Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “river”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Engineered Containment Mound (ECM) Design for LLRW at CNL in Chalk River, Canada - 19123

The Atomic Energy of Canada Limited has an initiative to transform the Chalk River Laboratory (CRL) facility into an updated research facility to continue nuclear energy and other energy research which is paramount to the continued growth of the energy sector in Canada. The Near Surface Disposal Facility (NSDF) will be licensed by Canadian Nuclear Safety Commission prior to construction and receipt of waste. The NSDF has been designed to allow for disposal of waste in a manner that is protective of the environment and human health. The Engineered Containment Mound (ECM) is a major structure associated with the NSDF design to allow for long-term disposal of 1,000,000 cubic meters of LLRW. This paper describes the design of major components of the ECM: ECM geometry, perimeter berm, base liner system, and cover system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Remediation of Waste Management Areas at Chalk River Laboratories - 19130

The Government of Canada's nuclear legacy liabilities have resulted from ∼70 years of nuclear research and development (R and D). The majority of these liabilities are located at the CRL Site and consist of shutdown research buildings (including prototype and research reactors), plus a wide variety of buried and stored wastes, and contaminated lands. The Environmental Remediation Projects (ERP) branch are assessing the waste inventory in the Chalk River Laboratories Waste Management Areas in order to make informed and risk based decisions on remediating affected lands. This paper provides examples of contaminated sites at CRL that require remediation as well as examples of remediation activities already complete. The environmental remediation process followed at CRL and the development of the CRL site cleanup plan are outlined. Until suitable disposal facilities are available ERP will continue to characterize and assess contaminated sites, monitoring and managing the risks in place while preparing for full-scale remediation activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contamination Control: Challenges and Innovative Design Solutions utilized at Chalk River Laboratories - 19263

CNL has operated research reactors at the Chalk River Laboratories (CRL) site since 1947, generating a variety of spent nuclear fuel wastes produced by irradiating metallic uranium and other prototype fuels. This legacy waste has been stored in below-grade, vertical cylindrical steel and concrete structures known as Tile Holes. Ongoing monitoring of the legacy waste has identified moisture resulting from incomplete drying prior to emplacement, surface water and humidity. The undesirable storage conditions result in corrosion of both the legacy waste and the storage containers. Continued storage in these conditions may result in further degradation of the storage container and contamination of the surrounding environment. In 2004, the Fuel Packaging and Storage (FPS) Project was initiated, with the objective to develop a complete system to safely retrieve legacy waste from these Tile Holes as well as provide a stable storage environment until a final long-term management plan is established. Contamination control during retrieval, transfer and repackaging operations is critical for personnel and environmental safety. The significant challenges with retrieval of the legacy waste from the Tile Holes includes management of loose collateral liquid and solids that will be brought into the system, with the retrieved waste container. During the retrieval, transfer and repackaging operation, the challenge was to: 1) Prevent an environmental release by potentially transferring these contaminants onto the external surface of the Tile Hole Array; 2) Prevent an environmental release and ensure personnel safety while transporting the legacy waste; 3) Control release of contaminants into the new clean storage container while preventing contamination of the packaging equipment. To address the first source of contamination, a debris guide liner capable of interfacing with multiple Tile Hole configurations was integrated within the Retrieval Flask to limit contamination of the flask interior and to direct collateral liquids and solids back into the Tile Hole. The system uses a multi-function sealed Shield Gate and Drip Tray to retain and prevent the contaminants from escaping while transferring the legacy waste. This gate, along with a thin walled, Disposable Debris Guide Liner (DDGL) is an innovative solution developed to control the flow characteristics of the residual waste and to contain the waste to protect the internal components of the repackaging equipment. The development of the complete solution was further challenged as the DDGL must not tear or rip and must compact inside the new storage containers for a range of legacy waste storage containers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Depth of the Biologically Active Zone in Terrestrial Habitats at the Chalk River Laboratories Site: Implications for Contaminated Site Assessment and Ecological Risk Assessment - 19272

Plants, soil invertebrates and burrowing mammals penetrate the soil layer to varying depths. As Canadian Nuclear Laboratories (CNL) assesses risks and remediates soils contaminated with radioactive and other hazardous wastes at the Chalk River Laboratories (CRL) site, a site-specific characterization of the biologically active zone is required to help to identify the relevant depth in soil for exposure assessment of ecological receptors. A defined biologically active zone is also required to determine the depth to which remedial actions should be taken to protect the environment, help prioritize locations for remediation efforts based on ecological risk and avoid unnecessary cleanup efforts. By taking advantage of the abundance of information on contaminant locations and depths, biodiversity, and hydrogeology available for the well-studied CRL site, it is possible to produce a site-specific estimation of the biologically active zone in CRL upland soils. A literature review was conducted to determine rooting and burrowing depths for vascular plants, soil invertebrates and burrowing mammals documented to be present (or potentially present) on the CRL site. This literature review was supplemented with field surveys to fill data gaps in our understanding of species composition (e.g., soil invertebrates and plant understory). Overall, we found that there was significant variability in maximum rooting/burrowing depths among plant, mammal and invertebrate species present on the CRL site. The majority of biological activity occurs in the top 0.5 m of soil. However, about 19% of burrowing or rooting receptors present at CRL may be in contact with soils up to 1 m depth, 9% of receptors present may be in contact with soils up to 2 m depth, and only about 2% of receptors may be in contact with soils up to 3 m depth. It is highly unlikely that any ecological receptor present at CRL is in direct contact with soils deeper than about 3.6 m. Further site-specific results pertaining to burrowing and rooting depths estimated for the CRL site will be presented, and these results will be compared to generic/default 'depth of biologically-active layer' guidelines recommended by various agencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Development of Legacy Waste Scaling Factors for Radioactively Contaminated Soils at Chalk River Laboratories - 19333

The Chalk River Laboratories (CRL) began nuclear operations in 1947. Beginning in 1952 after the NRX accident, the management of excess contaminated liquids from the accident, and later in 1953, other waste liquids, were intermittently dispersed to trenches and pits in the local sand. The local sands proved effective at immobilization of actinides, and most activation and fission products. However there was very limited retention of some more commonly mobile radionuclides. Sand filtration performance and radionuclide migration was studied beginning in 1952. Monitoring data indicated slow migration of most radioactive contaminants away from the trenches and pits due to the adsorbing capacity of the sand substrate. The radionuclide migration continues to be studied today in frequent plume monitoring studies. Because many hard-to measure (HTM) radionuclides may also present as long term dose contributors in post remediation scenarios, or in disposal site performance assessments, the quantification of these HTM radionuclides is important. The use of scaling factors between HTM radionuclides and easy-to-measure (ETM) radionuclides (gamma emitters) for packaged soil wastes would alleviate significant effort in sampling individual waste containers. As part of plume monitoring studies and the environmental remediation process, significant characterization of soils have been performed at the site. The soil sample data from multiple historic waste management areas across site is combined and relationships between HTM radionuclides and ETM or key radionuclides are examined. Additional (secondary) relationships between ETM key nuclides are also explored to evaluate secondary scaling relationships between ETM key radionuclides (e.g., Co- 60/Cs-137), because of the significant decay of the activation product key radionuclide Co-60, (predominantly 10-20 half-lives). The evaluation is yielding consistent scaling factors for legacy soil wastes in the historic waste management areas. Given the hydrogeology of the site, a sandy shallow unconfined aquifer, and the annual precipitation of about 0.85 m/a, this evaluation reveals some expected relationships between fission products and actinides and some unanticipated relationships between more mobile radionuclides and key gamma emitters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modern Integrated Decommissioning at Chalk River Laboratories - 19401

Canadian Nuclear Laboratories (CNL), formerly Atomic Energy of Canada Limited (AECL) is Canada's premier nuclear science and technology (S and T) organization in Canada. Over the next decade, CNL will be transforming its many different sites through the revitalization of essential site infrastructure, the decommissioning of aging infrastructure and a significant investment in new, world-class science facilities. In particular, the main site for CNL resides at the Chalk River Laboratories (CRL), where the majority of parallel activities of revitalization and decommissioning will take place. In 2016, CRL started an ambitious ten year plan to decommission more than 120 buildings. In order to ensure this project remains on track and the ALARA (as low as reasonably achievable) principle is maintained, a strategy is required. This strategy is to focus on integrated activities, which meet/exceed international best practices, to ensure the work is carried out as efficiently as possible. Given the complexity of CRL operations and the legacy issues accumulated over 60 years of operation, CNL needed to adopt a modern and integrated approach to handle competing project priorities. As a starting point, achieving complete radiological characterization of many building structures is required. CNL engaged various vendors to modernize radiological surveys from paper records to electronic documentation, deploying modern survey tools such as data-logging instruments, gamma cameras, robotic surveying tools, and introducing tablets to improve the flow of information while workers are in the field. Once fully implemented, these improvements will ensure that quality information is readily available at all stages of decommissioning, which greatly reduces project schedules and results in important company savings. These techniques will ensure that, during planning, historic radiological survey data is easily searchable from the electronic documentation system. Any additional data required can be quickly and safety collected using robotic surveying tools in areas of higher radiation to reduce possible exposure to individuals. As decommissioning progresses, individuals in the field can use tablets, gamma cameras and data-logging instruments to accurately retrieve, collect and share data. As a result of these efforts, CNL is progressing towards becoming a leader in the field of decommissioning within Canada, applying modern techniques and best practices to reduce decommissioning project risk. Access to high quality information results in improved decommissioning plans, which will reduce the amount of rework and scheduling delays required and improve worker safety as the project is executed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Collection of Radioactive Waste at Chalk River Laboratories - 19425

Remote handling of radioactive waste may be required during a variety of decommissioning and waste management activities. Based on the level of radiation and complexity of the application, the design, development and implementation of novel electromechanical systems can offer optimal solutions. At Canadian Nuclear Laboratories, current decommissioning and waste management projects routinely employ solutions including innovative and unique tools, test rigs, mock-ups, robotics, unmanned aerial vehicles, and automated systems. CNL ability to integrate an experienced team from a wide range of technical areas make such solutions possible. In this paper, we present an example of remotely controlled systems to collect highly radioactive waste materials from storage tanks at the Chalk River Laboratories. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Tunnel Inspection Lidar Mapping Solution - 19477

Over the summer of 2018, the Savannah River National Laboratory (SRNL) formed and hosted a robotics and sensor intern team and tasked them with developing a proof of concept for a modular sensor suite to be deployed in the next H-Canyon Air Exhaust (HCAEX) Tunnel inspection in spring 2019. The developed sensor suite includes a planar Lidar sensor for depth imaging, two Panospheric 4K cameras, and an inertial measurement unit to aid in base localization. The Lidar is actuated to rotate about the vertical axis, which allows for the team to gather 3D mapping data. These rotating planar scans can also be fused with the camera and IMU data to generate colorized internal maps of the tunnel. The supporting software was developed iteratively over the summer and leveraged prior research conducted at the University of Texas at Austin, which facilitated the stitching of Lidar scans, the fusion of the sensor data, and even algorithms to provide in-situ navigation feedback to the operators of the crawler. This software simultaneously represents huge leaps forward in the mapping and degradation measurement abilities of the crawler over past inspection units, while also allowing the operator much greater situational awareness. The improvement in awareness reduces risks of the robot becoming stuck or disabled inside the tunnel, which would jeopardize the success of both this and future inspections. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Collaborative Advanced Technology Demonstration (ATD) Program Review - 19499

The purpose of the Department of Energy-Environmental Management Office of Technology Development's (DOE-EM TD) Science of Safety (SOS) Robotics Initiative is to pull innovative commercial off the shelf (COTS) and near ready technologies to the field to expedite remaining EM mission clean up and enhance worker safety. A goal of this program is to demonstrate to DOE facilities the value of these available new technologies and their potential uses to solve difficult problems. In support of this goal, the Savannah River Site (SRS) H-Canyon Air Exhaust (HCAEX) tunnel biannual inspection task has been selected to demonstrate and evaluate the benefit of pulling advanced technology solutions to EM facilities. This is a highly collaborative task facilitated by SRNL and engaging SRS H-Canyon facility stakeholders, National Laboratory robotic and concrete inspection SMEs and university robotic and sensor researchers. Presently, the SRS HCAEX tunnel inspection consists of a visual examination to evaluate the structural integrity of the tunnel. Personal access is prohibited in the tunnel due to extreme conditions, thus the examination is accomplished remotely by deploying cameras mounted on a robotic crawler deployed into the tunnel. While the ability to see inside the tunnel in recent years has been highly valuable, it is desirable to have a better understanding of the environment to support a more thorough structural analysis and for long term planning purposes. This higher order of understanding can be accomplished through advanced COTS sensors and tools and those currently in development and near ready. The advanced technologies selected for demonstration will be evaluated for hosting on the FY19 HCAEX tunnel inspection crawler platform. The HCAEX ATD task is expected to be performed over a two-year period with year one now concluding. At WM2018, we presented the H-Canyon stakeholder's high priority inspection and remote handling needs, the collaboration team and the planned process of developing an integrated solution. This presentation will review the initial scope and inspection needs, then discuss the past year's progress to address these needs. The discussion includes the results of the Concrete Integrated Product Team (CIPT) formed to evaluate promising concrete NDE inspection technologies and a Lidar based tunnel mapping sensor suite solution. Highlighted in the discussion will be the engagement and pulling of university developed research and development to include student engagement through the formation and hosting of the SRNL Robotics and Sensors Intern team and collaboration with MSIPP funded Robotic Arm Concrete NDT Inspection University researchers. Lastly, the path forward to complete the demonstration will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Flaw Stability Analysis for the Savannah River Site 3H High-Level-Waste Evaporator - 19548

The Savannah River Site (SRS) 3H high-level-waste Evaporator (242-25H) entered service in January 2000 and was discovered to be leaking in February 2016. It was robotically repaired and resumed operation in July 2018. During initial restart in December 2017, salt deposits were discovered on the evaporator's lower shell near welds, indicating two more small leak sites. The leak sites have an estimated hydraulic diameter of about 0.1 mm or less - about the diameter of a human hair. The estimated leak rates are about a factor of 10,000 smaller than the robotically repaired leak. An API 579-1/ASME FFS-1 fitness-for-service evaluation determined that if the leak sites are cracks, then they would need to be about 60 mm long (∼ 2 inches) to actively and catastrophically grow. Furthermore, a crack of this length would have been detected earlier since it would leak thousands of liters per day. The evaporator was designed with engineered features that minimize risks posed by these small leaks. The path-forward involves operating the evaporator in a deliberate manner with enhanced surveillance. The 3H Evaporator is key to SRS safely and timely reducing its 130 million liter liquid high-level-waste inventory, closing remaining waste tanks, and reducing associated risks to workers, the public, and the environment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Closure Cesium Removal at Savannah River Site - 19604

Savannah River Remediation (SRR) has developed a supplemental at-tank ion exchange capability for the removal of cesium from liquid salt waste. Building on the development of previous ion exchange initiatives and the experience of commercial nuclear plant decontamination services, and following the disaster response associated with Fukushima, the technology has matured to deploy a modular at-tank treatment system for the selective removal of cesium from bulk salt waste. If feasible, this Tank Closure Cesium Removal (TCCR) initiative would provide a supplemental treatment capability to existing and future salt processing and improve confidence in supporting the desired acceleration of waste retrieval and tank closure efforts. In addition to accelerating waste retrieval and tank closure activities, demonstration of this capability has several other benefits. Deployment of commercially available technologies with minor modification can expand Department of Energy (DOE) utilization of commercially supplied treatment processes. This 'at-tank' treatment system could be modified to evaluate and demonstrate removal of other radioactive constituents (strontium, technetium, iodine, etc.) of bulk waste. The modular aspect of this capability can allow for additional units to be delivered and deployed at SRS, as well as, provide supplemental treatment capabilities for waste treatment at other DOE sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deployment of a 3D Sonar System at Savannah River: Results, Implications and Next Steps - 19718

Waste solids mapping is required at SRS to support the closure of high level radioactive waste tanks. The current mapping methodologies utilize a combination of video inspections and still camera photos to record the solids location and height in the tank with interpretation by site Engineering personnel. Tank liquid level is recorded during capture of the images to determine the height of solids. If no liquid is present, the images are compared to known waste tank features (e.g., cooling coils, support columns) to determine the height of the solids. In December of 2017, NuVision Engineering and Fortis Engineering conducted a demonstration of Sonar technology in SRS F-Tank Farm (FTF) Tank 7 using three risers (Risers 1, 5, and Center) for the purposes of mapping waste solids in the tank. Tank 7 was not the ideal choice for a 'first-of-a-kind' deployment given its congested internals but was selected based on the priority of tank farm operations. Savannah River Remediation (SRR) evaluated the results of this demonstration against the current solids mapping methodologies to determine potential future application of Sonar technology to support upcoming sludge or salt waste removal, decisions to cease waste removal and perform sampling and analysis, final residuals volume determinations, and applicability for use in H-Tank Farm (HTF) Type IV tanks. The efficiency of the Sonar mapping technology against the current mapping techniques and the relative costs of each were also evaluated. The Sonar demonstration performed in the three risers of Tank 7 resulted in a tank floor coverage of approximately 26%. This limited coverage was primarily due to shadow effects and image distortions created by vertical cooling coils and support columns within the waste tank. A comparison of the images produced during the Sonar demonstration and the historical Tank 7 mapping, performed in 2011 upon completion of Bulk Waste Removal Efforts (BWRE), showed physical similarities between the mounds located near the Sonar deployment risers. The technology performed well in accurately mapping solids in those areas accessible to coverage. The Sonar mapping technology may achieve more benefits if configured to work around internal obstructions, or in a Type IV tank, where the lack of vertical cooling coils may allow for a larger coverage area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 45: Savannah River National Laboratory Advancing the EM Mission Through Technology

This panel focused on Savannah River National Laboratory (SRNL) activities and addressed: 1) Initial development work that SRNL performed to develop the technologies and processes, as well as design the equipment for the DOE EM HLW tank waste treatment and soil and groundwater mission, 2) Implemented technology and process improvements to the EM systems, and 3) Current technologies being evaluated for future implementation to improve throughput and reduce cost/schedule. Panelists with presentations: Advancing the EM Mission: SRNL Technology Approach (Connie Herman); Nuclear Materials Management (William Bates); Adjust, Adapt, Attest, and Adjudicate (Bruce Wiersma); SRNL Research and Development for Technological Advancements in the Liquid Waste Mission at SRS (Frank Pennebaker); EM TD Applies Solutions at SRS (Andrew Fellinger); Remediation of Complex Groundwater Plumes: Three Decades of Cleanup Success (Carol Eddy-Dilek)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Process Exhaust Tunnel Inspection Crawler Development - 20036

This paper covers development of a remote crawler used to inspect a subterranean radiochemical process ventilation tunnel located at the Savannah River Site near Aiken, SC. The purpose of the inspection was to ascertain the apparent structural condition of the tunnel with video footage. Manned entry is prohibited due to the hazardous environment requiring a fully-remote approach. The inspection system used high-definition cameras to archive over 1000 linear feet in the tunnel. While previous inspections had been undertaken, this crawler was developed to overcome obstacles that had put tunnel regions out of reach of prior inspection platforms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determining Cs-137 Background body burdens for Wild Pigs At Savannah River Site

Savannah River Site (SRS) is a unique U.S. Department of Energy facility in that most of the 310-square miles of land has not be industrialized since operations began in 1953. This has allowed abundant, undisturbed vegetation structure to exists as well as an increase in herd sizes among wildlife populations onsite. Cs-137 is widespread across SRS due to the production of nuclear materials, but is mostly from global atmospheric fallout from nuclear weapons testing. Due to most of SRS being undisturbed land, the concentrations of Cs-137 are higher on site than off site. The SRS began conducting annual deer harvests that were open to the public beginning in 1965. All animals harvested during these hunts are monitored for Cs-137, which is measured using a Sodium Iodide detector. There has been an effective method for calculating the background Cs-137 body burden for the deer population at the SRS, developed by Gaines and Novak using data collected during hunts and gamma overflight data to determine the areas contaminated by site activities. For animals that have a Cs-137 concentration above the established background level, a dose is assigned to the hunter. By applying the same method for wild pigs using data collected from hunts, gamma overflight, and developing a site-specific home range of wild pigs, we were able to calculate the Cs-137 background body burden concentrations of wild pigs on site. Objectives: Develop site-specific home range for wild pigs at SRS; Determine the average concentrations of Cs-137 in wild pigs from background; Use Gaines and Novak method for determining background Cs-137 body burdens wild pigs on SRS. Methods and Materials: Development of site-specific home range of wild pigs was determined to be 2.5 miles using: Four studies conducted between 1969 and 1992 for the SRS wild pig population. (Mayer and Brisbin) The background compartments were determined using: Gamma overflight data showing contaminated areas; Site-specific home range of the wild pigs. Results and Conclusion: All data were generated through the JMP software to provide a histogram and summary statistics. The estimate of an upper tolerance limit for the background contamination with 95% confidence is 1.965 pCi/g for the wild pigs. This means that for wild pigs on SRS from the background compartments are expected to have Cs-137 concentrations of less than 1.965 pCi/g. The current background for the deer is 2.59 pCi/g. For the background compartments Cs-137 concentrations from 2012-2018: Mean: 0.815 pCi/g, Maximum: 2.341 pCi/g, Minimum: -0.704 pCi/g.

07 ISOTOPE AND RADIATION SOURCES↗

Long Term Assessment of Radiocesium in Deer, Fish, Soil, and Vegetation at the Savannah River Site

Throughout the Savannah River Site's (SRS) operational history, many radionuclides have been released into the environment. However, due to fallout from weapons testing, the amount released from SRS, its persistence in the environment, and the seclusion of the Site, radiocesium (Cs-137) is one of the most critical radionuclides in the SRS environment. The Effective half-life (Te) is the time it takes for a radionuclide in the environment to decrease by 50% of its initial amount. There are three means of radionuclide removal: Physical: Radioactive decay, sedimentation, and washout; Chemical: Changes in pH, oxidation state or adsorption; Biological: Changes in the food web or translocation. Effective half-life (T{sub e}) = log{sub e}2/λ{sub e} Where λ{sub e} is estimated from the slopes of loge-transformed Cs-137 activity concentrations regressed on year. The objective of this work was to calculate the effective half-life of Cs-137 in various biota at SRS and to perform an assessment of the changes in the effective half life over time. Compared to 2013 data, there is a slight increase in the effective half-lives for fish at most sampling locations. This effective half-life increase is an indication that the rate of Cs-137 loss is starting to plateau. The effective half-life of Cs-137 in SRS fish ranges from 4-11 years. The effective half-life of Cs-137 in soil at the Creek plantation is about 15 years. The effective half-life of Cs-137 in grassy vegetation at the Creek Plantation is about 14 years. The effective half-life of deer hunted on the SRS is about 15.5 years. After termination of all reactor activity by 1980, the Cs-137 activity began to drop drastically.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 67: US Savannah River Operation Office: Nuclear Materials Management

The Savannah River Site (SRS) has a proud 70-year history of nuclear materials management and processing. This panel provided an overview of the history, current status, and a look at potential future missions related to spent nuclear fuel (SNF), nuclear materials, and facilities at SRS. Panelists with presentations: SRS Nuclear Materials Management (Maxcine Maxted, Janice Lawson, Michael Mikolanis)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Advancing Technologies for Remote Inspections - 20345

In 2017, the DOE Environmental Management Office of Technology Development (DOE-EM TD) sponsored the H-Canyon Advanced Technology Demonstration (ATD) to demonstrate to DOE facilities the value of using new commercial-off-the-shelf (COTS) and near-ready technologies to solve difficult problems and enhance worker safety. The DOE Savannah River Site (SRS) H-Canyon Air Exhaust Tunnel (HCAEX) inspection task was identified as representative of the hazardous, human denied environments which could benefit from advanced technologies. The HCAEX underground concrete tunnel is visually inspected biannually using a camera mounted on a remotely operated vehicle (ROV) designed and built by SRNL. While tunnel images have provided valuable visual information, it is desirable to have a higher order of understanding of the environment to support a more thorough structural integrity (SI) analysis and for long term planning purposes. As part of the ATD, the Concrete Integrated Product Team (CIPT) was formed to identify and evaluate available sensors and methods mature enough to remotely obtain tunnel concrete characterization data of high value and with a high probability of success. The team included SMEs and H-Canyon stakeholders in the field of concrete, nondestructive examination (NDE), structural integrity, sensors and remote systems from SRNL, SRNS, LANL, DOE-SR and the Army Corps of Engineering. The CIPT completed an in-depth identification of customer concrete inspection needs and potential technology solutions. Sensors and methods were evaluated on performance, data usefulness, cost and the feasibility of a successful deployment given the unique tunnel access challenges and environment. Two technologies were identified as promising by the CIPT for near term demonstration and evaluation: Lidar (Light Detection and Ranging) 3-dimensional (3D) mapping and remote robotic deployment of NDE instrumentation. Laser spectroscopy to characterize tunnel surface chemical changes was also of interest, but presently cost prohibitive. This paper will include a discussion of the two efforts underway to evaluate and implement the CIPT recommendations. First, the status of the November 2019 deployment of Lidar at a single location into the tunnel is presented. This initial deployment provided the team a learning curve and lessons learned on the challenges of tunnel deployment to include remote operation and data collection, stabilization of the sensor in high air flow (∼30 mph), ability to achieve a tolerance accuracy of 0.25-inches, and the probability to identify change in tunnel dimensions over time. Secondly, a discussion on the development of the Robotic Arm Concrete Inspection Test Bed capable of deploying NDE instruments to examine custom concrete forms will be presented. Concrete forms simulating the rough concrete surfaces, strength, composition and potential structural defects that can be found at our DOE EM facilities have been designed and built for the test bed. Two state-of-the art concrete NDE instruments have been identified as having potential to work on rough concrete walls, they are being tested and characterized as to their ability to provide desired structural integrity data to include wall thickness and defect identification on the developed test beams. Lastly, lessons learned, and the path forward will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗