the National Renewable Energy Laboratory. These projects range from a Technical Assistance project for business, industry, government and individuals, to the EcoCar Advanced Vehicle Technology Competition, and the Fuel Economy Information Project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

USAID Colombia Young Leaders Workforce Training Program Action Plans: Forecasting Distributed Photovoltaic Adoption in Barranquilla, Colombia

As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, the Association of Renewable Energies Colombia (SER) participants leveraged their training and professional experience to develop an action plan for modeling the projected adoption of distributed solar photovoltaics (PV) out to 2050 for the city of Barranquilla, Colombia. This case study provides an overview of the key activities and outcomes of the Distributed Generation Market Demand Model (dGen™) Colombia project.

14 SOLAR ENERGY↗

Improving performance through concept formation and conceptual clustering

Research from June 1989 through October 1992 focussed on concept formation, clustering, and supervised learning for purposes of improving the efficiency of problem-solving, planning, and diagnosis. These projects resulted in two dissertations on clustering, explanation-based learning, and means-ends planning, and publications in conferences and workshops, several book chapters, and journals; a complete Bibliography of NASA Ames supported publications is included. The following topics are studied: clustering of explanations and problem-solving experiences; clustering and means-end planning; and diagnosis of space shuttle and space station operating modes.

Fisher, Douglas H.↗

A BIM-based system for demolition and renovation waste estimation and planning

Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Environmental Report for 2011

The Savannah River Site Environmental Report for 2011 (SRNS-STI-2012-00200) is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 2011 - including the Site’s performance against applicable standards and requirements. Details are provided on major programs such as the Environmental Management System (EMS) and permit compliance. Information for the 2011 report was compiled and prepared by the Environmental Compliance and Area Completion Projects (EC&ACP) Department of Savannah River Nuclear Solutions LLC (SRNS), the Site’s Management and Operations (M&O) contractor. The “Environmental Monitoring Program Management Plan” (SRS EM Plan, 2010) documents 1) the rationale and objectives for the monitoring program, 2) the frequency of monitoring and analysis, 3) the various sampling locations, and 4) the specific analytical and sampling protocols used. The “Environmental Monitoring Quality Assurance Project Plan” (SRS EM QA Plan, 2010) describes the associated quality assurance requirements.

54 ENVIRONMENTAL SCIENCES↗

2024 OES-Environmental 2024 State of the Science Report, Chapter 5: Stakeholder Engagement for Marine Renewable Energy

Stakeholder engagement is a critical piece of any new development project that affects public or private interests. Effective, thoughtful engagement and participatory activities early in the planning process of a project can help planners and project developers understand local concerns, adjust designs to avoid negative environmental impacts, select the best site for a project, answer questions, reduce delay, enhance opportunities and benefits, and build support for a project (Cuppen et al. 2016; Portman 2009; Wiersma & DevineWright 2014). On the other hand, cursory or inadequate engagement that is viewed as “checking the box” or tokenism is unlikely to be effective, and can result in project failures, diminished trust, strong opposition, or costly, drawn-out processes (Butcher & MacLennan 2020; Garard & Kowarsch 2017; Gill & Rand 2022; Jolivet & Heiskanen 2010; Pizzi et al. 2021; Sterling et al. 2017).

16 TIDAL AND WAVE POWER↗

An Enabling Technology for New Planning and Scheduling Paradigms

The Night Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called ?ask models," from the scientists and technologists for the tasks that are to be scheduled. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next, a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, the models are modified to be compatible with the scheduling engine. Then the models are submitted to the scheduling engine for automatic scheduling or, when requirements are expressed in notes, the timeline is built manually. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components: (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphical methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm that can exploit timing flexibilities and constraint and relationship options. (3) An innovative architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the remote users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Enabling a New Planning and Scheduling Paradigm

The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm which can exploit timing flexibilities and constraint and relationship options. (3) A web-based architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including considerations for planning, proposing, designing, procuring, and funding microgrid projects for resilience.

C2C↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Machine learning model to project the impact of COVID-19 on U.S. motor gasoline demand

Owing to the global lockdowns that resulted from the COVID-19 pandemic, fuel demand plummeted and the price of oil futures went negative in April 2020. Robust fuel demand projections are crucial to economic and energy planning and policy discussions. Here we incorporate pandemic projections and people's resulting travel and trip activities and fuel usage in a machine-learning-based model to project the US medium-term gasoline demand and study the impact of government intervention. We found that under the reference infection scenario, the US gasoline demand grows slowly after a quick rebound in May, and is unlikely to fully recover prior to October 2020. Under the reference and pessimistic scenario, continual lockdown (no reopening) could worsen the motor gasoline demand temporarily, but it helps the demand recover to a normal level quicker. Under the optimistic infection scenario, gasoline demand will recover close to the non-pandemic level by October 2020. The COVID 19 pandemic and consequent lockdown has had a substantial impact on mobility and therefore fuel demand and it is not clear when demand will recover. Ou et al. use a machine learning model that integrates health recovery scenarios to project the near-term future of gasoline demand.

COVID-19 pandemic↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A multi-scale calibration approach for process-oriented aggregated building energy demand models

Long-term energy planning relies largely on projections of future energy demand and hourly load profiles. Aggregate building models are increasingly being utilized to characterize the sensitivity of current and future building stocks to changes in climate, population, and building technology on city-to-regional-to-national scales. Due to challenges in the availability of data, those analyses have been limited to projection of energy demand at a single scale, usually state or country, while long-term planning power system models and production cost models might operate at different spatial scales such as energy regions which are focused on ensuring adequate generation infrastructure. In this work, we propose and evaluate a novel method to calibrate an aggregate building energy demand model (PNNL’s BEND model) against the best available data at the spatial scale of balancing authorities. This approach extends previous work on aggregated building energy demand by facilitating analysis of building energy demand across scales, in particular policy and operational decision-making scales. We show that the bias-corrected model estimates building electric loads reasonably well compared with estimates from a statistical model, but has the additional feature of flexibility across spatial scales. While the calibration approach is presently U.S.-centric and associated with U.S. energy regions, it can be extrapolated to other worldwide regions with similar scale challenges between policy and operational implementation decision making. We discuss the significant challenges involved in formulating and calibrating a complex physical model based on simulations of roughly 100,000 individual buildings against available aggregate regional electric load data and highlight areas for potential future work and improved data collection.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗