Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Licensing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,491 records · Page 83

Silicon Carbide Composite Cladding Qualification

This report examines the process to qualify a new fuel-cladding type focusing on the data requirements and types of irradiation testing necessary to meet the regulatory burden and related guidance applicable to fuel qualification of accident-tolerant fuel. The report considers the use of accelerated fuel qualification techniques and lead-test specimen programs that may shorten the timeline for qualifying fuel for use in a nuclear reactor at the desired burnup. The assessment framework particularly emphasizes the identification of key fuel manufacturing parameters, the specification of a fuel performance envelope to inform testing requirements, the use of evaluation models in the fuel qualification process, and the assessment of the experimental data used to develop and validate the empirical models and empirical safety criteria.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cost of Mitigating the Environmental Impacts of Hydropower Projects

The "Cost of Mitigating the Environmental Impacts of Hydropower Projects Database" compiles data on environmental impacts mitigation costs for 182 hydropower projects based on documents obtained from the U.S. Federal Energy Regulatory Commission (FERC).

13 HYDRO ENERGY↗

Marine Energy Environmental Permitting and Compliance Costs

Costs to permit Marine Energy projects are poorly understood. In this paper we examine environmental compliance and permitting costs for 19 projects in the U.S., covering the last 2 decades. Guided discussions were conducted with developers over a 3-year period to obtain historical and ongoing project cost data relative to environmental studies (e.g., baseline or pre-project site characterization as well as post-installation effects monitoring), stakeholder outreach, and mitigation, as well as qualitative experience of the permitting process. Data are organized in categories of technology type, permitted capacity, pre- and post-installation, geographic location, and funding types. We also compare our findings with earlier logic models created for the Department of Energy (i.e., Reference Models). Environmental studies most commonly performed were for Fish and Fisheries, Noise, Marine Habitat/Benthic Studies and Marine Mammals. Studies for tidal projects were more expensive than those performed for wave projects and the range of reported project costs tended to be wider than ranges predicted by logic models. For eight projects reporting full project costs, from project start to FERC or USACE permit, the average amount for environmental permitting compliance was 14.6%.

16 TIDAL AND WAVE POWER↗

PMT v4.0 Capabilities

Explore the source record for details and available documents.

Project Management Tool↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Regulatory Development for Advanced Manufacturing

Advanced Methods of Manufacturing (AMM) are new, novel manufacturing processes that have the potential to bring significant cost and schedule reductions to many industries, including the nuclear industry. These methods produce components faster and cheaper than many traditional methods. This includes replacing obsolete components at currently operating plants as well as manufacturing components of all sizes for advanced reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Systematic Evidence Based Performance Approach to Regulation of Nuclear Sites in England and Wales - 20058

The Environment Agency for England has developed a systematic evidence-based approach to pursue our strategic environmental objectives for the regulation of nuclear sites. We use an annual evidence review process to ensure effective and efficient targeting of limited resources to achieve those objectives. Over the last 8 years, we have been developing and refining this approach to ensure risk-based and value driven regulation. The approach comprises nuclear site and nuclear sector review processes known as Site Environment Review (SER) and Nuclear Environment Review (NER). This approach complements our regulation of nuclear site permit holders under the Environmental Permitting Regulations (EPR). We deliver our regulation of nuclear sites in England and Wales alongside the Office for Nuclear Regulation. The SER process involves the lead regulator for each nuclear site assessing the permit holder's environmental performance across 14 themes, set within the context of the site's main activities and associated waste disposals. Our themes include environmental leadership, resources and climate change, radioactive waste management, facility management and decommissioning, groundwater, and environmental radiological protection. We use evidence from site inspections and working within our subject matter groups to grade current and predicted future environmental performance. We are particularly interested in sustainability and the application of Best Available Techniques (BAT) to prevent the creation, and minimise the disposal, of radioactive wastes. We use risk analysis (strengths, weaknesses, threats and opportunities) to examine performance against our strategic environmental objectives, which are set out, in our 5-year Nuclear Delivery Plan (NDP). The output supports the targeting of our resources at each nuclear site. We consult the relevant permit holders on the SER priorities and use their feedback to refine our plans. We expect all permit holders to take account of our priorities when considering their own programmes of work, objectives and plans. The NER process brings together what we learn and achieve through regulation across the sector. It provides input to planning priorities, supported by qualitative and semi-quantitative evidence. It covers the 28 nuclear sites in England and Wales and spans the same 14 environmental themes. During the process we collate, compile and summarise evidence from the SERs and other sources such as inspection reports and evidence from our other nuclear work programmes. The output is the NER annual report. This provides a snapshot of the status of the nuclear sector and gives insights to enable us to regulate more efficiently and effectively. It also takes account of cross-cutting issues and risks such as changes in international standards, domestic policy, regulatory framework, domestic standards and guidance, learning from experience such as incidents, events and good practice, and innovation, research and development. It provides graphics that illustrate the grading of environmental performance for the nuclear sector across the fourteen environmental themes. This analysis allows benchmarking of nuclear site's environmental performance and the visualisation provides a convenient comparison of performance across themes, sites, and over time. We use this intelligence to inform our investment in training and development of our staff, and our cross-cutting engagement on strategic issues with government, the Nuclear Decommissioning Authority (NDA) and other corporate organisations. Adopting this approach can provide benefits with organisational reputation, stakeholder participation and ensuring value from the public investment. This paper describes the history of the SER/NER process, a selection of outputs from the process and ideas for improvement. The paper will be of interest to other regulators and organisations across the world that are interested in supporting continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Beginnings: Optimising Waste and End-state at UK Nuclear Sites to Enable Environmental Permit surrender (the GRR) - 20193

The decommissioning of nuclear sites involves the management of large volumes of radioactive waste, other conventional waste, and the clean-up of land and groundwater contamination. In the UK, the disposal of radioactive waste from nuclear sites is regulated by the Environment Agency (England), Natural Resources Wales (Wales) and the Scottish Environment Protection Agency (Scotland). All three environment agencies seek to make sure that the generation and disposal of radioactive waste is optimised: ensuring impacts to people are 'as low as reasonably achievable' (ALARA). With a large proportion of UK nuclear sites embarking on decommissioning, the environment agencies have collaboratively developed new guidance: the 'Management of radioactive waste from the decommissioning of nuclear sites: Guidance on the Requirements for Release from radioactive substances regulation' (referred to as the GRR)[1]. The environment agencies worked in liaison with the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, and the UK government body responsible, the Nuclear Decommissioning Authority (NDA). Prior to finalising the guidance, a 12 month trial was completed at three of the NDA's nuclear sites, enabling the environment agencies to test their draft GRR guidance against 'real world scenarios' and the challenge of incorporating its requirements into decommissioning plans. Experience gained during the trial was incorporated into the current version of the GRR, published in July 2018. The GRR represents the 'new beginning' of this paper's title because for the first time, the UK environmental regulators have expressed in detail their requirements for surrender of environmental permits for nuclear sites. The GRR provides a framework for a UK nuclear site to plan, assess and justify its management of radioactive waste and deliver through decommissioning, an optimal, environmentally safe and sustainable end-state. This paper will describe the requirements and technical standards within the GRR, the establishment of defensible clean-up criteria and the production of a Waste Management Plan (WMP), supported by a Site-Wide Environmental Safety Case (SWESC). It will describe the experience gleaned by operators and regulators during the trial and it will highlight current work by regulators to implement the new approach proportionately. Finally, this paper will look forward and outline planned amendments to legislation in the UK affecting nuclear sites that should enable the full benefits of the GRR to be realised in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Working with Us

NREL is focused on the long-term impact that strategic partnerships can have on energy research and development, grid security and resilience, the U.S. economy, and Americans' lives. NREL works with commercial and noncommercial entities, including national security and defense partners, national laboratories, and research institutions to advance foundational research and development - pushing the boundaries of scientific discovery and accelerating breakthroughs in energy innovation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Use of AI for Interpreting Technical Specifications for Power Uprates in Nuclear Power Plants

Powerpoint presentation. Background information provided on power plant uprates. Discussion of the current and proposed approaches to power plant uprates. Explanation of what data is used to draft a LAR. Methods such as retrieval augmented generation (RAG) and fine-tuning are discussed. Use case analysis is performed. Different failure types are examined. Conclusions are drawn from the analysis. Future work is proposed.

97 - MATHEMATICS AND COMPUTING↗