Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Offshore Space Center (offshore launch site)

Any activity requiring the development of the HLLV can benefit by operations from an offshore space center (OSC) since operating near the equator provides a twenty percent increase in payload in an ecliptic plan orbit. Some OSC concepts considered include a moored floating (semisubmersible) design, a stationary design supported by fixed piles, and a combination of these two. The facility supports: a 15,000 foot long, 300 foot wide runway, designed to accommodate a two staged winged launch vehicle, with a one million pound payload capacity to low earth orbit; an industrial area for HLLV maintenance; an airport terminal, control and operation center, and observation tower; liquid hydrogen and liquid oxygen production and storage, and fuel storage platforms; a power generation station, docks with an unloading area; two separate launch sites; and living accommodations for 10,000 people. Potential sites include the Paramount Seamount in the Pacific Ocean off the north coast of South America. Cost estimates are considered.

Harvey, D. G.↗

Electrifying Airport GSE: Monte Carlo Grid Impacts

Airports globally are shifting from ICE-powered to electric Ground Support Equipment (eGSE) to enhance efficiency, reduce operational costs, and improve operator health. Leveraging predictable routes, flat terrain, and low operational speeds, airports provide ideal conditions for electrification. This study evaluates freight GSE electrification at Dallas-Fort Worth International Airport (DFW), USA, using the Agile@ platform, which integrates three analytical methods: Freight Facility Model (FFM), Activity-Structure-Intensity-Fuel (ASIF), and Monte Carlo simulations. Results from 10,000 simulations indicate modest but critical increases in electricity demand and significant variability in GSE energy consumption. These insights emphasize the importance of data-driven scheduling, targeted maintenance, and strategic infrastructure planning. For high-uncertainty scenarios, airports are advised to deploy buffer energy storage systems (battery banks), implement demand-response charging strategies, schedule flexible workforce shifts, and prioritize proactive maintenance-particularly for equipment with higher operational uncertainty, such as tug tractors with trailers. Agile@ thus offers a robust, scalable, and data-driven framework to optimize long-term GSE planning and enhance reliability across diverse airport environments.

Bose, Ranjan [ORNL] (ORCID:0009000791026327)↗

MOD-Amp System Design Spring: Spring 2026 – Georgetown University, SYSM–5620

High-energy lasers (HELs) play an important role in both national defense and scientific research. In defense applications, HELs are used for target detection, tracking, and engagement. In research environments, they support studies of extreme physical conditions relevant to fusion energy and plasma science. These systems depend on the amplification of light through stimulated emission of radiation, allowing optical energy to be increased to the levels required for operation. This amplification occurs when light passes through an energized gain medium that receives energy from an external optical or electrical source. To achieve the desired output, laser systems often use multiple amplification stages, including high-gain preamplifiers and lower-gain power or booster amplifiers. At Lawrence Livermore National Laboratory (LLNL) and other national laboratories, many large-aperture laser amplifier systems are aging and rely on system-specific hardware, obsolete technologies, and incomplete documentation. These legacy systems create challenges for maintenance, supportability, and long-term operation. Their lack of standardization also increases the difficulty of sustaining reliable performance over time. As this infrastructure continues to age, the likelihood of unplanned downtime grows, which can negatively affect both national security missions and scientific research programs that depend on dependable HEL capabilities. The purpose of this document is to demonstrate the application of systems engineering fundamentals and design thinking through the development of a laser amplifier case study. The proposed system concept is intended as an academic exercise and not as a finalized engineering design. As a result, the development presented in this document is incomplete and may contain technical assumptions or errors that would require further investigation before any real-world implementation.

42 ENGINEERING↗

Crew Factors in Flight Operations X: Alertness Management in Flight Operations

In response to a 1980 congressional request, NASA Ames Research Center initiated a Fatigue/Jet Lag Program to examine fatigue, sleep loss, and circadian disruption in aviation. Research has examined fatigue in a variety of flight environments using a range of measures (from self-report to performance to physiological). In 1991, the program evolved into the Fatigue Countermeasures Program, emphasizing the development and evaluation of strategies to maintain alertness and performance in operational settings. Over the years, the Federal Aviation Administration (FAA) has become a collaborative partner in support of fatigue research and other Program activities. From the inception of the Program, a principal goal was to return the information learned from research and other Program activities to the operational community. The objectives of this Education and Training Module are to explain what has been learned about the physiological mechanisms that underlie fatigue, demonstrate the application of this information in flight operations, and offer some specific fatigue countermeasure recommendations. It is intended for all segments of the aeronautics industry, including pilots, flight attendants, managers, schedulers, safety and policy personnel, maintenance crews, and others involved in an operational environment that challenges human physiological capabilities because of fatigue, sleep loss, and circadian disruption.

Rosekind, Mark R.↗

Open Circuit Resonant (SansEC) Sensor for Composite Damage Detection and Diagnosis in Aircraft Lightning Environments

Composite materials are increasingly used in modern aircraft for reducing weight, improving fuel efficiency, and enhancing the overall design, performance, and manufacturability of airborne vehicles. Materials such as fiberglass reinforced composites (FRC) and carbon-fiber-reinforced polymers (CFRP) are being used to great advantage in airframes, wings, engine nacelles, turbine blades, fairings, fuselage and empennage structures, control surfaces and coverings. However, the potential damage from the direct and indirect effects of lightning strikes is of increased concern to aircraft designers and operators. When a lightning strike occurs, the points of attachment and detachment on the aircraft surface must be found by visual inspection, and then assessed for damage by maintenance personnel to ensure continued safe flight operations. In this paper, a new method and system for aircraft in-situ damage detection and diagnosis are presented. The method and system are based on open circuit (SansEC) sensor technology developed at NASA Langley Research Center. SansEC (Sans Electric Connection) sensor technology is a new technical framework for designing, powering, and interrogating sensors to detect damage in composite materials. Damage in composite material is generally associated with a localized change in material permittivity and/or conductivity. These changes are sensed using SansEC. Unique electrical signatures are used for damage detection and diagnosis. NASA LaRC has both experimentally and theoretically demonstrated that SansEC sensors can be effectively used for in-situ composite damage detection.

Wang, Chuantong↗

Comparison of Spares Logistics Analysis Techniques for Long Duration Human Spaceflight

As the durations and distances involved in human exploration missions increase, the logistics associated with the repair and maintenance becomes more challenging. Whereas the operation of the International Space Station (ISS) depends upon regular resupply from the Earth, this paradigm may not be feasible for future missions. Longer mission durations result in higher probabilities of component failures as well as higher uncertainty regarding which components may fail, and longer distances from Earth increase the cost of resupply as well as the speed at which the crew can abort to Earth in the event of an emergency. As such, mission development efforts must take into account the logistics requirements associated with maintenance and spares. Accurate prediction of the spare parts demand for a given mission plan and how that demand changes as a result of changes to the system architecture enables full consideration of the lifecycle cost associated with different options. In this paper, we utilize a range of analysis techniques - Monte Carlo, semi-Markov, binomial, and heuristic - to examine the relationship between the mass of spares and probability of loss of function related to the Carbon Dioxide Removal System (CRS) for a notional, simplified mission profile. The Exploration Maintainability Analysis Tool (EMAT), developed at NASA Langley Research Center, is utilized for the Monte Carlo analysis. We discuss the implications of these results and the features and drawbacks of each method. In particular, we identify the limitations of heuristic methods for logistics analysis, and the additional insights provided by more in-depth techniques. We discuss the potential impact of system complexity on each technique, as well as their respective abilities to examine dynamic events. This work is the first step in an effort that will quantitatively examine how well these techniques handle increasingly more complex systems by gradually expanding the system boundary.

Owens, Andrew↗

Best Practices for Resilience Hub Development and Management

The Carbon League and its community partners in East St. Louis, Illinois, have identified five facilities to serve as resilience hubs. These hubs are intended to support the local community through a range of services and resources during blue-sky (everyday), gray-sky (pre-event), and black-sky (emergency) conditions. Transforming these facilities into fully functional resilience hubs requires a broad operational improvement and programmatic planning roadmap. This memo outlines best practices to guide the development of these resilience hubs in East St. Louis, including recommendations for infrastructure services; safety and physical protection; community services; operational protocols; and a phased implementation strategy aligned with realistic funding and capacity constraints. Infrastructure recommendations include strengthening electric power, communications, water, sanitation, and transportation/logistics capabilities, all of which are essential for hubs that may serve as cooling and warming centers, distribution points, and information hubs during emergencies. Safety recommendations focus on accessibility, emergency action planning, indoor air quality, and secure storage of critical equipment. A phased roadmap provides guidance from immediate, low-cost readiness actions to long-term optimization and community integration. Performance metrics and maintenance protocols ensure continuous improvement and operational readiness. This guidance draws on best practices that can be used to support the development of resilient, community-centered hubs capable of enhancing public safety, health, and well-being during everyday operations and emergencies alike.

99 GENERAL AND MISCELLANEOUS↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of an automated checkout, service and maintenance system for a Space Station EVAS

The development of a new operational system for the Space Station will minimize the time normally spent on performing on-orbit checkout, servicing, and maintenance of an extravehicular activity system of the Space Station. This system, the Checkout, Servicing, and Maintenance System (COSM), is composed of interactive control software interfacing with software simulations of hardware components. The major elements covered in detail include the controller, the EMU simulator and the regenerative life support system. The operational requirements and interactions of the individual elements as well as the protocols are also discussed.

Abeles, Fred J.↗

Crew Factors in Flight Operations X: Alertness Management in Flight Operations

In response to a 1980 congressional request, NASA Ames Research Center initiated a Fatigue/Jet Lag Program to examine fatigue, sleep loss, and circadian disruption in aviation. Research has examined fatigue in a variety of flight environments using a range of measures (from self-report to performance to physiological). In 1991, the program evolved into the Fatigue Countermeasures Program, emphasizing the development and evaluation of strategies to maintain alertness and performance in operational settings. Over the years, the Federal Aviation Administration (FAA) has become a collaborative partner in support of fatigue research and other Program activities. From the inception of the Program, a principal goal was to return the information learned from research and other Program activities to the operational community. The objectives of this Education and Training Module are to explain what has been learned about the physiological mechanisms that underlie fatigue, demonstrate the application of this information in flight operations, and offer some specific fatigue counter-measure recommendations. It is intended for all segments of the aeronautics industry, including pilots, flight attendants, managers, schedulers, safety and policy personnel, maintenance crews, and others involved in an operational environment that challenges human physiological capabilities because of fatigue, sleep loss, and circadian disruption.

Rosekind, Mark R.↗

Maintenance Modernization in the Era of Artemis An RCM Journey

The NASA Artemis Program mission to return humans to the moon requires it ground test facilities to meet today’s performance and throughput demands. The NASA Ames Arc Jet Complex (AJC) at Ames Research Center is the Agency’s sole ground test facility supporting reentry thermal protection system testing and was developed to support Apollo era spacecraft. The research and development required to meet current and future mission demands continually grows, but the maintenance upkeep to ensure safe and reliable operations holds stagnant. This paper presents the journey and subsequent industry relatable story that includes the challenges, lessons learned, and testimonials to the AJC’s approach to the modernization of maintenance using RCM at NASA.

Reliability Centered Maintenance↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

Electronic Procedures for Medical Operations

Electronic procedures are replacing text-based documents for recording the steps in performing medical operations aboard the International Space Station. S&K Aerospace, LLC, has developed a content-based electronic system-based on the Extensible Markup Language (XML) standard-that separates text from formatting standards and tags items contained in procedures so they can be recognized by other electronic systems. For example, to change a standard format, electronic procedures are changed in a single batch process, and the entire body of procedures will have the new format. Procedures can be quickly searched to determine which are affected by software and hardware changes. Similarly, procedures are easily shared with other electronic systems. The system also enables real-time data capture and automatic bookmarking of current procedure steps. In Phase II of the project, S&K Aerospace developed a Procedure Representation Language (PRL) and tools to support the creation and maintenance of electronic procedures for medical operations. The goal is to develop these tools in such a way that new advances can be inserted easily, leading to an eventual medical decision support system.

Source record↗

The Launch Systems Operations Cost Model

One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.

Prince, Frank A.↗

Advanced manufacturing and digital twin technology for nuclear energy*

Advanced manufacturing techniques and digital twin technology are rapidly transforming the nuclear industry, offering the potential to enhance productivity, safety, and cost-effectiveness. Customized parts are being produced using additive manufacturing, automation, and robotics, while digital twin technology enables the virtual modeling and optimization of complex systems. These advanced technologies can significantly improve operational efficiency, predict system behavior, and optimize maintenance schedules in the nuclear energy sector, leading to heightened safety and reduced downtime. However, the nuclear industry demands the highest levels of safety and security, as well as intricate manufacturing processes and operations. Thus, challenges such as data management and cybersecurity must be addressed to fully realize the potential of advanced manufacturing techniques and digital twin technology in the nuclear industry. This comprehensive review highlights the critical role of digital twin technology with advanced manufacturing toward nuclear energy to improve performance, minimize downtime, and heighten safety, ultimately contributing to the global energy mix by providing dependable and low-carbon electricity.

36 MATERIALS SCIENCE↗

Total Cost of Ownership Reduction Using Passive Pre-Chamber Ignition in Natural Gas Engines

Spark plug durability is a factor affecting the total cost of ownership (TCO) of spark-ignited natural gas engines, with some heavy-duty platforms requiring plug replacement after only 750 hours of operation. The high ignition energy demand under lean or diluted conditions accelerates electrode wear, shortening plug life and increasing maintenance frequency. This work evaluates passive pre-chamber (PC) ignition operating at lowered spark energies as a strategy to reduce spark energy requirements and extend plug durability, thereby lowering TCO. Experiments were conducted on a medium-duty Cummins 6.7L ISB engine at 1600 RPM and 50% load under varying exhaust gas recirculation (EGR) dilution levels (0–40%). Two passive pre-chambers with 1.1 mm and 1.6 mm nozzle diameters were compared with conventional spark ignition (SI). SI was operated with a fixed coil dwell of 4 ms (~90 mJ), while the PC configuration was tested across 2–4 ms dwell times (~30–90 mJ). Cylinder pressure analysis revealed that PC ignition sustained stable combustion at significantly lower spark energies than SI, with improved combustion stability at ~30 mJ compared with SI at ~90 mJ. The PC system also extended the dilution tolerance beyond that achievable with SI, while delivering up to ~2% higher indicated thermal efficiency and reducing the COV by nearly 90% at 30% EGR. A TCO analysis was conducted to assess the economic benefit of adopting a passive PC system operating at reduced spark energies compared to SI. It was found that adopting a passive PC system could reduce TCO by approximately $11,000 per engine over a five-year operational period, primarily due to fuel savings, extended spark plug life, and reduced maintenance frequency. These projections were weighed against the additional hardware cost of the pre-chamber, yielding a rapid estimated return on investment of ~300 operating hours. Therefore, this work motivates continued research and development of passive PC technology and its commercial adoption in natural gas engines used in transportation applications.

Dhotre, Akash [University of Minnesota]↗

An approximation formula for a class of Markov reliability models

A way of considering a small but often used class of reliability model and approximating algebraically the systems reliability is shown. The models considered are appropriate for redundant reconfigurable digital control systems that operate for a short period of time without maintenance, and for such systems the method gives a formula in terms of component fault rates, system recovery rates, and system operating time.

White, A. L.↗