Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Strategic implementation plan

The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

Source record↗

Grasp planning under uncertainty

The planning of dexterous grasps for multifingered robot hands operating in uncertain environments is covered. A sensor-based approach to the planning of a reach path prior to grasping is first described. An on-line, joint space finger path planning algorithm for the enclose phase of grasping was then developed. The algorithm minimizes the impact momentum of the hand. It uses a Preshape Jacobian matrix to map task-level hand preshape requirements into kinematic constraints. A master slave scheme avoids inter-finger collisions and reduces the dimensionality of the planning problem.

Erkmen, A. M.↗

Redundancy of space manipulator on free-flying vehicle and its nonholonomic path planning

The nonholonomic mechanical structure of space robots and path planning is discussed. The angular momentum conservation works as a nonholonomic constraint while the linear momentum conservation is a holonomic one. Thus, a vehicle with a 6 d.o.f. manipulator is described as a 9 variable system with 6 inputs. This implies the possibility of controlling the vehicle orientation and the joint variables of the manipulator by actuating the joint variables, but only if the trajectory is carefully planned; however, both of them cannot be controlled independently. It means that by assuming feasible-path planning, a system that consists of a vehicle and a 6 d.o.f. manipulator can be utilized as 9 d.o.f. system. Initially, the nonholonomic mechanical structure of space vehicle/manipulator system is shown. Then a path planning scheme for nonholonomic systems is proposed using Lyapunov functions.

Nakamura, Yoshihiko↗

An efficient temporal logic for robotic task planning

Computations required for temporal reasoning can be prohibitively expensive if fully general representations are used. Overly simple representations, such as totally ordered sequence of time points, are inadequate for use in a nonlinear task planning system. A middle ground is identified which is general enough to support a capable nonlinear task planner, but specialized enough that the system can support online task planning in real time. A Temporal Logic System (TLS) was developed during the Intelligent Task Automation (ITA) project to support robotic task planning. TLS is also used within the ITA system to support plan execution, monitoring, and exception handling.

Becker, Jeffrey M.↗

The indexed time table approach for planning and acting

A representation is discussed of symbolic temporal relations, called IxTeT, that is both powerful enough at the reasoning level for tasks such as plan generation, refinement and modification, and efficient enough for dealing with real time constraints in action monitoring and reactive planning. Such representation for dealing with time is needed in a teleoperated space robot. After a brief survey of known approaches, the proposed representation shows its computational efficiency for managing a large data base of temporal relations. Reactive planning with IxTeT is described and exemplified through the problem of mission planning and modification for a simple surveying satellite.

Ghallab, Malik↗

Graphical interfaces for cooperative planning systems

Based on a cognitive task analysis of 5 airline flight crews in a simulator study, researchers have designed a testbed for studying computer aids for en route flight path planning. This testbed runs on a Mac II controlling three color monitors, and is being used to study the design of aids for both dispatchers and flight crews. Specifically, the research focuses on design concepts for developing cooperative problem-solving systems. We use en route flight planning (selecting alternate routes or destinations due to unanticipated weather, traffic, malfunctions, etc.) as the context for studying the design of such systems. Researchers are currently exploring three questions in this test environment: (1) When interacting with a flight planning aid, how does the role of the pilot influence overall system performance; (2) Can the architecture for a cooperative planning system be built around Sacerdoti's (1983) concept of an abstraction hierarchy, where the pilot can interact with the system at many different levels of detail (but where the computer aid by default handles lower level details that the pilot has chosen not to deat with); and (3) Can graphical displays and direct manipulation of these displays provide perceptual enhancements (Larkin and Simon, 1987) of the pilot's problem-solving activities. Information is given in viewgraph form.

Smith, Philip J.↗

AdaNET Dynamic Software Inventory (DSI) prototype component acquisition plan

A component acquisition plan contains the information needed to evaluate, select, and acquire software and hardware components necessary for successful completion of the AdaNET Dynamic Software Inventory (DSI) Management System Prototype. This plan will evolve and be applicable to all phases of the DSI prototype development. Resources, budgets, schedules, and organizations related to component acquisition activities are provided. A purpose and description of a software or hardware component which is to be acquired are presented. Since this is a plan for acquisition of all components, this section is not applicable. The procurement activities and events conducted by the acquirer are described and who is responsible is identified, where the activity will be performed, and when the activities will occur for each planned procurement. Acquisition requirements describe the specific requirements and standards to be followed during component acquisition. The activities which will take place during component acquisition are described. A list of abbreviations and acronyms, and a glossary are contained.

Hanley, Lionel↗

Microgravity strategic plan, 1988

The NASA agency-wide microgravity strategic plan is presented, and its research, applications, and commercialization for the 1990's is addressed. The plan presents an analysis of the current situation, identifies critical factors, and defines goals, objectives, and strategies, which are intended to: (1) provide a context for decision making; (2) assure realism in long-range planning and direction for hardware development; and (3) establish a framework for developing a national microgravity research plan.

Source record↗

Experimental study of trajectory planning and control of a high precision robot manipulator

The kinematic and trajectory planning is presented for a 6 DOF end-effector whose design was based on the Stewart Platform mechanism. The end-effector was used as a testbed for studying robotic assembly of NASA hardware with passive compliance. Vector analysis was employed to derive a closed-form solution for the end-effector inverse kinematic transformation. A computationally efficient numerical solution was obtained for the end-effector forward kinematic transformation using Newton-Raphson method. Three trajectory planning schemes, two for fine motion and one for gross motion, were developed for the end-effector. Experiments conducted to evaluate the performance of the trajectory planning schemes showed excellent tracking quality with minimal errors. Current activities focus on implementing the developed trajectory planning schemes on mating and demating space-rated connectors and using the compliant platform to acquire forces/torques applied on the end-effector during the assembly task.

Nguyen, Charles C.↗

Strategic planning for the International Space Station

The concept for utilization and operations planning for the International Space Station Freedom was developed in a NASA Space Station Operations Task Force in 1986. Since that time the concept has been further refined to definitize the process and products required to integrate the needs of the international user community with the operational capabilities of the Station in its evolving configuration. The keystone to the process is the development of individual plans by the partners, with the parameters and formats common to the degree that electronic communications techniques can be effectively utilized, while maintaining the proper level and location of configuration control. The integration, evaluation, and verification of the integrated plan, called the Consolidated Operations and Utilization Plan (COUP), is being tested in a multilateral environment to prove out the parameters, interfaces, and process details necessary to produce the first COUP for Space Station in 1991. This paper will describe the concept, process, and the status of the multilateral test case.

Griner, Carolyn S.↗

An innovative approach for distributed and integrated resources planning for the Space Station Freedom

This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.

Hornstein, Rhoda S.↗

Distributed planning and scheduling for instrument and platform operations

Distributed planning and scheduling for instruments and platform operations in resource constrained environments are discussed. NASA has repeatedly faced the situation of multiple users having differing goals, objectives, and requirements interacting with a planning and scheduling system. Current examples include the Hubble Space Telescope and Space Station Freedom. The paper provides a brief description of the instrument and platform operations domain, discusses both traditional and distributed planning and scheduling in the context of this domain, and looks at examples of NASA environments in which planning and scheduling is or will be performed in a distributed system.

Hull, Larry G.↗

Assembly planning based on subassembly extraction

A method is presented for the automatic determination of assembly partial orders from a liaison graph representation of an assembly through the extraction of preferred subassemblies. In particular, the authors show how to select a set of tentative subassemblies by decomposing a liaison graph into a set of subgraphs based on feasibility and difficulty of disassembly, how to evaluate each of the tentative subassemblies in terms of assembly cost using the subassembly selection indices, and how to construct a hierarchical partial order graph (HPOG) as an assembly plan. The method provides an approach to assembly planning by identifying spatial parallelism in assembly as a means of constructing temporal relationships among assembly operations and solves the problem of finding a cost-effective assembly plan in a flexible environment. A case study of the assembly planning of a mechanical assembly is presented.

Lee, Sukhan↗

Recent progress in utilization planning for Space Station Freedom

The progress made in utilization planning for the redesigned Space Station Freedom (SSF) concept is described. Consideration is given to the SSF user capabilities, the strategic planning process, the strategic planning organizations, and the Consolidated Operations and Utilization Plan (COUP, which will be released in January 1993) as well as to the COUP development process and implementation. The process by which the COUP will be produced was exercised in the international Multilateral Strategic and Tactical Integration Process (MUSTIP) simulation. The paper describes the MUSTIP simulation and its activities along with MUSTIP findings and recommendations.

Bartoe, John-David F.↗

The Automated Logistics Element Planning System (ALEPS)

The design and functions of ALEPS (Automated Logistics Element Planning System) is a computer system that will automate planning and decision support for Space Station Freedom Logistical Elements (LEs) resupply and return operations. ALEPS provides data management, planning, analysis, monitoring, interfacing, and flight certification for support of LE flight load planning activities. The prototype ALEPS algorithm development is described.

Schwaab, Douglas G.↗

Space Station Freedom - Initial plans for U.S. utilization

NASA's utilization plans for the Space Station Freedom (SSF) are outlined with references to the Consolidated Operations and Utilization Plan (COUP) being developed to cover the first five years of the program. The SSF is described with particular attention given to the spacecraft capabilities, and initial long-term U.S. objectives are set forth with more immediate corresponding research areas. U.S. plans include research in microgravity, life sciences, and technology, and payload concepts are shown to be in development for each area. The SSF is expected to be a useful resource for: (1) commercial research on crystal growth; (2) investigations into physical and chemical processes in the microgravitational environment; and (3) technology studies relevant to the efficient exploitation of space. The NASA Partner Utilization Plan on which these observations are based is being prepared for incorporation into the SSF COUP.

Epstein, Barry↗

Manager's assistant systems for space system planning

This paper describes a class of knowledge-based 'assistant' systems for space system planning. Derived from technology produced for the DARPA/USAF Pilot's Associate program, these assistant systems help the human planner by doing the bookkeeping to maintain plan data and executing the procedures and heuristics currently used by the human planner to define, assess, diagnose, and revise plans. Intelligent systems for Space Station Freedom assembly sequence planning and Advanced Launch System modeling will be presented as examples. Ongoing NASA-funded work on a framework supporting the development of such tools will also be described.

Bewley, William L.↗

Solar System Exploration Division Strategic Plan, volume 1. Executive summary and overview

This first document is the first of a six-volume series presenting the Solar System Exploration Division's Strategic Plan for the 10-year period FY 1994 to FY 2003. The overall strategy is characterized by five fundamental precepts: (1) execute the current program; (2) improve the vitality of the program and the planetary science community; (3) initiate innovative, small, low-cost planetary missions; (4) initiate new major and moderate missions; and (5) prepare for the next generation of missions. This Strategic Plan describes in detail our proposed approach to accomplish these goals. Volume 1 provides first an Executive Summary of highlights of each of the six volumes, and then goes on to present an overview of the plan, including a discussion of the planning context and strategic approach. Volumes 2, 3, 4, and 5 describe in detail the initiatives proposed. An integral part of each of these volumes is a set of responses to the mission selection criteria questions developed by the Space and Earth Science Advisory Committee. Volume 2, Mission From Planet Earth, describes a strategy for exploring the Moon and Mars and sets forth proposed moderate missions--Lunar Observer and a Mars lander network. Volume 3, Pluto Flyby/Neptune Orbiter, discusses our proposed major new start candidate for the FY 1994 to FY 1998 time frame. Volume 4, Discovery, describes the Near-Earth Asteroid Rendezvous, as well as other candidates for this program of low-cost planetary missions. Volume 5, Toward Other Planetary Systems, describes a major research and analysis augmentation that focuses on extrasolar planet detection and the study of planetary system processes. Finally, Volume 6 summarizes the technology program that the division has structured around these four initiatives.

Source record↗