Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Dynamic Scheduling Under Uncertainty

Often, autonomous agents that operate in real-world environments must be able to schedule and execute actions to accomplish mission goals while being robust to uncertainty and disturbances that arise during operations. This tutorial will focus on classes of models and algorithms that have been used to enable effective, robust strategies for dynamically dispatching plans in real time. The tutorial will begin with a survey of past and current research in modeling uncertainty in planning and scheduling, as well as research in different classes of approaches to dynamic scheduling. We then focus on a general class of approaches based on executing temporal plans using graphical models of events and their temporal ordering. These approaches allow for ensuring temporal flexibility in scheduling, as well as for developing strategies for executing partially controllable plans.

Morris, Robert↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

Air Traffic Management-eXploration Testbed for Urban Air Mobility Research and Development

The presentation will describe the architecture, current capabilities and some future enhancements of the testbed that is being developed at the National Aeronautics and Space Administration (NASA) to enable benefit, impact, safety and cost assessments for accelerating the deployment of air traffic management concept and technologies in the national airspace system. The testbed will support analysis of operational feasibility of urban air mobility operations, a part of NASA's Air Traffic Management eXploration project, and provide the data needed by regulatory agencies charged with public safety. Introduction of concepts and technologies, especially new concepts and technologies, is difficult and often takes decades because of the inability to assess the operational impact of the interaction between the proposed concept and technology and operationally deployed systems in terms of system-wide safety, traffic flow efficiency, roles and workload of controllers and traffic managers, and impact on airlines and other operators. To overcome these limitations, the testbed is developing infrastructure to enable mathematical modeling, human-in-the-loop evaluations and testing with operational systems in a simulated environment. In addition to the difficulty of establishing communications between geographically distributed systems, downloading/installing software, and management of startup, error-handling and shutdown, a major impediment for conducting simulations and human-in-the-loop testing with operational systems is the tedious manual scenario generation process. Several of these difficulties have been addressed in the current state of the testbed. The testbed can be described in terms of the following elements- (1) web-based frontend and backend, (2) Testbed Builder, (3) Data Distribution Service, (4) Component Library, (5) Simulation Management, and (6) Scenario Generation. The web-based frontend and backend enable the user to interact with the testbed for tasks such as composing a simulation, running a simulation and retrieving output data. The Testbed Builder application launched from the web frontend is a graphical user interface for the user to drag-and-drop and connect predefined blocks for composing a simulation/scenario generation task. The Builder writes a set of instructions for Simulation Management based on the links between the blocks and the block properties such as the component (executable) associated with a particular block. Management of the distributed simulation is accomplished by Execution and Component Managers. Execution Manager interprets the instructions provided by the Builder to instruct the Component Managers to download components from the Component Library to specified computers and to start them up. Once started, the components communicate with each other by publishing messages and subscribing to messages that are delivered by the Data Distribution Service. The Scenario Generation capability can be used for creating traffic scenarios for Multi-Aircraft Control System, which has been used extensively at NASA for human-in-the-loop-based concept evaluations. The presentation will provide a testbed enabled example scenario of Multi-Aircraft Control System based simulation in which the urban air mobility pilot using the conflict detection and resolution system would interact with the air traffic controllers for resolving conflicts with other aircraft during terminal area operations.

Simulation↗

International Space Station (ISS) Payload Autonomous Operations Past, Present and Future

Draper Laboratorys Timeliner is a scripting and automation system that runs onboard computers in the International Space Station (ISS). Timeliner is fully integrated with ISS and can be used to automate ISS operations tasks. Some of the most challenging aspects of operating a payload in low earth orbit are communication delays, ground equipment failures, and human errors. How does a Payload Developer (PD) know their equipment is operating nominally and collecting science in the most efficient way possible or even powered at any given time? During a ground Loss of Signal (LOS) data outage, PDs have no insight into their experiments state, and benefit greatly from Timeliner scripts executing on ISS to perform telemetry monitoring and commanding operations. This paper will discuss current software designs, and new operational uses for Timeliner. Existing Timeliner capabilities discussed will include: autonomous EXPRESS Rack activation and deactivation; autonomous science data downlinks; Minus Eighty Degree Freezer (MELFI) Dewar autonomous safing; JAXA and ESA module autonomous payload facility safing; as well as many others. New operational concepts discussed will include allowing Timeliner on the payload computer to issue core commands (Thermal, Power, Fire Detection), creation of new ground tools that will monitor the current status of Payload Racks as well as all the messaging from autonomous scripts executing, decreasing approval time for Timeliner bundles, and opening up the Payload MDM Enhanced Processor Integrated Communications Card (EPIC) interface. The EPIC interface could provide a new crew interface for PL Timeliner execution. The new interface could operate on either a Payload Computer System (PCS) or a Station Support Computer (SSC) that is plugged into either the Payload LAN or the Operations LAN which will make communicating to the PL MDM more flexible and greatly increase band width for communication.

Space Mission Automation↗

Resource Prospector (RP): A Cost-Effective Lunar Resource Pathfinder

Resource Prospector (RP) is an in-situ resource utilization (ISRU) technology demonstration mission under study by the NASA Human Exploration and Operations Mission Directorates (HEOMD). This clever mission is currently planned to launch in 2020 and will demonstrate extraction of oxygen, water and other volatiles, as well measure mineralogical content such as silicon and light metals, like aluminum and titanium, from lunar regolith. Expanding human presence beyond low-Earth orbit to asteroids and Mars will require the maximum possible use of local materials, so-called in-situ resources, and the moon presents a unique destination to conduct robotic investigations that advance ISRU capabilities, as well as providing significant exploration and science value. This mission is equally important; however, for how it executes as a risk-tolerant, cost-effective mission. RP follows on the path-finding approaches of the Lunar Crater Observation and Sensing Satellite (LCROSS) mission. The LCROSS mission confirmed the presence of water-ice on the moon, but also established a new lightweight-approach to project and mission execution which was considerably cheaper and faster than traditional NASA missions. RP has been designated as a Class D mission, just as LCROSS. This mission classification is the most risk-tolerant class of mission within the NASA risk framework and as such, is given more latitude to accept higher-levels of residual risk. The intention is that by saving monies normally spent attempting to assure a single missions success, more missions can be funded. A well-designed portfolio can accept occasional mission failure, as it still gets more done for the same investment of resources. This classification enables tailoring the NASA Policy Requirements (NPRs) to lighter-weight approaches to mission management and execution. RP is also studying both international and commercial partnerships as a means to maximize return on the investment. International partnerships provide both capabilities synergies and cost-sharing opportunities, while the evolving new space commercial options are revealing new approaches to acquiring cost-effective services, including the benefits of bundling services. Even the world of launch vehicles is changing, offering much less expensive access to space, especially if NASA is able to be flexible in how it approaches mission assurance. Finally, leveraging investments being made elsewhere within a program portfolio, can enable cost-savings by enabling two applications with one investment. RP will be the next pathfinder mission to both enable exploration capabilities for future missions, and continue to evolve cost-effective approaches for NASA.

Lunar↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission. To get to the Moon, the spacecraft traversed multiple phasing loops around the Earth, and then executed a breaking maneuver to achieve lunar orbit. This Lunar Orbit Insertion (LOI) maneuver was perhaps the most time-critical phase of the entire mission. The LOI maneuver had to occur within a twenty minute window in order to achieve lunar orbit with an acceptable amount of propellant remaining. Missing this window would have likely resulted in a loss of the entire mission. An additional challenge of the maneuver was that spacecraft was out of view for approximately one hour prior to the main thruster burn, with the burn needing to occur within five minutes after coming into view. These conditions resulted in unique challenges for ground operations and the fault management system. Early in the planning stages of the mission, the criticality and challenges of this maneuver were evident to the system designers. The major concern was that any triggering of the on-board fault management system, whether it is in response to a true fault or a false positive, would result in an unacceptable delay to the burn. Therefore the flight software was designed with a flexible fault management system, such that any or all of the fault management responses could be disabled for the lead up and execution of the maneuver. Later, a triage was conducted to develop a list of fault responses, mapped to various parts of the timeline of the maneuver. Some of these contingency responses were solely ground-based if the time to detect, diagnose, and respond were adequate. Other responses were automated on-board if the response time from the ground would have been inadequate. For instance, in order to recover from a system reboot, on-board automation would have automatically reconfigured the spacecraft for the burn and reoriented the spacecraft to the burn attitude.These contingency responses were practiced, over and over, during numerous rehearsals. Although the LOI maneuver was executed without having to use any of these contingencies, the LADEE team was adequately prepared for this highly critical phase of the mission.

Cannon, Howard↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part I: Thermal Architecture

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the mutiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

OTIS↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part II: Thermal Analysis

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

Testing↗

Refining the Safety - Liveness Classification of Temporal Properties According to Monitorability

Runtime verification is the topic of analyzing execution traces using formal techniques. It includes monitoring the execution of a system against temporal properties, commonly to detect violations. Not every temporal property is fully monitorable however: in some cases, the correctness of the execution does not depend on any finite prefix. We study the connection between monitorability and Lamport’s classification of properties to safety and liveness and their dual classes.We refine the definition of monitorability and provide algorithms to check which verdicts can be expected, a priori and during runtime verification.

Peled, Doron↗

Efficient Runtime Verification of First-Order Temporal Properties

Runtime verification allows monitoring the execution of a system against a temporal property, raising an alarm if the property is violated. In this paper we present a theory and system for runtime verification of a first-order past time linear temporal logic. The first-order nature of the logic allows a monitor to reason about events with data elements. While runtime verification of propositional temporal logic requires only a fixed amount of memory, the first-order variant has to deal with a number of data values potentially growing unbounded in the length of the execution trace. This requires special compactness considerations in order to allow checking very long executions. In previous work we presented an efficient use of BDDs for such first-order runtime verification, implemented in the tool DEJAVU. We first summarize this previous work. Subsequently, we look at the new problem of dynamically identifying when data observed in the past are no longer needed, allowing to reclaim the data elements used to represent them. We also study the problem of adding relations over data values. Finally, we present parts of the implementation, including a new concept of user defined property macros.

Peled, Doron↗

BDDs on the Run

Runtime verification (RV) of first-order temporal logic must handle a potentially large amount of data, accumulated during the monitoring of an execution. The DEJAVU RV system represents data elements and relations using BDDs. This achieves a compact representation, which allows monitoring long executions. However, the potentially unbounded, and frequently very large amounts of data value scan,ultimately, limit the executions that can be monitored. We present an automatic method for “forgetting” data values when they no longer affect the RV verdict on an observed execution.We describe the algorithm and illustrate its operation through an example.

Peled, Doron↗

The Cooling Loop A Anomaly of 2013: A Case Study in Human-Systems Resilience

Throughout the history of human spaceflight, NASA has employed an operational paradigm of 24/7 dependence on experts in Mission Control Center (MCC). In addition to nominal flight control and mission operations, these 85+ experts per shift manage anomaly detection, diagnosis, and response, and support the crew in real-time in performing maintenance and repair, procedure execution, and other complex mission operations. Future long-duration exploration missions (LDEMs) beyond low-Earth orbit (LEO) will not operate successfully using this same Human-Systems Integration Architecture (HSIA) where crew rely on ground controllers, have ready access to resupply, and have a fallback plan of evacuation. As distance from Earth increases and the communication delay grows, crews will need to respond independently and adequately to time-critical vehicle malfunctions. It will not always be sufficient or even possible to ‘safe the system’ and then wait upon ground intervention. A new and radically different HSIA is needed to accommodate the paradigm shift of deep-space travel. Historical International Space Station (ISS) data show that for a 30-day mission, the likelihood of a high-consequence vehicle anomaly of uncertain origin that requires rapid response is greater than 10%. The likelihood of such an event is 50% by the fourth month of the mission, and it grows exponentially with time. Our team has conducted in-depth investigations into these events and their corresponding anomaly resolution activities. Using MCC and Mission Evaluation Room (MER) anomaly resolution artifacts (including meeting summaries, caution and warning data, and ISS daily summaries), we created timelines detailing ground actions and in-orbit events for two significant anomalies. We then mapped these timelines onto Mars transit conditions, introducing a ground-crew communications time delay and shifting immediate response, time-critical task execution, and vehicle commanding to the crew. In detailing successful anomaly resolution in transit to Mars, the timelines highlight where effective resolution requires drastically evolved onboard capabilities. Though this research has yielded a rich data set based on ground response in past missions, there is still insufficient knowledge to assess the potential impact of inflight anomalies on a small autonomous crew on future LDEMs beyond LEO. To begin building an evidence base that will inform future HSIA standards and requirements, we are developing an approach to systematically capture crew anomaly response and procedure execution during early Artemis missions. Being the first human spaceflight beyond LEO since Apollo, early Artemis missions provide a rare and unique opportunity to serve as a testbed for Mars missions. Our work aims to capitalize on planned data collection to derive crew operational responses to anomalous events in real-time. Our team is also researching the level of simulation fidelity required for empirically validating proposed HSIA standards and evaluating HSIA implementations for LDEMs beyond LEO. This work will produce a trade space study of HSIA simulation objectives and fidelity requirements. Ultimately, these research efforts will assist in developing the standards and technologies needed to build a next-generation HSIA for LDEMs beyond LEO.

human-systems integration architecture↗

Space Technology Mission Directorate Small Spacecraft Technology Program

The Small Spacecraft Technology (SST) program within NASA’s Space Technology Mission Directorate, expands the ability to execute unique missions through rapid development and demonstration of capabilities for small spacecraft applicable to exploration, science and the commercial space sector. Through targeted development and frequent in space testing, the program: • Enables execution of missions at much lower cost than previously possible • Substantially reduces the time required for development of spacecraft • Enables new mission architectures through the use of small spacecraft • Expands the reach of small spacecraft to new destinations and challenging new environments • Enables the augmentation of existing assets and future missions with supporting small spacecraft. The program achieves its objectives through: • Identification and investment in the development of new subsystem technologies to enhance or expand the capabilities of small spacecraft • Sponsorship of flight demonstrations of new technologies, capabilities and applications for small spacecraft • Promotion of the use of small spacecraft as platforms for testing and demonstrating technologies and capabilities that might have more general applications in larger-scale spacecraft and systems Program-funded projects may be executed at academic institutions, in the private sector, at NASA Centers, as public-private partnerships, or cooperative agreements.

Roger Hunter↗

Space Technology Mission Directorate Small Spacecraft Technology

The Small Spacecraft Technology (SST) program within NASA’s Space Technology Mission Directorate, expands the ability to execute unique missions through rapid development and demonstration of capabilities for small spacecraft applicable to exploration, science and the commercial space sector. Through targeted development and frequent in space testing, the program: • Enables execution of missions at much lower cost than previously possible • Substantially reduces the time required for development of spacecraft • Enables new mission architectures through the use of small spacecraft • Expands the reach of small spacecraft to new destinations and challenging new environments • Enables the augmentation of existing assets and future missions with supporting small spacecraft. The program achieves its objectives through: • Identification and investment in the development of new subsystem technologies to enhance or expand the capabilities of small spacecraft • Sponsorship of flight demonstrations of new technologies, capabilities and applications for small spacecraft • Promotion of the use of small spacecraft as platforms for testing and demonstrating technologies and capabilities that might have more general applications in larger-scale spacecraft and systems [1] Program-funded projects may be executed at academic institutions, in the private sector, at NASA Centers, as public-private partnerships, or cooperative agreements.

Roger Hunter↗

A sampling-based optimization approach to handling environmental uncertainty for a planetary lander

Planning for unknown environments presents a number of technical challenges. The planner must ensure robustness to unknown phenomena and manage unpredictable variation in execution, all while operating in a capacity that maximizes its objective. Productivity in the face of these challenges re-quires an integrated approach to planning and execution that is capable of accomplishing goals, reacting to variation, and maximizing overall utility. We examine this problem in the context of a Europa Lander concept mission. We model the problem as a hierarchical task network, framing it as a utility maximization problem constrained on a depletable energy resource. We propose an uncertainty–sensitive deterministic planning framework that utilizes periodic replanning to better handle model uncertainty and variable execution. We demonstrate the efficacy of our framework through simulations of a Europa Lander concept mission in which our algorithm out-performs several baseline approaches in both utility maximization and robustness

Zilberstein, Shlomo↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

BACKGROUND This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. METHODS Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. RESULTS The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. DISCUSSION These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

Background: This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. Methods: Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. Results: The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. Discussion: These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Mars 2020 Trajectory Correction Maneuver Design

The Mars 2020 mission launched on 30 July 2020 and arrived at Mars on 18 February 2021. Delivering the mission’s Perseverance rover to Jezero Crater required adjusting the postlaunch trajectory to remove the launch injection bias and to target the atmospheric entry conditions, while also satisfying requirements on the propellant usage and non-nominal impact probability at Mars. The Mars 2020 maneuver design team achieved these goals by designing and executing three propulsive maneuvers in flight. The accurate on-board execution of those maneuvers delivered the spacecraft into the Martian atmosphere in a state that allowed for a successful entry, descent, and landing on the surface. This paper details the maneuver design process and describes the design and execution of the three in-flight propulsive maneuvers.

Kruizinga, Gerhard↗