Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Risk estimation based on chromosomal aberrations induced by radiation

The presence of a causal association between the frequency of chromosomal aberrations in peripheral blood lymphocytes and the risk of cancer has been substantiated recently by epidemiological studies. Cytogenetic analyses of crew members of the Mir Space Station have shown that a significant increase in the frequency of chromosomal aberrations can be detected after flight, and that such an increase is likely to be attributed to the radiation exposure. The risk of cancer can be estimated directly from the yields of chromosomal aberrations, taking into account some aspects of individual susceptibility and other factors unrelated to radiation. However, the use of an appropriate technique for the collection and analysis of chromosomes and the choice of the structural aberrations to be measured are crucial in providing sound results. Based on the fraction of aberrant lymphocytes detected before and after flight, the relative risk after a long-term Mir mission is estimated to be about 1.2-1.3. The new technique of mFISH can provide useful insights into the quantification of risk on an individual basis.

STS Shuttle Project↗

Evaluation of risk from space radiation with high-energy heavy ion beams

The most challenging radiation in space consists of fully ionized atomic elements with high energy for which only the few lowest energy ions can be stopped in shielding materials. The health risk from exposure to these ions and their secondary radiations generated in shield materials is poorly understood since there are few human data and a systematic study in relevant animal model systems has not been made. The accuracy of risk prediction is described as the major limiting factor in the management of space radiation risk. The expected impact of systematic studies is examined using the limited available biological data and models. Given the limitations of current predictions, models must be developed that are able to incorporate the required fundamental scientific data into accurate risk estimates. The important radiation components that can be provided for laboratory testing are identified. The use of ground-based accelerator beams to simulate space radiation is explained and quantitative scientific constraints on such facilities are derived. Three facilities, one each in the United States, in Germany and in Japan, currently have the partial capability to satisfy these constraints. A facility has been proposed using the Brookhaven National Laboratory Booster Synchrotron in the United States; in conjuction with other on-site accelerators, it will be able to provide the full range of heavy ion beams and energies required.

NASA Discipline Radiation Health↗

Renal stone risk assessment during Space Shuttle flights

PURPOSE: The metabolic and environmental factors influencing renal stone formation before, during, and after Space Shuttle flights were assessed. We established the contributing roles of dietary factors in relationship to the urinary risk factors associated with renal stone formation. MATERIALS AND METHODS: 24-hr. urine samples were collected prior to, during space flight, and following landing. Urinary and dietary factors associated with renal stone formation were analyzed and the relative urinary supersaturation of calcium oxalate, calcium phosphate (brushite), sodium urate, struvite and uric acid were calculated. RESULTS: Urinary composition changed during flight to favor the crystallization of calcium-forming salts. Factors that contributed to increased potential for stone formation during space flight were significant reductions in urinary pH and increases in urinary calcium. Urinary output and citrate, a potent inhibitor of calcium-containing stones, were slightly reduced during space flight. Dietary intakes were significantly reduced for a number of variables, including fluid, energy, protein, potassium, phosphorus and magnesium. CONCLUSIONS: This is the first in-flight characterization of the renal stone forming potential in astronauts. With the examination of urinary components and nutritional factors, it was possible to determine the factors that contributed to increased risk or protected from risk. In spite of the protective components, the negative contributions to renal stone risk predominated and resulted in a urinary environment that favored the supersaturation of stone-forming salts. Dietary and pharmacologic therapies need to be assessed to minimize the potential for renal stone formation in astronauts during/after space flight.

STS Shuttle Project↗

Software risk estimation and management techniques at JPL

In this talk we will discuss how uncertainty has been incorporated into the JPL software model, probabilistic-based estimates, and how risk is addressed, how cost risk is currently being explored via a variety of approaches, from traditional risk lists, to detailed WBS-based risk estimates to the Defect Detection and Prevention (DDP) tool.

software risk↗

Space Nuclear Power Public and Stakeholder Risk Communication

The 1986 Challenger accident coupled with the Chernobyl nuclear reactor accident increased public concern about the safety of spacecraft using nuclear technology. While three nuclear powered spacecraft had been launched before 1986 with little public interest, future nuclear powered missions would see significantly more public concern and require NASA to increase its efforts to communicate mission risks to the public. In 1987 a separate risk communication area within the Launch Approval Planning Group of the Jet Propulsion Laboratory was created to address public concern about the health, environmental, and safety risks of NASA missions. The lessons learned from the risk communication strategies developed for the nuclear powered Galileo, Ulysses, and Cassini missions are reviewed in this paper and recommendations are given as to how these lessons can be applied to future NASA missions that may use nuclear power systems and other potentially controversial NASA missions.

Galileo↗

Probabilistic Risk Assessment for Concurrent, Conceptual Design of Space Missions

NASA is expanding its capability to perform PRA. This capability gives insight into the links of a suggested design and drives the refinement of the design by identifying optimal areas for investments. Clearly, it is more viable and less expensive to refine a design at the time that it is being conceived. Hence the utility of conducting PRA at the conceptual design phase. Concurrent engineering teams greatly reduce the design time and costs. However, there is currently no standardized means for building probabilistic risk models to assess risks associated with a design produced by such teams. The capability to produce a consistent and valid risk metric associated with such designs would greatly enhance the value of such design teams. This paper explains the experimental results obtained to date from building probabilistic risk models for sample studies conducted at the concurrent engineering design team at the Jet Propulsion Laboratory (TeamX).

conceptual designs↗

Security Risks: Management and Mitigation in the Software Life Cycle

A formal approach to managing and mitigating security risks in the software life cycle is requisite to developing software that has a higher degree of assurance that it is free of security defects which pose risk to the computing environment and the organization. Due to its criticality, security should be integrated as a formal approach in the software life cycle. Both a software security checklist and assessment tools should be incorporated into this life cycle process and integrated with a security risk assessment and mitigation tool. The current research at JPL addresses these areas through the development of a Sotfware Security Assessment Instrument (SSAI) and integrating it with a Defect Detection and Prevention (DDP) risk management tool.

securiy↗

How Engineers Really Think About Risk: A Study of JPL Engineers

The objectives of this work are: To improve risk assessment practices as used during the mission design process by JPL's concurrent engineering teams. (1) Developing effective ways to identify and assess mission risks (2) Providing a process for more effective dialog between stakeholders about the existence and severity of mission risks (3) Enabling the analysis of interactions of risks across concurrent engineering roles.

risk identification↗

Physics-based Entry, Descent and Landing Risk Model

A physics-based risk model was developed to assess the risk associated with thermal protection system failures during the entry, descent and landing phase of a manned spacecraft mission. In the model, entry trajectories were computed using a three-degree-of-freedom trajectory tool, the aerothermodynamic heating environment was computed using an engineering-level computational tool and the thermal response of the TPS material was modeled using a one-dimensional thermal response tool. The model was capable of modeling the effect of micrometeoroid and orbital debris impact damage on the TPS thermal response. A Monte Carlo analysis was used to determine the effects of uncertainties in the vehicle state at Entry Interface, aerothermodynamic heating and material properties on the performance of the TPS design. The failure criterion was set as a temperature limit at the bondline between the TPS and the underlying structure. Both direct computation and response surface approaches were used to compute the risk. The model was applied to a generic manned space capsule design. The effect of material property uncertainty and MMOD damage on risk of failure were analyzed. A comparison of the direct computation and response surface approach was undertaken.

descent and landing↗

Engineering Risk Assessment of Space Thruster Challenge Problem

The Engineering Risk Assessment (ERA) team at NASA Ames Research Center utilizes dynamic models with linked physics-of-failure analyses to produce quantitative risk assessments of space exploration missions. This paper applies the ERA approach to the baseline and extended versions of the PSAM Space Thruster Challenge Problem, which investigates mission risk for a deep space ion propulsion system with time-varying thruster requirements and operations schedules. The dynamic mission is modeled using a combination of discrete and continuous-time reliability elements within the commercially available GoldSim software. Loss-of-mission (LOM) probability results are generated via Monte Carlo sampling performed by the integrated model. Model convergence studies are presented to illustrate the sensitivity of integrated LOM results to the number of Monte Carlo trials. A deterministic risk model was also built for the three baseline and extended missions using the Ames Reliability Tool (ART), and results are compared to the simulation results to evaluate the relative importance of mission dynamics. The ART model did a reasonable job of matching the simulation models for the baseline case, while a hybrid approach using offline dynamic models was required for the extended missions. This study highlighted that state-of-the-art techniques can adequately adapt to a range of dynamic problems.

Assessment↗

Risk Identification and Visualization in a Concurrent Engineering Team Environment

Incorporating risk assessment into the dynamic environment of a concurrent engineering team requires rapid response and adaptation. Generating consistent risk lists with inputs from all the relevant subsystems and presenting the results clearly to the stakeholders in a concurrent engineering environment is difficult because of the speed with which decisions are made. In this paper we describe the various approaches and techniques that have been explored for the point designs of JPL's Team X and the Trade Space Studies of the Rapid Mission Architecture Team. The paper will also focus on the issues of the misuse of categorical and ordinal data that keep arising within current engineering risk approaches and also in the applied risk literature.

Risk Scoring↗

Assessing Inter-Sectoral Climate Change Risks: The Role of ISIMIP

The aims of the Inter-Sectoral Impact Model Intercomparison Project (ISIMIP) are to provide a framework for the intercomparison of global and regional-scale risk models within and across multiple sectors and to enable coordinated multi-sectoral assessments of different risks and their aggregated effects. The overarching goal is to use the knowledge gained to support adaptation and mitigation decisions that require regional or global perspectives within the context of facilitating transformations to enable sustainable development, despite inevitable climate shifts and disruptions. ISIMIP uses community-agreed sets of scenarios with standardized climate variables and socioeconomic projections as inputs for projecting future risks and associated uncertainties, within and across sectors. The results are consistent multi-model assessments of sectoral risks and opportunities that enable studies that integrate across sectors, providing support for implementation of the Paris Agreement under the United Nations Framework Convention on Climate Change.

Regional-scale risk models↗

Risk Management at NASA and Its Applicability to the Oil and Gas Industry

NASA has a world-class capability for quantitatively assessing the risk of highly-complex, isolated engineering structures operated in extremely hostile environments. In particular, the International Space Station (ISS) represents a reasonable risk analog for High Pressure, High Temperature drilling and production operations on deepwater rigs. Through a long-term U.S. Government Interagency Agreement, BSEE has partnered with NASA to modify NASA's Probabilistic Risk Assessment (PRA) capabilities for application to deepwater drilling and production operations. The immediate focus of the activity will be to modify NASA PRA Procedure Guides and Methodology Documents to make them applicable to the Oil &Gas Industry. The next step will be for NASA to produce a PRA for a critical drilling system component, such as a Blowout Preventer (BOP). Subsequent activities will be for NASA and industry partners to jointly develop increasingly complex PRA's that analyze other critical drilling and production system components, including both hardware and human reliability. In the presentation, NASA will provide the objectives, schedule, and current status of its PRA activities for BSEE. Additionally, NASA has a Space Act Agreement with Anadarko Petroleum Corporation to develop a PRA for a generic 20K BOP. NASA will summarize some of the preliminary insights gained to date from that 20K BOP PRA as an example of the distinction between quantitative versus qualitative risk assessment.

PRA↗

Technology Evaluation for Environmental Risk Mitigation Compendium

The Technology Evaluation for Environmental Risk Mitigation (TEERM) Principal Center and its predecessor organization the Acquisition Pollution Prevention Program (AP2) supported the National Aeronautics and Space Administration (NASA) in identifying technology solutions to risks and costs to NASA programs driven by environmental regulations and requirements. TEERM researched the commercial and government marketplace to locate viable and available technologies that met NASAs needs. TEERM focused on addressing environmentally-driven risks of direct concern to NASA programs and facilities, including hazardous materials in NASA operations and materials that became obsolescent because of environmental regulations. TEERM projects aimed to reduce cost; ensure the health and safety of people, assets, and the environment; promote efficiency; and minimize duplication. Major TEERM and AP2 projects focused on waste minimization and hazardous waste treatment, recycling, corrosion prevention and control, solvent and ozone depleting substances substitution, and aqueous based cleaners. In 2017, NASA made the decision to terminate the TEERM Principal Center. This Compendium Report documents TEERM and AP2 project successes. The Compendium Report traces the evolution of TEERM based on evolving risks and requirements for NASA and its relationship to the Space Shuttle Program, the United States Department of Defense, the European Space Agency, and other public and private stakeholders. This Compendium Report also documents project details from Project Summaries and Joint Test Plans and describes project stakeholders and collaborative effort results.

material obsolescent↗

Dynamic Simulation Probabalistic Risk Assessment Model for an Enceladus Sample Return Mission

Enceladus, a moon of Saturn, has geyser-like jets that spray plumes of material into orbit. These jets could enable a free-flying spacecraft to collect samples and return them to Earth for study to determine if they contain the building blocks of life. The Office of Planetary Protection at NASA requires containment of any unsterilized samples and prohibits destructive impact of the spacecraft upon return to Earth, with a sample release probability of less than 1 in 1,000,000 as a recommended goal. This paper describes a probabilistic risk assessment model that uses dynamic simulation techniques to capture the physics-based, time- and state-dependent interactions between the sample return system and the environment, which drive the risk of sample release. The dynamic approach uses a Monte Carlo-style simulation to integrate the many phases and sources of risk for a sample return mission. The model is used to assess the achievability of the planetary protection reliability goal. This is accomplished by performing sensitivity studies assessing the impact of modeling assumptions to identify where uncertainties drive the risk. These results, in turn, are used to examine the feasibility of meeting key design and performance parameters that are needed to achieve the reliability goal for a given architecture with existing technologies.

Dynamic Simulation↗

Burning Embers: Towards More Transparent and Robust Climate-change Risk Assessments

The Intergovernmental Panel on Climate Change (IPCC) reports provide policy-relevant insights about climate impacts, vulnerabilities and adaptation through a process of peer-reviewed literature assessments underpinned by expert judgement. An iconic output from these assessments is the burning embers diagram, first used in the Third Assessment Report to visualize reasons for concern, which aggregate climate-change-related impacts and risks to various systems and sectors. These burning embers use colour transitions to show changes in the assessed level of risk to humans and ecosystems as a function of global mean temperature. In this Review, we outline the history and evolution of the burning embers and associated reasons for concern framework, focusing on the methodological approaches and advances. While the assessment framework and figure design have been broadly retained over time, refinements in methodology have occurred, including the consideration of different risks, use of confidence statements, more formalized protocols and standardized metrics. Comparison across reports reveals that the risk level at a given temperature has generally increased with each assessment cycle, reflecting accumulating scientific evidence. For future assessments, an explicit, transparent and systematic process of expert elicitation is needed to enhance comparability, quality and credibility of burning embers.

burning embers diagram↗

Testing a Run-Time Assurance Framework Coupled with Integrated Risk Mitigation Capabilities for Autonomous Urban UAS Flights

The In-Time Aviation Safety Management System (IASMS) Concept of Operations (ConOps) envisions new capabilities to monitor, assess, and mitigate flight safety risks. Systems will be tailored to mission type, vehicle/equipage type, operational environment, and safety risk tolerance. Within an IASMS framework, several capabilities may be implemented spanning three operational phases (pre-flight, in-flight, and post-flight/off-line); and consisting of lower level functions and information services which may reside onboard the aircraft, on third-party server(s), and/or on ground/operator station(s). Each capability will be designed to produce and disseminate safety-relevant information; perform detection, diagnosis, and prediction of unsafe situations; and/or execute mitigation actions when hazardous events warrant such changes. This paper focuses on recent testing of airborne capabilities that demonstrate inflight aspects of the overarching concept for autonomous unmanned aircraft systems (UAS) operations in urban environments. A flight test architecture is described that applies run-time assurance principles (e.g., executes independent of the unassured autopilot), real-time risk assessment, and a technique to execute contingencies if necessary either automatically or via pilot intervention. Several tests using small UAS were conducted to verify the assured in-flight risk mitigation capability. The paper draws significantly from a larger NASA technical report and recent prior conference papers, providing additional details. Data is analyzed for two representative flights to illustrate the performance for various sequential and simultaneous hazards used during testing. During each automated flight, several hazards are encountered at various points along the flight path. At each point, the hazard is mitigated by the system, with the vehicle then continuing to subsequent points. The paper concludes with lessons-learned regarding relevant aspects of the overarching IASMS concept and how it may be updated and further advanced in the future.

population activity↗

Single Integrated Flux Files to Account for Spacecraft Attitude Motion in Meteoroid Risk Assessments Using the NASA MEM3 and Bumper Codes

Spacecraft meteoroid risk assessments can be performed using NASA’s Meteoroid Engineering Model 3 (MEM3) and the Bumper risk assessment code. The MEM3 meteoroid flux is highly directional in heliocentric space. To represent the directionality, MEM3 outputs the flux in commonly used coordinate frames. For example, if a spacecraft attitude is fixed in the orbital tangential frame, a single Bumper run using the MEM3 flux file in the body-fixed frame can be performed. Cases exist in which the spacecraft does not remain fixed in one of these frames during a mission. This could be handled by performing a series of Bumper runs at points along the trajectory. For each trajectory point, the spacecraft has to be rotated into the frame in which the MEM3 flux file is defined. Another option presented here is to generate a single integrated flux (SIF) file. A SIF file is an average over a trajectory of the time varying MEM3 flux files rotated from their native frame into the spacecraft bus frame. A SIF file enables accounting for spacecraft rotation (coupled with flux variation over the trajectory) in a single Bumper run. An example of an application of SIF files is the meteoroid risk assessment for the Mars Sample Return (MSR) campaign Capture Containment and Return System (CCRS). This report discusses how SIF files were generated for the CCRS risk assessment and presents metrics on the accuracy of the impinging fluence that is generated when using the files. The results show a maximum difference per element in a finite element model within 1 percent for seven of the eight examined cases, with the outlier being less than 2 percent. The results also show that the maximum standard deviation of differences across all elements is within 0.275 percent. The maximum difference in the total fluence across all the elements is 0.0463 percent. The maximum difference in the mean fluence across all the elements is 0.0407 percent.

Meteoroids↗