Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLUGGING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Geometric Optimization of an Electrochemical Purification Cell to Prevent Corrosion in CSP Plants During Operation

When exposed to moisture or oxygen, molten chloride salts produce corrosive impurities which degrade containment alloys. As a result, this can significantly decrease the lifetime and increase costs of molten-salt-based systems. To overcome this barrier, we designed and modeled an electrochemical purification cell to remove the corrosive impurity MgOH+. Various reactor architectures, including constant stirred tank reactors (CSTRs) and plug flow reactors (PFRs) were investigated. Steady-state thermoelectric properties were evaluated, allowing assessment of the effects of structure and design parameters such as flow rate, cell length, and cross-sectional area of molten salt. The results suggest that our design could most effectively increase reliability and decrease costs of molten-chloride-salt-based systems by protecting them during continuous operation using an annular plug flow reactor.

chloride salts↗

Expanding thermite reactions for downhole applications

Methods and apparatus for forming platforms and flow control features in underground wells is described, using modified thermite reactions to form a ceramic plug in place. The reactive package is engineered to expand laterally, filling the well, and may be used to form a ceramic bridge plug, porous ceramic screen sections, or mitigate lost circulation of drilling fluids. These objectives are achieved through the design of the reactive package and through use of carefully chosen reaction additives that control the molten product rheology, solidification temperature, and pore generations and sustainment.

Lowry, William Edward↗

Triple containment targets for particle irradiation

The invention provides a system for containing irradiated particles, the system having a housing having a closed upstream end and an open downstream end; an axially disposed tunnel extending from the downstream end to the upstream end, wherein longitudinally extending regions of the tunnel define a plurality of threaded surfaces; a sample cup positioned within the tunnel and proximal to the closed upstream end; threaded plugs matingly received by the threaded surfaces so as to provide at least one seal between the sample cup and the atmosphere external of the housing; and a plurality of deformable substrates disposed between the plugs.

Smith, Nicholas A.↗

Microscale device and method for purification of radiopharmaceuticals

A microfluidic chip device for the purification of radiochemical compounds includes a chip having an injection channel and intersecting branch channels with a plurality of valves are located along the injection channel and branch channels and configured to retain a plug of solution containing the radiochemical compound. The chip further includes a serpentine channel segment (for separation) coupled to the output of the injection channel. A high voltage power source advances the plug of solution through the purification region and into the downstream fraction collection channel. The chip includes a downstream fraction collection channel coupled to the serpentine channel segment and having an optical and radiation detection regions. One or more branch fraction channels intersect with the fraction collection channel and include valves located therein so that the radiochemical compound that is detected using a radiation detector is directed into the desired branch fraction channel for subsequent use.

Van Dam, R. Michael↗

The pre-conceptual design of the nuclear island of ASTRID

The CEA is involved in a substantial effort on the ASTRID (Advanced Sodium Technological Reactor for Industrial Demonstration) pre-conceptual design in cooperation with EDF, as experienced Sodium-cooled Fast Reactor (SFR) operator, AREVA, as experienced SFR Nuclear Island engineering company and components designer, ALSTOM POWER as energy conversion system designer and COMEX NUCLEAIRE as mechanical systems designer. The CEA is looking for other partnerships, in France and abroad. The ASTRID preliminary design is based on a sodium-cooled pool reactor of 1500 MWth generating about 600 MWe, which is required to guarantee the representativeness of the reactor core and the main components with regard to future commercial reactors. ASTRID lifetime target is 60 years. Two Energy Conversion Systems are studied in parallel until the end of 2012: Rankine steam cycle or Brayton gas based energy conversion cycle. ASTRID design is guided by the following major objectives: improved safety, simplification of structures, improved In Service Inspection and Repair (ISIR), improved manufacturing conditions for cost reduction and increased quality, reduction of risks related to sodium fires and water/sodium reaction, and improved robustness against external hazards. The core is supported by a diagrid, which lay on a strong back to transfer the weight to the main vessel. AREVA is involved in a substantial effort in order to improve the core support structure in particular regarding the ISIR and the connection to primary pump. In the preliminary design, the primary system is formed by the main vessel and the upper closure comprising the reactor roof, two rotating plugs - used for fuel handling - and the components plugs located in the roof penetrations. The Above Core Structure deflects the sodium flow in the hot pool and provides support to core instrumentation and guidance of the control rod drive mechanisms. The number of the major components in the main vessel, primary pumps, Intermediate Heat Exchangers, and Decay Heat Exchangers are now under consideration. Under normal conditions, power release is achieved using the steam/water plant (in case of Rankine steam cycle) or the gas plant (in case of Brayton gas cycle). The diverse design and operating modes of Decay Heat Removal systems provide protection against common cause failures. A Decay Heat Removal system through the reactor vault is in particular studied with the objective to complement Direct Reactor Cooling systems. At this stage of the studies, the secondary system comprises four independent sodium loops (two and three sodium loops configurations are also investigated). Each loop includes one mechanical pump (or a large capacity Annular Linear Induction Electromagnetic Pump), and three modular Steam Generator Units characterized by once through straight tube units with a ferritic tube bundle; nevertheless, helical coil steam generator with tubes made of Alloy 800, and inverted type steam generator with a ferritic tube bundle are also investigated. The limited power of each modular Steam Generator Unit allows the whole secondary loop to withstand a large water/sodium reaction consecutive to the postulated simultaneous rupture of all the heat exchange tubes of one module. The arrangement of the components is based on the 'Regain' concept, in which the secondary pump is situated at a low level in the circuit; conventional arrangement, as SUPERPHENIX type, is a back-up option. Alternative arrangements based on gas cycles are also studied together with Na-gas heat exchanger design. This paper presents a status of the ASTRID pre-conceptual design. The most promising options are highlighted as well as less risky and back-up options. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Phase-change valves and related methods

Valves may include an opening sized and shaped to permit a subject fluid to flow through the opening when the opening is unobstructed. A heat exchange element may be located proximate to the opening, the heat exchange element positioned and configured to induce a localized phase change in the subject fluid to form and unform a solid plug from the subject fluid around at least a portion of the heat exchange element. A heat transfer rate of the heat exchange element may be variable to control a rate of flow of the subject fluid through the valve by controlling a size of the solid plug from the subject fluid.

Sabharwall, Piyush↗

Metal wick crimping method for heat pipe internals

A wick assembly for use with a heat pipe is disclosed. The wick assembly includes an end plug including a wick receiving area, a wick, and a crimp. A portion of the wick is positioned about the wick receiving area. The crimp is positioned about the portion of the wick and the wick receiving area. The end plug, the portion of the wick, and the crimp are diffusion bonded.

Gross, David M.↗

Design Improvements and Analysis of Innovative High-Level Waste Pipeline Unplugging Technologies - 12171

Transferring high-level waste (HLW) between storage tanks or to treatment facilities is a common practice performed at the Department of Energy (DoE) sites. Changes in the chemical and/or physical properties of the HLW slurry during the transfer process may lead to the formation of blockages inside the pipelines resulting in schedule delays and increased costs. To improve DoE's capabilities in the event of a pipeline plugging incident, FIU has continued to develop two novel unplugging technologies: an asynchronous pulsing system and a peristaltic crawler. The asynchronous pulsing system uses a hydraulic pulse generator to create pressure disturbances at two opposite inlet locations of the pipeline to dislodge blockages by attacking the plug from both sides remotely. The peristaltic crawler is a pneumatic/hydraulic operated crawler that propels itself by a sequence of pressurization/depressurization of cavities (inner tubes). The crawler includes a frontal attachment that has a hydraulically powered unplugging tool. In this paper, details of the asynchronous pulsing system's ability to unplug a pipeline on a small-scale test-bed and results from the experimental testing of the second generation peristaltic crawler are provided. The paper concludes with future improvements for the third generation crawler and a recommended path forward for the asynchronous pulsing testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High aspect ratio gratings fabricated by electrodeposition

A method is provided for making gratings of gold or other metal in silicon substrates. The disclosed method may achieve high aspect ratios. According to the disclosed method, a silicon wafer is through-etched. A seed layer of metal is vapor-deposited on one side of the wafer, and a layer of metal is electrodeposited on the seed layer. The electrodeposited metal plugs the trenches and provides a conductive surface for subsequent electrodeposition. The trenches are then filled by electrodeposition from within the trenches, so that the walls of the metal grating grow on the metal plugs.

Arrington, Christian Lew↗

VENTSAR V3.0: A Python GUI for Estimating Contaminant Concentrations on or Near Buildings Due to Building Effects and Plume Rise and For Calculating Inhalation and Plume Shine Doses

VENTSAR: Originated as VENTAX (Smith and Weber 1983) on the IBM Mainframe at the Savannah River Site (SRS) as a Fortran program. Updated to VENTSAR XL V1.0 (Simpkins 1997) as a spreadsheet version using macros created in Microsoft Excel. Later updated to VENTSAR XL V2.0 (Dixon 2018) as a spreadsheet executing a modified version of the original VENTAX Fortran code. Estimates contaminant concentrations on or near a building from a release at a nearby location. Calculates concentrations for a given meteorological exceedance probability or for a given stability and wind speed combination. Can model a single building with or without a penthouse on top or a ground location from either a stack or ground release. Plume rise can be considered. Contaminant releases can be chemical or radioactive with downwind concentrations determined at user-specified distances. Wind passing over and around buildings creates a complicated dispersion pattern. Air-intake vents may be located on building roofs or near the ground downwind of a release source. An estimation of pollutant concentrations on or near a structure is important in determining expected pollutant levels. Meteorological data are selected based on a specific area of the site. Fortran-based VENTAX able to make fast, complex mathematical calculations. Not user-friendly VENTSAR XL V1.0 no longer supported due to obsolete Excel macros. VENTSAR XL V2.0 an interim solution using an Excel spreadsheet to interface with the modified VENTAX Fortran code. Requires user to have Microsoft Excel. Not an intuitive interface for someone unfamiliar with VENTSAR. Does not perform dose calculations. VENTSAR V3.0 goal to combine the strengths of previous versions of VENTSAR into a single, powerful yet user-friendly program with a Graphical User Interface (GUI). Not dependent upon a specific program or plug-ins. Self-contained package to be used on any computer running Microsoft Windows. User-friendly, intuitive GUI created in Python for parameter input. Executes same modified VENTAX Fortran code as VENTSAR XL V2.0. Outputs formatted text file of completed calculations for easy review and dissemination. Performs inhalation and plume shine dose calculations for up to 11 user-selected nuclides from a nuclide dose factor library of almost 500 nuclides. 12 test cases were created for verification of V1.0 and V2.0. Same test cases run in V3.0 to verify correct performance. V3.0 produced similar results to V1.0. Confirmed GUI did not alter calculations in any way. Comparisons of the test case results confirm the V3.0 GUI does not influence the VENTSAR calculations. Simply passes same input parameters to VENTAX Fortran code for execution. Provides end user an easy-to-use, intuitive tool to quickly make building effect and plume rise calculations, as well as, inhalation and plume shine dose calculations. No experience with or working knowledge of Fortran, Excel, command line, or macros required. Self-contained package allows VENTSAR be deployed to any Windows computer without the need for specific programs or plug-ins.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Generic Post-Closure Safety Assessment for Deep Borehole Disposal of Heat-Generating Waste - 20451

The deep borehole disposal (DBD) concept for high-activity waste consists of drilling a large-diameter borehole into crystalline basement rock to a depth of about 5,000 m, placing waste packages in the lower portion of the borehole - the waste emplacement zone - and sealing and plugging the upper portion of the borehole with a combination of bentonite, cement plugs, and sand or crushed rock ballast. The waste emplacement zone is several times deeper than typical mined repositories and is well below the typical maximum depth of fresh groundwater resources. Recent work describes a generic reference case for deep borehole disposal of Cs and Sr capsules stored at the Hanford Site. Two scenarios are described: an undisturbed (nominal) scenario, and disturbed scenario, in which a waste package is stuck adjacent to a transmissive fracture zone in crystalline basement. Simulations of the processes affecting radionuclide release and transport in the two scenarios provide the basis for quantitative post-closure performance assessment (PA) of the reference case. This paper presents a probabilistic PA of the stuck waste package scenario, i.e. uncertainties affecting radionuclide mobilization and transport are propagated through 200 realizations of a predictive model to quantify uncertainties in predicted radionuclide concentrations within the borehole and the fracture zone. Simulations predict no radionuclide transport in the borehole to distances greater than 100 m above the stuck waste package. An assumed lateral pressure gradient results in predictions of limited radionuclide transport in the fracture zone at a lateral distance of 200 m from the stuck waste package. These results complement previous results for the nominal scenario and contribute to the development of a generic safety case for DBD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System for multiple burns from a rocket motor

A system for multiple burns from a solid fuel rocket motor may extinguish rocket fuel after the rocket has been ignited. The motor may be extinguished via rapid decompression of the combustion chamber. The fuel may then be reignited by a suitable igniter, and the process of extinguishing and reigniting may be repeated, enabling multi-burn maneuvers. A decompressive extinguishing plug nozzle may extinguish solid rocket fuel after the rocket has been ignited and/or keep a rocket in a disarmed (zero thrust) state until the rocket is to be armed. The nozzle may include a plug that mostly impedes the opening of the nozzle and an outer cowl that is movable to rapidly decompress the combustion chamber. This rapid decompression extinguishes the solid rocket fuel. In some aspects, the fuel can be reignited and extinguished multiple times.

Dallmann, Nicholas↗

Wellbore Stability and Mud Loss Management in Geothermal Drilling: Optimizing Mud Weight to Mitigate Tensile Wellbore Fracturing at The Geysers, California

As part of a U.S. Department of Energy (DOE) Geothermal Technologies Office-funded initiative, Geysers Power Company, LLC, a subsidiary of Calpine Corporation, has been working to enhance drilling performance at the world’s largest geothermal field, The Geysers, in northern California. In a recent drilling operation of the GDC-36 well, excessive mud losses were encountered, initially addressed through repeated but largely ineffective cement plugging. Ultimately, the most effective strategy was to drill blind through the loss zones, made feasible by the high rate of penetration (ROP) achieved with PDC bits, allowing significant progress before the mud tanks were depleted and water-sensitive argillic formation layers could collapse. In response to these challenges, the project team explored alternative methods to minimize downtime and risks associated with cement plugging and continuous mud loss and to contemplate the driving mechanisms for the losses. Wellbore imaging using Formation MicroImager (FMI) and Ultrasonic Borehole Imager (UBI) tools revealed longitudinal tensile fractures, which were attributed to mud weights exceeding the minimum circumferential stress resulting from the native stress field and formation pressure. This study examines the mud losses encountered and leverages wellbore imaging data to understand the mechanisms behind mud induced tensile fracturing in specific rock facies. Understanding fracture behavior across different lithologies is crucial, as fractures within the reservoir can enhance steam migration throughout the system. The reservoir at The Geysers lies within the Mesozoic Franciscan Assemblage, a tectonic mélange formed by subduction. It consists of metamorphosed turbidite sandstone (greywacke) and mudstone (argillite), oceanic upper crust (including greenstone and chert), and serpentinized ultramafic rocks - each exhibiting distinct geomechanical fracturing properties. The structural fabric of the Franciscan Assemblage was shaped by low-angle Mesozoic thrust faulting and later overprinted by sub-vertical strike-slip structures related to the Pacific-North American plate boundary. A wellbore stability model was developed using core measurements and logs to simulate fracturing scenarios during drilling under varying stress conditions. These simulations guided the development of an optimized mud weight management strategy that should enable adaptive adjustments during drilling, reducing the likelihood of tensile fracturing and mud losses, ultimately improving operational efficiency.

15 GEOTHERMAL ENERGY↗

The future of subsurface monitoring: AEC’s breakthroughs in CCS technology

Carbon capture and storage (CCS) has emerged as a key solution in the fight against climate change. However, for CCS to succeed, it is crucial to ensure that the sequestered CO2 stays safely trapped underground. The U.S. Department of Energy (DOE) has emphasized the need for advancements in subsurface monitoring, measurement, reporting, and verification. Aside from caprock integrity failure, the other primary failure points usually involve defective cement in the casing annulus of wellbores or plugged and abandoned wells. In addition, many energy producers (e.g., oil and gas, geothermal) and storage and disposal operators (e.g., H2 and water) must deal with the same issue. Poorly placed or degraded cement can create pathways for gas or fluid to escape from casing annuli and in plugged and abandoned or orphan wells, posing environmental risks. Yet, a reliable and cost-effective way to monitor cement and well integrity over multiple decades is still unavailable. Traditional geophysical methods like 4D seismic imaging and surface-based electromagnetic monitoring lack the resolution and accuracy for detecting these types of failures (Vasco et al., 2022; Fawad and Mondol, 2021). Wireline logging is expensive to run continuously and is obtrusive to the operation. While fiber optics can potentially be a solution, its bulkiness can significantly compromise the cement's integrity. To address these challenges, the Advanced Energy Consortium (AEC) at The University of Texas at Austin’s Bureau of Economic Geology (the Bureau) has been pioneering research in subsurface monitoring using its portfolio of distributed autonomous microfabricated sensors for harsh subsurface environments since 2008. A class of these microsensors [System on a Chip (SoC)] can be mixed in cement and permanently placed without compromising the cement column; the sensors would then communicate with each other or a data acquisition (DAQ) master node. Another class of the AEC microsensors can be fully autonomous, with rechargeable micro-batteries capable of exceeding 100°C, flash memory, and, currently, a pressure and temperature sensor. They are designed to circulate in mud, geothermal fluids, U-loops, or pipelines. They can log data into memory and are unobtrusive to operations. Our team has been working on a multi-year DOE-funded project (DE-FE0031856)—supported by $2.95M in federal funding and $0.75M in cost-matching from the AEC—to demonstrate SoC sensor utility for CO2 leakage monitoring in CCS applications. This multi-institutional collaboration developed a novel sensing architecture utilizing radiofrequency (RF) microsensors embedded within the cement sheath. These sensors detect CO2 migration and are interrogated via a Smart Casing Collar (SCC).

58 GEOSCIENCES↗

?Just-in-Time? Battery Charge Depletion Control for PHEVs and E-REVs for Maximum Battery Life

Conventional methods of vehicle operation for Plug-in Hybrid Vehicles first discharge the battery to a minimum State of Charge (SOC) before switching to charge sustaining operation. This is very demanding on the battery, maximizing the number of trips ending with a depleted battery and maximizing the distance driven on a depleted battery over the vehicle s life. Several methods have been proposed to reduce the number of trips ending with a deeply discharged battery and also eliminate the need for extended driving on a depleted battery. An optimum SOC can be maintained for long battery life before discharging the battery so that the vehicle reaches an electric plug-in destination just as the battery reaches the minimum operating SOC. These Just-in-Time methods provide maximum effective battery life while getting virtually the same electricity from the grid.

25 ENERGY STORAGE↗

RF-driven Proton Source with a Back-streaming Electron Dump

This article describes an RF ion source with a back-streaming electron dump. A quartz tube, brazed to a metal plug at one end, is fused in the center of a flat quartz plate. RF power (at 13.6 MHz) is coupled to generate hydrogen plasma using a planar external antenna bonded to the window. Bonding the water-cooled rf antenna to the quartz window significantly lowers its temperature. The water-cooled metal plug serves as the backstreaming electron dump. At 1800W, the current density of extracted hydrogen ions reaches approximately 125 mA/cm{sup 2}.

43 PARTICLE ACCELERATORS↗