Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

TH-A-BRF-03: Evaluation of Synthetic CTs Generated Using MR-SIM Data

Purpose: To describe and evaluate a novel algorithm for generating synthetic CT images from MR-SIM data for dose calculations in MR-only treatment planning. Methods: A voxel-based weighted summation method was implemented to generate synthetic CT (synCT) images. MR data were acquired using Philips 1.0T Panorama high-field open MR-SIM. Retrospective patient data from seven prostate patients and one brain patient (three lesions) enrolled in an IRB-approved study were used. 3D T1-weighted fast field echo and 3D T2-weighted turbo spin echo sequences were utilized for all patients. A 3D balanced turbo field echo sequence using spectral presaturation with inversion recovery was acquired for prostate patients, but 3D ultra-short echo time (UTE)-DIXON was instead acquired for the brain patient to amplify bone signal for semi-automatic bone segmentation. Weight optimization was performed using a training subset of patients. HU value differences between planning CT and synCTs were analyzed using mean absolute error (MAE). Original patient CT-based treatment plans were mapped onto synCTs, dose was recalculated using original leaf motion and MU values, and DRRs were generated. Dosevolume metrics and gamma analysis were used for dosimetric evaluation. Results: Average whole-body MAE of synCTs across all patients was 75+12 HU. In prostate cancer patients, average HU difference between planning and synCTs was 0.9±1.0% for soft tissue structures and 4.3±2.5% for bony structures. DRRs were generated from synCTs and qualitatively showed good geometric agreement with planning CT-generated DRRs. D99, mean dose, and maximum dose to CTV calculated using the synCT remained within 1.2% of planning CT-based dose calculations. All gamma analysis evaluated at 2%/2mm dose difference/distance to agreement) pass rates were greater than 95% with an average of 99.9±0.1% for prostate patients and 98.4±2.2% for three brain lesions. Conclusion: SynCTs were generated with clinically acceptable accuracy comparable to planning CTs, enabling dose computations for MR-only simulation. Research supported in part by a grant from Philips HealthCare (Best, Netherlands)

60 APPLIED LIFE SCIENCES↗

Human Reliability for the Next Generation of Nuclear Experts

As the nuclear renaissance progresses and today s nuclear and radiological experts retire, a new generation of experts will ultimately be recruited, trained, and replace the old guard. Selecting individuals who have the attitudes and values appropriate to work in the nuclear industry and who have the best qualifications for the position will be a key to the success of this renaissance. In a world with deep divisions on political and social issues; how a State, agency, or company assures that those hired can be trusted with the access to, and responsibilities for, nuclear and/or radiological materials is an important consideration. Human interactions invariably rely on the offering of assurance and the receipt of trust. A fundamental element in any human relationship is knowing when to trust and when to doubt. When are assurances to be believed or questioned? Human reliability programs (HRP) are used to assure a person s truthfulness and loyalty to the State. An HRP program has a number of elements and may not fit all cultures in the same form. An HRP can vary in scope from simple background checks of readily available data to full field investigations and testing. This presentation discusses possible elements for an HRP from regulation to implementation and the issues related to each element. The effects of an HRP on potential recruits will be discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SU-C-BRD-02: A Team Focused Clinical Implementation and Failure Mode and Effects Analysis of HDR Skin Brachytherapy Using Valencia and Leipzig Surface Applicators

Purpose: and Leipzig applicators (VLAs) are single-channel brachytherapy surface applicators used to treat skin lesions up to 2cm diameter. Source dwell times can be calculated and entered manually after clinical set-up or ultrasound. This procedure differs dramatically from CT-based planning; the novelty and unfamiliarity could lead to severe errors. To build layers of safety and ensure quality, a multidisciplinary team created a protocol and applied Failure Modes and Effects Analysis (FMEA) to the clinical procedure for HDR VLA skin treatments. Methods: team including physicists, physicians, nurses, therapists, residents, and administration developed a clinical procedure for VLA treatment. The procedure was evaluated using FMEA. Failure modes were identified and scored by severity, occurrence, and detection. The clinical procedure was revised to address high-scoring process nodes. Results: Several key components were added to the clinical procedure to minimize risk probability numbers (RPN): -Treatments are reviewed at weekly QA rounds, where physicians discuss diagnosis, prescription, applicator selection, and set-up. Peer review reduces the likelihood of an inappropriate treatment regime. -A template for HDR skin treatments was established in the clinical EMR system to standardize treatment instructions. This reduces the chances of miscommunication between the physician and planning physicist, and increases the detectability of an error during the physics second check. -A screen check was implemented during the second check to increase detectability of an error. -To reduce error probability, the treatment plan worksheet was designed to display plan parameters in a format visually similar to the treatment console display. This facilitates data entry and verification. -VLAs are color-coded and labeled to match the EMR prescriptions, which simplifies in-room selection and verification. Conclusion: Multidisciplinary planning and FMEA increased delectability and reduced error probability during VLA HDR Brachytherapy. This clinical model may be useful to institutions implementing similar procedures.

60 APPLIED LIFE SCIENCES↗

Neutron Scattering Experiment Automation with Python

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory currently holds the Guinness World Record as the world most powerful pulsed spallation neutron source. Neutrons scattered off atomic nuclei in a sample yield important information about the position, motions, and magnetic properties of atoms in materials. A neutron scattering experiment usually involves sample environment control (temperature, pressure, etc.), mechanical alignment (slits, sample and detector position), magnetic field controllers, neutron velocity selection (choppers) and neutron detectors. The SNS Data Acquisition System (DAS) consists of real-time sub-system (detector read-out with custom electronics, chopper interface), data preprocessing (soft real-time) and a cluster of control and ancillary PCs. The real-time system runs FPGA firmware and programs running on PCs (C++, LabView) typically perform one task such as motor control and communicate via TCP/IP networks. PyDas is a set of Python modules that are used to integrate various components of the SNS DAS system. It enables customized automation of neutron scattering experiments in a rapid and flexible manner. It provides wxPython GUIs for routine experiments as well as IPython command line scripting. Matplotlib and numpy are used for data presentation and simple analysis. We will present an overview of SNS Data Acquisition System and PyDas architectures and implementation along with the examples of use. We will also discuss plans for future development as well as the challenges that have to be met while maintaining PyDas for 20+ different scientific instruments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

FedFleet 2023: FAST - What's New, What's Coming, What's Next?

This presentation presents an overview and demonstration of new capabilities being incorporated into the Federal Automotive Statistical Tool (FAST) to gather information from Federal agencies about electric vehicle supply equipment (EVSE) they are planning to deploy in support of EO 14057 and its implementing instructions. It also includes an overview other related changes being made to FAST over FY 2023 and following years. FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles; FAST is developed, maintained, and supported by DOE's Idaho National Laboratory (INL).

99 GENERAL AND MISCELLANEOUS↗

Performance Analysis: Work Control Events Identified January - August 2010

This performance analysis evaluated 24 events that occurred at LLNL from January through August 2010. The analysis identified areas of potential work control process and/or implementation weaknesses and several common underlying causes. Human performance improvement and safety culture factors were part of the causal analysis of each event and were analyzed. The collective significance of all events in 2010, as measured by the occurrence reporting significance category and by the proportion of events that have been reported to the DOE ORPS under the ''management concerns'' reporting criteria, does not appear to have increased in 2010. The frequency of reporting in each of the significance categories has not changed in 2010 compared to the previous four years. There is no change indicating a trend in the significance category and there has been no increase in the proportion of occurrences reported in the higher significance category. Also, the frequency of events, 42 events reported through August 2010, is not greater than in previous years and is below the average of 63 occurrences per year at LLNL since 2006. Over the previous four years, an average of 43% of the LLNL's reported occurrences have been reported as either ''management concerns'' or ''near misses.'' In 2010, 29% of the occurrences have been reported as ''management concerns'' or ''near misses.'' This rate indicates that LLNL is now reporting fewer ''management concern'' and ''near miss'' occurrences compared to the previous four years. From 2008 to the present, LLNL senior management has undertaken a series of initiatives to strengthen the work planning and control system with the primary objective to improve worker safety. In 2008, the LLNL Deputy Director established the Work Control Integrated Project Team to develop the core requirements and graded elements of an institutional work planning and control system. By the end of that year this system was documented and implementation had begun. In 2009, training of the workforce began and as of the time of this report more than 50% of authorized Integration Work Sheets (IWS) use the activity-based planning process. In 2010, LSO independently reviewed the work planning and control process and confirmed to the Laboratory that the Integrated Safety Management (ISM) System was implemented. LLNL conducted a cross-directorate management self-assessment of work planning and control and is developing actions to respond to the issues identified. Ongoing efforts to strengthen the work planning and control process and to improve the quality of LLNL work packages are in progress: completion of remaining actions in response to the 2009 DOE Office of Health, Safety, and Security (HSS) evaluation of LLNL's ISM System; scheduling more than 14 work planning and control self-assessments in FY11; continuing to align subcontractor work control with the Institutional work planning and control system; and continuing to maintain the electronic IWS application. The 24 events included in this analysis were caused by errors in the first four of the five ISMS functions. The most frequent cause was errors in analyzing the hazards (Function 2). The second most frequent cause was errors occurring when defining the work (Function 1), followed by errors during the performance of work (Function 4). Interestingly, very few errors in developing controls (Function 3) resulted in events. This leads one to conclude that if improvements are made to defining the scope of work and analyzing the potential hazards, LLNL may reduce the frequency or severity of events. Analysis of the 24 events resulted in the identification of ten common causes. Some events had multiple causes, resulting in the mention of 39 causes being identified for the 24 events. The most frequent cause was workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete. The second most frequent cause was unclear, incomplete or confusing documents directing the work. Together, these two causes were mentioned 17 times and contributed to 13 of the events. All of the events with the cause of ''workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete'' had this error in the first two ISMS functions: define the work and analyze the hazard. This means that these causes result in the scope of work being ill-defined or the hazard(s) improperly analyzed. Incomplete implementation of these functional steps leads to the hazards not being controlled. The causes are then manifested in events when the work is conducted. The process to operate safely relies on accurately defining the scope of work. This review has identified a number of examples of latent organizational weakness in the execution of work control processes.

99 GENERAL AND MISCELLANEOUS↗

A control-inspired approach for energy transition planning under uncertainty

As the global carbon footprint continues to grow, many countries are implementing carbon emission reduction policies which have incentivized the expansion of low-carbon and renewable technologies. However, the speed and scale of deployment falls short of that needed to meet climate goals. Energy system models serve as key tools for guiding investment decisions and helping policymakers evaluate the effects of various policies on the development of an energy system. This study focuses on the energy system of the United States and builds upon prior work by incorporating more geographic granularity to account for the trade of commodities and addresses transmission congestion through electricity price adjustments. Furthermore, real-world characteristics, such as delays in constructing new liquid fuel production and electricity generation facilities, are integrated using a sequential decision-making approach that better reflects how decisions can be updated as uncertainties unfold. Results demonstrate that stochastic programming combined with sequential decision-making produces energy transition pathways that are robust to multiple uncertain futures. Additionally, considering real-world characteristics significantly impacts the deployment of renewable technologies and the ability to meet carbon emission reduction goals while also reliably meeting demand. These findings highlight the importance of accounting for uncertainty and real-world characteristics to avoid overly optimistic projections in energy system planning.

energy systems↗

A GPU-accelerated Monte Carlo dose calculation platform and its application toward validating an MRI-guided radiation therapy beam model

Purpose: The clinical commissioning of IMRT subject to a magnetic field is challenging. The purpose of this work is to develop a GPU-accelerated Monte Carlo dose calculation platform based on PENELOPE and then use the platform to validate a vendor-provided MRIdian head model toward quality assurance of clinical IMRT treatment plans subject to a 0.35 T magnetic field. Methods: PENELOPE was first translated from FORTRAN to C++ and the result was confirmed to produce equivalent results to the original code. The C++ code was then adapted to CUDA in a workflow optimized for GPU architecture. The original code was expanded to include voxelized transport with Woodcock tracking, faster electron/positron propagation in a magnetic field, and several features that make gPENELOPE highly user-friendly. Moreover, the vendor-provided MRIdian head model was incorporated into the code in an effort to apply gPENELOPE as both an accurate and rapid dose validation system. A set of experimental measurements were performed on the MRIdian system to examine the accuracy of both the head model and gPENELOPE. Ultimately, gPENELOPE was applied toward independent validation of patient doses calculated by MRIdian’s KMC. Results: An acceleration factor of 152 was achieved in comparison to the original single-thread FORTRAN implementation with the original accuracy being preserved. For 16 treatment plans including stomach (4), lung (2), liver (3), adrenal gland (2), pancreas (2), spleen(1), mediastinum (1), and breast (1), the MRIdian dose calculation engine agrees with gPENELOPE with a mean gamma passing rate of 99.1% ± 0.6% (2%/2 mm). Conclusions: A Monte Carlo simulation platform was developed based on a GPU- accelerated version of PENELOPE. This platform was used to validate that both the vendor-provided head model and fast Monte Carlo engine used by the MRIdian system are accurate in modeling radiation transport in a patient using 2%/2 mm gamma criteria. Future applications of this platform will include dose validation and accumulation, IMRT optimization, and dosimetry system modeling for next generation MR-IGRT systems.

60 APPLIED LIFE SCIENCES↗

Knowledge Management Initiatives Used to Maintain Regulatory Expertise in Transportation and Storage of Radioactive Materials - 12177

The U.S. Nuclear Regulatory Commission (NRC) was established in 1974 with the mission to license and regulate the civilian use of nuclear materials for commercial, industrial, academic, and medical uses in order to protect public health and safety, and the environment, and promote the common defense and security. Currently, approximately half (∼49%) of the workforce at the NRC has been with the Agency for less than six years. As part of the Agency's mission, the NRC has partial responsibility for the oversight of the transportation and storage of radioactive materials. The NRC has experienced a significant level of expertise leaving the Agency due to staff attrition. Factors that contribute to this attrition include retirement of the experienced nuclear workforce and mobility of staff within or outside the Agency. Several knowledge management (KM) initiatives have been implemented within the Agency, with one of them including the formation of a Division of Spent Fuel Storage and Transportation (SFST) KM team. The team, which was formed in the fall of 2008, facilitates capturing, transferring, and documenting regulatory knowledge for staff to effectively perform their safety oversight of transportation and storage of radioactive materials, regulated under Title 10 of the Code of Federal Regulations (10 CFR) Part 71 and Part 72. In terms of KM, the SFST goal is to share critical information among the staff to reduce the impact from staff's mobility and attrition. KM strategies in place to achieve this goal are: (1) development of communities of practice (CoP) (SFST Qualification Journal and the Packaging and Storing Radioactive Material) in the on-line NRC Knowledge Center (NKC); (2) implementation of a SFST seminar program where the seminars are recorded and placed in the Agency's repository, Agency-wide Documents Access and Management System (ADAMS); (3) meeting of technical discipline group programs to share knowledge within specialty areas; (4) development of written guidance to capture 'administrative and technical' knowledge (e.g., office instructions (OIs), generic communications (e.g., bulletins, generic letters, regulatory issue summary), standard review plans (SRPs), interim staff guidance (ISGs)); (5) use of mentoring strategies for experienced staff to train new staff members; (6) use of Microsoft SharePoint portals in capturing, transferring, and documenting knowledge for staff across the Division from Division management and administrative assistants to the project managers, inspectors, and technical reviewers; and (7) development and implementation of a Division KM Plan. A discussion and description of the successes and challenges of implementing these KM strategies at the NRC/SFST will be provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-J-217: Accuracy Comparison Between Surface and Volumetric Registrations for Patient Setup of Head and Neck Radiation Therapy

Purpose: Optical surface imaging has been applied to radiation therapy patient setup. This study aims to investigate the accuracy of the surface registration of the optical surface imaging compared with that of the conventional method of volumetric registration for patient setup in head and neck radiation therapy. Methods: Clinical datasets of planning CT and treatment Cone Beam CT (CBCT) were used to compare the surface and volumetric registrations in radiation therapy patient setup. The Iterative Closest Points based on point-plane closest method was implemented for surface registration. We employed 3D Slicer for rigid volumetric registration of planning CT and treatment CBCT. 6 parameters of registration results (3 rotations and 3 translations) were obtained by the two registration methods, and the results were compared. Digital simulation tests in ideal cases were also performed to validate each registration method. Results: Digital simulation tests showed that both of the registration methods were accurate and robust enough to compare the registration results. In experiments with the actual clinical data, the results showed considerable deviation between the surface and volumetric registrations. The average root mean squared translational error was 2.7 mm and the maximum translational error was 5.2 mm. Conclusion: The deviation between the surface and volumetric registrations was considerable. Special caution should be taken in using an optical surface imaging. To ensure the accuracy of optical surface imaging in radiation therapy patient setup, additional measures are required. This research was supported in part by the KIST institutional program (2E24551), the Industrial Strategic technology development program (10035495) funded by the Ministry of Trade, Industry and Energy (MOTIE, KOREA), and the Radiation Safety Research Programs (1305033) through the Nuclear Safety and Security Commission, and the NIH (R01EB016777)

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Commonwealth of the Northern Mariana Islands Energy Action Plan

This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

New Beginnings: Optimising Waste and End-state at UK Nuclear Sites to Enable Environmental Permit surrender (the GRR) - 20193

The decommissioning of nuclear sites involves the management of large volumes of radioactive waste, other conventional waste, and the clean-up of land and groundwater contamination. In the UK, the disposal of radioactive waste from nuclear sites is regulated by the Environment Agency (England), Natural Resources Wales (Wales) and the Scottish Environment Protection Agency (Scotland). All three environment agencies seek to make sure that the generation and disposal of radioactive waste is optimised: ensuring impacts to people are 'as low as reasonably achievable' (ALARA). With a large proportion of UK nuclear sites embarking on decommissioning, the environment agencies have collaboratively developed new guidance: the 'Management of radioactive waste from the decommissioning of nuclear sites: Guidance on the Requirements for Release from radioactive substances regulation' (referred to as the GRR)[1]. The environment agencies worked in liaison with the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, and the UK government body responsible, the Nuclear Decommissioning Authority (NDA). Prior to finalising the guidance, a 12 month trial was completed at three of the NDA's nuclear sites, enabling the environment agencies to test their draft GRR guidance against 'real world scenarios' and the challenge of incorporating its requirements into decommissioning plans. Experience gained during the trial was incorporated into the current version of the GRR, published in July 2018. The GRR represents the 'new beginning' of this paper's title because for the first time, the UK environmental regulators have expressed in detail their requirements for surrender of environmental permits for nuclear sites. The GRR provides a framework for a UK nuclear site to plan, assess and justify its management of radioactive waste and deliver through decommissioning, an optimal, environmentally safe and sustainable end-state. This paper will describe the requirements and technical standards within the GRR, the establishment of defensible clean-up criteria and the production of a Waste Management Plan (WMP), supported by a Site-Wide Environmental Safety Case (SWESC). It will describe the experience gleaned by operators and regulators during the trial and it will highlight current work by regulators to implement the new approach proportionately. Finally, this paper will look forward and outline planned amendments to legislation in the UK affecting nuclear sites that should enable the full benefits of the GRR to be realised in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Physics-based shape matching for intraoperative image guidance

Purpose: Soft-tissue deformations can severely degrade the validity of preoperative planning data during computer assisted interventions. Intraoperative imaging such as stereo endoscopic, time-of-flight or, laser range scanner data can be used to compensate these movements. In this context, the intraoperative surface has to be matched to the preoperative model. The shape matching is especially challenging in the intraoperative setting due to noisy sensor data, only partially visible surfaces, ambiguous shape descriptors, and real-time requirements. Methods: A novel physics-based shape matching (PBSM) approach to register intraoperatively acquired surface meshes to preoperative planning data is proposed. The key idea of the method is to describe the nonrigid registration process as an electrostatic–elastic problem, where an elastic body (preoperative model) that is electrically charged slides into an oppositely charged rigid shape (intraoperative surface). It is shown that the corresponding energy functional can be efficiently solved using the finite element (FE) method. It is also demonstrated how PBSM can be combined with rigid registration schemes for robust nonrigid registration of arbitrarily aligned surfaces. Furthermore, it is shown how the approach can be combined with landmark based methods and outline its application to image guidance in laparoscopic interventions. Results: A profound analysis of the PBSM scheme based on in silico and phantom data is presented. Simulation studies on several liver models show that the approach is robust to the initial rigid registration and to parameter variations. The studies also reveal that the method achieves submillimeter registration accuracy (mean error between 0.32 and 0.46 mm). An unoptimized, single core implementation of the approach achieves near real-time performance (2 TPS, 7–19 s total registration time). It outperforms established methods in terms of speed and accuracy. Furthermore, it is shown that the method is able to accurately match partial surfaces. Finally, a phantom experiment demonstrates how the method can be combined with stereo endoscopic imaging to provide nonrigid registration during laparoscopic interventions. Conclusions: The PBSM approach for surface matching is fast, robust, and accurate. As the technique is based on a preoperative volumetric FE model, it naturally recovers the position of volumetric structures (e.g., tumors and vessels). It cannot only be used to recover soft-tissue deformations from intraoperative surface models but can also be combined with landmark data from volumetric imaging. In addition to applications in laparoscopic surgery, the method might prove useful in other areas that require soft-tissue registration from sparse intraoperative sensor data (e.g., radiation therapy)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Light Water Reactor Sustainability Program Development of an Initial Business Case Framework for Fleet-Based Control Room Modernization

This milestone report presents a plan or framework for developing a generic business case for implementation of technology that supports Control Room Modernization (CRM) in existing power plants (NPP). The decision fund CRM activities often depends on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce operations and maintenance (O&M) or capital costs. The proposed Business Case Methodology (BCM) thus addresses the fact that the lack of a business case is often cited by utilities as a barrier to pursuing large-scale CRM activities. Using past BCM analyses for CRM as a model for this framework, this BCM proposes to base cost savings on advanced digital instrumentation and control (I&C), human-system interface (HSI), and work process technologies that allow NPP operators to conduct control room operations with improved human factors and efficiency, and therefore operate with fewer operational events. The technologies employed in CRM include large overview displays, task-based operator displays, computer- based procedures, advanced alarm systems, computerized operator support systems, and wireless networks, among others, but this initial plan will also focus only on a subset of these technologies. Thus, under this BCM model, labor savings can be harvested in terms of reduced overtime and redistribution of work. In short, the BCM addresses the benefits of the technology as opposed to the investment costs of the utility. The methodology provides the means to determine the maximum investment that will result in a positive return. Significant savings are also demonstrated as reduced time to bring the plant back on line after completion of outages. The benefits are quantified to a rough order of magnitude, providing directional guidance to NPPs that are interested in developing similar business cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

STAR-CCM+ Verification and Validation Plan

The commercial Computational Fluid Dynamics (CFD) code STAR-CCM+ provides general purpose finite volume method solutions for fluid dynamics and energy transport. This document defines plans for verification and validation (V&V) of the base code and models implemented within the code by the Consortium for Advanced Simulation of Light water reactors (CASL). The software quality assurance activities described herein are port of the overall software life cycle defined in the CASL Software Quality Assurance (SQA) Plan [Sieger, 2015]. STAR-CCM+ serves as the principal foundation for development of an advanced predictive multi-phase boiling simulation capability within CASL. The CASL Thermal Hydraulics Methods (THM) team develops advanced closure models required to describe the subgrid-resolution behavior of secondary fluids or fluid phases in multiphase boiling flows within the Eulerian-Eulerian framework of the code. These include wall heat partitioning models that describe the formation of vapor on the surface and the forces the define bubble/droplet dynamic motion. The CASL models are implemented as user coding or field functions within the general framework of the code. This report defines procedures and requirements for V&V of the multi-phase CFD capability developed by CASL THM. Results of V&V evaluations will be documented in a separate STAR-CCM+ V&V assessment report. This report is expected to be a living document and will be updated as additional validation cases are identified and adopted as part of the CASL THM V&V suite.

97 MATHEMATICS AND COMPUTING↗

U.S. department of energy safety design strategy review and approval beyond critical decision 3 for the high-level waste facility - 15525

The Waste Treatment and Immobilization Plant (WTP) in Hanford, Washington, is the nation's largest environmental remediation construction project. In 2012, at the WTP's High-Level Waste (HLW) Facility, the U.S. Department of Energy (DOE), Office of River Protection (ORP) restricted construction work at the Hazard Category 2 nuclear facility because of unresolved technical issues associated with the facility and of misalignment of the design and nuclear safety basis. By 2013, as additional issues were discovered, ORP limited HLW design and procurement activities. Addressing the technical issues and the misalignment of the design basis with the Preliminary Documented Safety Analysis (PDSA) is a priority for ORP. A proposal was developed to use the concept of a safety design strategy (SDS), as documented in DOE-STD-1189-2008, Integration of Safety into the Design Process, as a planning mechanism to support facility design and PDSA alignment. The standard provides the processes to develop an SDS that will ensure safety is integrated into design early in the project, by the start of preliminary design. Ultimately, as design progresses, an SDS is intended to support development of the project's PDSA. However, in this unique case, the HLW Facility design and construction phase has progressed beyond Critical Decision 3 and DOE-STD-1189-2008 was issued in 2008; 6 years after ORP approved the first WTP PDSA. In July 2013, ORP and the contractor recognized that the unresolved technical issues and design - safety basis misalignment should be addressed through a renewed look at nuclear safety requirements, and agreed that developing an SDS tailored to the criteria in DOE-STD-1189-2008 provided the best path forward to better integrate design and safety. Development of the SDS for the HLW Facility was one of many goals ORP established in a plan that describes how ORP will determine whether, and under what conditions, the contractor should be authorized to proceed with production engineering, procurement, and construction activities for the HLW Facility. Over the next several months, the contractor developed the draft SDS, identifying design basis accidents and control strategies for those accidents. ORP monitored progress and, when appropriate, provided recommendations. In April 2014, the contractor provided a draft SDS to ORP for initial review by an independent DOE Review Team. The Review Team was comprised of representatives from nuclear safety, criticality safety, engineering, fire protection, the Office of Environmental Management, the Assistant Manager WTP, and the DOE Chief of Nuclear Safety. A unique draft document review and interactive review process, facilitated through work sessions and continuous communication with the contractor, culminated in the development of 147 technical comments on topics varying from SDS implementation to hydrogen deflagration in vessels. Comment resolution sought to improve project clarity, delineation of control strategies, and, holistically, facilitate integration of safety into design in the SDS, as it will guide the restart of the HLW Facility production engineering and limited procurement and construction activities. All comments were resolved in support of a contractor submission of the final SDS to ORP at the end of June 2014. Successful resolution of these comments was achieved by continuing the real-time response and incorporation interaction with the contractor to ensure that mutual objectives were satisfied. The response times were facilitated through telephone, E-mail, and a shared file server accessible to contractor and DOE reviewers across the DOE complex. As a measure of success of this process, the Safety Basis Approval Authority (ORP Manager) and the WTP Federal Project Director approved the SDS on August 1, 2014, with no conditions of approval. DOE and the contractor recognized that it would be difficult to implement the SDS without changes to the existing contractor's engineering and nuclear safety processes. Accordingly, the contractor developed or revised a significant number of engineering and nuclear safety plans and procedures to implement the SDS into the design process. Over the coming year, the contractor will conduct a gap analysis between the SDS and the presently approved PDSA to incorporate the design basis accidents and preferred control strategies developed from the SDS into the PDSA. In addition, ORP will conduct an assessment of the contractor's implementation of the SDS into the design process at the appropriate stage of implementation, within 6 to 12 months of approval. Although the SDS was developed late in the HLW project timeline, the document will facilitate alignment of design and the safety basis, and is a key step in the return to full production engineering for the HLW Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Packing Optimization for Dismantled Parts of Nuclear Facilities - 18625

When dismantling nuclear facilities, the removed large components must be segmented into smaller pieces and then be stored in the containers. With good cutting and packing plans, the required quantity of the containers can be decreased, and the cost spent in preparing, handling, and disposing these containers can also be reduced significantly. To accomplish this, this article developed a methodology which integrates voxelization and metaheuristic to discretize the irregular shape of various components and put them into the containers with greatest efficiency. The proposed methodology is not limited to certain component types or shapes and can be used for all types of containers. This makes the proposed methodology useful and practical in the nuclear facility dismantling applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canadian Regulatory Framework for Waste Management and Decommissioning - 19373

The Canadian Nuclear Safety Commission (CNSC) licences, monitors and inspects all nuclear facilities and activities in Canada, including radioactive waste management and decommissioning, in order to assure the protection of the health, safety and security of persons and the environment. This paper will discuss the Canadian regulatory framework as it applies to all radioactive waste management and decommissioning of nuclear facilities. The Government of Canada's Radioactive Waste Policy Framework specifies that the Government of Canada is responsible for developing policy and for regulating and overseeing radioactive waste producers and owners and that, in accordance with the 'polluter pays' principle, waste owners are responsible for the funding, organization, management and operation of the facilities required to safely manage their wastes over the short- and long-terms. The CNSC's regulatory approach for radioactive waste stems from the Nuclear Safety and Control Act (NSCA) and identifies the need for long-term management of radioactive and hazardous waste arising from licensed activities and indicates that, when making regulatory decisions about the management of radioactive waste, the CNSC will seek to achieve its objectives by considering certain key principles in the context of the facts and circumstances of each case. These principles cover the concepts of waste minimization in all phases of a facility's life cycle, hazard assessment, future impacts of the waste, and transborder effects. As a facility life cycle regulator, all nuclear facilities are required to keep decommissioning plans up to date throughout the life cycle of a licensed activity. In addition, the CNSC requires that all licensees implement financial guarantees to cover the cost of decommissioning work resulting from the licensed activities. A preliminary decommissioning plan must be filed with the CNSC as early as possible in the life cycle of the activity or facility and must be reviewed and updated at a minimum every five years. Under the CNSC's non-prescriptive approach to regulation, the applicant proposes a waste management or decommissioning approach, supported by scientifically defensible benchmarks. The CNSC then assesses the proposal against existing regulatory requirements to ensure the health, safety and security of the public and the protection of the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗