Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Configuration Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,495 records · Page 83

Additions to the ICSBEP and IRPHEP handbooks since NCSD 2013

Innumerable experiments have been performed worldwide to support criticality safety activities. Those experiments represent significant investments in cost, expertise, and infrastructure; as such, they represent valuable assets as the basis for recording, development, and validation of methods and nuclear data vital for modern and future criticality safety needs. Preservation and evaluation of these experimental data as benchmarks serves to provide for the best interest of the nuclear criticality safety community. High-quality integral benchmark experiments have always been a priority. There is ever growing interest in developing integral benchmark data to increasingly quantify and reduce calculational uncertainties to meet the demands of future criticality safety needs supporting next generation reactors and advanced fuel cycle concepts. The importance of drawing upon existing benchmark data is becoming more apparent because of dwindling availability of critical facilities worldwide and the high cost of performing new experiments. Integral benchmark data from the International Handbook of Evaluated Criticality Safety Benchmark Experiments (ICSBEP Handbook) and the International Handbook of Reactor Physics Benchmark Experiments (IRPhEP Handbook) are widely utilized. Significant benchmark data have been added to those two handbooks since the last Nuclear Criticality Safety Division Topical Meeting in Wilmington, North Carolina (September-October 2013). This paper highlights those additions. The 2016 edition of the ICSBEP Handbook now includes data for 570 evaluations containing benchmark specifications for 4913 critical, subcritical, or near-critical configurations, representing contributions from over 20 countries. There are a total of seven criticality-alarm-placement/shielding evaluations containing a total of 45 benchmark configurations, and eight fundamental physics benchmark evaluations containing a total of 215 measurements relevant to criticality safety applications. The IRPhEP Handbook now includes data from 151 experimental series (representing 50 reactor facilities) and also represents contributions from over 20 countries. Of the 151 benchmarks, five are draft contributions. Both the ICSBEP and IRPhEP are collaborative efforts that involve numerous scientists, engineers, and administrative support personnel worldwide. Continued contribution to these handbooks is expected to further provide the high-quality benchmark data necessary to compliment criticality safety activities going forward. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Structural, Criticality, and Radiation Dose Calculations to Support SNF Loading into a DOE Standard Canister

The DOE Standard Canister Demonstration Project includes the development of an internal support structure (ISS) for the 4.6-m-long and 45.7-cm-diameter canister. This study presents structural evaluations, criticality safety assessments, and dose rate calculations conducted within the scope of the ISS design process to support smooth canister loading operations and to ensure safe storage, transportation, and disposal of Peach Bottom 1 Core II (PB2) and Fort St. Vrain (FSV) SNF, currently stored at INL’s CPP-603 facility. The ISS includes a 316L stainless-steel basket that holds 12 PB2 SNF rods. The PB2 basket rests on top of six individual, 78.7-cm-long, 316L stainless-steel columns that are equally spaced and welded to the inner canister wall at the lower end of the shell. These columns represent the FSV basket and can hold one FSV SNF element. An A92014 T6 aluminum spacer disc is bolted to the bottom plate of the PB2 basket to vertically restrain the FSV SNF element after the PB2 basket is placed inside the canister above the FSV basket. The structural evaluations of the ISS followed applicable ASME BPVC.III.3 guidelines and included finite element (FE) analyses of the PB2 basket structure; analyses of welds and bolds; buckling analyses of selected components, and acceptability assessments of the expected basket deformations under loading operations. The criticality safety assessments used the Monte Carlo N-Particle (MCNP) software architecture Version 6.2, including ENDF/B-V continuous-energy cross-section libraries, considering intact SNF in a single storage overpack or two multistorage overpack configurations and intact or failed SNF configured for disposal. The dose rate computations are based on source terms taken from the DOE Spent Fuel Database. The isotopic composition was decay corrected for the year 2022 using the ORIGEN module in the SCALE suite. A 19-group photon spectrum and a 27-group neutron-source spectrum were generated and used in MCNP to calculate estimated dose-equivalent rates, both on DOE Standard Canister contact and at a radial distance of 1 m from the canister surface. The results of this study indicate a structurally sound system that can uphold its criticality safety functions throughout its intended operational phases. Furthermore, this study provides confidence that sufficient radiological protection is technically achievable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Gasification to Produce Fischer-Tropsch Jet and Diesel Fuel

The primary objective of this project and the U.S. DOE’s integrated biorefinery (“IBR”) program was to demonstrate conversion of biomass and waste-derived feedstocks into military spec liquid fuels. Frontline’s proposed integrated process was to incorporate several novel technologies and innovative applications of existing technologies that would serve both to increase plant efficiency and also to lower the cost of the produced biofuels. The project was intended to demonstrate Frontline Bioenergy’s technologies for gasification and synthesis gas clean-up configuration to produce a syngas stream suitable for a proven Fischer-Tropsch (“F-T”) unit that would produce F-T intermediate products. These F-T intermediate products were to be upgraded to military spec diesel and jet fuel, including F76, JP5, and JP8. Specifically, these technologies consisted of: 1. Frontline’s PMFreeGas® ultra low particulate matter (PM) hot gas filtration technology 2. Application of Frontline’s TarFreeGas® ultra low-tar gasification technology 3. Frontline’s novel approach to syngas conditioning The proposed gasifier system was to operate at 10 tpd capacity while the F-T plant was capable of approximately one barrel per day. Although the gasifier output would have been roughly ten times the F-T plant’s required input, the 10 tpd capacity was chosen to enable scaling to commercial capacity. Project partners included i) SGC Energia, owner of the F-T technology and owner of the proposed demonstration site in Pasadena, Texas; ii) Stanley Consultants, a reputable engineering company that provided detailed electrical engineering services; and iii) Delphi Engineering & Construction LLC, a consulting company that provided project management advisory services. The integrated plant was never constructed due to lack of cost share funds. However, the commercialization plan and associated financial model suggested such a plant could be economically viable when the price of oil exceeds $70 per barrel. The price of feedstock plays a significant role in the profitability of the plant for a given value of oil. An integrated biorefinery capable of producing liquid transportation fuels and other chemical feedstocks would benefit the public by providing a sustainable pathway to convert domestically available feedstocks into fuels that might otherwise be imported from countries or regions of the world that are typically hostile to the United States.

09 BIOMASS FUELS↗

Decoupling of heat generated from ejected and non-ejected contents of 18650-format lithium-ion cells using statistical methods

Effective thermal management systems, designed to handle the impacts of thermal runaway (TR) and to prevent cell-to-cell propagation, are key to safe operation of lithium-ion (Li-ion) battery assemblies. Critical factors for optimizing these systems include the total energy released during a single cell TR event and the fraction of the total energy that is released through the cell casing versus through the ejecta material. A unique fractional thermal runaway calorimeter (FTRC), designed to characterize said critical factors, was utilized to examine the TR behavior of 18650-format Li-ion cells representing a variety of manufacturers, chemistries, capacities, and safety features. Primarily, the impacts of bottom vent (BV) safety features, varied cell casing thickness, and Dreamweaver cellulose based separators were assessed for select cell types. A subset of cells also had an imbedded internal short circuiting (ISC) device to allow examination of TR behavior initiated at lower temperatures (i.e. closer to field failure conditions). The impact of bottom rupture on TR behavior was also examined for experiments that resulted in this non-standard failure mechanism. Statistical analysis of the results for each cell configuration reveals that a lognormal distribution effectively characterizes the variation of total TR energy release. Typically 20%-30% of the total energy yield is released through the cell casing with the remainder through the ejecta material. Higher energy cells tend to exhibit more violent ejections and less predictable TR events. Inclusion of a BV feature reduces the overall severity of the TR event and can increase the predictability. Results also suggest that the magnitude of the TR event may not be directly proportional to the stored electrical energy, but rather has additional dependence on other design and failure mode factors.

25 ENERGY STORAGE↗

Testing of Helium-Cooled Metal Molybdenum Disk Target

NorthStar Medical Radioisotopes LLC is planning to produce an important medical radioisotope, molybdenum-99 (Mo-99), through photonuclear reaction on molybdenum-100 (Mo-100). In this approach, molybdenum metal will be bombarded with a 40-MeV electron beam. Because enriched Mo-100 is expensive, it is desired to use as much beam power as possible to achieve maximum production yield and minimize target mass. This objective leads to very high beam power density (heat deposition in the target), which sets challenging requirements for cooling. Together with scientists at Los Alamos National Laboratory, a team at Argonne National Laboratory has developed and demonstrated a cooling approach using pressurized helium, which allows for efficient heat removal. One of the main challenges in this approach is the management of the heat load on the target window. The target window separates the high-pressure helium inside the target from the vacuum in the beamline, so it is constantly under stress from differential pressure. Also, the window is cooled only by the helium gas flowing on one side, making the window cooling even more challenging. High heat deposition in the target disks also imposes a strict requirement on performance of the helium cooling system and thickness of the target disks. The target disks are produced from metal powder via a press-and-sinter process. The resulting disks do not possess tensile strength as high as solid molybdenum and might not survive the vibration from the high-velocity helium coolant and high thermal stress from beam heating. An Argonne team of scientists performed a series of tests at Argonne’s Low Energy Accelerator Facility (LEAF) [3-7]. This report describes two series of tests for scale down production target designs that utilize full-scale 29 millimeters diameter, 0.75 mm thick press-and-sintered disks. We performed two thermal tests with different beam parameters and configurations of the disk laminations. We compared the results of the window temperature measurements and cooling system parameters obtained in the experiments with those predicted by analytical calculations and Computation Flow Dynamic (CFD) simulations. Results of the experiments and calculations are presented below.

36 MATERIALS SCIENCE↗

Simulations of Criticality Control Overpack Container Compaction at the Waste Isolation Pilot Plant

Criticality Control Overpack (CCO) containers are being considered for the disposal of defense-related nuclear waste at the Waste Isolation Pilot Plant (WIPP). At WIPP, these containers would be placed in underground disposal rooms, which will naturally close and compact the containers closer to one another over several centuries. This report details simulations to predict the final container configuration as an input to nuclear criticality assessments. Each container was discretely modeled, including the plywood and stainless steel pipe inside the 55-gallon drum, in order to capture its complex mechanical behavior. Although these high-fidelity simulations were computationally intensive, several different material models were considered in an attempt to reasonably bound the horizontal and vertical compaction percentages. When exceptionally strong materials were used for the containers, the horizontal and vertical closure respectively stabilized at 43:9 % and 93:7 %. At the other extreme, when the containers completely degraded and the clay seams between the salt layers were glued, the horizontal and vertical closure reached respective final values of 48:6 % and 100 %.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of Electronics Upgrades to the LANL Green is Clean Phoswich Detector Systems - 16419

Los Alamos National Laboratory radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to assay and verify that GIC candidate waste meets free release disposal requirements. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The crystals are set in an oxygen-free high-conductivity copper housing with a very thin (0.025 mm) aluminum entrance window. The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. These electronic modules provide the buffering, amplification, and pulse shape analyzer needed for the proper presentation of signals to the custom Phosmux router module. The router module separates the sodium iodide and cesium iodide signals by their rise times and transfers this information into the computer-mounted multichannel analyzer, a Canberra Model S-100 system. While these NIM Bin counting electronics configurations have been effective for approximately 20 years of operation, they are bulky requiring numerous modules per detector and the important Phosmux module is no longer manufactured by LANL. Modern advancement of commercial counting electronics now offer more compact options for equivalent detector signal processing. A pulse shape discriminator module, the DGF Pixie-4, made by XIA LLC, has been identified that can replace the majority of the original NIM bin electronics in a much more compact chassis - one Pixie-4 replaces four NIM amplifiers and four NIM PSAs and fits in a small National Instruments{sup TM} chassis. Thus, LANL has initiated a system upgrade project to replace the historic NIM electronics with the XIA Pixie4 and associated configuration software. The hardware for one Phoswich systems has been procured for the project and the configuration software, customized for the LANL Phoswich detector application, has been written by the manufacturer. Initial setup and optimization of the Pixie-4 configuration has been performed. Qualitative and quantitative baseline comparisons to the NIM electronics has been performed. Good agreement of key low energy gamma lines between the systems has allowed 'Proof of Concept' to be concluded. Further optimization and performance evaluations are in progress. Modifications to the LabVIEW{sup TM} based operating software (originally written by VI Control Systems Ltd.) are being performed by a LANL LabVIEW{sup TM} programmer to accommodate the electronics upgrade. A new LabVIEW{sup TM} interface to control the Pixie-4 has already been developed. Final optimization and testing, formal software QA, and revisions to operating procedures are in progress to achieve completion of the GIC system upgrade project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final report of a scalable, automated, semipermanent seismic array (SASSA) method for detecting CO 2 extent during geologic CO 2 injection

The scalable, automated, semipermanent seismic array (SASSA) project led and managed by the Energy & Environmental Research Center (EERC) was designed as a 3-year proof-of-concept study to evaluate and demonstrate an innovative application of the seismic method. The concept was to use a sparse surface array of 96 nodal seismic sensors paired with a single, remotely operated active seismic source at a fixed location to monitor for CO 2 saturation changes in a subsurface reservoir by processing the data for time-lapse changes at individual, strategically chosen reservoir reflection points. The combination of autonomous equipment and modern processing algorithms was used to apply the seismic method in a manner different from the normal paradigm of collecting a spatially dense data set to produce an image. It was used instead to monitor individual, strategically chosen reservoir reflection points for detectable signal character changes that could be attributed to the passing of a CO 2 saturation front or, possibly, changes in reservoir pressure. Data collection occurred over the course of 1 year at an oil field undergoing CO 2 injection for enhanced oil recovery (EOR) and focused on four overlapping “five-spot” EOR injector–producer patterns. Selection, procurement, configuration, installation, and testing of project equipment and collection of five baseline data sets were completed in advance of CO 2 injection within the study area. Weekly remote data collection produced 41 incremental time-lapse records for each of the 96 nodes. Validation was provided by two methods: 1) a conventional 2-D seismic line acquired through the center of the study area before injection started and again after the project ended and processed in a time-lapse manner and 2) by CO 2 saturation maps created from reservoir simulations based on injection and production history matching. Interpreted results were encouraging but mixed, with indications of changes likely due to the presence of CO 2 on some node reflection points where and when effects would be expected and noneffects where no CO 2 was expected, while results at some locations where simulation outputs suggested CO 2 should be present were ambiguous. Acquisition noise impacted interpretation of data at several locations. Many lessons learned were generated by the study to inform and improve results on a follow-up study. The ultimate aim of the project was to evaluate whether deployment of a SASSA technology can provide a useful and cost-effective monitoring solution for future CO 2 injection projects. The answer appears to be affirmative, with the expectation that lessons learned applied to future iterations, together with technology advances, will likely result in significant improvements.

58 GEOSCIENCES↗

A New Era of Nuclear Criticality Experiments: The First 10 Years of Planet Operations at NCERC

Planet is a vertical-lift assembly machine currently located at the National Criticality Experiments Research Center (NCERC) at the Nevada National Security Site. In the past, Planet resided at Technical Area-18 in Los Alamos, New Mexico, as part of the Los Alamos Critical Experiments Facility (LACEF). Following the de-inventorying of LACEF, the Planet assembly was relocated to NCERC in 2008 and became fully operational in June of 2011. The Class Foils experiment, which involves stacking highly enriched uranium foils to obtain a critical configuration, was the first critical experiment performed on Planet. As a major component of the Nuclear Criticality Safety Class taught for the U.S. Department of Energy (DOE) Nuclear Criticality Safety Program, the Class Foils experiment allows personnel from all over the DOE complex to handle nuclear material and to complete the approach to critical safely and successfully. This paper describes the Planet vertical assembly and recent engineering upgrade and a selection of the experiments that have been performed on Planet since its transition to NCERC 10 years ago.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

V31 Test Report

The V31 containment vessel was procured by the US Army Recovered Chemical Materiel Directorate (RCMD) as a third-generation EDS containment vessel. It is the fifth EDS vessel to be fabricated under Code Case 2564 of the 2019 ASME Boiler and Pressure Vessel Code, which provides rules for the design of impulsively loaded vessels. The explosive rating for the vessel, based on the code case, is twenty-four (24) pounds TNT-equivalent for up to 1092 detonations. This report documents the results of explosive tests that were performed on the vessel at Sandia National Laboratories in Albuquerque, New Mexico to qualify the vessel for field operations use. There were three design basis configurations for qualification testing. Qualification test (1) consisted of a simulated M55 rocket motor and warhead assembly of 24lbs of Composition C-4 (30 lb TNT equivalent). This test was considered the maximum load case, based on modeling and simulation methods performed by Sandia prior to the vessel design phase. Qualification test (2) consisted of a regular, right circular cylinder, unitary charge, located central to the vessel interior of 19.2 lb of Composition C-4 (24 lb TNT equivalent). Qualification test (3) consisted of a 12-pack of regular, right circular cylinders of 2 lb each, distributed evenly inside the vessel (totaling 19.2 lb of C-4, or 24 lb TNT equivalent). All vessel acceptance criteria were met .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SEIN: Breaking Barriers Resilient Energy System Analysis [Slides]

The Solar Energy Innovation Network (SEIN) is a collaborative research program that supports multi-stakeholder teams in researching and sharing solutions to real-world challenges associated with solar energy adoption. The Breaking Barriers project was selected to participate in the Solar Energy Innovation Network, Round 2, and was led by Groundswell, a D.C.-based clean energy project developer. The Breaking Barriers team included Partnership for Southern Equity, Atlanta University Center campus facility managers and professors, the City of Atlanta's Neighborhood Planning Unit T, and Georgia Power Company. The project aimed to design and construct innovative urban energy resiliency hubs integrating microgrid technology, solar generation, and energy storage in Atlanta colleges and communities. The hubs will help these historically Black colleges and universities (HBCUs) and the energy-burdened broader community in West Atlanta be more resilient, in addition to informing new course curricula at Atlanta University Center campuses. With many possible options for the system's battery size, the Breaking Barriers team needed insight into the relationships between BESS size, economic performance, and resilience at Spelman College's Manley Center. These insights are crucial for entering procurement negotiations with project developers, establishing resilience capabilities that the HBCU campuses can plan around, and guiding the team's fundraising targets. This analysis includes estimates of PV and battery performance, costs, savings, and resilience for multiple battery sizes. In order to provide power during a grid outage, the resilient energy system also needs to be connected to the Manley Center in a safe and island-able manner (electrically isolated from the grid). Analysis of potential electrical configurations and estimated setup costs is key to successfully entering a required interconnection agreement with Georgia Power, as well as informing requests for engineering firms to construct the system. This analysis includes conceptual options and rough order of magnitude cost estimates for electrically interconnecting the resilient energy system to the Manley Center and the grid. The Breaking Barriers team used this analysis to select preferred system characteristics and design for the resilient energy system.

14 SOLAR ENERGY↗

Criticality Accident Alarm System Shielding Benchmark: Integral Experiment Request 498, Critical Engineering Decision 1 Report

This report supports Critical/Subcritical Experiment Decision 1 (CED-1) for Integral Experiment Request (IER) 498, a shielding benchmark produced using the Godiva IV critical assembly at the National Critical Experiments Research Center (NCERC). Shielding benchmarks are datasets collected to provide a comparison for computer models that simulate the effect of shielding on radiation transmission from a source to a detector. The purpose of a CED-1 report is to produce a conceptual design for an integral experiment and to identify the long lead-time items. The design presented in this report favors certain detailed design options such as material selections. However, alternative options can be selected as the project evolves. Dimensions are specified only as needed to evaluate feasibility and performance. Development of Criticality Accident Alarm System (CAAS) shielding benchmarks supports two main programmatic needs. The first need is to improve confidence in models of facilities that house nuclear material handling operations. Better models can support effective CAAS detector placement when criticality may result in dose, and it enables more accurate analysis of criticality accident impacts at various locations in a facility. A key quantity that can be verified is the secondary gamma production caused by neutron interactions with various materials. The second programmatic need supported by shielding benchmarks is the ongoing development of methods being integrated into nuclear simulation codes such as the Monte Carlo N-Particle (MCNP) transport code and the SCALE code system used in efforts funded by the Nuclear Criticality Safety Program (NCSP). Previous work performed under the International Criticality Safety Benchmark Experimental Program (ICSBEP) to produce shielding benchmark data is primarily limited to a set of measurements at the SILENE critical assembly at the Valduc facility in France. The experiment used an open configuration and a burst mode operation, which limited detector options to thermoluminescent dosimeters (TLDs) and activation foils. Because TLDs do not record gamma spectra, it was difficult to verify the gamma energy spectrum from the experiment. In this work, the Godiva IV assembly will be used because it is a fast system capable of producing a wide range of source strengths, including super-prompt critical bursts. The room return for the facility is expected to be substantial and challenging to characterize, so a more closed, shielded experimental configuration is considered. Furthermore, because the physics of radiation transport outside the assembly does not change between the burst mode and the delayed critical mode, it is anticipated that most measurements will be made with the Godiva IV assembly in delayed critical mode, operating within a range that will allow electronic counters to collect accurate data. Scoping calculations concluded that a workable room return shield is comprised of 40 cm of 5% borated polyethylene backed by 7 cm of lead. This configuration was shown to produce a ratio of signal–to–room return of over 100 for up to 2 mean free paths of shield sample material, and over 10 for up to 4 mean free paths of shield sample material, ensuring that useful results can be obtained. With no shielding sample in the room return shield, it was shown that the neutron and gamma spectra do not appreciably change with a change in room size. This scoping calculation does not preclude the use of tungsten powder in a binder, some other effective gamma shielding material, or a hybrid design. Dose rates for various source intensities at an unshielded detector are listed herein to inform detector selection during CED-2, and calibration chains are identified. Preliminary estimates of costs and schedules are outlined but remain to be verified. Values could double or triple as estimates become more accurate and are principally included here to demonstrate feasibility. Preliminary estimates indicate that the apparatus can be installed within a feasible schedule and budget. Two measurements per day are assumed. Producing a shielding benchmark at NCERC using the Godiva IV assembly has been shown to be feasible, with manageable uncertainties and risks. A clear, continuing need for shielding benchmark data remains present, and this report identifies and evaluates a method for creating integrated shielding benchmark datasets.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RH-TRU Waste Content Codes (RH-TRUCON) (Rev. 14)

The Remote-Handled Transuranic (RH-TRU) Content Codes (RH-TRUCON) document describes the inventory of RH-TRU waste within the transportation parameters specified by the Remote-Handled Transuranic Waste Authorized Methods for Payload Control (RH-TRAMPAC). The RH-TRAMPAC defines the allowable payload for the RH-TRU 72-B. This document is a catalog of RH-TRU 72-B authorized contents by site. A content code is defined by the following components: (1) a two-letter site abbreviation that designates the physical location of the generated/stored waste (e.g., ID for Idaho National Laboratory [INL]); and (2) a three-digit code that designates the physical and chemical form of the waste (e.g., content code 317 denotes TRU Metal Waste). For RH-TRU waste to be transported in the RH-TRU 72-B, the first number of this three-digit code is "3." The second and third numbers of the three-digit code describe the physical and chemical form of the waste. Content codes are further defined as subcodes by an alpha trailer after the three-digit code to allow segregation of wastes that differ in one or more parameters. Examples are as follows: (1) the alpha trailers of ID 322A and ID 322D differentiate waste packaging configurations; (2) the alpha trailers of OR 321F and OR 321G differentiate shipping periods for the same waste (i.e., 60 days versus 10 days); and (3) the alpha trailers of OR 321D and OR 321H differentiate generating sources and time periods from the same waste stream, resulting in different isotopic content. As detailed in the RH-TRAMPAC, compliance with flammable gas limits may be demonstrated through the evaluation of compliance with either a decay heat limit or flammable gas generation rate (FGGR) limit per container specified in approved content codes. As applicable, if a container meets the watt*year criteria specified by the RH-TRAMPAC, the decay heat limits based on the dose-dependent G value may be used as specified in an approved content code.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH-TRU Waste Content Codes (RH-TRUCON) (Rev. 15)

The Remote-Handled Transuranic (RH-TRU) Content Codes (RH-TRUCON) document describes the inventory of RH-TRU waste within the transportation parameters specified by the Remote-Handled Transuranic Waste Authorized Methods for Payload Control (RH-TRAMPAC). The RH-TRAMPAC defines the allowable payload for the RH-TRU 72-B. This document is a catalog of RH-TRU 72-B authorized contents by site. A content code is defined by the following components: (1) a two-letter site abbreviation that designates the physical location of the generated/stored waste (e.g., ID for Idaho National Laboratory [INL]); and (2) a three-digit code that designates the physical and chemical form of the waste (e.g., content code 317 denotes TRU Metal Waste). For RH-TRU waste to be transported in the RH-TRU 72-B, the first number of this three-digit code is "3." The second and third numbers of the three-digit code describe the physical and chemical form of the waste. Content codes are further defined as subcodes by an alpha trailer after the three-digit code to allow segregation of wastes that differ in one or more parameters. Examples are as follows: (1) the alpha trailers of ID 322A and ID 322D differentiate waste packaging configurations; (2) the alpha trailers of OR 321F and OR 321G differentiate shipping periods for the same waste (i.e., 60 days versus 10 days); and (3) the alpha trailers of OR 321D and OR 321H differentiate generating sources and time periods from the same waste stream, resulting in different isotopic content. As detailed in the RH-TRAMPAC, compliance with flammable gas limits may be demonstrated through the evaluation of compliance with either a decay heat limit or flammable gas generation rate (FGGR) limit per container specified in approved content codes. As applicable, if a container meets the watt*year criteria specified by the RH-TRAMPAC, the decay heat limits based on the dose-dependent G value may be used as specified in an approved content code.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH-TRU Waste Content Codes (RH-TRUCON) (Rev. 16)

The Remote-Handled Transuranic (RH-TRU) Content Codes (RH-TRUCON) document describes the inventory of RH-TRU waste within the transportation parameters specified by the Remote-Handled Transuranic Waste Authorized Methods for Payload Control (RH-TRAMPAC). The RH-TRAMPAC defines the allowable payload for the RH-TRU 72-B. This document is a catalog of RH-TRU 72-B authorized contents by site. A content code is defined by the following components: (1) a two-letter site abbreviation that designates the physical location of the generated/stored waste (e.g., ID for Idaho National Laboratory [INL]); and (2) a three-digit code that designates the physical and chemical form of the waste (e.g., content code 317 denotes TRU Metal Waste). For RH-TRU waste to be transported in the RH-TRU 72-B, the first number of this three-digit code is "3." The second and third numbers of the three-digit code describe the physical and chemical form of the waste. Content codes are further defined as subcodes by an alpha trailer after the three-digit code to allow segregation of wastes that differ in one or more parameters. Examples are as follows: (1) the alpha trailers of ID 322A and ID 322D differentiate waste packaging configurations; (2) the alpha trailers of OR 321F and OR 321G differentiate shipping periods for the same waste (i.e., 60 days versus 10 days); and (3) the alpha trailers of OR 321D and OR 321H differentiate generating sources and time periods from the same waste stream, resulting in different isotopic content. As detailed in the RH-TRAMPAC, compliance with flammable gas limits may be demonstrated through the evaluation of compliance with either a decay heat limit or flammable gas generation rate (FGGR) limit per container specified in approved content codes. As applicable, if a container meets the watt*year criteria specified by the RH-TRAMPAC, the decay heat limits based on the dose-dependent G value may be used as specified in an approved content code.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY 2018 ARM Radar Plan

The fundamental objective of the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility radar facility is to provide high-quality radar observations to the scientific user community with an overarching goal of improving the treatment of clouds and precipitation in climate models. Historically, ARM has operated zenith-profiling cloud radars at millimeter wavelengths at five of its facilities. Since 2010, 16 scanning systems have been added to the radar facility. The ARM radar facility has 33 radars in its possession at three fixed sites and three mobile facilities. A breakdown of the ARM radar assets is given below: 8 Scanning ARM Clouds Radar Systems (SACR: two radars on single pedestal; six 1st- and two 2nd- generation) 7 Ka-band ARM Zenith profiling Radar (KAZR: five 1st- and two 2nd-generation) 5 X-band Scanning ARM precipitation Radar (XSAPR: four 1st- and one 2nd-generation) 3 C-band Scanning ARM precipitation Radar (CSAPR: two 1st- and one 2nd-generation) 1 W-band ARM Cloud Radar (WACR) 1 Marine W-band ARM Cloud Radar (MWACR: configured to be deployed on a stable table or scanning pedestal). Of these radars, all but six (two SACRs [accounting for four radars], one KAZR, and one 1st-generation CSAPR) have operational assignments. Therefore, the current measurement strategy involves operating 27 radars, not including radar wind profilers (RWPs). This array of instruments represents a combination of scanning and profiling radars at ARM’s sites. In addition to the scanning capabilities, the radars at each site differ in operating frequency, technology, and complexity, but all are complex systems. Some of them were custom designed and built specifically for ARM. Typically, newer systems take a few years to reach operational maturity with adequate characterization, calibration, testing, and quality control. Due to various factors, not all of the radars have achieved an operationally mature status sufficient to provide high-quality data in a research environment. In addition, these radars are often deployed in remote locations and harsh environments to meet science needs. The remoteness of such complex systems is a considerable challenge for continuous operations. Tools needed for a research-level operational radar are not readily available from vendors, and many of the necessary system management tools, both hardware and software, to manage these systems must be developed in-house for such deployments. Based on experience over the past seven years, including conclusions from the first phase of the radar plan, implemented in mid-2016, it is clear that ARM cannot support the operation of all 27 currently deployed radars and expect to provide research-quality data (including higher-order products) with the current resources. Experience from the first phase of the radar plan has provided a better indication than has been available previously of what size radar network is reasonable. A preliminary proposal for what that radar network could look like is provided here. The plan presented here uses the available resources to best support this proposed network.

ARM Mobile Facility↗

Development and Testing of Techniques for In-Ground Stabilization, Size Reduction and Safe Removal of Radioactive Wastes Stored in Large Containments in Burial Grounds - 13591

Radioactive waste materials, including Transuranic (TRU) wastes from laboratories have been stored below ground in large containments at a number of sites in the US DOE Complex, and at nuclear sites in Europe. These containments are generally referred to as caissons or shafts. The containments are in a range of sizes and depths below grade. The caissons at the DOE's Hanford site are cylindrical, of the order of 2,500 mm in diameter, 3,050 mm in height and are buried about 6,000 mm below grade. One type of caisson is made out of corrugated pipe, whereas others are made of concrete with standard re-bar. However, the larger shafts in the UK are of the order of 4,600 mm in diameter, 53,500 mm deep, and 12,000 below grade. This paper describes the R and D work and testing activities performed to date to evaluate the concept of in-ground size reduction and stabilization of the contents of large containments similar to those at Hanford. In practice, the height of the Test Facility provided for a test cell that was approximately 22' deep. That prevented a 'full scale mockup' test in the sense that the Hanford Caisson configuration would be an identical replication. Therefore, the project was conducted in two phases. The first phase tested a simulated Caisson with surrogate contents, and part of a Chute section, and the second phase tested a full chute section. These tests were performed at VJ Technologies Test Facility located in East Haven, CT, as part of the Proof of Design Concept program for studying the feasibility of an in-situ grout/grind/mix/stabilize technology for the remediation of four caissons at the 618-11 Burial Ground at US Department of Energy Hanford Site. The test site was constructed such that multiple testing areas were provided for the evaluation of various tools, equipment and procedures under conditions that simulated the Hanford site, with representative soils and layout dimensions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments of the Versa-Pac to Expand Use for the Industry - 17475

The Versa-Pac is a certified Type AF packaging (USA NRC Certificate no. USA/9342/AF-96), designed as a replacement for USA DOT 6M drum-type transportation packaging, which was retired approximately ten years ago. The Versa-Pac can be used directly or in conjunction with pails, drums, or inserts, and a variety of smaller containers and vessels. The Versa-Pac comes in two sizes: the VP-55 (i.e. 200-liter drum version) and VP-110 (i.e. 400-liter drum version). It features a patented design that, in combination with the drum exterior, provides enhanced structural protection to payloads under Normal Conditions of Transport and Hypothetical Accident Conditions. Since its introduction in 2010, the Versa-Pac has been utilized mainly as a one-time-use package for disposing of radioactive waste. However, the Versa-Pac package, which has the familiar simplicity of a drum, is a reusable transport package with the capability of shipping a variety of radioactive materials. In the spirit of simplicity yet versatility, the capability of the package has been improved several times in collaboration with our customers. The latest design improvements include a new configuration designated the VP-55HC (high capacity), which utilizes an internal safe geometry pipe container that increases the U-235 capacity. The pipe container is similar in design to the historic USA DOT 2R vessel. Other planned and proposed improvements include provisions to transport UF{sub 6} in 1S, 2S, and 5A/5B cylinders; design changes that further increase the amount of U-235 at enrichments less than 20 wt.%; increasing the capacity of the VP-110 with a VP-110-specific analysis; developing a new, lighter 113-liter version of the package; and introducing content limits specific to uranium oxides in multiple forms. This paper traces the engineering and design efforts involved in expanding the Versa-Pac's versatility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗