Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

United States Nuclear Data Program Work Plan for Fiscal Year 2025

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2025 that begins on October 1, 2024. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan : ASC software quality engineering practices Version 3.0.

The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in the US Department of Energy/National Nuclear Security Agency (DOE/NNSA) Quality Criteria, Revision 10 (QC-1) as 'conformance to customer requirements and expectations'. This quality plan defines the SNL ASC Program software quality engineering (SQE) practices and provides a mapping of these practices to the SNL Corporate Process Requirement (CPR) 001.3.6; 'Corporate Software Engineering Excellence'. This plan also identifies ASC management's and the software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals. This SNL ASC Software Quality Plan establishes the signatories commitments to improving software products by applying cost-effective SQE practices. This plan enumerates the SQE practices that comprise the development of SNL ASC's software products and explains the project teams opportunities for tailoring and implementing the practices.

97 MATHEMATICS AND COMPUTING↗

Environmental Monitoring Plan, Revision 5

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for ensuring that this work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 5400.5, Radiation Protection of the Public and the Environment, and DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 450.1A, DOE Order 5400.5, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies. (See LLNL [1992] and LLNL [2008] for information about LLNL's CERCLA activities).

54 ENVIRONMENTAL SCIENCES↗

Planning horizon affects prophylactic decision-making and epidemic dynamics

The spread of infectious diseases can be impacted by human behavior, and behavioral decisions often depend implicitly on a planning horizon?the time in the future over which options are weighed. We investigate the effects of planning horizons on epidemic dynamics. We developed an epidemiological agent-based model (along with an ODE analog) to explore the decision-making of self-interested individuals on adopting prophylactic behavior. The decision-making process incorporates prophylaxis efficacy and disease prevalence with the individuals? payoffs and planning horizon. Our results show that for short and long planning horizons individuals do not consider engaging in prophylactic behavior. In contrast, individuals adopt prophylactic behavior when considering intermediate planning horizons. Such adoption, however, is not always monotonically associated with the prevalence of the disease, depending on the perceived protection efficacy and the disease parameters. Adoption of prophylactic behavior reduces the epidemic peak size while prolonging the epidemic and potentially generates secondary waves of infection. Lastly, these effects can be made stronger by increasing the behavioral decision frequency or distorting an individual's perceived risk of infection.

60 APPLIED LIFE SCIENCES↗

System Definition Phase and Acquisition Phase Project Plan for Small Astronomy Satellite SAS-D

This Project Plan for the Small Astronomy Satellite (SAS-D) is Goddard Space Flight Center's plan for accomplishing the project. It is issued in compliance with NASA Handbook NHB 7121.2 and NMI 7120.1, dated May 4, 1970, Subject: Approval and Implementation of Office of Space Science and Applications (OSSA) Research and Development (R&D) Projects. The Project Plan, as approved by GSFC executive management and NASA Headquarters, is the project manager's charter and defines his specific plan of action. System definition phase activities of the SAS-D Project will be a continuation of the analytical work that established the overall feasibility of the project. The system concept derived from that analytical work is defined in the Phase A (Mission Definition Phase) technical report. System definition phase activities will include detailed engineering analysis and preliminary breadboarding necessary to establish a single project approach from the feasible approaches. This document will be revised at the end of the system definition phase to provide greater detail on acquisition phase planning and to specify a specific system design.

Donald A Krueger↗

The cryogenics analysis program for Apollo mission planning and analysis

The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

Scott, W.↗

Remote sensing as a source of data for outdoor recreation planning

Specific data needs for outdoor recreation planning and the ability of tested remote sensors to provide sources for these data are examined. Data needs, remote sensor capabilities, availability of imagery, and advantages and problems of incorporating remote sensing data sources into ongoing planning data collection programs are discussed in detail. Examples of the use of imagery to derive data for a range of common planning analyses are provided. A selected bibliography indicates specific uses of data in planning, basic background materials on remote sensing technology, and sources of information on environmental information systems expected to use remote sensing to provide new environmental data of use in outdoor recreation planning.

Reed, W. E.↗

Phased Project Planning Guidelines

NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

Source record↗

Logistics planning for phased programs.

It is pointed out that the proper and early integration of logistics planning into the phased program planning process will drastically reduce these logistics costs. Phased project planning is a phased approach to the planning, approval, and conduct of major research and development activity. A progressive build-up of knowledge of all aspects of the program is provided. Elements of logistics are discussed together with aspects of integrated logistics support, logistics program planning, and logistics activities for phased programs. Continuing logistics support can only be assured if there is a comprehensive sequential listing of all logistics activities tied to the program schedule and a real-time inventory of assets.

Cook, W. H.↗

Vehicle management and mission planning in support of shuttle operations.

An operational approach to shuttle mission planning during high flight frequency years (20 or more flights per year) is described wherein diverse mission planning functions interface via an interactive computer system and common data base. The Vehicle Management and Mission Planning System (VMMPS) is proposed as a means of helping to accomplish the mission planning function. The VMMPS will link together into an interactive system the major mission planning areas such as trajectory, crew, vehicle performance, and launch operations. A common data base will be an integral part of the system and the concept of standard mission types and phases will be used to minimize mission to mission uniqueness. The use of this system will eliminate much redundancy and replanning, shorten interface times between functions, and provide a means to evaluate unplanned events and modify schedules.

Pruett, W. R.↗

Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

Source record↗

Experiment planning during the Skylab missions

The objectives of the Skylab Program included observations of the earth, the sun, the stars, and a comet in addition to a variety of engineering and medical experiments. Attention is given to mission planning activities accomplished before the launch of the orbital workshop, during the manned missions, and between manned missions. Two major purposes of early experiments planning were related to the establishment of reasonable potential goals in terms of accomplishment and the discovery of potential problems in scheduling. Planning during the mission proceeded according to a scheme in which the planning was done on a daily basis. Experiences from the three Skylab missions are discussed separately. The results of the Skylab Program demonstrate the value of the daily experiment planning system that was capable of reacting to changing constraints.

Sevier, J. R.↗

Advanced space system concepts and their orbital support needs (1980 - 2000). Volume 4: Detailed data. Part 2: Program plans and common support needs (a study of the commonality of space vehicle applications to future national needs

The methodology of alternate world future scenarios is utilized for selecting a plausible, though not advocated, set of future scenarios each of which results in a program plan appropriate for the respective environment. Each such program plan gives rise to different building block and technology requirements, which are analyzed for common need between the NASA and the DoD for each of the alternate world scenarios. An essentially invariant set of system, building block, and technology development plans is presented at the conclusion, intended to allow protection of most of the options for system concepts regardless of what the actual future world environment turns out to be. Thus, building block and technology needs are derived which support: (1) each specific world scenario; (2) all the world scenarios identified in this study; or (3) generalized scenarios applicable to almost any future environment. The output included in this volume consists of the building blocks, i.e.: transportation vehicles, orbital support vehicles, and orbital support facilities; the technology required to support the program plans; identification of their features which could support the DoD and NASA in common; and a complete discussion of the planning methodology.

Bekey, I.↗

Formulation of detailed consumables management models for the development (preoperational) period of advanced space transportation system. Volume 1: Detailed requirements for the mission planning processor

Detailed requirements for the mission planning processor are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. A quasi top-down approach was applied to the design of the mission planning processor. Interface requirements, input/output, and data base concepts were considered before computational processing. Existing analytical models were investigated for applicability before new models were developed. The mission planning processor was designed for an interactive system using demand terminals for input/outputdisplay and interfacing with an updateable mission data bank. The control and support routines provide the user interface, peripheral data handling, program control, and support functions required by the mission planning processor for execution on an interactive system. A description, interface requirements, definition of internal variables, listing of input data, processing flow diagram, and listing of output data are presented for each routine.

Connelly, L. C.↗

Two-stage chain sampling inspection plans with different sample sizes in the two stages

A further generalization of the family of 'two-stage' chain sampling inspection plans is developed - viz, the use of different sample sizes in the two stages. Evaluation of the operating characteristics is accomplished by the Markov chain approach of the earlier work, modified to account for the different sample sizes. Markov chains for a number of plans are illustrated and several algebraic solutions are developed. Since these plans involve a variable amount of sampling, an evaluation of the average sampling number (ASN) is developed. A number of OC curves and ASN curves are presented. Some comparisons with plans having only one sample size are presented and indicate that improved discrimination is achieved by the two-sample-size plans.

Stephens, K. S.↗

Shuttle payload vibroacoustic test plan evaluation

Statistical decision theory is used to evaluate seven alternate vibro-acoustic test plans for Space Shuttle payloads; test plans include component, subassembly and payload testing and combinations of component and assembly testing. The optimum test levels and the expected cost are determined for each test plan. By including all of the direct cost associated with each test plan and the probabilistic costs due to ground test and flight failures, the test plans which minimize project cost are determined. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level.

Stahle, C. V.↗

The influence of various test plans on mission reliability

Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.

Stahle, C. V.↗

Studies of planning behavior of aircraft pilots in normal, abnormal and emergency situations

A methodology for the study of planning is presented and the results of applying the methodology within two experimental investigations of planning behavior of aircraft pilots in normal, abnormal, and emergency situations are discussed. Beyond showing that the methodology yields consistent results, these experiments also lead to concepts in terms of a dichotomy between event driven and time driven planning, subtle effects of automation on planning, and the relationship of planning to workload and flight performance.

Johannsen, G.↗