Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, th Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and grou handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, Jim↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, the Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and ground handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early as the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, J. L.↗

Experimental Studies and Energy Modeling for Evaluating Performance of Various Deep Wall Retrofits

The Pacific Northwest National Laboratory, Oak Ridge National Laboratory, and the University of Minnesota conducted a three-year, multipart study on residential retrofit wall assemblies. The project, which was funded by the U.S. Department of Energy’s Building Technology Office, aimed to compare a range of residential wall retrofit systems that prioritized affordability, durability, and energy savings potential. The research team identified, constructed, tested, simulated, and analyzed the feasibility and economics of 16 wall retrofit assemblies (14 test configurations and two baseline configurations) that can be applied to the exterior side of existing walls (either with or without the existing cladding). The 16 wall assemblies were installed in an in-situ laboratory environment, to evaluate the ease of construction and study the thermal and hygrothermal performance of the walls. This paper presents the methodology used to evaluate the thermal performance of the walls and discusses the energy modeling results of the study. The results from the experiments were used to calibrate a THERM model of each wall assembly, which was then applied to a whole building using the EnergyPlus 8.6 simulation engine. A residential prototype building was used to extrapolate whole-building energy savings in each U.S. climate zone. To capture the conditions of the largest number of homes in the United States, the most frequent building characteristics (e.g., attic insulation level, window specifications, foundation insulation, etc.) were extracted from ResStock data and applied to the prototype model. Results from the energy modeling showed that the climate zones with the highest potential for retrofit savings are those which are heating-dominated (i.e., Cold and Very Cold climate designations). In these climate zones, heating and cooling energy savings due to the wall retrofits alone ranged from 21.5% to 38.2%.

Nagda, Harshil↗

Friction Experiment Data Analysis

The Spent Fuel Waste Disposition (SFWD) program under the U.S. Department of Energy (DOE) is planning a seismic shake table test of full-scale dry storage systems of spent nuclear fuel (SNF) to close the gap related to the seismic loads on the fuel assemblies in dry storage systems. This test will allow for quantifying the strains and accelerations on surrogate fuel assembly during representative earthquakes. A concrete layer will be installed on the shake table before the test to simulate conditions representative of an ISFSI pad. In the shake table tests with the vertical cask, the cask will be free-standing because this is representative of all, except two, ISFSIs in the U.S. with vertical dry storage casks. The static and dynamic friction coefficients between the steel bottom of the cask and the concrete layer on the shake table are important parameters that will affect cask behavior during the test. These parameters must be known for the pre- and post-test modelling, data analysis, and model validation. The friction experiment was performed at the Engineering Department of the University of New Mexico (UNM) to determine the friction coefficients between a steel plate with the same finish as the bottom of the vertical cask manufactured for the test and different concrete surfaces. In this experiment the steel plate was fixed and the concrete sample was pulled over the plate with a constant displacement rate using an MTS machine. This allowed for collecting continuous horizontal force data over the length of the steel plate. Four displacement rates and three vertical loads were used. The tests were performed with four concrete blocks with different degrees of the surface roughness - light sandblast, light to medium sandblast, medium bush hammer, and heavy sandblast. The total number of tests was 48. The data were used to calculate static and dynamic friction coefficients.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Photonic Doppler Velocimetry for Valve Analysis and Surveillance

This study is an experimental evaluation to measure and surveil the velocity of stainless steel (Carpenter 455) pistons within a forged 21-6-9 stainless steel valve body. The velocity of the piston “stroke” will be identified using Photonic Doppler Velocimetry (PDV). The piston velocity will be the measured variable of interest. The outcome of this testing series provides further understanding to whether the extracted piston velocity can provide enough information to determine valve integrity. PDV has been identified as a diagnostic of interest as it can detect surface motion at high speeds with reliable accuracy. Through preliminary studies conducted with velocity interferometer system for any reflector (VISAR), the velocity of the piston is expected to stroke with a speed of 135 m/s. The PDV technique is much more reliable and repeatable than the VISAR technique because of its high-speed precision and accuracy, so it will not only validate the preliminary data, but also provide a testing technique that is capable of being used in future valve qualification efforts. The initial testing was completed using valves that were assembled per qualified procedures in a pristine condition. These initial tests were conducted to provide baseline data. This baseline data was then compared to data collected from valves where man-made defects were introduced. These defects are discussed in later sections. Lastly, actuators used to operate the valves were loaded with varied amounts of high explosives to identify if velocity is a function of the amount of explosive in an actuator. These parameters were adjusted to conclusively determine and identify if PDV can be used as a method to assess valve integrity. It was concluded through the testing discussed in this paper that in fact, PDV is capable of measuring the differences in piston velocities based on varied parameters. As far as understanding the PDV accuracy of the measured differences, this is ongoing and will have to be assessed in continued testing series.

42 ENGINEERING↗

Logic circuitry used to automatically test shielded cables

Automatic cable tester checks multiple shielded conductors assembly cable connections. The tester uses logic circuitry to sequentially test all conductors and their shields to reveal any connection error in a GO-NO GO test.

Dibb, G.↗

Test fixture design for boron-aluminum and beryllium test panels

A detailed description of the test fixture design and the backup analysis of the fixture assembly and its components are presented. The test fixture is required for the separate testing of two boron-aluminum and two beryllium compression panels. This report is presented in conjunction with a complete set of design drawings on the test fixture system.

Breaux, C. G.↗

Development and Operation of the Microshutter Array System

The microshutter array (MSA) is a key component in the James Webb Space Telescope Near Infrared Spectrometer (NIRSpec) instrument. The James Webb Space Telescope is the next generation of a space-borne astronomy platform that is scheduled to be launched in 2013. However, in order to effectively operate the array and meet the severe operational requirements associated with a space flight mission has placed enormous constraints on the microshutter array subsystem. This paper will present an overview and description of the entire microshutter subsystem including the microshutter array, the hybridized array assembly, the integrated CMOS electronics, mechanical mounting module and the test methodology and performance of the fully assembled microshutter subsystem. The NIRSpec is a European Space Agency (ESA) instrument requiring four fully assembled microshutter arrays, or quads, which are independently addressed to allow for the imaging of selected celestial objects onto the two 4 mega pixel IR detectors. Each microshutter array must have no more than approx.8 shutters which are failed in the open mode (depending on how many are failed closed) out of the 62,415 (365x171) total number of shutters per array. The driving science requirement is to be able to select up to 100 objects at a time to be spectrally imaged at the focal plane. The spectrum is dispersed in the direction of the 171 shutters so if there is an unwanted open shutter in that row the light from an object passing through that failed open shutter will corrupt the spectrum from the intended object.

Jhabvala, M. D.↗

Initial Experiments of High-Speed Drive System Windage Losses

High speed gearing performance is very important to the overall drive system efficiency. Certain losses such as gear meshing and bearing drag can be minimized by design changes such as pressure angle of the gears and the geometry and type of bearings being used. One component that can have a large effect on the overall performance of high-speed drive systems is the parasitic drag known as gear windage. This loss mechanism is not well understood and minimizing this component is usually accomplished through much trial and error. The results presented in this paper will document some of the design parameter effects on the amount of windage losses. A new test facility at NASA Glenn has been assembled to systematically study the design variables. Results from recent tests will be presented. The tests are for a single gear, with and without lubricants, and some initial studies using shrouds

Handschuh, Robert F.↗

Initial Experiments of High-Speed Drive System Windage Losses

High speed gearing performance is very important to the overall drive system efficiency. Certain losses such as gear meshing and bearing drag can be minimized by design changes such as pressure angle of the gears and the geometry and type of bearings being used. One component that can have a large effect on the overall performance of high-speed drive systems is the parasitic drag known as gear windage. This loss mechanism is not well understood and minimizing this component is usually accomplished through much trial and error. The results presented in this paper will document some of the design parameter effects on the amount of windage losses. A new test facility at NASA Glenn has been assembled to systematically study the design variables. Results from recent tests will be presented. The tests are for a single gear, with and without lubricants, and some initial studies using shrouds.

Handschuh, Robert F.↗

High Resolution Terrain Sensing Lidar for Precision Navigation and Safe Landing of Space and Aerial Vehicles

A 3-D imaging flash lidar sensor employing a resolution enhancement algorithm is being developed at NASA Langley Research Center for providing Terrain Relative Navigation and Hazard Avoidance capabilities onboard spacecraft landing on the Moon, Mars, and other planetary bodies. This lidar sensor, we refer to as Terrain Sensing Lidar (TSL), is a solution for future missions that require landing at pre-designated sites near high value resources or at areas of high scientific value, while avoiding hazardous terrain features, such as escarpments, craters, slopes, and rocks, or pre-deployed assets. TSL can also benefit terrestrial applications such as autonomous aerial vehicles without reliance on signals from Global Positioning System (GPS). The feasibility of the TSL concept has been shown through a series of drone, fixed-wing aircraft, and helicopter flight tests. A prototype version of the TSL has been recently assembled for conducting another set of flight tests to demonstrate its readiness for upcoming landing missions. This paper describes the TSL, provides its performance parameters, and explains its operational concepts for landing missions.

Precision Navigation↗

Load converter interactions with the secondary system in the Space Station Freedom power management and distribution DC test bed

The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF Program design and development phases, a system Power Management and Distribution (PMAD) DC test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

Lebron, Ramon C.↗

Load converter interactions with the secondary system in the Space Station Freedom power management and distribution dc test bed

The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF program design and development phases, a system Power Management and Distribution (PMAD) dc test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

Lebron, Ramon C.↗

Dynamic testing of the Kearfott 2401 accelerometer

A Kearfott pendulous accelerometer was integrated with a United Aircraft pulse torque servo assembly (PTSA) forced binary loop. The test objective was to measure dynamic errors due to anisoinertia and OA coupling effects. The instrument and its torque loop are described, and the technique for isolating the anisoinertia error from centripetal acceleration effects is discussed in detail. The measured anisoinertia error coefficient was 3.0 cm, and the testing confirmed that no rectified OA coupling error was present.

Katz, B.↗

Status of DSMT research program

The status of the Dynamic Scale Model Technology (DSMT) research program is presented. DSMT is developing scale model technology for large space structures as part of the Control Structure Interaction (CSI) program at NASA Langley Research Center (LaRC). Under DSMT a hybrid-scale structural dynamics model of Space Station Freedom was developed. Space Station Freedom was selected as the focus structure for DSMT since the station represents the first opportunity to obtain flight data on a complex, three-dimensional space structure. Included is an overview of DSMT including the development of the space station scale model and the resulting hardware. Scaling technology was developed for this model to achieve a ground test article which existing test facilities can accommodate while employing realistically scaled hardware. The model was designed and fabricated by the Lockheed Missile and Space Co., and is assembled at LaRc for dynamic testing. Also, results from ground tests and analyses of the various model components are presented along with plans for future subassembly and matted model tests. Finally, utilization of the scale model for enhancing analysis verification of the full-scale space station is also considered.

Mcgowan, Paul E.↗

Design and application of a test rig for super-critical power transmission shafts

The design, assembly, operational check-out and application of a test facility for testing supercritical power transmission shafts under realistic conditions of size, speed and torque are described. Alternative balancing methods and alternative damping mechanisms are demonstrated and compared. The influence of torque upon the unbalance distribution is studied, and its effect on synchronous vibrations is investigated. The feasibility of operating supercritical power transmission shafting is demonstrated, but the need for careful control, by balancing and damping, of synchronous and nonsynchronous vibrations is made clear. The facility was demonstrated to be valuable for shaft system development programs and studies for both advanced and current-production hardware.

Darlow, M.↗

Variation in the modal parameters of space structures

An analytic and experimental study of gravity and suspension influences on space structural test articles is presented. A modular test article including deployable, erectable, and rotary modules was assembled in three one- and two-dimensional structures. The two deployable modules utilized cable diagonal bracing rather than rigid cross members; within a bay of one of the deployable modules, the cable preload was adjustable. A friction lock was used on the alpha joint to either allow or prohibit rotary motion. Suspension systems with plunge fundamentals of 1, 2, and 5 Hz were used for ground testing to evaluate the influences of suspension stiffness. Assembly and reassembly testing was performed, as was testing on two separate shipsets at two test sites. Trends and statistical variances in modal parameters are presented as a function of force amplitude, joint preload, reassembly, shipset and suspension. Linear finite element modeling of each structure provided analytical results for 0-g unsuspended and 1-g suspended models, which are correlated with the analytical model.

Crawley, Edward F.↗

Steady-State Vacuum Ultraviolet Exposure Facility With Automated Lamp Calibration and Sample Positioning Fabricated

The Next Generation Space Telescope (NGST) will be placed in an orbit that will subject it to constant solar radiation during its planned 10-year mission. A sunshield will be necessary to passively cool the telescope, protecting it from the Sun s energy and assuring proper operating temperatures for the telescope s instruments. This sunshield will be composed of metalized polymer multilayer insulation with an outer polymer membrane (12 to 25 mm in thickness) that will be metalized on the back to assure maximum reflectance of sunlight. The sunshield must maintain mechanical integrity and optical properties for the full 10 years. This durability requirement is most challenging for the outermost, constantly solar-facing polymer membrane of the sunshield. One of the potential threats to the membrane material s durability is from vacuum ultraviolet (VUV) radiation in wavelengths below 200 nm. Such radiation can be absorbed in the bulk of these thin polymer membrane materials and degrade the polymer s optical and mechanical properties. So that a suitable membrane material can be selected that demonstrates durability to solar VUV radiation, ground-based testing of candidate materials must be conducted to simulate the total 10- year VUV exposure expected during the Next Generation Space Telescope mission. The Steady State Vacuum Ultraviolet exposure facility was designed and fabricated at the NASA Glenn Research Center at Lewis Field to provide unattended 24-hr exposure of candidate materials to VUV radiation of 3 to 5 times the Sun s intensity in the wavelength range of 115 to 200 nm. The facility s chamber, which maintains a pressure of approximately 5 10(exp -6) torr, is divided into three individual exposure cells, each with a separate VUV source and sample-positioning mechanism. The three test cells are separated by a water-cooled copper shield plate assembly to minimize thermal effects from adjacent test cells. Part of the interior sample positioning mechanism of one test cell is shown in the illustration. Of primary concern in VUV exposure is the maintenance of constant measured radiation intensity so that the sample s total exposure can be determined in equivalent Sun hours. This is complicated by the fact that a VUV lamp s intensity degrades over time, necessitating a decrease in the distance between the test samples and the lamp. The facility overcomes this challenge by periodically measuring the lamp s intensity with a cesium-iodide phototube and adjusting the sample distance as required to maintain constant exposure intensity. Sample positioning and periodic phototube location under the lamp are both achieved by a single lead-screw assembly. The lamps can be isolated from the main vacuum chamber for cleaning or replacement so that samples are not exposed to the atmosphere during a test.

Sechkar, Edward A.↗