Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Particle Accelerator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

LCLS-II helium cryoplant and cryo distribution system installation

The helium cryoplant and cryo distribution system (CDS) are key elements of the new superconducting Linac Coherent Light Source (LCLS-II) and will provide superfluid helium to the accelerator. The cryoplant consists of two helium refrigerators with an equivalent 4.5 K refrigeration capacity of 18 kW each. The 37 cryomodules of the LINAC will be operated at a temperature of 2.0 K to accelerate a 4 GeV electron beam that will generate extremely bright X-ray laser light. Two five-stage cold compressor cold boxes will be utilized to provide superfluid helium II for the superconducting cavity structures with a total cooling capacity of 8 kW at 2.0 K. This paper describes the installation of the LCLS-II cryoplant and CDS. The LCLS-II cryoplant was designed and contributed by Jefferson Lab. To expedite the project completion the reuse of proven design and technology from the Jefferson Lab CHL-2 cryoplant was the preferred strategy. The CDS consists of ~260 m thermally shielded and vacuum super insulated transfer lines, two distribution boxes and eight feed and end caps, and was designed and contributed by Fermilab. SLAC installed the cryoplant components into a newly erected building and the CDS components into the existing accelerator tunnel and klystron gallery with strong engineering support from both partner labs.

43 PARTICLE ACCELERATORS↗

Upgrade of the ILC Cryomodule

Results of testing modified components for the cryomodule of the International Linear Collider (ILC) are summarized. To reduce the ILC project cost, it is proposed to replace titanium cryomodule components with stainless steel (SS) ones. New bimetallic transitions (Ti/SS, Nb/SS) have been produced by a unique method based on explosion welding. Successive upgrading of these components to the latest version of the Nb/Ti/SS transition element has led to improvement of the ILC cryomodule. This new component resolves problems of residual stress, and its specific design prevents the possibility of a shift due to the difference in the linear expansion coefficients of the constituent metals. Furthermore, leak tests with the He gas revealed no leaks at the background rate of ≈0.2 × 10$^{–10}$ atm cc/s. The test results are very encouraging. The up-to-date design of trimetallic Nb/Ti/SS element promises technologically simpler and less expensive manufacture. Investigations have shown that explosion welding allows unique trimetallic components to be made not only for cryogenic units of accelerators but also for laboratory equipment and for general engineering applications.

43 PARTICLE ACCELERATORS↗

Simulation study of ion beam used to produce Mo-99

An 820 mA CW positive ion source is being developed to produce Mo-99 using the fusion of deuterium and tritium ion beams on a rotating target to produce neutrons for use in the production of radiopharmaceuticals. The ion source consists of an RF plasma source, a multi-aperture extractor, and 300 kV accelerating column. This paper will describe a simulation study of the beam through the extractor grid and the accelerator to the target. The uniformity of beam distribution on the target is an important aspect of the simulation.

43 PARTICLE ACCELERATORS↗

Microstructure Changes Observed in the Near-Surface Region of SRF Nb Cavities Cutouts upon Cooling/Heating Cycles Using GI-Synchrotron XRD

We have mapped microstructural changes in the near-surface region of Nb from SRF cavity-cutouts upon thermal cycles in the range from 300 to 30 K using grazing incidence synchrotron X-Ray diffraction (GIXRD). Segregation of secondary phases was observed after the thermal cycle, and their nature has been clarified and discussed in view of previous studies on hydrides formation in SRF bulk Nb cavities. The temperature dependence of the relative population of these formed phases was obtained from GIXRD patterns profile fitting. Both, Nb bulk matrix and the new phases formed after cool-down show specific structural features as thermal contraction/expansion, structural transitions, and Nb lattice variation due to the induced strain by precipitates formation. The information derived from this structural study can explain some phenomena as the dissipation at high accelerating field (i.e. High Field Q Slope, HFQS) in the Nb SRF performance as well as new mechanisms never addressed in previous studies.

43 PARTICLE ACCELERATORS↗

SNOWMASS2021 (AF7): Sub-scale models and infrastructure for accelerator magnet development

The LHC is undoubtfully the most important instrument the HEP community has on its disposal and is widely considered an amazing technological achievement. At the core of this instrument lay accelerator magnets based on NbTi technology – a technology well developed and widely used in the commercial sector too. Yet, a decade after the accelerator started it still did not reach its design collision energy of 14 TeV and it operated for years well below it. The reason for this is simple – magnet training (even though only a subset of the magnets is mostly affected).

43 PARTICLE ACCELERATORS↗

LANL Report on Northstar Facility Design Support FY21

As Northstar enters a stage of rapid progress in the construction and implementation of their accelerator based Mo99 production facility, LANL has been supporting the effort as requested. This support is often an assistance response to issues as they arise. This report will describe these issues and the LANL contribution in analysis, advice and experimentation.

43 PARTICLE ACCELERATORS↗

LANL Report on Northstar Facility Design Support FY2021

As Northstar enters a stage of rapid progress in the construction and implementation of their accelerator based Mo99 production facility, LANL has been supporting the effort as requested. This support is often an assistance response to issues as they arise. This report will describe these issues and the LANL contribution in analysis, advice and experimentation.

43 PARTICLE ACCELERATORS↗

LAMP Low-Energy Region Options: Workshop Report and Ranking Assessment

The LANSCE accelerator complex at Los Alamos National Laboratory provides beam to five user facilities: IPF, pRad, UCN, WNR and the Lujan Center. Each user facility receives a beam tailored to its specific requirements, including species (H+ or H- ) and beam pulse format. The capabilities and beam requirements of the LANSCE user facilities are documented elsewhere. The core components of the LANSCE accelerator complex – the beam source area, drift-tube and cavity-coupled linear accelerators – are more than 50 years old; a critical subsystem for beam delivery to the Lujan Center, the proton storage ring (PSR), is approximately 40 years old, with its last major refresh being completed in the late 1990s. The LAMP project is intended to begin a revitalization and update of the LANSCE accelerator complex, starting with the beam source region, drift-tube linac, and PSR.

43 PARTICLE ACCELERATORS↗

Requirements and Overview of the LAMP PDM Vault

The Los Alamos Neutron Science Center (LANSCE) is located at Technical Area 53 (TA-53) at Los Alamos National Laboratory in Los Alamos, New Mexico. LANSCE is driven by an 800 mega electron volt (MeV) proton accelerator that delivered first beam in 1972. The LANSCE accelerator is unique in that it accelerates both H- (to full energy of 800 MeV) and H+ ions (up to 100 MeV currently but has accelerated high-power H+ beam to 800 MeV in the past) and supports five separate experimental areas that operate simultaneously with each having different timing and beam current requirements.

43 PARTICLE ACCELERATORS↗

Beam Loss Monitoring with Fixed and Translating Scintillation Detectors Along the Fermilab Drift-tube Linac

The Fermilab Linac is a roughly 145 meter linear accelerator that accelerates H- beam from 750 keV to 400 MeV and provides beam for the Booster and the rest of the accelerator chain. The first section of the Linac is a Drift-Tube Linac (DTL), which in its current state, suffers from a lack of instrumentation along its length. As a result, operational staff do not have access to the diagnostic information needed to tune the critical components of this accelerator, such as the quadrupole magnets within the drift tubes. This work presents an effort to utilize both fixed and translating scintillation detectors to investigate beam loss along the first two cavities of the DTL.

43 PARTICLE ACCELERATORS↗

Excellent performance of 650 MHz single-cell niobium cavity after electropolishing

Electropolishing process and cathodes have undergone modification and optimization for both low- and high-beta 650 MHz five-cell niobium cavities for PIP-II. Cavities treated with these modified electropolishing conditions exhibited smooth surfaces and good performance in baseline tests. Nonetheless, due to administrative constraints on project cavities, maximum gradient performance testing was not conducted. This paper presents a study conducted on a single-cell 650 MHz cavity utilizing the optimized electropolishing conditions, highlighting the maximum performance attained for this specific cavity. The cavity tested at 2 K in a vertical cryostat reached a superior accelerating field gradient of 53.3 MV/m at Q0 of 1.6x1010, which is the highest gradient attained for this type of large-sized cavities.

43 PARTICLE ACCELERATORS↗

Accelerator Physics of Colliders

This article provides background for the High-Energy Collider Parameter Tables that follow and some additional information; see in-depth review and a comprehensive list of references in [1]; citations below are limited to widely used textbooks and open access seminal papers and reviews.

43 PARTICLE ACCELERATORS↗

Facility upgrade for superheavy-element research at RIKEN

The RIKEN Nishina Center (RNC) executed an accelerator upgrade project for the heavy-ion linac (called RILAC). A superconducting RIKEN linear accelerator (SRILAC) and a new superconducting electron-cyclotron-resonance ion source (SC-ECRIS) to boost the final energy and intensity were constructed, aimed at synthesizing a new superheavy element, 119, through a hot fusion reaction. The project included the construction of a gas-filled recoil ion separator (GARIS-III) suitable for detecting the residues of the hot-fusion reaction. To avoid research interruption during the SRILAC construction period (2017–2019) and gain experience in hot-fusion reaction processes, GARIS-II located in the GARIS experimental hall in LINAC building was moved to the E6 experimental hall in Nishina building. Certain exploratory measurements were performed employing the beams accelerated by RILAC2 and the RIKEN ring cyclotron (RRC), which is a part of the existing accelerator complex of the radioactive isotope beam factory (RIBF). Further, commissioning experiments with the upgraded facility (SRILAC and GARIS-III) were performed. The upgrade project and its commissioning results are chronologically described in this article.

43 PARTICLE ACCELERATORS↗

Beam Position Monitor: Sensors, Calibration and Analysis [Slides]

A beam position monitor (BPM) provides information on electron beam current and position, essential to meeting the performance requirements for the Scorpius accelerator as laid down in FR1.1 –FR1.8 and FR2.2. The critical elements in employing BPM’s to meet those requirements are design of the sensor, design of calibration equipment for the sensor, and design of methods to record and process data.

43 PARTICLE ACCELERATORS↗

IROS 2023 Workshop Report: Draft Guidelines on Manufacturing Procedures, Test Methods and Reporting for Soft Robotics

Soft roboticists are facing challenges with reproducibility, which prevents researchers from making holistic comparisons to prior work, impedes full understanding of results, and forces the need to “reinvent the wheel,” delaying fundamental advances. Reproducibility of results is key to advancing science as well as achieving technology transfer from research laboratories to industrial applications. Recently, a discussion-based workshop dedicated to the topic, “Developing Standard Testing and Reporting Guidelines for Soft Robotics,” was held at IROS 2023 in Detroit, MI. The purpose of this document is to record a set of recommendations and voluntary draft guidelines for soft roboticists concerning fabrication/manufacturing, test procedures, and reporting, which were collectively developed at the workshop. Together as a community, we hope to improve the reporting standards of soft robotics and drive the field as a whole toward more rigorous research practices.

43 PARTICLE ACCELERATORS↗